Wartsila SP PPT 2012 LNG OSV 1.
Wartsila SP PPT 2012 LNG OSV 1.
Wrtsil
LOCAL
LOCAL
NOx
LOCAL
SOx
GLOBAL
Particulate matter
CO2
30 25 USD/MBtu 20
NG Henry hub [USD/MBtu] HFO 380cst Rotterdam [USD/MBtu] MGO Rotterdam [USD/MBtu]
15 10 5
0
O ct -0 Fe 1 b0 Ju 2 n0 O 2 ct -0 Fe 2 b0 Ju 3 n0 O 3 ct -0 Fe 3 b0 Ju 4 n0 O 4 ct -0 Fe 4 b0 Ju 5 n0 O 5 ct -0 Fe 5 b0 Ju 6 n0 O 6 ct -0 Fe 6 b0 Ju 7 n0 O 7 ct -0 Fe 7 b0 Ju 8 n0 O 8 ct -0 Fe 8 b0 Ju 9 n0 O 9 ct -0 Fe 9 b1 Ju 0 n1 O 0 ct -1 Fe 0 b1 Ju 1 n11
Sources: www.lngoneworld.com, www.bunkerworld.com, LR Fairplay
(based on 950 USD/t for MGO and 630 USD/t for LNG)
1987
1992
1995
Power Plants
Merchant
Offshore
Navy
LNGC 89 vessels 353 engines 1900000 rh Conversion 1 Chem. Tanker 2 engines conv. Complete gas train Complete design
PSVs/FPSOs 17 vessels 87 engines Online from 1994 New orders: Harvey Gulf; the first 3 LNG-PSV to be operated in the Gulf of Mexico!
LNG ferries 1+1 vessels 4 engines per vessels Complete gas train 2800 passengers In service in 2013
4 segments
>150 installations
Dual-Fuel advantages
Main advantages of the Dual-Fuel 4-stroke engine compared to SG: Redundancy, backup without interruptions in power or speed. Able to operate on liquid fuel outside ECA-area Simple system, no PTI/take me home or double gas system needed. DP class fulfilled with single tank/gas supply system Vessel re-routing possible, gas supply not a limitation
Emission advantage
-25%
-85%
60 50 40
CO2 NO
x
-100%
SOx
30 20
-100%
Dual-Fuel engine in gas mode
10 Diesel engine 0
Particulates
Methane slip
THC = 6 g/kWh corresponds to 8-10% reduction in GHG compared with MDF operation