Steam Turbine Description

Technical Data Construction, Speed & Steam Pressure

Load
Rated Load Maximum Load under valve wide open (VWO) condition 600 MW 629.2 MW

Construction
Three cylinder reheat condensing turbine Single flow HP Turbine with 14 reaction stages Double flow IP Turbine with 10 reaction stages per flow Double flow LP Turbine (2 no.s) with (5 drum + 3 module) stages per flow 2 Main Stop and Control valves (HP casing mounted) 2 Reheat Stop and Control Valves (Floating) 1 Swing Check Valve in cold reheat line Type : H30-100-2 Type : M30-63 Type : N30-4x6.3

Type : EV 320-1 Type : IV 560 DN-800 Make : BHEL, Trichy Make: CCI Switzerland

2 LP Bypass Stop and Control Valves with actuators & HPSU (High pressure EHA based) Extraction Swing Check Valves Extraction 1 Extraction 2 : No valve : 2 Swing Check Valve with actuator and 2 Swing Check Valve without actuator : 2 Swing Check Valve with actuator and 2 Swing Check Valve without actuator

DN 600 Make : BHEL, Trichy DN 500 Make : BHEL, Trichy DN 500 Make : BHEL, Trichy DN 500 Make : BHEL, Trichy DN 400 Make : BHEL, Trichy

Extraction 3

Extraction 4.1 : 2 Swing Check Valves with actuator

Extraction 4.2 : 2 Swing Check Valves with actuator

Extraction 5

: 1 Swing Check Valve with actuator and 1 Swing Check Valve without actuator : No valve

Extraction 6

Extraction 7 : 1 swing check valve with actuator and 1 swing check valve without actuator

DN 250 Make : BHEL, Trichy

BHEL, Hardwar

6.1-0100-99/1

Speed
Rated speed Speed limitation in load and station operation Max. Speed, no time limitation Min. Speed, no time limitation Permissible for maximum 2 hours during the life of LP blading Speed below Speed above Speed exclusion range at operation without load * Standard over speed trip setting 51.5 c/s 47.5 c/s 47.5 c/s 51.5 to 60 c/s 7 to 47.5 c/s Max. 55.5 c/s 50.0 c/s

* This speed range should be passed through in one smooth operation to avoid endangering the
blades due to resonance

Steam Pressures
Rated Initial Steam Before 1 HP drum stage HP cylinder exhaust IP cylinder stop valve inlet Extraction 7 Extraction 6 Extraction 5 Extraction 4 Extraction 3 Extraction 2 Extraction 1 LP cylinder exhaust
st

Long time operation

Short time operation

Unit ata ata ata ata ata ata ata ata ata ata ata ata

170.0 158.6 42.9 38.7 65.8 42.9 19.2 7.6 2.56 0.967 0.392 0.1033

178.5 171.8 49.4 44.8 73.6 49.4 22.6 9.15 3.12 1.21 0.49 0.31

203.9 171.8 51.5 46.3


73.6 51.5 22.6 9.15 3.12 1.21 0.49 0.31

These values correspond to 600 MW load with 3 % make-up and 0.1033 ata back pressure with all heaters in service and rated steam conditions. The safety valves must be set so that short time values are not exceeded. Long time operation: Upper limit value, permissible without time limit. Short time operation: Permissible momentary value. The aggregate duration of such swings must not exceed 12 hours in any one year All pressures are absolute pressures

BHEL, Hardwar

6.1-0100-99/2

Low vacuum trip, standard setting


Electrical low vacuum trip Electrical low vacuum trip bypass operation 0.3 bar 0.6 bar

Seal steam supply system


Pressure in seal steam header (above atmospheric) 35 mbar

Axial shift
Alarm Trip 0.5 mm 1.0 mm

Direction of rotation
Anti clock wise when viewed from Front Pedestal towards the Generator

BHEL, Hardwar

6.1-0100-99/3