Professional Documents
Culture Documents
Front Pages Fun Cinema
Front Pages Fun Cinema
A Minor Project Report Submitted for the partial fulfillment of Master of Computer Applications (5 yrs Integrated Course)
DIRECTORATE OF DISTANCE EDUCATION GURU JAMBHESHWAR UNIVERSITY OF SCIENCE AND TECHNOLOGY, HISAR 125001
(2007-2012)
DECLARATION
I hereby declare that the minor project work entitled FUN CINEMA TICKET BOOKING submitted for the MCA (5yrs course) is my original work carried out by me under the guidance of Mr. Nihar Ranjan Roy for the partial fulfilment of the award of the degree of the Master of Computer Applications. The matter embodied in this report has not submitted anywhere else for the award of any other degree/diploma.
ACKNOWLEDGEMENT
It is obvious that the development of a project and the dissertation is the beyond the scope of one person alone. The project work mentioned in this report, is the result of cumulative efforts over a period of an entire semester in course of which, I have received intellectual support from various sources. It is my pleasure to express my profound sense of gratitude to all those who have contributed richly to this project and have been highly instrumental in making this a success. I am highly indebted to my teacher Mr. Nihar Ranjan Roy for giving me opportunity to work on this project. He has been an invaluable source of guidance and motivation at all stages of my work.
NEHA
TABLE OF CONTENTS
CONTENTS
Declaration Certificate Acknowledgement List of Tables List of Figures List of Abbreviations 1.) 1 2 Application areas 2.) Problem selection Problem definition Identification of need 3.) Project monitoring system About c++ Application of c++ Introduction to software selection User requirements 4.) System study Operational feasibility Technical feasibility Feasibility has four solid dimensions 5.) System analysis Overall strategy Advantages of computerization. SDLC 3 4 4 5 6 7 8 9 11 12 13 13 13 15 15 16 17 Objective Introduction
PAGE NO
6.) System design Objective of the design Hardware and software Design and analysis Entity relationship diagram Data flow analysis for the current system Data flow diagram Block diagram Data dictionary 7.) System testing and implementation Implementation Program structure Timing Booking Cancellation Display System design data type used Universal variable Software process model System/information engineering and modeling System requirement and analysis Code generation Testing Maintenance 8.) Documentation Output 9.) Conclusion 10.) Scope of the project 11.) References
19 20 20 21 22 24 25 33 34 35 36 36 37 38 39 40 41 42 43 44 45 45 45 46 47 47 57 58 59
12.) Appendices
60
LIST OF TABLES
S. No. 1. Table no. 6.1 Description of Table Data Dictionary
LIST OF FIGURES
S. No. 1. 2. 3. 4. 4. 5. Figure no. 6.1 6.2 6.3 6.4 6.5 6.6 Description of Table ER- Diagram Level 0 DFD Level 1 DFD Level 2 DFD Flow Chart Block Diagram (Booking) Page no. 22 26 27 28 29 30
LIST OF ABBREVIATIONS
S. no. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Abbreviations
Word
Multiplex Ticketing Records Requirement Analysis Acknowledgment Structured System Analysis Methodology Programs Waterfall Model Preliminary Survey Hardware Software Requirement Specification Trans System Analysis Data Flow Diagram Entity Relationship Diagram Data Dictionary Unit Testing System Testing