Noapara, Jessore

Operation Engineer Name

Javed Md.Fazlul Haque

Daily Engine Observation Report & Work O Engine No. 8


Running Load 5.8

Shift In-Charge Name


S/N

Mechanical Problems: 01 L/O circulation low at B6 left side exhaustvalve 02 water leakage from A bank intake air manifold near at cylinder A9. 03 Intake air manifold temp difference high A=27,B=37. 04 05 06 07 08 09 10 11
S/N

Exh. Temp. A 451 452 421 437 461 432 435 441 432 481

Electrical Problems:

01 02 03

L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.( C)


o

6.5 51/58

J/W Press. (bar) J/W Temp. (I/O)

2.9 48/57

R/W Press. (bar) R/W Temp. (I/O)

3.1 23/25

67

70

69

69

70

71

70

Spare Parts Used

Report By Operation Maint. Work Start Time:

Engine Taken By Maintenance

apara, Jessore 0:00 4283 Peak Pressure


Last Start Time/Date

on Report & Work Order Form Reporting Time 8


5.8
Cumm. Running HRS

15:52/01.02.13 01.02.2013

Date

Exh. Temp. B 421 422 441 421 432 392 421 425 402 462

Fuel rack Posn. A B 31 30 28 28 29 27 27 27 29 33 30 32 30 30 34 30 31 30

Action Taken by Maint. Dept.

Fuel Press. (bar) Fuel Temp. (oC)

5.5 105

Intake Air Temp. A/B Intake Air Press. A/B

28/36 1.5/1.0

R.ARM L/O Press. 1.25 (bar) T/C RPM (A/B) 12000/13500

70

69

66

61

51

Engine Handover/ Work Done Reported Maintenance Work Done Time:

Engine Clearance Taken By Operation

Noapara, Jessore
Operation Engineer Name

Javed Md.Fazlul Haque

Daily Engine Observation Report & Work O Engine No. 6


Running Load 6

Shift In-Charge Name


S/N

01 02 03 04 05 06 07 08 09 10 11
S/N

Mechanical Problems: All HPFP side cover has opened need to again filling. HFO leakage from common return line joint near R/A tank. Exhaust gas leakage from head to liner at B3 Small belows red in B3 cylinder. (Temp=495C). Intake air temp difference A=43,B=35.

Exh. Temp. A 360 405 390 391 415 428 431 392 383 465

Electrical Problems:

01 02 03

L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.(oC)

6 54/59

J/W Press. (bar) J/W Temp. (I/O)

3 51/61

R/W Press. (bar) R/W Temp. (I/O)

3 26/27

73

72

73

73

74

73

74

Spare Parts Used

Report By Operation Maint. Work Start Time:

Engine Taken By Maintenance

Noapara, Jessore 0:00 3819.54 Peak Pressure


Last Start Time/Date

servation Report & Work Order Form Reporting Time 6


6
Cumm. Running HRS

12:25/01.02.13 01.02.2013

Date

Exh. Temp. B 380 385 495 378 450 425 406 393 378 456

Fuel rack Posn. A B 30 22 31 23 32 21 32 22 31 24 32 24 30 18 28 22 29 22

Action Taken by Maint. Dept.

Fuel Press. (bar) Fuel Temp. ( C)


o

5.9 113

Intake Air Temp. A/B Intake Air Press. A/B

41/34

R.ARM L/O Press. (bar) T/C RPM (A/B)

1.2 11200/11000

74

72

70

58

66

Engine Handover/ Work Done Reported Maintenance Work Done Time:

Engine Clearance Taken By Operation

Noapara, Jessore
Operation Engineer Name

Rajib Md.Fazlul Haque

Daily Engine Observation Report & Work O Engine No. 2


Running Load 6

Shift In-Charge Name


S/N

Mechanical Problems: 01 R/A L/O leakage from push guide line in cylinder A1,2,3,5,7,8,9 B2,4,5,6,7,8,9 02 R/A pressure gauge not work. 03 Exhaust gas leakage from small bellows in cylinder B4,5,6,9 04 HPFP side cover is B7,9 has dissamble need to filling. 05 06 07 08 09 10 11
S/N

Exh. Temp. A 399 353 407 420 368 433 421 411 370 470

Electrical Problems:

01 02 03

L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.( C)


o

5.5 53/55

J/W Press. (bar) J/W Temp. (I/O)

3.2 73/81

R/W Press. (bar) R/W Temp. (I/O)

2.6 28/30

61

65

70

71

71

71

72

Spare Parts Used

Report By Operation Maint. Work Start Time:

Engine Taken By Maintenance

apara, Jessore 0:00 3768.35 Peak Pressure


Last Start Time/Date

on Report & Work Order Form Reporting Time 2


6
Cumm. Running HRS

16:42/01.02.13 01.02.2013

Date

Exh. Temp. B 431 432 398 368 402 397 413 391 402 501

Fuel rack Posn. A B 32 30 26 30 29 32 33 29 29 30 31 33 30 29 32 30 29 32

Action Taken by Maint. Dept.

Fuel Press. (bar) Fuel Temp. (oC)

5.8 115

Intake Air Temp. A/B Intake Air Press. A/B

39/37 1.4/1.1

R.ARM L/O Press. (bar) T/C RPM (A/B) 13200/12000

72

71

71

61

50

Engine Handover/ Work Done Reported Maintenance Work Done Time:

Engine Clearance Taken By Operation

Noapara, Jessore
Operation Engineer Name

Rajib Md.Fazlul Haque

Daily Engine Observation Report & Work O Engine No. 1


Running Load 6

Shift In-Charge Name


S/N

Mechanical Problems:

01 R/A L/O pressure low 0.50 2 Both T/C vibration and abnormal sound. 03 Both exhaust manifold red hot. 04 L/O leakage from the push guid A=2.5, B=1.3,4.8 05 A4 cylinder small bellows clamp open and sparking. 06 07 08 09 10 11
S/N

Exh. Temp. A 413 425 423 402 436 437 445 410 411 495

Electrical Problems:

01 02 03

L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.( C) <A


o

5.7 52/61

J/W Press. (bar) J/W Temp. (I/O)

3.2 75/80

R/W Press. (bar) R/W Temp. (I/O)

3.4 26/29

60

68

72

69

72

72

75

Spare Parts Used

Report By Operation Maint. Work Start Time:

Engine Taken By Maintenance

apara, Jessore 0:00 2894.99 Peak Pressure


Last Start Time/Date

on Report & Work Order Form Reporting Time 1


6
Cumm. Running HRS

15:40/01.02.13 01.02.2013

Date

Exh. Temp. B 428 395 398 402 431 422 424 440 360 420

Fuel rack Posn. A B 30 30 30 30 30 30 30 30 30 29.5 29.5 29.5 30 29.5 29.5 30 29 28

Action Taken by Maint. Dept.

Fuel Press. (bar) Fuel Temp. (oC)

5.9 111

Intake Air Temp. A/B Intake Air Press. A/B

36/31 1.2/0.9

R.ARM L/O Press. 1.9 (bar) T/C RPM (A/B) 12000/12500

71

71

71

45

54

Engine Handover/ Work Done Reported Maintenance Work Done Time:

Engine Clearance Taken By Operation