Daily Engine Observation Report & Work Order Form 8: A Mechanical Problems: Exh. Temp
Daily Engine Observation Report & Work Order Form 8: A Mechanical Problems: Exh. Temp
Mechanical Problems: 01 L/O circulation low at B6 left side exhaustvalve 02 water leakage from A bank intake air manifold near at cylinder A9. 03 Intake air manifold temp difference high A=27,B=37. 04 05 06 07 08 09 10 11
S/N
Exh. Temp. A 451 452 421 437 461 432 435 441 432 481
Electrical Problems:
01 02 03
6.5 51/58
2.9 48/57
3.1 23/25
67
70
69
69
70
71
70
15:52/01.02.13 01.02.2013
Date
Exh. Temp. B 421 422 441 421 432 392 421 425 402 462
5.5 105
28/36 1.5/1.0
70
69
66
61
51
Noapara, Jessore
Operation Engineer Name
01 02 03 04 05 06 07 08 09 10 11
S/N
Mechanical Problems: All HPFP side cover has opened need to again filling. HFO leakage from common return line joint near R/A tank. Exhaust gas leakage from head to liner at B3 Small belows red in B3 cylinder. (Temp=495C). Intake air temp difference A=43,B=35.
Exh. Temp. A 360 405 390 391 415 428 431 392 383 465
Electrical Problems:
01 02 03
6 54/59
3 51/61
3 26/27
73
72
73
73
74
73
74
12:25/01.02.13 01.02.2013
Date
Exh. Temp. B 380 385 495 378 450 425 406 393 378 456
5.9 113
41/34
1.2 11200/11000
74
72
70
58
66
Noapara, Jessore
Operation Engineer Name
Mechanical Problems: 01 R/A L/O leakage from push guide line in cylinder A1,2,3,5,7,8,9 B2,4,5,6,7,8,9 02 R/A pressure gauge not work. 03 Exhaust gas leakage from small bellows in cylinder B4,5,6,9 04 HPFP side cover is B7,9 has dissamble need to filling. 05 06 07 08 09 10 11
S/N
Exh. Temp. A 399 353 407 420 368 433 421 411 370 470
Electrical Problems:
01 02 03
5.5 53/55
3.2 73/81
2.6 28/30
61
65
70
71
71
71
72
16:42/01.02.13 01.02.2013
Date
Exh. Temp. B 431 432 398 368 402 397 413 391 402 501
5.8 115
39/37 1.4/1.1
72
71
71
61
50
Noapara, Jessore
Operation Engineer Name
Mechanical Problems:
01 R/A L/O pressure low 0.50 2 Both T/C vibration and abnormal sound. 03 Both exhaust manifold red hot. 04 L/O leakage from the push guid A=2.5, B=1.3,4.8 05 A4 cylinder small bellows clamp open and sparking. 06 07 08 09 10 11
S/N
Exh. Temp. A 413 425 423 402 436 437 445 410 411 495
Electrical Problems:
01 02 03
5.7 52/61
3.2 75/80
3.4 26/29
60
68
72
69
72
72
75
15:40/01.02.13 01.02.2013
Date
Exh. Temp. B 428 395 398 402 431 422 424 440 360 420
5.9 111
36/31 1.2/0.9
71
71
71
45
54