Professional Documents
Culture Documents
OB-56 - Oceana High-Speed Rail Act (2013)
OB-56 - Oceana High-Speed Rail Act (2013)
OB-56 - Oceana High-Speed Rail Act (2013)
Oceana Bill
Summary/Abstract
An act with provision to establish a planning commission, public consultation, property compensation, A short paragraph or two on the general principles of the Bill, some specifics of the Bill, what the Bill hopes to achieve and why it is necessary.
predicted to begin in Late Summer 2013 with the prescribed commissions and consultations. Construction is predicted to begin in the Summer of 2014 and the expected start of revenue services is by the Summer of 2019. Section 2 Timeline of Project February 2012 Government receives HS2 Ltd advice on phase 2 route options Engagement programme along phase 1 route on Environmental Impact Spring 2012 Assessment issues After Summer Consultation with statutory bodies on the safeguarding zone for phase 1 recess in September 2012 After Summer Public consultation on Property compensation proposals recess in September 2012 Engagement programme on phase 2 initial preferred route Early 2013 Consultation on draft Environmental Statement for phase 1 including design Spring 2013 refinements Introduction of a hybrid bill to provide necessary powers to construct and operate End of 2013 phase 1 of the railway Consultation on preferred route for phase 2 Early 2014 Governments announcement of the chosen route for phase 2 Late 2014 Target date for Royal Assent for the Hybrid Bill, containing legal powers to 2015 construct HS2 Construction period (starts and ends at different times and at different points 2014 - 2018 along the route) Commissioning and testing 2018 - 2019 Summer 2019 OHSR Line opens to passengers
Signed:
Jani Helle