Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 18

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.

METHOD STATEMENT TITLE: CURING TIME ELEMENT: BASEMENT SLAB NO 74 OPERATION METHOD Steam curing Waiting period of one to of concrete three hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3700m2 OUTPUT 1 panel = 10m2 3700m2/ 10m2= 370 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 370 panels/ 100 panels=3.5 round 3.7 round x 6 hours= 22 hours PAGE:63 DURATION 1 day

75.

Remove formwork

3700m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT

TITLE: CURING TIME NO 76 OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 1100m2 OUTPUT 1 panel = 7.5m2 1100m2/ 7.5m2= 147 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 147 panels/ 100 panels=1.5 round 1.5 round x 6 hours= 9 hours DURATION 1 day

77

Remove formwork

1100m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT ELEMENT: BASEMENT WALL ELEMENT: 1st FLOOR SLAB NO 78. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3700m2 DATE: PREPARED BY: OUTPUT 1 panel = 10m2 3700m2/ 10m2= 370 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 370 panels/ 100 panels=3.7 round 3.7 round x 6 hours= 22 hours DURATION 1 day

79.

Remove formwork

3700m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 2ST FLOOR WALL NO 80. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3050m2 DATE: PREPARED BY: OUTPUT 1 panel = 7.5m2 3050 m2/ 7.5m2= 407 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 407 panels/ 100 panels=4.07 round 4.07 round x 6 hours= 25 hours DURATION 2 day

81.

Remove formwork

3050m2

2 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 3ND FLOOR SLAB NO 82. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3700m2 DATE: PREPARED BY: OUTPUT 1 panel = 10m2 3700m2/ 10m2= 370 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 370 panels/ 100 panels=3.7 round 3.7 round x 6 hours= 22 hours DURATION 1 day

83.

Remove formwork

3700m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 4TH FLOOR WALL NO 84. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3050m2 DATE: PREPARED BY: OUTPUT 1 panel = 7.5m2 3050 m2/ 7.5m2= 407 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 407 panels/ 100 panels=4.07 round 4.07 round x 6 hours= 25 hours DURATION 2 day

85.

Remove formwork

3050m2

2 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 4TH FLOOR SLAB NO 86. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3700m2 PREPARED BY: OUTPUT 1 panel = 10m2 3700m2/ 10m2= 370 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 370 panels/ 100 panels=3.5 round 3.7 round x 6 hours= 22 hours DURATION 1 day DATE:

87.

Remove formwork

3700m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 5rd FLOOR WALL NO 88. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 2050m2 DATE: PREPARED BY: OUTPUT 1 panel = 7.5m2 3050 m2/ 7.5m2= 407 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 407 panels/ 100 panels=4.07 round 4.07 round x 6 hours= 25 hours DURATION 2 day

89.

Remove formwork

3050m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 5th FLOOR SLAB NO 90. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3700m2 OUTPUT 1 panel = 10m2 3700m2/ 10m2= 370 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 370 panels/ 100 panels=3.5 round 3.7 round x 6 hours= 22 hours DURATION 1 day

91.

Remove formwork

3700m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 6th FLOOR WALL NO 92. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3050m2 OUTPUT 1 panel = 7.5m2 3050 m2/ 7.5m2= 407 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 407 panels/ 100 panels=4.07 round 4.07 round x 6 hours= 25 hours DURATION 2 day

93.

Remove formwork

3050m2

2 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 6th FLOOR SLAB NO 94. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3700m2 OUTPUT 1 panel = 10m2 3700m2/ 10m2= 370 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 370 panels/ 100 panels=3.5 round 3.7 round x 6 hours= 22 hours DURATION 1 day

95.

Remove formwork

3700m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 5th FLOOR WALL NO 96. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3050m2 OUTPUT 1 panel = 7.5m2 3050 m2/ 7.5m2= 407 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 407 panels/ 100 panels=4.07 round 4.07 round x 6 hours= 25 hours DURATION 2 day

97.

Remove formwork

3050m2

2 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 6th FLOOR SLAB NO 98. OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3700m2 OUTPUT 1 panel = 10m2 3700m2/ 10m2= 370 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 370 panels/ 100 panels=3.5 round 3.7 round x 6 hours= 22 hours DURATION 1 day

99.

Remove formwork

3700m2

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: 6th FLOOR WALL NO 100 OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 3050m2 OUTPUT 1 panel = 7.5m2 3050 m2/ 7.5m2= 407 panels 1 chamber= 10 panels 10 steam chamber10 panels=100 panels one round 407 panels/ 100 panels=4.07 round 4.07 round x 6 hours= 25 hours DURATION 2 day

101

Remove formwork

3050m2

2 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: COLUMN NO 102 OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 320nos OUTPUT 1nos = 3m3 320nos x 3m3 = 960m3 1 chamber= 10nos 10 steam chamber 10nos = 100nos one round 320 panels/ 100 panels=3.2 round 3.2 round x 6 hours= 19hours 320nos 1 day DURATION 1 day

103

Remove formwork

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: HOISTWAY NO 104 OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 21nos OUTPUT 1 nos = 7.2m3 21 nos x 7.2m3= 151.2m3 1 chamber= 1 nos 21 nos / 10 steam chamber = 2.1 rounds 2.1 round x 6 hours = 12.6hours DURATION 1 day

105

Remove formwork

21nos

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT TITLE: CURING TIME ELEMENT: STAIRCASE NO 106 OPERATION METHOD Steam curing Waiting period of one to three of concrete hours after the concrete has been poured Then the concrete is heated up gradually by introducing steam. The duration may vary between 1 and 6 hours. The rate of temperature increase should not be allowed to exceed 20C per hour. Extends over a period of 12 to 18 hours, the temperature is kept constant at the maximum value which varies between 50C and 70C Removed formwork from precast concrete wall DIAGRAM PLANT/MANPOWER 10 Steam chamber 1 Forklift 1 Forklift operator 1 Steam chamber operator 1 supervisor QUANTITY 35 nos OUTPUT 1 nos = 486m3 35 nos x 486m3 = 17010m3 1 chamber= 1 nos 35 nos / 10 steam chambers = 3.5 rounds 3,5 rounds x 6 hours= 21 hours DURATION 1 day

107

Remove formwork

35 nos

1 day

PROJECT: PROPOSED BUILT AND COMPLETE 6 STOREY MEDIUM COST APARTMENT WITH 1 STOREY BASEMENT, 60 UNITS.
METHOD STATEMENT

You might also like