8th February 2009

Ref:- Fence Construction


Project File ... 08010800 Dijkverzwaring

In January 2008 Mr. Henk J TH. Van Stokkom came to visit


KidaneMehiret School and Franciscan Sisters Mission . Late Bishop Leonardus
brought him in our house and therefore we got an opportunity to meet him. In that
time we are in need to get a fence for school compound and we gave the project to
Henk . As we heard from Mr. Henk you accepted that project and sent the cost
22,000 Euro. We received 293,625.19 Birr from the bank .For the construction we
took an agreement with a Contractor who is working in the Vicariate of Nekemte .
His name is Amanuel Olana. When we submitted this project to you the total
calculation was290,525 Birr. The Contractor argued to get some more because of
the cost variation. At that time every materials became expensive. Therefore the
contract agreement done with 293,000Birr. Please find enclosed financial reports,
all original receipts and photographs about the fence construction. Thank you so
much from the core of my heart for supporting us to continue our mission .
Through Mr. Henk we came to know your organization and to receive your
generosity .
May I express my heartfelt gratitude to you Henk . You are
our guard angel for this project . When you visit our home we feit one of our
brother came to home . Really we appreciate your special care ,concern and
collaboration. We received the calendar which you sent to us . It is wonderfui.
Thank you very much . On behalf of Franciscan Sisters may I extend our gratitude
to you and friends of Stichting Dijkverzawaring Organization . May the good God
bless you abundantly . When Mr. Henk visited in October the Construction was not
finished at that time. Now the school compound became more beautiful . Really we
are remembering you in our daily prayers.
Mr. Henk ,we remind you the next project for nth &12th school building .Soon we
will send to you that project too. We are keeping our full hope in you. Thank you
very much for your good will and co-operation . /'1
Yours Sincerely Sr. Cisily Augustine ~ '-fo. Ç%tif
FINANClAL REPORT

No Payment System Birr


1 First payment 140,000
2 Second; 84,000
3 Third " 42,000
4 Fourth " 27,000

Total 293,000

Total Amount 22,000 Euro


Bank Transfer Amount Received 293,625.19
Total Expense 293,000
Balance in Hand 625.19

Prepared by

Name ..... Sr. Cisily Augustine

Signature • jcJ?Cr
This agreement made and entered into at Nekemte by and between Kidane Mehiret
School running by FRANCISCAN SISTERS and Ato Amanuel Olana.
SCOPE OF THE WORKS
The Contractor shall furnish all Materials , Equipment and Labour and any other
requirement and perform all the works as shows on the plan provided by the
contractor and do everything required for the satisfactory completion of the works
within the time limit.
The Investor shall pay to the Contractor for fulfilling of this agreement the sum of
Birr 293,000 (TWO HUNDRED NINTY THREE THOUSAND)
CONTRACT TIME
Work as laid down in the contract shall commence at the handing over of the
site and shall be completed within 90 working days .
PAYMENT SYSTEM
Ist Payment

Birr ... 140,000


( One hundred forty thousand only)
11nd Payment

Birr84,000(Eighty four thousand only )

111rd Payment
Birr .. .42,000 (Forty Two Thousand only)

IVth payment Birr 27,000 (Twenty Seven Thousand only)


This AGREEMENT shall be deemed to be an administrative contract as that term is
defined under the civil code of Ethiopia ,1960 .In witness hereof the parties involved
have affixed here under their signatures on the date mentioned.

_ i.J-p-jziQ-2..----- c1~~~_
_~Q_t_~_[__~Y__-B..JLg-tl-..r-L-!../j..C.1f----
Witness
1) ./?{ij).(k 2J.~d
If .

~0{~
bw.
2).1.' e.«.~6 G.f-.~ .. :Î.afR.. & O/I.t.t;\. .
3) •. fi:/;Q :i . . 1 ~ ~ .
ETHIOPIAN CATHOLIC CHURCH
APOSTOLIC VICARlATE OF NEKEMTE
BILL OF QUANTITES AND SPECIFICATION
OF
FENCE WORK

SUMMARY OF BILL QUANTITIE OF FANCE


A. SUBSTRUCTURE
1. EXCA VATION AND EAR TH WORKS -----------------------------------------------15000
2. MAS ONAR Y ------------------------------------------------------------------------------ 55,650
3. CONCRETE ------------------------------------------------------------------------------178,600
SUB TOT AL ------------------------------------------------------------------------------- 249250

B. SYPERSTRWITURE
I . H CB FENCE ------------------------------------------------------------------------------ 38,250
CON CRETE COPING ------------------------------------------------- ------------- --------000
3. POINT ING ----------------------------------------------------- ----------------------------- 3025
SUB TOT AL ------------------------------------------------------------------------------41,275 .
GRAN D TOT AL ---------------------------------------------------------------------------- 2 90525
ETHIOPIAN CATHOLIC CHURCH
APOSTOLIC VICARlATE OF ·NEKEMTE
BILL OF QUANTITES AND SPECIFICATION
OF
FENCE WORK
LOCATION --- NEKEMTE k:HIDANE MIHIRET SCHOOL
NO DESCRIPTION UNIT QUANTITY RATE AMOUNT
A. SUBTRUTURE
1. EXCAVATION AND EARTH ML
WORK
1.1 SITE CLEARING TO REMOVE ML 25350 320 7.000
TOP SOIL
1.2 90 CM DEEP. TRENCH
EXCAVATED
SOIL AWAY FROM THE SITE MJ 150 20 3000
TOTAL CARRIED TO 15,000
SUMMARY
2.1 MASONARY STONE
FOUNDATION
BELOW GROUND LEVEL WITH M3 450 65 29,250
CEME T MORTAR OF RATIO
\:3

2.1 B. IM MIGH DRESSED STONE


MASONARY
ABOVE GROUND LEVEL WITH MJ 120 220 26,400
CEME T MORT AR 1:3 OF AND
ALLO
TOT AL CARRIED SUMMERY 55,650
3. CONCRET
3.1 LEAN CONCRETEUNDER ML 95 120 11,400
MASONARY
GRADE BEAM WITH CEMENT
CONTENT OF 50 KG/ M3 MJ 550 20 1,100
-, -,
.J . .J RINFORCEMENT IN GRADE
BEAM
a. dia 12 KG 265 120 31,800
b. dia 6 KG 360 150 54,000

3.4 FORMWORK
TO GRADE BEAM ML 220 120 26,400
TOT AL CARREID SUMMARY 50,16.0
SUB TOTAL 178,600
SUPERSTRUCTURE
l. 20 CM HCB JOINTED WITH
FONCB
CEMENT MORTAR
WITH RATIO TO 1:4 ML 150 95 14,250
J
2 CONCRET COPING ON TOP OF M 25 960 24,000
HCBFENCE
TOT AL CARRIED SUMMARY 38,250
POINTING
l. TO DRESSED STONE
ON BOTH SIDES ML 55 55 3025
L
2 DITTO BUT, TO HCB M 0 0 00
TOT AL CARREID TO
SUMMARY 3025
SUB TOTAL 290.525