In the report, production general manger is describing technical problem that affected completion of a project.
INTEROFFICE MEMORANDUM
To: Mr. Paul Walker From: Mr. Will Smith Subject: Delay in Hybris Project due to technical failure Date: January 28, 2012
The Hybris project was delayed due to a technical failure in the assembly line system of A7 production department. This had led to a loss of 1.2 million dollars. The Hybris project was an agreement with Matrix Ltd., one of our major dealers. According to the agreement, the Hybris project was supposed to be completed by January 30 but due to insufficient production, the project had to be delayed by four days. This had damaged the companys relationship with them. Short-circuiting in the assembly line system was the main cause of the failure. The accidental over-supply of current in the wires led to short-circuit of the system. I have replaced the old system with new and advance M60 assembly line system which is capable of withstanding such over-supply of current. The loss in volume of production will be covered by extending the working hours. I also had apologized and assured Matrix Ltd. that project would be completed within four days i.e. by February 3.
Hybris Incorporation
INSPECTION REPORT
Newly purchased machineries for A7 production department
The newly purchased machineries for the A7 production department will be ready for use from March 1, 2012. Except for one major fault in one of the machines, rest of the machinery is fine. Due to slow production, the obsolete machines in the A7 production department are being replaced by the new and high-tech machineries which produced twice the old ones and are more efficient. The purchase order was made with Sky-net Corporation on January 31, 2012 and it was delivered on February 22, 2012. I went for the inspection of the machinery on next day i.e. on February 23. The contractor delivered the machinery on time. While inspecting the machines, I found that one of the machines does not have an automatic timer system. I have order for the replacement of that machine with a new one and sky-net had assured that it would deliver by February 26. Rest all the machineries were found acceptable. I suggest an inspection for the machine that would be arriving on February 26 before contactor payment is approved.