Wbs Element
Wbs Element
Wbs Element
WBS Level:
4
D. Mitchell
WBS Element Description: The scope of this element includes all engineering and design effort required for the development of the extraction steam system.
Page 1 4 Of 27
Example 1
WBS Level:
4
Originator:
600 MW Fossil Unit
J. Jones
to piping systems, mechamcal equipment, electrical power, instrumentation and control for the extraction steam system. This includes determination of design pressures and temperatures, pipe sizes, wall thickness, plpe material, insulationrequirements, pipe supports, and control schemes. The scope of this element includes all supporting studies and calculations used in determination of the previously mentioned design definition.
Page 1 4 Of 27
Example 2
WBS Level:
4
1
600 MW Fossil Unit
I
originator:
A. Thompson
WBS Element Description: The scope of this element includes the engineering and deslgn effort for
the extraction steam system, as defined in the control element work products defined below. Svstem Descriotions SDlOl Extraction Steam Procurement Packages None Drawings Control Logic Diagram C L D l O l Extraction Line Control, LP and HP Heaters Control Logic Diagram CLD102 - Extraction Line Control, Deaerator P&ID101 - Extraction Steam Electrical Elementary Diagram EED 101 -Extraction Line Control, LP and HP Heaters Electrical Elementary Diagram EED102 -Extraction Line Control, Deaerator Piping Drawing PDlOl - First, Second & Third Point Extraction Steam Piping Piping Drawing PD102 Fourth & Fifth Point Extraction Steam Piping Piping Isometric PI101 -First, Second & Third Point Extraction steam Isometric Piping Isometric PI102 -Fourth & Fifth Point Extraction Steam Isometric Pipe Supports PS101 - Supports for First, Second &Third Point Extraction Steam Piping Pipe Suppoa PSI02 - Supports for Fourth & Fifth Extraction Steam Piping Calculations Pressure drops for Extraction Steam Lines Related Work Excluded 1. Associated supervision (included in WBS Element 3.16) 2. System Design Review (included in WBS Element 3.20) 3 . Engineering input to schedule logic development and review (included in WBS Element 4.11)
-
Page 1 4 Of 27
Example 3
WBS Level:
4
Originator:
600 MW Fossil Unit
R. Smith
WBS Element Description: The scope of this element includes the engineering and design effort for the extraction steam system, as defined in the WBS element work products defmed below.
I System Descriptions
- 1,
Pmcurement Packages - 0
Drawings - 73 sheets, as broken down below; 15 sheets control logic diagrams 2 sheet P t I D 21 sheets elementav wiring diagram 26 sheets piping drawings 5 sheets piping isometrics 4 sheets pipe support drawings
4 Page 1 Of 27
Example 5