6 - BITUMINOUS WORK

Sl No 32

Description Cleaning the existing WBM road surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/ or compressed air to receive bituminous treatment. Cleaning of the existing black topped surfaces with brooms, soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment. Providing and applying primer coat over prepared surface of granular base with bitumen heated in bitumen boiler fitted with spray set (excluding cleaning of road surface).

Unit sqm

Rate Rs.5.10
(Rupees five and paise ten) only.

33

sqm

Rs.1.40
(Rupees one and paise forty) only.

34

(a) Primer from 7.5 - 9.8kg and 9.8 to 12.2 kg/10 sqm for surface of low and medium porosity.

sqm

Rs.19.40
(Rupees nineteen and paise forty) only.

(b) Primer for surfaces of high porosity. Primer 12.2 - 14.60 kg/10sqm.

sqm

Rs.24.90
(Rupees twenty four and paise ninety) only.

35

Providing and applying primer coat over prepared surface of granular base with emulsion bitumen and spraying with spray set (excluding cleaning of road surface).

1 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

(a) Primer from 6.0 - 9.0 kg and 9.0 to 12.0 kg/10 sqm for surface of low and medium porosity.

sqm

Rs.20.00
(Rupees twenty) only.

(b) Primer for surfaces of high porosity. Primer 12.0 - 15.0 kg/10sqm.

sqm

Rs.28.40
(Rupees twenty eight and paise forty) only.

2 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

36

Providing and applying tack coat on the prepared surface, heating bitumen in boiler and spraying the bitumen with spray set fitted on bitumen boiler.

(a) On black topped 5kg/10Sqm.

surface,

Bitumen

sqm

Rs.11.40
(Rupees eleven and paise forty) only.

(b) On granular surface treated with primer, Bitumen @ 7.5kg/10sqm.

sqm

Rs.16.50
(Rupees sixteen and paise fifty) only.

(c) On granular base such as WBM and WMM surfaces not treated with primer, Bitumen @ 10kg/10Sqm.

sqm

Rs.21.90
(Rupees twenty one and paise ninety) only.

37

Providing and applying emulsion bitumen as tack coat on the prepared surface, and spraying the emulsion bitumen with spray set.

(a) On black topped surface, emulsion bitumen @ 2.5kg/10Sqm.

sqm

Rs.7.50
(Rupees seven and paise fifty) only.

(b) On granular surface treated with primer, emulsion bitumen @ 3.0kg/10sqm.

sqm

Rs.10.80
(Rupees ten and paise eighty) only.

(c) On granular base such as WBM and WMM surfaces not treated with primer, emulsion bitumen @ 4.0kg/10Sqm.

sqm

Rs.12.20
(Rupees twelve and paise twenty) only.

38

Providing and laying bituminous macadam on prepared surface with specified graded crushed aggregates for base/binding course including loading of aggregates with F.E. Loader and hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixed material in Tipper to paver and laying mixed material with paver finisher to the required level and grade, rolling by Power Roller to achieve the desired density but excluding

3 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

cost of primer/tack coat.

50mm compacted thickness (75mm loose thickness) with 4% bitumen with lead of mix material one km.

cum

Rs.3,596.10
(Rupees three thousand five hundred ninety six and paise ten) only.

4 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

39

Providing, laying and consolidation of crushed stone aggregates on prepared surface as per built up spray grout specification 75mm thick as base course compacted in two layers composite construction of crushed stone aggregates with application of bitumen binder after each layer and lay aggregate on the top of second layer and rolling with power roller 8 - 10 tonne but excluding cost of primer/tack coat.

sqm

Rs.185.70
(Rupees one hundred eighty five and paise seventy) only.

40

Providing and laying dense bituminous macadam on prepared surface with specified graded crushed aggregates for base/binder course including loading of material with F.E. loader, heating of binder, aggregates and filler in hot mix plant, transporting the mixed material by tipper and laying with paver finisher to the required level and grade, rolling by power roller to achieve the desired density but excluding primer/tack coat. (Using 5% bitumen content and lead of mixed material 1 km ).

cum

Rs.4,610.30
(Rupees four thousand six hundred ten and paise thirty) only.

41

Extra labour for precoating crushed stone chipping with bitumen including heating and mixing the material and handling the mixed material within a lead of 30metres. (a) By Manual means. cum Rs.403.90
(Rupees four hundred three and paise ninety) only.

(b) By Mechanical means.

cum

Rs.850.00
(Rupees eight hundred fifty) only.

42

Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone chippings of specified size (may be precoated also) and rolling with power roller 8

5 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

- 10 tonne.

(a) Single coat surface dressing or first coat of the two coat surface dressing with 0.15cum crushed stone chipping & bitumen 18kg/10Sqm.

sqm

Rs.55.00
(Rupees fifty five) only.

6 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

(b) Second coat of two coat surface dressing (also used as renewal coat) with 0.10 cum crushed stone layer as wearing course and bitumen 11kg/10Sqm.

sqm

Rs.37.20
(Rupees thirty seven and paise twenty) only.

43

Providing and laying open graded premix carpet 2 cm thick with specified graded crushed aggregates for wearing course including loading of aggregates with F.E. Loader, heating binder and aggregates in hot mix plant 30 - 40 tonne, transporting the mixed material with tipper and laying with paver finisher to the required level and grade, rolling with Power Roller 8-10 tonne but excluding cost of primer, tack and seal coat with lead of mix material 1 km.

sqm

Rs.74.80
(Rupees seventy four and paise eighty) only.

44

Providing and laying open graded premix carpet 2 cm thick on prepared surface in a single course as wearing course composed of specified size of crushed aggregates premix with bituminous binder in Mini hot mix plant 6 - 10 tonne, laying manually and rolling with Power Roller 8-10 tonne but excluding cost of primer/tack coat.

sqm

Rs.76.10
(Rupees seventy six and paise ten) only.

45

Providing and laying open graded premix carpet 2.5cm thick on prepared surface in a single course as wearing course composed of specified size of crushed aggregates premix with bituminous binder in Mini hot mix plant 6 -10 tonne laying manually and rolling with Power Roller 8-10 tonne but excluding cost of primer/tack coat.

sqm

Rs.94.90
(Rupees ninety four and paise ninety) only.

46

Providing and laying open graded premix carpet 2.5cm thick on prepared surface with 3.00cum of crushed aggregates 10mm well graded size per 100sqm and 71kg of hot bitumen per cum of aggregates; heating, mixing and laying done

sqm

Rs.88.00
(Rupees eighty eight) only.

7 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

manually and rolling with power roller 8 - 10 tonne but excluding cost of primer/tack coat.

8 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

47

Providing and laying open graded premix carpet 2cm thick on prepared surface with 2.4cum of crushed aggregates 10mm well graded size per 100sqm and 71kg of hot bitumen per cum of aggregates; heating, mixing and laying done manually and rolling with power roller 8 - 10 tonne but excluding cost of primer/tack coat.

sqm

Rs.71.00
(Rupees seventy one) only.

48

Providing and laying mix seal surfacing on prepared surface as wearing course with specified graded crushed aggregates premixed with bitumen binder in hot mix plant 20 - 30 tonne, laying with paver finisher 30 - 40 tonne, transporting the mixed material by Tipper and rolling with power roller 8 - 10 tonne but excluding cost of tack coat.

(a) Type 'A'

sqm

Rs.87.70
(Rupees eighty seven and paise seventy) only.

(b) Type 'B'

sqm

Rs.83.40
(Rupees eighty three and paise forty) only.

49

Providing and laying mix seal surfacing on prepared surface in a single course composed of specified graded crushed aggregates premixed with bitumen binder in a mini hot mix plant 6 - 10 tonne, laying mannually and rolling with Power Roller 8 - 10 tonne but excluding cost of tack coat. (a) Type 'A' sqm Rs.90.20
(Rupees ninety and paise twenty) only.

(b) Type 'B'

sqm

Rs.85.60
(Rupees eighty five and paise sixty) only.

50

Providing and laying of semi dense bituminous concrete on prepared surface with specified graded crushed aggregates for wearing coarse including loading aggregates with F.E. loader,

cum

Rs.4,841.10
(Rupees four thousand eight hundred forty one and paise ten) only.

9 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

heating aggregate and binder in hot mix plant, transporting the mixed material with Tipper and laying with paver finisher to the required level, rolling with power roller to achieve the desired density but excluding primer/tack coat with lead of mix material 1km.

10 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

51

Providing and laying bituminous concrete on prepared surface with specified graded stone aggregate for wearing course including loading of aggregates with F.E. loader and hot mixing of bitumen filler with aggregates in hot mix plant, transporting the mixed material with tipper to paver and laying with mechanical paver finisher to the required level, grade and rolling with power roller to achieve the desired density but excluding cost of primer/tack coat. (Using 6.5% bitumen and 3% filler with lead of mix 1km.)

cum

Rs.5,654.10
(Rupees five thousand six hundred fifty four and paise ten) only.

52

Providing and applying liquid seal coat type 'A' comprising of a layer of thin bituminous binder, followed by a cover of stone chippings of specified grading and rolling with Power Roller 8 - 10 tonne.

sqm

Rs.34.00
(Rupees thirty four) only.

53

Providing and applying premix seal coat type 'B' comprising of thin application of fine aggregate premixed with bituminous binder in mini hot mix plant, carriage manually of mixed material and laying and rolling with Power Roller 8 - 10 tonne.

sqm

Rs.27.00
(Rupees twenty seven) only.

54

Providing and laying seal coat of premix sand with bitumen binder using 128kgs of bitumen per cum of sand per 100sqm of road surface; heating, mixing and laying done manually and rolling with power roller 8 - 10 tonne.

sqm

Rs.36.50
(Rupees thirty six and paise fifty) only.

55

Painting one coat with bitumen using 2.25kg of bitumen per sqm with 1.65cum of stone aggregate 12.50mm well graded size per 100sqm of road surface complete.

sqm

Rs.73.00
(Rupees seventy three) only.

11 of 12

2/6/2013 5:25 PM

Sheduled of Rates, PWD- Mizoram

http://mizopwd.nic.in/sratenorth/partb/bitumen.htm

56

Painting two coats with bitumen using 2.0kg of bitumen per sqm with 1.5cum of stone aggregate 12.50mm nominal size per 100sqm of road surface for first coat and 1kg of bitumen per sqm with 0.90cum stone aggregate 10mm nominal size per 100sqm of road surface for second coat complete.

sqm

Rs.113.30