Agend a
Traditional vs New Approach Key Drivers Definition Solution: Process-wise Modules Best Practices Advantage Customers
Decreasing Production Volumes Increasing Product Variety Shortening of Product Life Cycles (PLC) Reducing Number of Repeat Orders
Manufacturing Processes: Flexible Manufacturing Systems (FMS) Balanced Manufacturing System Considering Organization, People and Technology Skill-based Automated Manufacturing Systems Process Industry: Variations Tracking (quality of inputs is inconsistent) Shelf Life Management (batch quarantine) Co/By-Product Mngmt. Overheads Management (trace utility consumption for costing) Recipe Security (patents)
Present Scenario
Competition and Cost Complex Supply Chain Complex Outsourcing Decisions Suppliers Competency Lacking Systems Integration Low Visibility No Compatibility Inefficient Business Analysis No Supply Chain Analysis
Key Drivers
Optimize Manufacturing Techniques On-time Supply Global Integration Customer Relationship Management Customer Information Management Effective Information Sharing Cost Competition Critical Market Share
Present Approach Effective Production Planning CRP, RP, RCCP Net Planning in MPS and MRP Production Order WIP Tracking at all Stages Analysis at all stages ATP & CTP
Process Manufacturing
Process Manufacturing
SOP Manufacturi ng Cycle Sales and Operations Planning
Input: Forecasting
Optional Process
Process Manufacturing
SO P MS Master Scheduling
Input: Firm Production Plan, Sales order
Services etc, Project, Manual etc.,
Manufacturi ng Cycle
Process Manufacturing
Manufactur ing Cycle
SOP MS
MPS
Process Manufacturing
SO P MS
Manufacturi ng Cycle
MP S
Logic: 1. Planning period entered 2. Bucket/Bucket less planning 3. Preliminary MPS calculated 4. PAB and scheduled receipts are considered to calculate net requirements Output: Input to RCCP Input to ATP based on MPS
Process Manufacturing
SO P
MS
MP S
RCCP
Manufacturi ng Cycle
Process Manufacturing
SO P MS
MP S
Manufacturi ng Cycle
RCCP
MRP
Process Manufacturing
SOP
MRP CRP
Process Manufacturing
SOP MS
MPS
RCCP
Manufacturi ng Cycle
Planned orders
MRP CRP
Process Manufacturing
SO P
MS
Manufacturi ng Cycle
MP S
2. Order release for all operations 3. PO items release Process RCCP Output: Item request to inventory
orders
Planne d orders
MRP CRP
Process Manufacturing
SOP
Manufacturi ng Cycle
Shop floor reporting
Input: Completed operations Logic: 1. Material details 2. Machine details 3. Quantity produced Production Output: Status of production order orders
RCCP
Planned orders
MRP CRP
Process Manufacturing
Order Confirmati on
SOP MS
Shop floor Manufacturi reporting Input: Completed production orders ng Cycle Logic: 1. All operations completion 2. Required QC check completion 3. Quantity settled Process 4 Partial/Full Confirmation orders 5 Lot Number Production can Output: Completed production orders
MPS
RCCP
Planned orders
MRP CRP
Process Manufacturing
Order settlemen t
SOP MS
Manufacturi ng Cycle
Shop floor MPS reporting Input: Backlog orders Logic: 1. SOP production plan calculation 2. Master scheduling for customer orders Process RCCP Output: Initiation of SOP and MS orders
Planned orders
MRP CRP
Module s
SO P
MS
Master Execution Planning and Control Detailed of of Scheduling Resource Resources and planning s
MP S
RCCP
Manufacturi ng Cycle
Planne d orders
MRP CRP
Modul es
It consists of two sub modules: Production Planning Production Activity Control
Manufacturing
Production Planning
Module s
Master Planning of Resources
Production Planning Detailed Scheduling and Planning MRP Run MRP Record Capacity Requirement Planning Confirm Planned Orders Release Planned Orders
Manual Forecasting Preliminary Sales and Operations Planning Resource Planning and Leveling Production Plan Allocation Master Scheduling Master Production Scheduling Rough-cut Capacity Planning Firm MPS
Modules
Production Activity Control
Execution and Control of Resources Process Order Generation (POG) Availability Check (AC) Production Order Release (POR) Process Order Item Release (POIR) Shop Floor Instruction Sheet Item Requisition Planned Withdrawal Item Requisition Unplanned Withdrawal Shop floor Reporting Process Order Confirmation
Exensys Supports Industry Best Practices SOP (Sales and Operations Planning)
Availability check before production order release Capacity planning at each stage Exception/transaction messages from MRP system Production order status at any point of time Effective integration with QC Multilevel BOM
Advantage eXensys
Domain Expertise Extensive domain knowledge, to understand the business problem and suggest optimal business solutions. Mastermind Re-engineering Optimization of business processes, by re-engineering critical functions across the entire value chain. Quality in Process Transparent development methodologies through metrics-based management to control costs and quality, leading to reduced time to market.
Advantage eXensys
Perpetual Support Global delivery and support capabilities for 24 x 7 uptime Unmatchable Competencies Proven capabilities in offshore methodology to bring down cost of IT ownership Flexible Models A partnership mode of engagement, with flexibility in choosing models Strong Roots Improved bottom-line operational efficiency and meet new
Vertical s
Industry Vertical
Wood Minerals Paper and Pulp Printing Publishing Consumables Food, Beverages and Tobacco
Thank you