TULIP INFRATECH P LTD.

76-G , Sector - 18 , Gurgaon.


Ph:01244417777

Work Order

Project

TULIP VIOLET

Block

BLOCK-A

Contractor

TULIP INFRATECH PVT. LTD

Work Order No.

WO//VIOLET/2

Cont. Category

Civil

Work Order Date

17/Jan/2013

Cont.PAN No.

88CCT3755E

Dear Sir,
Sub: Construction of Tower A3.
We are happy to confirm our order with you for the under mentioned subject to the following Terms and Conditions.
Sl No. Activity Name
W.O Qty
PBS Name :BRICK WORK{A/A-3/C/BW}
1

Unit

Rate

Total Amount Description

Labour rate for Basement for


Brick Work
Labour
rate 230mm
for Ground Floor

21.290

Cum

405.72

45.000

Cum

405.72

18257.4

for
Brickrate
Work
Labour
for 230mm
Ist Floor for
Brick
Work
Labour
rate 230mm
for 2nd Floor for

44.000

Cum

426.01

18744.44

44.000

Cum

446.29

19636.76

Brick
Work
Labour
rate 230mm
for 3rd Floor for
Brick
Work
Labour rate 230mm
for 4th Floor for
Brick
Work
Labour
rate 230mm
for 5th Floor for

44.000

Cum

466.58

20529.52

44.000

Cum

486.86

21421.84

44.000

Cum

507.15

22314.6

Brick
Work
Labour
rate 230mm
for 6th Floor for
Brick Work
Labour
rate 230mm
for 7th Floor for

44.000

Cum

527.44

23207.36

44.000

Cum

547.72

24099.68

Brick
Work
Labour
rate 230mm
for 8th Floor for
Brick
Work
Labour
rate 230mm
for 9th Floor for

44.000

Cum

568.01

24992.44

44.000

Cum

588.29

25884.76

Brick
Work
Labour
rate 230mm
for 10th Floor for
Brick
Work
Labour rate 230mm
for 11th Floor for

44.000

Cum

608.58

26777.52

44.000

Cum

628.87

27670.28

Brick
Work
Labour
rate 230mm
for 12th Floor for
Brick Work
Labour
rate 230mm
for 13th Floor for

44.000

Cum

649.15

28562.6

44.000

Cum

669.44

29455.36

Brick
Work
Labour
rate 230mm
for 14th Floor for
Brick
Work
Labour
rate 230mm
for Terrace for

44.000

Cum

689.72

30347.68

46.940

Cum

710.01

33327.87

Brick
Work
Labour
rate 230mm
for Basement for
Half
Brick
Masonery
& 70mm
Labour rate
for Ground
Floor for

26.010

Sqm

115.00

2991.15

409.360

Sqm

115.00

47076.4

Half
Brick
Masonery
& 70mm
Labour
rate
for Ist Floor
for Half
Brick Masonery
& 70mm
Labour
rate for 2nd
Floor brick
for

409.360

Sqm

120.75

49430.22

409.360

Sqm

126.50

51784.04

Half
Brick
Masonery
& 70mm
Labour
rate
for 3rd Floor
for
Half Brick
Masonery
& 70mm
Labour
rate
for 4th Floor
for

409.360

Sqm

132.25

54137.86

409.360

Sqm

138.00

56491.68

Half
Brick
Masonery
& 70mm
Labour
rate
for 5th Floor
for
Half
Brick
Masonery
& 70mm
Labour rate for 6th Floor
for

409.360

Sqm

143.75

58845.5

409.360

Sqm

149.50

61199.32

Half
Brick
Masonery
& 70mm
Labour
rate
for 7th Floor
for
Half
Brick
Masonery
& 70mm
Labour rate for 8th Floor
for

409.360

Sqm

155.25

63553.14

409.360

Sqm

161.00

65906.96

Half
Brick
Masonery
& 70mm
Labour
rate
for 9th Floor
for
Half Brick
Masonery
& 70mm
Labour
rate
for 10th Floor
for

409.360

Sqm

166.75

68260.78

409.360

Sqm

172.50

70614.6

Half
Brick
Masonery
& 70mm
Labour
rate
for 11th Floor
for
Half
Brick
Masonery
& 70mm
Labour
rate
for 12th Floor
for

409.360

Sqm

178.25

72968.42

409.360

Sqm

184.00

75322.24

Half
Brick
Masonery
& 70mm
Labour
rate
for 13th Floor
for
Half
Brick
Masonery
& 70mm
Labour rate for 14th Floor
for

409.360

Sqm

189.75

77676.06

409.360

Sqm

195.50

80029.88

730.610

Cum

2,927.61

2138941.14

35

Half
BrickforMasonery
& 70mm
Material
Brick Work
230mm
Material for half Brick Work &

6,166.340
70mm
Brick
Work
PBS Name :CEMENT CONCRETE{A/A-3/C/PCC}

Sqm

332.61

2050986.35

36

Material for PCC (M15)

Cum

1,518.00

47361.6

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

31.200

8637.78

Page number : 1/12

37

Labour chrges for pouring of


concrete
RMC
Supply charges (M-15)

31.200

Cum

287.50

8970

38

31.200

Cum

2,415.00

75348

39

MATERIAL FOR PCC (M10)

105.000

Cum

1,454.98

152772.9

40

RMC supply charges ( M10)

105.000

Cum

2,415.00

253575

Labour chrges for pouring of


105.000 Cum
concrete(M10)
PBS Name
:CEMENT CONCRETE{A/A-3/RCC/CC}

287.50

30187.5

41

42

Material for RCC (M-25)

43
44

Labour chrges for pouring of


concretecharges in Slab
Labour

3,620.000

Cum

2,174.54

7871834.8

455.000

Cum

287.50

130812.5

2,750.000

Cum

86.25

45

Labour charges in column

237187.5

870.000

Cum

287.50

46
47

Labour charges in chipping &


Hacking
Labour charges for Lintel Fixing

250125

1,750.000

Cum

115.00

201250

615.000

Nos

126.50

77797.5

48
49

Material of RCC (M-30)

455.000

Cum

2,243.08

1020601.4

RMC Supply charges (M-30)

455.000

Cum

2,415.00

50

1098825

RMC Supply charges (M-25)

3,620.000

Cum

2,415.00

8742300

350.00

350

95,000.00

95000

PBS Name :EARTHING{A/A-3/E/EARTHING}


51

Providing and fixing of lightning


1.000 Each
conductor
finial,
made
of
25
PBS Name :ELECTRICAL EXTERNALS{A/A-3/E/EXTERNAL}

52

CCTV Camera

1.000

Set

71.000

Sqm

23.00

1633

71.000

Sqm

51.75

3674.25

3,650.000

Cum

115.00

419750

450.000

Cum

115.00

51750

53600

PBS Name :EXCAVATION{A/A-3/C/EXC}


53
54
55
56

Labour Chrges for sprinkling of


ATT
Material for ATT
Earth work in excavation by
mechanical
means
(Hydraulic
Filling available
excavated

earth:FIRE
(excluding
rock) in
PBS Name
FIGHTING{A/A-3/FIRE}
57

SUPPLYING INSTALLING &


COMMISSIONING
OF HOSE
SUPPLYING
INSTALLING
&

16.750

Nos

3,200.00

40.000

Nos

780.00

31200

COMMISSIONING
OF
SUPPLYING INSTALLING
&
COMMISSIONING
OF HOSE
SUPPLYING INSTALLING
&

16.750

Nos

1,850.00

30987.5

18.000

Nos

5,900.00

106200

COMMISSIONING
OF FIRE&
SUPPLYING INSTALLING
COMMISSIONING
OF FIRE&
SUPPLYING INSTALLING

18.000

Nos

710.00

12780

14.000

Nos

4,200.00

58800

COMMISSIONING
OF SUB&
SUPPLYING INSTALLING
COMMISSIONING
OF
SUPPLYING
INSTALLING
&

28.000

Nos

1,965.00

55020

15.000

Nos

1,400.00

21000

COMMISSIONING
OF
SUPPLYING INSTALLING
&
15.000
COMMISSIONING
OF
PBS Name
:FLOORING{A/A-3/C/FLOORING}

Nos

1,570.00

23550

1736212.5

58
59
60
61
62
63
64
65

66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

Providing and fixing wooden


flooring
in particular
location
Labour charges
for Toilet

2,745.000

Sqm

632.50

240.000

Each

862.50

207000

Counter
Stone
Labour rate
for Ground Floor
Concrete
Flooring
Labour rate
for Ist Floor

189.000

Sqm

74.75

14127.75

189.000

Sqm

77.96

14734.44

Concrete
Flooring
Labour rate
for 2nd Floor
Concrete
Flooring
Labour
rate
for 3rd Floor

189.000

Sqm

81.67

15435.63

189.000

Sqm

85.38

16136.82

Concrete
Flooring
Labour rate
for 4th Floor
Concrete
Flooring
Labour rate
for 5th Floor

189.000

Sqm

89.09

16838.01

189.000

Sqm

92.81

17541.09

Concrete
Flooring
Labour rate
for 6th Floor
Concrete
Flooring
Labour rate
for 7th Floor

189.000

Sqm

96.52

18242.28

189.000

Sqm

100.23

18943.47

Concrete
Flooring
Labour rate
for 8th Floor
Concrete
Flooring
Labour
rate
for 9th Floor

189.000

Sqm

103.94

19644.66

189.000

Sqm

107.65

20345.85

Concrete
Flooring
Labour rate
for 10th Floor
Concrete
Flooring
Labour
rate
for 11th Floor

189.000

Sqm

111.37

21048.93

189.000

Sqm

115.08

21750.12

Concrete
Flooring
Labour rate
for 12th Floor
Concrete
Flooring
Labour rate
for 13th Floor

189.000

Sqm

118.79

22451.31

189.000

Sqm

122.50

23152.5

Concrete
Flooring
Labour rate
for 14th Floor
Concrete
Flooring
Labour rate
for Basement,

189.000

Sqm

126.21

23853.69

68.500

Sqm

276.00

18906

Granite
Flooring
Labour rate
for Ground Floor,
Granite rate
Flooring
Labour
for Ist Floor,

102.500

Sqm

276.00

28290

41.000

Sqm

289.80

11881.8

Granite
Flooring
Labour rate
for 2nd Floor,
Granite
Flooring
Labour rate
for 3rd Floor,

41.000

Sqm

303.60

12447.6

41.000

Sqm

317.40

13013.4

Granite
Flooring
Labour rate
for 4th Floor,
Granite Flooring

41.000

Sqm

331.20

13579.2

Page number : 2/12

89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118

Labour rate for 5th Floor,


Granite rate
Flooring
Labour
for 6th Floor,

41.000

Sqm

345.00

14145

41.000

Sqm

358.80

14710.8

Granite
Flooring
Labour rate
for 7th Floor,
Granite
Flooring
Labour rate
for 8th Floor,

41.000

Sqm

372.60

15276.6

41.000

Sqm

386.40

15842.4

Granite
Flooring
Labour rate
for 9th Floor,
Granite
Flooring
Labour rate
for 10th Floor,

41.000

Sqm

400.20

16408.2

41.000

Sqm

414.00

16974

Granite
Flooring
Labour rate
for 11th Floor,
Granite rate
Flooring
Labour
for 12th Floor,

41.000

Sqm

427.80

17539.8

41.000

Sqm

441.60

18105.6

Granite
Flooring
Labour rate
for 13th Floor,
Granite rate
Flooring
Labour
for 14th Floor,

41.000

Sqm

455.40

18671.4

41.000

Sqm

469.20

19237.2

110.000

Rm

28.75

3162.5

4.000

Nos

1,495.00

5980

Granite
stone
in Kitchen
Labour rate
forfixing
Ist Floor,
Granite
stone
fixing
in Kitchen
Labour rate for 2nd Floor,

4.000

Nos

1,569.75

6279

4.000

Nos

1,644.50

6578

Granite
stone
in Kitchen
Labour rate
forfixing
3rd Floor,
Granite rate
stone
in Kitchen
Labour
forfixing
4th Floor,

4.000

Nos

1,719.25

6877

4.000

Nos

1,794.00

7176

Granite
stone
in Kitchen
Labour rate
forfixing
5th Floor,
Granite
stone
in Kitchen
Labour rate
forfixing
6th Floor,

4.000

Nos

1,868.75

7475

4.000

Nos

1,943.50

7774

Granite
stone
in Kitchen
Labour rate
forfixing
7th Floor,
Granite
stone
fixing
in Kitchen
Labour rate for 8th Floor,

4.000

Nos

2,018.25

8073

4.000

Nos

2,093.00

8372

Granite
stone
in Kitchen
Labour rate
forfixing
9th Floor,
Granite rate
stone
Kitchen
Labour
forfixing
10th in
Floor,

4.000

Nos

2,167.75

8671

4.000

Nos

2,242.50

8970

Granite
stone
Kitchen
Labour rate
forfixing
11th in
Floor,
Granite rate
stone
Kitchen
Labour
forfixing
12th in
Floor,

4.000

Nos

2,317.25

9269

4.000

Nos

2,392.00

9568

Granite
stone
Kitchen
Labour rate
forfixing
13th in
Floor,
Granite
stone
fixing
in
Kitchen
Labour rate for 14th Floor,

4.000

Nos

2,466.75

9867

4.000

Nos

2,541.50

10166

Granite
stone
in Kitchen
Labour rate
forfixing
Vitrified
Tile
Fixing
Labour rate for Ceremic Tile

3,354.000

Sqm

172.50

578565

1,620.000

Sqm

172.50

279450

Fixing
Floor
Labourinrate
for ceremic Tile
Fixing in for
Wall
Material
Trimix (M25)

3,135.000

Sqm

172.50

540787.5

Granite
Granite Flooring
moulding in kitchen
counter
Labour rate for Ground Floor,

52.500

Cum

2,174.54

114163.35

Labour Charges for Joint


Cutting
in Trimixfor
Flooring
Labour charges
Trimix

520.000

Rm

120.75

62790

52.500

Cum

690.00

36225

240.000

Each

1,398.54

335649.6

122

Flooring
(M-20)
Material for
Toilet Counter
Stone
RMC Supply charges (M-15)

113.000

Cum

2,415.00

272895

123

RMC Supply charges (M-25)

52.500

Cum

2,415.00

126787.5

124

Material for Cement Concrete


Flooring(1:2:4)
IPS Flooring
Material
for Granite

2,835.000

Sqm

189.75

537941.25

745.000

Sqm

1,407.28

1048423.6

Skirting,for
Dado
etc in Kitchen
Material
Granite
Counter
Material for Vitrified Tile

195.500

Sqm

1,399.15

273533.82

3,354.000

Sqm

523.61

1756187.94

1,620.000

Sqm

464.67

752765.4

3,135.000

Sqm

758.03

2376424.05

1,600,000.00

3200000

119
120
121

125
126
127
128
129

Material for Ceramic Glazed


Floor
Material
for Ceramic Glazed

Wall :LIFT INSTALLATION{A/A-3/LIFT}


PBS Name
130

Supply, Installation, Testing


and Commissioning
of LIFT as
PBS Name
:LPG WORKS{LPG/A3}

131
132
133
134

2.000

Set

Supply, fabrication, erection,


testing
commissioning
of
Supply,and
fabrication,
erection,

572.000

Meter

274.00

156728

60.000

Nos

325.00

19500

testing
commissioning
of
Supply,and
fabrication,
erection,
testing
and
commissioning
of
Supply, fabrication, erection,

60.000

Nos

800.00

48000

60.000

Nos

400.00

24000

2,505.00

150300

testing
commissioning
of
Supply,and
fabrication,
erection,
60.000 Nos
testing
and
commissioning
of
PBS Name :PAINTING&POLISHING{A/A-3/C/FINISH/PAINT}

135

136
137
138
139
140
141

Polishing on wood work with


Duco Paint
of approved
White
washing
with lime brand
to give
an
even shade
: New
work
Finishing
walls with
water
proofing
paint
of
Finishingcement
walls with
textured
exterior
required
shade
Finishingpaint
wallsofwith
Premium
Acrylic
Smooth
exterior
paint
Painting on G.S. sheet with

750.000

Sqm

161.00

120750

1,742.000

Sqm

23.00

40066

900.000

Sqm

69.00

62100

8,265.000

Sqm

207.00

1710855

21,825.000

Sqm

115.00

2509875

2,360.000

Sqm

97.75

230690

92.00

228804

synthetic
enamel paint of
PBS Name
:PLASTER{A/A-3/C/FINISHING/PLASTER}
142

Labour rate for 15mm cement


plastering

2,487.000

Sqm

Page number : 3/12

143
144

Labour rate for Chicken wire


mesh rate for gypsum
Labour

115.000

Sqm

11.50

1322.5

24,147.000

Sqm

149.50

3609976.5

8,265.000

Sqm

189.75

1568283.75

115.000

Sqm

31.05

3570.75

146

plastering
Labour charges for 18mm
External
Plastering
Material for
chicken wire mesh

147

Material for Gypsum plaster.

24,147.000

Sqm

141.45

3415593.15

148

Material for 18mm External


Plastering
Material for 15mm plastering

8,265.000

Sqm

75.07

620453.55

2,487.000

Sqm

63.30

157427.1

64,641.50

38845016.6

145

149

PBS Name :REINFORCEMENT{A/A-3/C/RCC/REINF}


150

Material for Reinforcement

151

Providing and fixing of dash


Fastner
Labour rate for Basement

1,200.000
130.960

Reinforcement
Labour rate for work
Ground Floor
Reinforcement
Labour rate for work
Ist Floor

152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168

600.930

Mt
Each

28.75

34500

Mt

2,875.00

376510

38.580

Mt

2,875.00

110917.5

35.990

Mt

3,018.75

108644.81

Reinforcement
Labour rate for work
2nd Floor
Reinforcement
Labour
rate for work
3rd Floor

35.390

Mt

3,162.50

111920.88

34.320

Mt

3,306.25

113470.5

Reinforcement
Labour rate for work
4th Floor
Reinforcement
Labour
rate for work
5th Floor

33.080

Mt

3,450.00

114126

31.810

Mt

3,593.75

114317.19

Reinforcement
Labour rate for work
6th Floor
Reinforcement
Labour rate for work
7th Floor

30.830

Mt

3,737.50

115227.12

29.770

Mt

3,881.25

115544.81

Reinforcement
Labour rate for work
8th Floor
Reinforcement
Labour rate for work
9th Floor

28.650

Mt

4,025.00

115316.25

28.950

Mt

4,168.75

120685.31

Reinforcement
Labour rate for work
10th Floor
Reinforcement
Labour
rate for work
11th Floor

28.140

Mt

4,312.50

121353.75

27.490

Mt

4,456.25

122502.31

Reinforcement
Labour rate for work
12th Floor
Reinforcement
Labour rate for work
13th Floor

27.490

Mt

4,600.00

126454

27.490

Mt

4,743.75

130405.69

Reinforcement
Labour rate for work
14th Floor
Reinforcement
Labour rate for work
Terrace

27.490

Mt

4,887.50

134357.38

4.500

Mt

5,031.25

22640.62

33000

Reinforcement
PBS Name
:RISINGwork
MAINS & BUS TRUNKING{A/A-3/E/RISING}
169
170
171
172
173
174

Supplying,installing,connecting
to existing Air Insulated
Supplying,installing,connecting

10.000

Meter

3,300.00

9.000

Meter

4,500.00

40500

to
existing Air Insulated
Supplying,installing,connecting
to existing Air Insulated
Supplying,installing,connecting

15.000

Meter

8,000.00

120000

12.000

Meter

9,000.00

108000

to
existing
Air Insulated
Design,
Fabrication,
Supply,
installation,
testing &
Design,Fabrication,Supply,Insta

15.000

Nos

16,000.00

240000

1.000

Nos

45,000.00

45000

499.000

Sqm

902.75

450472.25

llation,Testing
& commissioning
PBS Name
:ROOFING{A/A-3/C/ROOFING}
175

P/F false ceiling with 12 mm

thick:SHUTTERING{A/A-3/C/RCC/SHUTTERING}
plain/ semi perforated or
PBS Name
176

Material for Shuttering

25,817.000

Sqm

95.22

2458294.74

177

Labour rate for Basement


Shuttering
Labour
rate for Ground Floor

2,132.000

Sqm

92.00

196144

1,539.000

Sqm

92.00

141588

Shuttering
Labour rate for Ist Floor
Shuttering
Labour rate for 2nd Floor

1,539.000

Sqm

96.60

148667.4

1,539.000

Sqm

101.20

155746.8

Shuttering
Labour rate for 3rd Floor
Shuttering
Labour rate for 4th Floor

1,539.000

Sqm

105.80

162826.2

1,539.000

Sqm

110.40

169905.6

Shuttering
Labour rate for 5th Floor
Shuttering
Labour rate for 6th Floor

1,539.000

Sqm

115.00

176985

1,539.000

Sqm

119.60

184064.4

Shuttering
Labour rate for 7th Floor
Shuttering
Labour rate for 8th Floor

1,539.000

Sqm

124.20

191143.8

1,539.000

Sqm

128.80

198223.2

Shuttering
Labour rate for 9th Floor
Shuttering
Labour rate for 10th Floor

1,539.000

Sqm

133.40

205302.6

1,539.000

Sqm

138.00

212382

Shuttering
Labour rate for 11th Floor
Shuttering
Labour rate for 12th Floor

1,539.000

Sqm

142.60

219461.4

1,539.000

Sqm

147.20

226540.8

Shuttering
Labour rate for 13th Floor
Shuttering
Labour rate for 14th Floor

1,539.000

Sqm

151.80

233620.2

1,539.000

Sqm

156.40

240699.6

600.000

Sqm

161.00

96600

7,745.100

Sqm

46.00

356274.6

1,725.00

27600

178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194

Shuttering
Labour rate for Terrace
Shuttering
Labour Charges for Making of

board:STEEL
for shuttering
PBS Name
WORKS{A/A-3/C/STEEL WORKS}
195

Labour charges for Staircase


railing fixing

16.000

Nos

Page number : 4/12

196
197
198

Providing & fixing of 8 mm


Toughened
Glass ininRailing
Material
for Railing
Balcony

Sqm
Kg

10,397.000

Kg

1,380.00

414000

66.91

695663.27

11.50

119565.5

Nos

1,380.00

165600

597.000

Sqm

221.95

132504.15

597.000

Sqm

530.27

316571.19

Providing & laying Water


1,650.000 Sqm
Proofing
treatment
of Sunken.
PBS Name
:WATER
SUPPLY{A\A-3/PLUMBING/WS}

211.60

349140

7080000

199

Labour Rate for Fabrication of


Railing
Labour rate for Fixing of Railing

300.000
10,397.000
120.000

PBS Name :WATER PROOFING{A/A-3/C/WPF}


200
201

Labour rate for Brick Coba


Fixing
Material for Brick Coba

202

203
204
205
206
207
208
209
210

Internal Water Supply &


Drainge Water
Work for
Toilet&
Internal
Supply

240.000

Nos

29,500.00

60.000

Nos

8,500.00

510000

Drainge
forwater
Kitchen
External Work
vertical
Supply
for
toilet &
kitchen
External
vertical
Rain water Soil

270.000

Nos

5,200.00

1404000

270.000

Nos

5,100.00

1377000

&
Waste
Supply
for toilet bore
&
P/F
of 65mm
dia nominal
G.I.
pipes
complete
with
G.I.
P/F of 80 mm dia nominal bore

60.000

Meter

632.00

37920

56.000

Meter

842.14

47159.84

G.I.
pipes
complete
with G.I.
P/F of
160mm
dia uPVC
soil,
waste
for
P/F
of and
100vent
mm pipes
dia nominal

645.000

Meter

452.41

291804.45

42.000

Meter

1,150.34

48314.28

Supply ,Installtion, Testing With


all Fittings( Copper
Supply,laying
fixing Piping
of Slab

75.000

Nos

30,000.00

2250000

60.000

Per Flat

6,373.30

382398

Conduit
in Slab
withof
allwall
fitting(
Supply,laying
fixing
Conduit
in
wall
with
Suitable
Supply laying and fixing Wiring

60.000

Per Flat

10,802.86

648171.6

60.000

Per Flat

51,275.16

3076509.6

bore :WIRING{A/A-3/E/WIRING}
G.I. pipes complete with
PBS Name
211
212
213
214

in All:WOOD
ready lay &
PVC
Conduit
PBS Name
PVC{A/A-3/C/WOOD
& PVC}
215

Providing and fixing ISI marked


Fire Doorfor
shutters
frame of
Material
MIrandiwith
door

36.000

Sqm

4,600.00

165600

34.500

Cum

30,347.00

1046971.5

frames
Material for UPVC Door &
Windows
Labour Charges for UPVC Door

1,650.000

Sqm

1,912.80

3156120

218

1,650.000

Sqm

690.00

1138500

219

&
Window&Fixing
Providing
fixing of Hold Fasts

2,664.000

Each

103.50

275724

220

600.000

Each

13.80

8280

221

Labour Charges for fixing of


Wood
Saver
Material
for Wood Saver

600.000

Each

46.00

27600

222

Material for Flush Door

255.000

Sqm

2,354.82

600479.1

223

Providing and fixing Modular


Kitchen as
approved
Material
forper
Skin
Door

60.000

Each

287,500.00

17250000

216
217

224
225
226
227
228
229
230
231

960.000

Sqm

1,849.34

1775366.4

Providing and fixing aluminium


extruded
sectionfor
body
tubular
Labour charges
Main

62.000

Each

3,450.00

213900

60.000

Nos

138.00

8280

Door/Window
Frame
fixing
Labour charges
for Internal
Door/Window
Frame
fixingfixing
Labour rate for Skin door

600.000

Nos

126.50

75900

540.000

Each

172.50

93150

Labour rate for Skin door Locks


fixing charges for Flush Door
Labour

540.000

Each

92.00

49680

120.000

Sqm

172.50

20700

Fixing
lock. for Flush Door
Labourwith
charges
Fixing without lock.

120.000

Sqm

92.00

11040

Cost of Work
149658523.1
Retention
0
Discount [-]
0
Advance
Terms & Conditions

0
Total Cost
149658523.1

Thanking You,

For TULIP INFRATECH P LTD.

Page number : 5/12

Your's Faithfully
Prepared By
Dheerendra Awasthi

Verified By

Approved By

Accepted By

Dheerendra Awasthi

Page number : 6/12

CK-A

/VIOLET/2

an/2013

nditions.
Description

Page number : 7/12

Page number : 8/12

Page number : 9/12

Page number : 10/12

149658523.1

149658523.1

Page number : 11/12

Accepted By

Page number : 12/12