Professional Documents
Culture Documents
Tulip Infratech P LTD.: Work Order
Tulip Infratech P LTD.: Work Order
Work Order
Project
TULIP VIOLET
Block
BLOCK-A
Contractor
WO//VIOLET/2
Cont. Category
Civil
17/Jan/2013
Cont.PAN No.
88CCT3755E
Dear Sir,
Sub: Construction of Tower A3.
We are happy to confirm our order with you for the under mentioned subject to the following Terms and Conditions.
Sl No. Activity Name
W.O Qty
PBS Name :BRICK WORK{A/A-3/C/BW}
1
Unit
Rate
21.290
Cum
405.72
45.000
Cum
405.72
18257.4
for
Brickrate
Work
Labour
for 230mm
Ist Floor for
Brick
Work
Labour
rate 230mm
for 2nd Floor for
44.000
Cum
426.01
18744.44
44.000
Cum
446.29
19636.76
Brick
Work
Labour
rate 230mm
for 3rd Floor for
Brick
Work
Labour rate 230mm
for 4th Floor for
Brick
Work
Labour
rate 230mm
for 5th Floor for
44.000
Cum
466.58
20529.52
44.000
Cum
486.86
21421.84
44.000
Cum
507.15
22314.6
Brick
Work
Labour
rate 230mm
for 6th Floor for
Brick Work
Labour
rate 230mm
for 7th Floor for
44.000
Cum
527.44
23207.36
44.000
Cum
547.72
24099.68
Brick
Work
Labour
rate 230mm
for 8th Floor for
Brick
Work
Labour
rate 230mm
for 9th Floor for
44.000
Cum
568.01
24992.44
44.000
Cum
588.29
25884.76
Brick
Work
Labour
rate 230mm
for 10th Floor for
Brick
Work
Labour rate 230mm
for 11th Floor for
44.000
Cum
608.58
26777.52
44.000
Cum
628.87
27670.28
Brick
Work
Labour
rate 230mm
for 12th Floor for
Brick Work
Labour
rate 230mm
for 13th Floor for
44.000
Cum
649.15
28562.6
44.000
Cum
669.44
29455.36
Brick
Work
Labour
rate 230mm
for 14th Floor for
Brick
Work
Labour
rate 230mm
for Terrace for
44.000
Cum
689.72
30347.68
46.940
Cum
710.01
33327.87
Brick
Work
Labour
rate 230mm
for Basement for
Half
Brick
Masonery
& 70mm
Labour rate
for Ground
Floor for
26.010
Sqm
115.00
2991.15
409.360
Sqm
115.00
47076.4
Half
Brick
Masonery
& 70mm
Labour
rate
for Ist Floor
for Half
Brick Masonery
& 70mm
Labour
rate for 2nd
Floor brick
for
409.360
Sqm
120.75
49430.22
409.360
Sqm
126.50
51784.04
Half
Brick
Masonery
& 70mm
Labour
rate
for 3rd Floor
for
Half Brick
Masonery
& 70mm
Labour
rate
for 4th Floor
for
409.360
Sqm
132.25
54137.86
409.360
Sqm
138.00
56491.68
Half
Brick
Masonery
& 70mm
Labour
rate
for 5th Floor
for
Half
Brick
Masonery
& 70mm
Labour rate for 6th Floor
for
409.360
Sqm
143.75
58845.5
409.360
Sqm
149.50
61199.32
Half
Brick
Masonery
& 70mm
Labour
rate
for 7th Floor
for
Half
Brick
Masonery
& 70mm
Labour rate for 8th Floor
for
409.360
Sqm
155.25
63553.14
409.360
Sqm
161.00
65906.96
Half
Brick
Masonery
& 70mm
Labour
rate
for 9th Floor
for
Half Brick
Masonery
& 70mm
Labour
rate
for 10th Floor
for
409.360
Sqm
166.75
68260.78
409.360
Sqm
172.50
70614.6
Half
Brick
Masonery
& 70mm
Labour
rate
for 11th Floor
for
Half
Brick
Masonery
& 70mm
Labour
rate
for 12th Floor
for
409.360
Sqm
178.25
72968.42
409.360
Sqm
184.00
75322.24
Half
Brick
Masonery
& 70mm
Labour
rate
for 13th Floor
for
Half
Brick
Masonery
& 70mm
Labour rate for 14th Floor
for
409.360
Sqm
189.75
77676.06
409.360
Sqm
195.50
80029.88
730.610
Cum
2,927.61
2138941.14
35
Half
BrickforMasonery
& 70mm
Material
Brick Work
230mm
Material for half Brick Work &
6,166.340
70mm
Brick
Work
PBS Name :CEMENT CONCRETE{A/A-3/C/PCC}
Sqm
332.61
2050986.35
36
Cum
1,518.00
47361.6
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
31.200
8637.78
37
31.200
Cum
287.50
8970
38
31.200
Cum
2,415.00
75348
39
105.000
Cum
1,454.98
152772.9
40
105.000
Cum
2,415.00
253575
287.50
30187.5
41
42
43
44
3,620.000
Cum
2,174.54
7871834.8
455.000
Cum
287.50
130812.5
2,750.000
Cum
86.25
45
237187.5
870.000
Cum
287.50
46
47
250125
1,750.000
Cum
115.00
201250
615.000
Nos
126.50
77797.5
48
49
455.000
Cum
2,243.08
1020601.4
455.000
Cum
2,415.00
50
1098825
3,620.000
Cum
2,415.00
8742300
350.00
350
95,000.00
95000
52
CCTV Camera
1.000
Set
71.000
Sqm
23.00
1633
71.000
Sqm
51.75
3674.25
3,650.000
Cum
115.00
419750
450.000
Cum
115.00
51750
53600
earth:FIRE
(excluding
rock) in
PBS Name
FIGHTING{A/A-3/FIRE}
57
16.750
Nos
3,200.00
40.000
Nos
780.00
31200
COMMISSIONING
OF
SUPPLYING INSTALLING
&
COMMISSIONING
OF HOSE
SUPPLYING INSTALLING
&
16.750
Nos
1,850.00
30987.5
18.000
Nos
5,900.00
106200
COMMISSIONING
OF FIRE&
SUPPLYING INSTALLING
COMMISSIONING
OF FIRE&
SUPPLYING INSTALLING
18.000
Nos
710.00
12780
14.000
Nos
4,200.00
58800
COMMISSIONING
OF SUB&
SUPPLYING INSTALLING
COMMISSIONING
OF
SUPPLYING
INSTALLING
&
28.000
Nos
1,965.00
55020
15.000
Nos
1,400.00
21000
COMMISSIONING
OF
SUPPLYING INSTALLING
&
15.000
COMMISSIONING
OF
PBS Name
:FLOORING{A/A-3/C/FLOORING}
Nos
1,570.00
23550
1736212.5
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
2,745.000
Sqm
632.50
240.000
Each
862.50
207000
Counter
Stone
Labour rate
for Ground Floor
Concrete
Flooring
Labour rate
for Ist Floor
189.000
Sqm
74.75
14127.75
189.000
Sqm
77.96
14734.44
Concrete
Flooring
Labour rate
for 2nd Floor
Concrete
Flooring
Labour
rate
for 3rd Floor
189.000
Sqm
81.67
15435.63
189.000
Sqm
85.38
16136.82
Concrete
Flooring
Labour rate
for 4th Floor
Concrete
Flooring
Labour rate
for 5th Floor
189.000
Sqm
89.09
16838.01
189.000
Sqm
92.81
17541.09
Concrete
Flooring
Labour rate
for 6th Floor
Concrete
Flooring
Labour rate
for 7th Floor
189.000
Sqm
96.52
18242.28
189.000
Sqm
100.23
18943.47
Concrete
Flooring
Labour rate
for 8th Floor
Concrete
Flooring
Labour
rate
for 9th Floor
189.000
Sqm
103.94
19644.66
189.000
Sqm
107.65
20345.85
Concrete
Flooring
Labour rate
for 10th Floor
Concrete
Flooring
Labour
rate
for 11th Floor
189.000
Sqm
111.37
21048.93
189.000
Sqm
115.08
21750.12
Concrete
Flooring
Labour rate
for 12th Floor
Concrete
Flooring
Labour rate
for 13th Floor
189.000
Sqm
118.79
22451.31
189.000
Sqm
122.50
23152.5
Concrete
Flooring
Labour rate
for 14th Floor
Concrete
Flooring
Labour rate
for Basement,
189.000
Sqm
126.21
23853.69
68.500
Sqm
276.00
18906
Granite
Flooring
Labour rate
for Ground Floor,
Granite rate
Flooring
Labour
for Ist Floor,
102.500
Sqm
276.00
28290
41.000
Sqm
289.80
11881.8
Granite
Flooring
Labour rate
for 2nd Floor,
Granite
Flooring
Labour rate
for 3rd Floor,
41.000
Sqm
303.60
12447.6
41.000
Sqm
317.40
13013.4
Granite
Flooring
Labour rate
for 4th Floor,
Granite Flooring
41.000
Sqm
331.20
13579.2
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
41.000
Sqm
345.00
14145
41.000
Sqm
358.80
14710.8
Granite
Flooring
Labour rate
for 7th Floor,
Granite
Flooring
Labour rate
for 8th Floor,
41.000
Sqm
372.60
15276.6
41.000
Sqm
386.40
15842.4
Granite
Flooring
Labour rate
for 9th Floor,
Granite
Flooring
Labour rate
for 10th Floor,
41.000
Sqm
400.20
16408.2
41.000
Sqm
414.00
16974
Granite
Flooring
Labour rate
for 11th Floor,
Granite rate
Flooring
Labour
for 12th Floor,
41.000
Sqm
427.80
17539.8
41.000
Sqm
441.60
18105.6
Granite
Flooring
Labour rate
for 13th Floor,
Granite rate
Flooring
Labour
for 14th Floor,
41.000
Sqm
455.40
18671.4
41.000
Sqm
469.20
19237.2
110.000
Rm
28.75
3162.5
4.000
Nos
1,495.00
5980
Granite
stone
in Kitchen
Labour rate
forfixing
Ist Floor,
Granite
stone
fixing
in Kitchen
Labour rate for 2nd Floor,
4.000
Nos
1,569.75
6279
4.000
Nos
1,644.50
6578
Granite
stone
in Kitchen
Labour rate
forfixing
3rd Floor,
Granite rate
stone
in Kitchen
Labour
forfixing
4th Floor,
4.000
Nos
1,719.25
6877
4.000
Nos
1,794.00
7176
Granite
stone
in Kitchen
Labour rate
forfixing
5th Floor,
Granite
stone
in Kitchen
Labour rate
forfixing
6th Floor,
4.000
Nos
1,868.75
7475
4.000
Nos
1,943.50
7774
Granite
stone
in Kitchen
Labour rate
forfixing
7th Floor,
Granite
stone
fixing
in Kitchen
Labour rate for 8th Floor,
4.000
Nos
2,018.25
8073
4.000
Nos
2,093.00
8372
Granite
stone
in Kitchen
Labour rate
forfixing
9th Floor,
Granite rate
stone
Kitchen
Labour
forfixing
10th in
Floor,
4.000
Nos
2,167.75
8671
4.000
Nos
2,242.50
8970
Granite
stone
Kitchen
Labour rate
forfixing
11th in
Floor,
Granite rate
stone
Kitchen
Labour
forfixing
12th in
Floor,
4.000
Nos
2,317.25
9269
4.000
Nos
2,392.00
9568
Granite
stone
Kitchen
Labour rate
forfixing
13th in
Floor,
Granite
stone
fixing
in
Kitchen
Labour rate for 14th Floor,
4.000
Nos
2,466.75
9867
4.000
Nos
2,541.50
10166
Granite
stone
in Kitchen
Labour rate
forfixing
Vitrified
Tile
Fixing
Labour rate for Ceremic Tile
3,354.000
Sqm
172.50
578565
1,620.000
Sqm
172.50
279450
Fixing
Floor
Labourinrate
for ceremic Tile
Fixing in for
Wall
Material
Trimix (M25)
3,135.000
Sqm
172.50
540787.5
Granite
Granite Flooring
moulding in kitchen
counter
Labour rate for Ground Floor,
52.500
Cum
2,174.54
114163.35
520.000
Rm
120.75
62790
52.500
Cum
690.00
36225
240.000
Each
1,398.54
335649.6
122
Flooring
(M-20)
Material for
Toilet Counter
Stone
RMC Supply charges (M-15)
113.000
Cum
2,415.00
272895
123
52.500
Cum
2,415.00
126787.5
124
2,835.000
Sqm
189.75
537941.25
745.000
Sqm
1,407.28
1048423.6
Skirting,for
Dado
etc in Kitchen
Material
Granite
Counter
Material for Vitrified Tile
195.500
Sqm
1,399.15
273533.82
3,354.000
Sqm
523.61
1756187.94
1,620.000
Sqm
464.67
752765.4
3,135.000
Sqm
758.03
2376424.05
1,600,000.00
3200000
119
120
121
125
126
127
128
129
131
132
133
134
2.000
Set
572.000
Meter
274.00
156728
60.000
Nos
325.00
19500
testing
commissioning
of
Supply,and
fabrication,
erection,
testing
and
commissioning
of
Supply, fabrication, erection,
60.000
Nos
800.00
48000
60.000
Nos
400.00
24000
2,505.00
150300
testing
commissioning
of
Supply,and
fabrication,
erection,
60.000 Nos
testing
and
commissioning
of
PBS Name :PAINTING&POLISHING{A/A-3/C/FINISH/PAINT}
135
136
137
138
139
140
141
750.000
Sqm
161.00
120750
1,742.000
Sqm
23.00
40066
900.000
Sqm
69.00
62100
8,265.000
Sqm
207.00
1710855
21,825.000
Sqm
115.00
2509875
2,360.000
Sqm
97.75
230690
92.00
228804
synthetic
enamel paint of
PBS Name
:PLASTER{A/A-3/C/FINISHING/PLASTER}
142
2,487.000
Sqm
143
144
115.000
Sqm
11.50
1322.5
24,147.000
Sqm
149.50
3609976.5
8,265.000
Sqm
189.75
1568283.75
115.000
Sqm
31.05
3570.75
146
plastering
Labour charges for 18mm
External
Plastering
Material for
chicken wire mesh
147
24,147.000
Sqm
141.45
3415593.15
148
8,265.000
Sqm
75.07
620453.55
2,487.000
Sqm
63.30
157427.1
64,641.50
38845016.6
145
149
151
1,200.000
130.960
Reinforcement
Labour rate for work
Ground Floor
Reinforcement
Labour rate for work
Ist Floor
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
600.930
Mt
Each
28.75
34500
Mt
2,875.00
376510
38.580
Mt
2,875.00
110917.5
35.990
Mt
3,018.75
108644.81
Reinforcement
Labour rate for work
2nd Floor
Reinforcement
Labour
rate for work
3rd Floor
35.390
Mt
3,162.50
111920.88
34.320
Mt
3,306.25
113470.5
Reinforcement
Labour rate for work
4th Floor
Reinforcement
Labour
rate for work
5th Floor
33.080
Mt
3,450.00
114126
31.810
Mt
3,593.75
114317.19
Reinforcement
Labour rate for work
6th Floor
Reinforcement
Labour rate for work
7th Floor
30.830
Mt
3,737.50
115227.12
29.770
Mt
3,881.25
115544.81
Reinforcement
Labour rate for work
8th Floor
Reinforcement
Labour rate for work
9th Floor
28.650
Mt
4,025.00
115316.25
28.950
Mt
4,168.75
120685.31
Reinforcement
Labour rate for work
10th Floor
Reinforcement
Labour
rate for work
11th Floor
28.140
Mt
4,312.50
121353.75
27.490
Mt
4,456.25
122502.31
Reinforcement
Labour rate for work
12th Floor
Reinforcement
Labour rate for work
13th Floor
27.490
Mt
4,600.00
126454
27.490
Mt
4,743.75
130405.69
Reinforcement
Labour rate for work
14th Floor
Reinforcement
Labour rate for work
Terrace
27.490
Mt
4,887.50
134357.38
4.500
Mt
5,031.25
22640.62
33000
Reinforcement
PBS Name
:RISINGwork
MAINS & BUS TRUNKING{A/A-3/E/RISING}
169
170
171
172
173
174
Supplying,installing,connecting
to existing Air Insulated
Supplying,installing,connecting
10.000
Meter
3,300.00
9.000
Meter
4,500.00
40500
to
existing Air Insulated
Supplying,installing,connecting
to existing Air Insulated
Supplying,installing,connecting
15.000
Meter
8,000.00
120000
12.000
Meter
9,000.00
108000
to
existing
Air Insulated
Design,
Fabrication,
Supply,
installation,
testing &
Design,Fabrication,Supply,Insta
15.000
Nos
16,000.00
240000
1.000
Nos
45,000.00
45000
499.000
Sqm
902.75
450472.25
llation,Testing
& commissioning
PBS Name
:ROOFING{A/A-3/C/ROOFING}
175
thick:SHUTTERING{A/A-3/C/RCC/SHUTTERING}
plain/ semi perforated or
PBS Name
176
25,817.000
Sqm
95.22
2458294.74
177
2,132.000
Sqm
92.00
196144
1,539.000
Sqm
92.00
141588
Shuttering
Labour rate for Ist Floor
Shuttering
Labour rate for 2nd Floor
1,539.000
Sqm
96.60
148667.4
1,539.000
Sqm
101.20
155746.8
Shuttering
Labour rate for 3rd Floor
Shuttering
Labour rate for 4th Floor
1,539.000
Sqm
105.80
162826.2
1,539.000
Sqm
110.40
169905.6
Shuttering
Labour rate for 5th Floor
Shuttering
Labour rate for 6th Floor
1,539.000
Sqm
115.00
176985
1,539.000
Sqm
119.60
184064.4
Shuttering
Labour rate for 7th Floor
Shuttering
Labour rate for 8th Floor
1,539.000
Sqm
124.20
191143.8
1,539.000
Sqm
128.80
198223.2
Shuttering
Labour rate for 9th Floor
Shuttering
Labour rate for 10th Floor
1,539.000
Sqm
133.40
205302.6
1,539.000
Sqm
138.00
212382
Shuttering
Labour rate for 11th Floor
Shuttering
Labour rate for 12th Floor
1,539.000
Sqm
142.60
219461.4
1,539.000
Sqm
147.20
226540.8
Shuttering
Labour rate for 13th Floor
Shuttering
Labour rate for 14th Floor
1,539.000
Sqm
151.80
233620.2
1,539.000
Sqm
156.40
240699.6
600.000
Sqm
161.00
96600
7,745.100
Sqm
46.00
356274.6
1,725.00
27600
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
Shuttering
Labour rate for Terrace
Shuttering
Labour Charges for Making of
board:STEEL
for shuttering
PBS Name
WORKS{A/A-3/C/STEEL WORKS}
195
16.000
Nos
196
197
198
Sqm
Kg
10,397.000
Kg
1,380.00
414000
66.91
695663.27
11.50
119565.5
Nos
1,380.00
165600
597.000
Sqm
221.95
132504.15
597.000
Sqm
530.27
316571.19
211.60
349140
7080000
199
300.000
10,397.000
120.000
202
203
204
205
206
207
208
209
210
240.000
Nos
29,500.00
60.000
Nos
8,500.00
510000
Drainge
forwater
Kitchen
External Work
vertical
Supply
for
toilet &
kitchen
External
vertical
Rain water Soil
270.000
Nos
5,200.00
1404000
270.000
Nos
5,100.00
1377000
&
Waste
Supply
for toilet bore
&
P/F
of 65mm
dia nominal
G.I.
pipes
complete
with
G.I.
P/F of 80 mm dia nominal bore
60.000
Meter
632.00
37920
56.000
Meter
842.14
47159.84
G.I.
pipes
complete
with G.I.
P/F of
160mm
dia uPVC
soil,
waste
for
P/F
of and
100vent
mm pipes
dia nominal
645.000
Meter
452.41
291804.45
42.000
Meter
1,150.34
48314.28
75.000
Nos
30,000.00
2250000
60.000
Per Flat
6,373.30
382398
Conduit
in Slab
withof
allwall
fitting(
Supply,laying
fixing
Conduit
in
wall
with
Suitable
Supply laying and fixing Wiring
60.000
Per Flat
10,802.86
648171.6
60.000
Per Flat
51,275.16
3076509.6
bore :WIRING{A/A-3/E/WIRING}
G.I. pipes complete with
PBS Name
211
212
213
214
in All:WOOD
ready lay &
PVC
Conduit
PBS Name
PVC{A/A-3/C/WOOD
& PVC}
215
36.000
Sqm
4,600.00
165600
34.500
Cum
30,347.00
1046971.5
frames
Material for UPVC Door &
Windows
Labour Charges for UPVC Door
1,650.000
Sqm
1,912.80
3156120
218
1,650.000
Sqm
690.00
1138500
219
&
Window&Fixing
Providing
fixing of Hold Fasts
2,664.000
Each
103.50
275724
220
600.000
Each
13.80
8280
221
600.000
Each
46.00
27600
222
255.000
Sqm
2,354.82
600479.1
223
60.000
Each
287,500.00
17250000
216
217
224
225
226
227
228
229
230
231
960.000
Sqm
1,849.34
1775366.4
62.000
Each
3,450.00
213900
60.000
Nos
138.00
8280
Door/Window
Frame
fixing
Labour charges
for Internal
Door/Window
Frame
fixingfixing
Labour rate for Skin door
600.000
Nos
126.50
75900
540.000
Each
172.50
93150
540.000
Each
92.00
49680
120.000
Sqm
172.50
20700
Fixing
lock. for Flush Door
Labourwith
charges
Fixing without lock.
120.000
Sqm
92.00
11040
Cost of Work
149658523.1
Retention
0
Discount [-]
0
Advance
Terms & Conditions
0
Total Cost
149658523.1
Thanking You,
Your's Faithfully
Prepared By
Dheerendra Awasthi
Verified By
Approved By
Accepted By
Dheerendra Awasthi
CK-A
/VIOLET/2
an/2013
nditions.
Description
149658523.1
149658523.1
Accepted By