John P. Murnyack
Power Plant Retrofits Vendor/Supplier Management Environmental/Construction Permitting Instituting Cost Conservation Measures Implementing Quality Control Measures
Project Safety Programs Multiple Project Management Structural Project Engineering Managing Multi-Disciplinary Teams Multi-Million-Dollar Project Budgeting
Career Highlights
Entrusted by NRG senior management with the daily field management for a combined $600+ million of new environmental air quality improvement projects at 3 separate coal fired power facilities that were completed safely, ontime and on-budget. Engineered and managed construction of the civil, structural and environmental components of more than $30+ million of new furnacing production at Unifrax Corporation. Additionally, managed all aspects of the design and construction of a $12 million facility expansion and paper production line installation. Held sole responsibility at AECOM for securing all construction permitting for more than $300 million of new environmental air quality projects. Managed construction of new components for 2 production lines as part of a $1+ billion new heavy construction initiative at 2 GM facilities.
Benefit Statement
A convincing and credible communicator with a demonstrated 20+ year track record of accomplishments in managing multimillion-dollar environmental retrofit projects, power plant construction/power transmission work, and managing highperformance contract teams that consistently maintained construction costs with daily on-site project supervision.
Formal Presentation Skills Project Leadership & Scheduling High Standards of Ethics & Integrity Amending Project Plans According to Economic Cycles
Client Relationship Management (CRM) Evaluating & Addressing Risk Exposure Facilitating Inter-Departmental Cooperation Managing all Phases of a Construction Lifecycle
2007 to 2012
Construction Manager-NRG Power LLC, Indian River Station, Dagsboro, Delaware (2010-2012) Scope of duties focus on oversight management of CMs field construction activities for the Indian River Environmental Retrofit AQCS project from initial site mobilization, foundation construction, mechanical and electrical power installation including tie in to power distribution substation
John P. Murnyack
Page Two
Entrusted by senior project manager with reviewing a wide-array of contracts and subsequent approval of power plant construction contractor payment request. Established a wide-array of comprehensive procedures that focused on establishing and monitoring all aspects of CMs constructions site safety programs that recorded no lost time accident during the entire 2 year period of the project.
Construction Manager-NRG Power LLC, Huntley Station, Tonawanda, New York & Dunkirk Station, Dunkirk, New York (2007-2009) Primary duties focused on the management of field construction activities for the Huntley Dunkirk Environmental Retrofit EPC project from initial site mobilization, foundation construction, mechanical equipment and electrical power installation tie into power distribution substation. Responsible for securing all building and special variance permits, including the DEC and Corps of Engineers on construction related matters.
Conducted weekly construction coordination meetings with all contractors as well as documented daily construction activities for onsite personnel. Consequently, charged with processing and documenting all RFIs, FCNs and NCRs, including validating all contractor payment requests.
Prior positions include Project Manager, Structural Design Engineer, and Structural Project Engineer