A PROJECT REPORT

ON

EMPLOYEES SATISFACTION LEVEL AT M.E.S.Pvt.Ltd

This Project Report is submitted in partial fulfillment for the requirement of BACHLOR IN BUSINESS ADMINISTRATION from DR. M.P.S. GROUP OF BUSINESS STUDIES DR. B.R. AMBEDKAR UNIVERSITY, AGRA

Submitted to:Mr. Shekhar Gupta (H.O.D of management dept.)

Submitted by:Surbhi garg(100761) BBA- 5th sem

DR. MPS COLLEGE OF BUSINESS STUDIES, AGRA

PREFACE
The summer training is an integrating part of BBA course during the course of trainees are expected to use and apply their academic knowledge and gain a valuable insight into cooperate culture with all its environment operation complexities. The said training offers valuable opportunities to trainees to meet their academic knowledge with real world situation. I undertook the said training; I visited each department of the industry and concentrated my training in marketing where my focus was on understanding the various policies and procedure followed during training and development of the employees and their impact on various employees. In this recent report, I have put my best efforts to compile the information to the highest level aacuracy.

SURBHI GARG

ACKNOWLEDGEMENT
I owe a great thanks to a great many people who helped , supported me while I was preparing this project.

My deepest thanks to MR. RAJIV RATAN, Director of Dr. MPS COLLEGE OF BUSINESS STUDIES for his constant encouragement and stimulating atmosphere provided to me.

A sincere thanks to Mr. PAWAN GUPTA who helped me with the smallest issues in the project, Mr. SHEKHAR GUPTA (H.O.D. Management) & Mr. RAHUL SHARMA (cordinator of BBA ) for his valuable advice.

I also extent my sincere thanks to my family and friends for their encouragement and support. (SURBHI GARG)

COLLEGE CERTIFICATE
This is to certify to Surbhi garg student of BBA, Batch 2010-2013 has conducted empirical research study and prepare this research report on EMPLOYEES SATISFACTION LEVEL AT M.E.S.P.L. This research report is submitted in partial fulfillment of the award of BBA degree, Dr.Bhim Rao Ambedkar University, Agra. His work is original and authentic.
Mr. Shekhar Gupta HOD (Management)

DECLARATION
I SURBHI GARG do hereby declare that the project entitled EMPLOYEE SATISFACTION LEVEL AT M.E.S.PVT.LTD carried out at M.E.S.P.L., AGRA is an original work carried out by me under the guidance of Mr. Pradeep Singh (External Guide) and Mr. Vinay banshal (Internal Guide) and has not been presented earlier for any other university for the award of degree in BACHLOR OF BUSINESS ADMINISTRATION

Place: Agra Date :

SURBHI GARG

CONTENTS
S.No
01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. 12. 13. 14. 15. 16.

TITLE
Objective of the study Introduction Profile of promoter and management Vision and mission Area of Research Organization chart Refrence list of project Quality assurance along with work practices Inspection and work plan Quality control List of machinery and testing equipments Methodology Data interpretation Photo gallery Strategic planning questionnaire Bibliography

PAGE NO.

OBJECTIVES

PRIMARY OBJECTIVE To know about the satisfaction level of employees at M.E.S.P.L

SECONDARY OBJECTIVE

To know about the working environment of the M.E.S.P.L

Introduction
Welcome to MES Pvt. Ltd:Major Electrical Solutions Private Limited was evolved to match the growth of the Organization to meet the requirement of medium and large turnkey electrical projects. Board of Directors supported by well experienced Managerial Team manages the company professionally. MESPL believes in long-term relationship with its customers through quality and timely completion of projects. Thecompany is capable to carryout projects right from Srinagar in North to Kanyakumari in South.

Area of Specialization:HT, LT & Sub Station Works Division

HT, LT & Sub-Station Work Division of MESPL Handle All Sub-Station Project of Rural Electrification work, Substation Work, Overhead Transmission Line & DTR Packages

High Mast, Street Lighting & Toll Plaza Installation Division

High Mast, Street Lighting & Toll Plaza Service Providers in All our India. MESPL has work with M/s. Aster Teleservices Pvt Ltd for Foundation and Erection of High Mast & Street Light Pole of different size at Punjab Punjab, Dehradun , Haridwar , Patna & Andhra Pradesh Pradesh, Karnataka , Karnataka. High Mast, Street Lighting & Toll Plaza Electrical Division of Major Electrical are engaged in providing Foundation and Erection services to the High Mast and Street Light Pole land based based.

Industrial & Commercial Electrical Division

Industrial and Commercial Electricals Division of Major Electrical Solutions Private Limited handles electrical contracts of medium and large Industrial as well as Commercial Establishments , Hospitals , Centers for Software Facility , Mega and Hyper Retail business centers , Banking/Financial Services.

Services:Electrical Design Services - Engineering Consultants

Electrical Design Outsourcing is a leading electrical engineering consultant delivers high quality and cost-effective computer-aided designing and drafting (CADD) services through a team of highly skilled and qualified professionals. We provide electrical engineering services for several industries and applications. Electrical design outsourcing provides solutions for a dynamic environment where business and technology strategies combine to meet the unique demands of each client. We develop schemes and designs for electrical engineering needs depending on clients' requirements. Our electrical engineering skills and strong resource base combined with our flexible in-house capacity helps us in providing wide-ranging services, ensuring stability, reliability and design quality. Our work culture is built on a strong base of values, ethics and positive attitude, which contribute to our accomplishment, productivity, and retention. We are committed to providing reliable, quality and total solution to our customers.

The core services provided by Electrical Design Outsourcing are the following: Electrical Designing and Drafting Services Electrical Power Distribution Earthing and Lightning Protection Systems Industrial Process Control Lighting and Illumination System Electrical Schematics Electrical Wiring Diagrams Detailing Electrical Site Plans Lighting Fixture Schedules Outdoor Lighting Plan Selection of Wire Size, Lighting Fixture, and MCB Rating Our Electrical Drafting Services include: Wiring diagrams Interior and exterior lighting Fire alarm systems Power distribution systems Emergency and exit lighting Ladder logic drawings Electrical power and lighting plans

We are one-stop solution for specialized services in the domain of electrical engineering. With our strong engineering background, expertise and understanding of electrical engineering products, we are consistently trying to provide highly specialized engineering services to clients around the world.

Our company rests on the following core values: 1. Customer Satisfaction is our utmost priority 2. We consider the execution and delivery of all projects vitally important 3. We have responsive Customer Service 4. Consistency in meeting deadlines, quality, and accuracy 5. Integrity and transparency can be seen through the project cycle. We are always in pursuit of excellence We aim to grow with our clients in a mutually beneficial relationship

Maintain Confidentiality of the client data:Security:We work together to continuously improve and reach our full potential. We always look forward to an opportunity to assist you.

Electrical Contractors:-

Owing to its superior quality of service delivery MESPL has emerged as one of the leading Electrical Contractors in India . One of the chief reasons why MESPL has emerged as one of the leading electrical contractors in the country is because we strive to stay one step ahead of competition. We always keep ourselves up-to-date with the latest technology in the electrical engineering domain and keep an eye on the latest trends prevailing in our field. Our vast experience in catering to organizations from diverse industry verticals would prove very handy for turnkey projects. Enterprises who are looking for reliable quality technicians for their maintenance needs would find the caliber of our team members much better than competition. So if you are a or builder involved in constructing new homes or commercial facilities and are looking for a vendor for your electrical/facility management needs then MESPL is the right choice for you. Please call/email us for a free quote and you will find that MESPL offers the best combination of performance, reliability and cost.

Electrical and Allied Work:-

MESPL has been engaged in the field of Electrical and Allied work for nearly two decades and in this time period we have developed a reputation for integrity and quality amongst our customers. Repeat customers comprise a substantial part of our business and over the years, the scope of our work has expanded to include not just electrical work but other allied work like Air Conditioning, Networking, P.A. Systems etc. As word of MESPL reliability and dependability spread, we started getting orders from large corporates based in cities outside NCR to include places like Punjab, Dehradun , Haridwar , Patna & Andhra Pradesh, Karnataka etc. In today's highly competitive marketplace a company is identified by its client portfolio and MESPL's impressive client list is a testimony to its standing in the Electrical Engineering space. Majority of our clients testify that what brings them back is the knowledgeable service and customer-friendly attitude of our team members. We have the

confidence that a job done right has the potential to bring customers back and prompt follow-up of customer base helps build a loyal customer base. Based on these fundamental beliefs we have created a niche for ourselves in the mindscape of our patrons.

Networking / Server / LAN Wiring:-

MESPL helps enterprises enhance their productivity by providing real time access to information through seamless connectivity. Our state-of the art networking services have been designed keeping in mind both the wired and the next generation mobile/wireless environments. By leveraging MESPL, networking expertise organizations can connect to their geographically dispersed workforce including suppliers and vendors and communicate with them in real-time. When you choose MESPL for your networking needs, you can be sure that with our vast experience in network configuration and installation you can be assured of a reliable and economical solution for your network. Trouble shooting services provided by MESPL have helped organizations reduce their down time to a bare minimum and maintain their productivity. Our trouble shooting methodology involves identifying the source of the problem, which is

interfering with productivity and then rectifying it in the shortest possible time to ensure maximum uptime for our client's network. Apart from this, MESPL engineers also have the necessary expertise for performing server room connectivity as well as structured cabling for voice and data.

Fire Alarm and Smoke Detection Systems:-

MESPL bouquet of offerings is not limited to installation of electrical systems only. We also undertake design and installation of fire alarm and smoke detection systems for residential and commercial buildings. We also have the experience and expertise to successfully deploy fire-fighting systems in commercial enterprises. Our array of Fire / Smoke Detection and Automation Consultancy services include installation of not just conventional fire alarm systems but also Analogue Addressable Fire Alarm Systems and Building Escaping Singes. Conventional systems fail if there is deterioration in the sensitivity of the smoke detectors. In such situations analogue addressable detectors succeed as they give an output signal representing the value of the sensed phenomenon. This helps in early detection and safety of the life and property of the occupants of a building.

We also undertake maintenance of the fire alarm and smoke detection systems that we install and conduct routine checks to ensure that detection and early warning systems are functional and will work effectively during an emergency.

Client List: GMR 5 STAR HOTEL INTERNATIONAL AIRPORT, HYDERABAD. IVRCL INFRASTRUCTURE & PROJECT LTD, JALANDHAR-AMRITSAR TOLL PLAZA. LANCO 2-TOLL PLAZA NH-48, BANGLURU. JINDAL STEEL POWER PLANT, JAJAPUR ORISSA. SAHARA RESIDENCIAL APARTMENT, INDORE. ASTER PEB & SHELTER BUILDING AT HYDERABAD. KEMTYFALL, DEHRADUN ASTER HIGH MAST. MILESTONE ENGINEERING (P) LTD, POWER PLANT, ORISSA. NV-GROUP, WIN FACT0RY, RAJPURA PUNJAB. ARSHIYA GROUP 40 MTR MONOPOLE, KHURJA U.P

Profile of promoters & Management


Major electrical was promoted by P. K. Pushkar, a young and ambitious Engineer in 2003. Hard work, sincere Efforts in meeting the clients project Targets and on time completion helped In getting repeat orders. Major electrical solutions private Limited was evolved to match the Growth of the organization to meet the Requirement of medium and large Turnkey electrical projects. Board of Directors supported by well Experienced managerial team manages The company professionally. Mespl believes in long-term Relationship with its customers through Quality and timely completion of Projects. The company is capable to Carryout projects right from srinagar In north to kanyakumari in south. The corporate office at agra has all Infrastructure and resources to engineer Any project.

VISION:-

To be the preferred Engineering & Contracting partner, fulfilling our Customer needs in Electrical Engineering.

MISSION:-

We shall adopt professional and strong engineering knowledge & practices to partner our customers to meet their business goals.

Area of Specialization:High Mast Lighting & Street Lighting Division of MESPL handles Foundation & Total Erection In All our India. & Industrial and Commercial Electricals Division of Major Electrical Solutions Private Limited handles electrical contracts of medium and large Industrial as well as Commercial Establishments , Hospitals , Centers for Software Facility , Mega and Hyper Retail business centers , Banking/Financial Services.

The field of activity covers :


LT/HT Electrical installations from concept to commissioning. We undertake complete range of services including engineering design, installation and commissioning of the Electrical needs of industrial & commercial buildings, Hospitals, Hotels, Mega & Hyper Retail Business Outlets, Software Service facilities and Office Complex. The activity also covers obtaining power sanction and also sanction for servicing power to any building after obtaining approval from the local electrical authority. Interact & co-ordinate with other Building

Services to deliver a total solution. Street Lighting & High Mast Electrical Division of Major Electrical are engaged in providing Foundation and Erection services to the High Mast and Street Light Pole land based. High Mast & Street Lighting Service Providers in All our India. MESPL has work with M/s. Aster Teleservices Pvt Ltd for Foundation and Erection of High Mast & Street Light Pole of different size at Punjab, Dehradun , Haridwar , Patna & Andhra Pradesh, Karnataka.

ORGANISATION CHART:MESPL DIRECTOR MARKETING DEPARTMENT PROJECT MANAGEMENT SUPPORT SERVICES ENGINEERING SERVICES PROJECT PROGRESS QUALITY SERVICES FINANCE HUMAN RESOURCE MATERIAL MANAGEMENT

REFERENCE LIST OF PROJECTS


GMR 5 STAR HOTEL INTERNATIONAL AIRPORT, HYDERABAD. IVRCL INFRASTRUCTURE & PROJECT LTD, JALANDHARAMRITSAR TOLL PLAZA. LANCO 2-TOLL PLAZA NH-48, BANGLURU. JINDAL STEEL POWER PLANT, JAJAPUR ORISSA. SAHARA RESIDENCIAL APARTMENT, INDORE. ASTER PEB & SHELTER BUILDING AT HYDERABAD. KEMTYFALL, DEHRADUN ASTER HIGH MAST. MILESTONE ENGINEERING (P) LTD, POWER PLANT, ORISSA. NV-GROUP, WIN FACT0RY, RAJPURA PUNJAB. ARSHIYA GROUP 40 MTR MONOPOLE, KHURJA U.P.

QUALITY ASSURANCE AND QUALITY CONTROL ALONG WITH PROPOSED WORK PRACTICES, INSPECTION & TEST PLAN:This Chapter deals with the Quality Assurance & Quality Control and Work Practices adopted by us. Our Company firmly believes in Quality and the concepts of Quality Assurance & Quality Control are well understood by us. The important concept of these two terms are furnished below.

QUALITY:Totality of features and characteristics of a product or a service that bear on its ability to satisfy the stated and implied needs.

QUALITY ASSURANCE:All those planned and systematic actions necessary to provide adequate confidence that product or a service will satisfy given requirement for quality.

QUALITY CONTROL: The Operational techniques and activities that are used to fulfill the requirements for quality. We are following the below mentioned Work Practices to achieve Quality Assurance and Quality Control for the electrical work carried out by us. Quality assurance can be mainly attributed to the materials

supplied to site and Quality control plan will be for conversion of material supplied to work. Quality Assurance starts from the ordering of the materials from our Purchase Department. The order to the suppliers will contain the entire specification as indicated in Bill of Quantity and as per the particular specification of the Tender Document. The supplier will be given strict instructions that the material supplied by him should be in accordance with the specification. For this the supplier will be asked to produce necessary type Test Certificate, Manuals and any other relevant document along with the materials supplied. This will be inspected in the Shop Floor at various stages by our Engineers to make sure that the quality is maintained by the Fabricator. After the Initial order is given to the various suppliers, final working drawings will be collected from the consultants / clients and detailed assessment for each item of work will be made as per the schemes and as per the layout drawings- for example like cable schedule, light fitting schedule, MCB DB schedule. Any changes in the schematic drawings of panels and the quantities and charges / amendments will be informed to the Supplier along with a copy to the Clients / Consultants. This is to ensure that there is no additional or excess material supplied as per the requirement and as per the final working drawing. Regarding the materials supplied to the site, the material will be checked for the quantity mentioned in the suppliers invoice. All the materials received at the site will be visually checked for any physical or mechanical damages and for missing or short supply items, the same will be reported to the office to take necessary action.

The materials received at site will be properly stored and identification tags will be provided before issuing the material for the work. The same will be physically checked and issued. For all the major equipment supplied by us, necessary factory test certificates, instruction manuals, wherever applicable will be documented and copy of the same along with the final as built drawings will be submitted to the consultants/ clients for their records and maintenance. The Quality assurance for various materials supplied will be checked as per the following procedure.

WIRES: Size and color coding of the wires as per the suppliers invoice will be checked. Gauge of the wire will be checked. Continuity of the wire coil will be checked before issuing for work.

LIGHT FITTINGS: Quantity as mentioned in the Invoice will be physically checked. Cat. Nos. of the light fittings mentioned on each case will be checked and properly stored as per the individual type of light fittings, so that it can be easily taken out for erection. Tubes and lamps will be separately stored. Light fittings will be checked physically for any damage or breakage for taking action for replacement. M.V. SWITCHBOARDS / MCB DBs / BBTs: All DBs Switch Boards will be checked for their sizes / No. of

ways as per order and as per BOQ. All the Switch Boards and DBs will be checked for physical correctness. If there is any damage or breakage, the same will be intimated to the Office for necessary corrections. For all L.T. Switch Boards, the fabricators general arrangement drawings as per the final schematic drawings issued will be submitted for approval to the Consultants / Clients. Any comments indicated in the Approved drawings will be incorporated and it will be resubmitted for final approvals and all these will documented. The revised final approved drawings will be submitted to the consultants and clients. After the panel boards are fabricated, the final as built drawings will be submitted to the consultants and clients for their records.

QUALITY SYSTEM:QUALITY CONTROL FOR VARIOUS ACTIVITIES OF WORK CONDUIT LAYING:


Conducting Recessed Conduit System: The Inside surface and ends of MS conduits and threads and fittings will be cleaned and made smooth by removing the burrs arising out of threading at site. After the conduits, junction boxes, outlet boxes etc., are fixed in position, their outlets will be properly plugged with PVC bushings or with any other suitable materials so that water, cement mortar , Vermins or any other foreign material do not enter into the conduits. To facilitate the easy drawing of wires in the conduit, necessary GI pull wires will be inserted into the conduit immediately after shuttering is removed. Surface Conduit System: In this system the conduits will be run in square & symmetrical lines. Before the conduits are installed the conduit routes shall be marked at site and approval of the Architect / Clients representative will be obtained. The conduit shall be fixed by GI spacer saddles secured by suitable plugs / teak wood plugs at an interval of not more than 1 meter. The conduits shall be joined by means of screwed couplers and screwed accessories. For long distance straight run of conduits, inspection type bends or pull boxes will be provided. Adopter boxes will be used at junction / crossings of surface conduits.

WIRING:Wiring will be carried out as per the final approval drawings. After the wiring, following tests will be carried out on all types of wiring energizing the installation: 1. Insulation resistance test: Insulation resistance test will be

measured using 500 Volts Megger between the following points a) Phase and Neutral conductors with all fuses in position and all switches in closed condition and main switch in Off position, lamps and other devices removed. b) Between the Earth and the whole system of conductors with all fuses in place, all switches closed and all lamps in position. 2. Electrical continuity test: Each and every circuit will be tested for electrical continuity by using multimeter. 3. Earth continuity test: Earth continuity including metal conduit will be tested for electrical continuity and the resistance of the same along with the earthing grid measured from the connection with the earth electrode to any point in the earth continuity conductor and the complete installation shall not exceed 1 Ohm. 4. Switch Polarity Test and Functional Test: Fixing of Light Fixtures: The light fixtures and fittings shall be assembled and installed in position and ready for service, in accordance with details, drawings, manufacturers instructions and to the satisfaction of the consultants / clients. All suspended fixtures shall bemounted rigid and fixed in position in accordance with drawings, instructions and the approval of the Consultant / Clients. Fixtures will be suspended true to alignment, plumb level and capable of resisting all lateral and vertical forces and shall be fixed as required. Before fixing the light fixture, each fitting will be checked for physical damages. Each fittings will be provided with lamps and tubes and it will be physically checked for its correctness by giving the power to make sure that the light fittings is in working condition and then it will be taken for erection. Before erecting the light fitting, thread line will be marked for its straight line and correctness. After the fittings are erected, the

same will be covered with the plastic covers till it is energized to prevent dust accumulation or damage. Before energizing, all the covers will be removed and the fittings will be cleaned for any dust collection.

HT & LT CABLE:

Instruction for Safe Handling of Cable Drums: Please check the cable drums for any physical damage. Also check that the cable and seals are proper and in position. In case of any damage and suspected shortage, take open delivery from the transporter and inform the insurance co. with copy to the Manufacturer. In case of any damages / shortage, do not give the clear receipt to the carriers Loading / Unloading of the drum to or from Truck should be done by Crane or use of a ramp. Flanges shall be kept always in up right position during storage and handling and paying off or during Transportation of drum. Use pair of jacks and shaft for mounting cable drums before paying off. Roll the drum only in the direction of printed arrow on the Drum flanges and only for short distances. Do not lay the damaged cable before repair and testing. While laying off Cable from Mounted Drum, the cable drum shall rotate in the direction opposite to that of the arrow marked on the drum flanges. Cable end shall be taken from the top side of the mounted drum of cable and never from the Bottom side. Ensure proper security for cable from damage and fire during storage. The Cables supplied will be wound on drums in convenient lengths, the length, size, type, etc., marked on the drum. The Cable drum will be slung by a bar or spindle through the center of the drum. Cable jacks will be used for rolling down the cable from the drum. While the cable is removed from the drum, the drum will be properly mounted on cable jacks, making sure that the

spindle is strong enough to carry the weigh without bending. The drum will be mounted, such that, when the drum is turned against the direction of the arrow, the cable is paid out from the drum to avoid any danger of binding and breaking the cable, if unreeled from the bottom. Whenever a cable crosses a temperature expansion joint in the structure, sufficient sag will be provided at that point. Cable normally shall be laid in a continuous length so that joints are avoided. Cable joints wherever necessary and approved by the consultants, will be done as per the recommendations of the cable manufacturer and the same will be carried out by a qualified and experienced cable jointer and the cable jointing shall be weather proof. Wherever, number of cable is running together, the cables will be separated by a distance indicated in installation Drawings. Each run of the cable will be measured before cutting the cable from the drum. Cables will be neatly dressed, clamped on fully / partly supported horizontal run and vertical run. Cables will be laid in hume or PVC pipe while entering the building. The pipes shall be suitably sealed after laying cables, to prevent water entering inside the building. Bending radius of LT cables will not be less than 12 times the overall diameter of cable, while that of HT cable will not be less than 15 times the overall diameter of cable. This will also be taken into account while unwinding the cables from drum.

CABLE LAID UNDERGROUND:-

LT cables laid underground (directly buried) shall be laid min. 600 mm below finished grade level unless otherwise specified. Layer of 50mm fine sand shall be prepared at the bottom of trench and cable laid over it. Brick protection will be given as per the specification. Trenches will be back filled and made good as necessary. Cable markers will be provided at every 30 meter run and at bends. Cable numbering tags will be provided at entry, 30 meter run and at bends.

CABLE & TRAYS: Cables will be paid neatly on trays avoiding criss- crossing of the cables. They will be dressed neatly with help of necessary cleats and clamps. The cables will be clamped at every 750 mm to 1000mm. Cables cleated on wall / structure. Cable or group of cables not exceeding four numbers when run on structure etc., will be provided with saddles and clamps. Clamps will be spaced at 750 mm to 1000 mm. Insulation resistance test will be carried out on each cable before and after laying it.

CABLE TERMINATION:-

Termination of all L.T. Cables shall be done by using Brass Cable Glands with Copper Cable Lugs of proper size and type. Bimetallicpaste will be used whenever copper lugs are being Used for terminating aluminum conductors. The opening for the cable glands will be done by using required dia. Knock-out punches, which will avoid deformation of the gland plates. The cable sizes upto 70 sq.mm will be terminated using either hand crimping tool or BRD 95 crimping tool. The cable sizes above 70sq.mm will be terminated using hydraulic type crimping tools. The crimped surface and the adjoining cable surface will be Taped with insulation tape of color representing the phase. All H.T. Cables shall be terminated using RAYCHEM or equivalent 11KV cable joining kits by experienced cable jointers as per the manufacturers instructions.

TRANSFORMER:-

The transformer will be installed and accessories shall be connected in accordance with installation manual provided by vendor. The transformer will be installed on readymade foundation constructed by civil contractor. Marshalling box wiring, other connections and terminations will be checked. All clearances will be verified as per the latest revisions of standard. Silica gel breather, thermometers and Buchholz relay will be checked for proper function and operation.

BUS DUCTS: The bus ducts will be installed in horizontal/vertical formation As shown on the drawings. Proper flange alignment shall be Carried out at both transformer and switchgear ends. Flexible connectors will be used at switchgear and transformer ends. All joints shall be checked and nut bolts will be tightened if Found loose. Insulation resistance test will be carried out on Each bus before it is switched ON.

ERECTION OF SWITCH BOARDS: As and when switchboards arrive at site, professional unloaders will unload it and the same will be stored in a safe place. When the building is ready for erection, these boards will be shifted to the individual locations on rollers or using derricks and the shipping sections will be assembled by experienced workmen with necessary supervision by our Engineers. The Panel boards will be assembled placing in location all the necessary coupler plates and checked for its correctness. After the panels are fully erected, it will be meggered and the values recorded. Before energizing the panel, the boards will be

opened and cleaned with air blowers to remove all dust. All the bolt, nuts and hardwares will be again checked for its tightness and feeders will be physically checked for the proper connection of all outgoing and incoming cables.

STEEL ITEMS: All fabricated items at site, before fabrication, each & every angle iron length will be made straight. The trays and other physical supports will be fabricated as per the drawings and will be erected at site at individual locations busing necessary platforms, tower ladders, safety belts, safety goggles, etc. All steel items will be painted with 2 Coates of red oxide and 2 coats of approved colour Enamel paint.

EARTHING: Earthing materials Earthing conductor will be checked physically for its proper sizes and galvanizing. The GI flats will be straightened stored in proper place. For the Earthing conductors buried inside the ground, the joints will be welded & painted. The Earthing station will be fabricated as per the relevant I.S. drawings. Earthing conductor laid open will be straight and it will be joined through hardware/ welding to have proper continuity. Earthing pits shall be installed as per the installation details Earthing earth resistance at every earth pit and plant building shall be checked by opening the test link provided, and with the help of a good quality Earth tester/ Meggar. The value of earth resistance at each pit shall be approximately 5 ohms maximum and the combined earth resistance of the whole system shall not be more than 1 ohm. If this value is not achieved then the number of earth pits shall be increased after consulting owner/consultant.

LIGHTNING PROTECTION: Generally, a common Earthing system will be provided for equipment Earthing and static Earthing. The Earthing system for lighting protection will be separate and will not be interconnected with the former unless specifically called for in the drawings/ specific requirements. Installation will be carried out as per Earthing and lightning protection layout drawings and in accordance with IS 2309. Lightning protection system shall generally consist of lightning finials (air terminals), roof conductors, down conductors, test links and earth electrodes complete with supporting and anchoring materials. The number, types, materials and sizes shall be in accordance with the details shown in earthing and lightning protection layout drawings and installation standard drawings. Air terminals will be mounted on top of buildings or structure as shown in the drawings. All air terminals will be interconnected with roof conductors. Chimneys, vent pipes, handrails or any other metallic protection above the roof will be bonded to the proof conductors. Down conductors from air terminals or from roof conductors will be routed as directly as possible to the test links or earth buses, with minimum bends. Air termination will be firmly secured so that they remain in installed position under worst weather conditions. Every down conductor will be provided with a test joint at 1500 mm, above ground level. The test joint will be directly connected to the earthing system, as far as possible without sharp bends, turns, links etc. The run of down conductor will be as short as possible. The lightning protection system will not be in direct contact with underground metallic service ducts and cables.

LIST OF PRE-COMMISSION TESTS-:

We will carry out the following tests before commissioning of the installation:TRANSFORMER:A) Test of transformer oil for dielectric strength. B) Insulation test for windings C) Voltage/turns ratio test at all taps D) Phase sequence test E) Operation test for all protective devices/relays and interlocks.

H.T. PANELS:A) Insulation resistance test B) Check of ratio/polarity/secondary ratio C) Check of closing/tripping/interlocking etc. D) Testing of relays and instruments E) Test indicating & signaling lamp.

CURRENT TRANSFORMER:A) Continuity test B) Polarity test

C) Insulation resistance test D) Ration test

POTENTIAL TRANSFORMER:A) Insulation resistance test B) Polarity test C) Ration test on all cores / windings

CIRCUIT BREAKER:A) Checking for correctness of control wiring, continuity and IR values B) Closing / opening operation C) Checking of electrical and mechanical interlocks D) AC High Voltage Test of primary and secondary circuits of HV circuit breaker panel, if directed.

RELAY AND CONTROL PANEL:A) Checking for correctness of wiring and operation B) Insulation test

RELAYS:A) Checking of operating characteristic by secondary injection B) Checking of correctness of CT / PT connections and settings.

METERS:A) Checking for correctness of CT/PT connection B) Physical check for any damage C) Checking the ranges

CABLES:A) Continuity check B) Checking for correctness of connections C) Meggar Test D) DC HV test (HT cables only)

EARTHINGS:a) Measure resistance of each earth pit by isolating the same from the station grid, by fall of potential measurements method. b) Checking for continuity of grid conductors and wires.

DRAWINGS:ISSUE OF DRAWINGS :-

The installation drawings like single line diagrams, manufactures drawings, power and earthing layouts cable schedules, etc., will be jointly prepared by us along with the consultants. The necessary work will be carried out by the contractor as per the latest good for construction drawings issued to us.

AS BUILT DRAWINGS :The prints of each drawing marked out with As Built status and certified by us will be submitted to the clients on completion of the installation. MACHINERY & TEST EQUIPMENT o HAND DRILLING MACHINES o CHIPPING MACHINES o DRILLING MACHINE WITH STAND o WELDING MACHINE o CRIMPING TOOLS o TORQUE WRINCH o GRINDING MACHINE o GAS CUTTER o BRAZING TOOLS o HAND TOOLS o OTHER TOOLS & TACKLES AS REQUIRED o INSULATION TESTERS o PHASE SEQUENCE TESTER o LUX METER

o EARTH TESTER o TOUNGE TESTER o CONTINUITY TESTER o SOCKET TESTER

EHS METHODOLOGY:-

DIGGING AND EARTHING PROCEDURES: First survey the place where the digging has to be done and find out if there are any live wires and pipes underneath, with drawings. Clearly mark the place where the job has to be done before starting. Use pickaxe with wooden handles for digging. Put barricades while the job under progress. Fills back the place where the digging had been done and concrete the place. Provide safety shoes, hand gloves and helmets to our employees involving in the excavation works. Train our employees involved in the excavation works. Ensure shoring or proper sloping to prevent soil collapse. Will follow site permit condition.

HOT WORK (WELDING) PROCEDURE:Hot work procedure is followed to ensure the safety of the employees and property. Hot works may lead to fire and

explosion if adequate precautions are not followed. Management adopts the following to carry out hot works safely. Follow the hot work permit as per the site rules. Use only standard air-cooled welding machines. Welding cables and return cables will be maintained in good condition without wear and tear. Power cables will be protected from external damages. Cable terminals are properly guarded to prevent accidental contact with operating employees. Employ qualified and certified welders for doing welding operations. Ensure the area is free from combustible materials before starting the work. Will train our employees carrying our hot work activities. We follow LOTO procedure of the site. Will carry out all hot work activities under constant supervision. Will train our employees in carrying our hot work activities. Provide personal protective equipments like welders screen, leather hand gloves, welder apron, safety shoes etc.

HEALTH AND SAFETY POLICY: Major Electrical Solutions Private Limited is committed to the safety and well being of our employees. Provide quality of materials and service to ensure the customer

satisfaction. Protect the environment wherever we are operating. We follow standard operating methods and good management practices. Training programs have been conducted for the employees at in handling of tools & equipments. They have been provided with adequate safety equipments and they are aware how to use the safety equipments during work. Major Electrical has top priority for the safety & health of our employees.

ELECTRICAL SAFETY POLICY:We follow Indian Electricity Acts and Rules. To ensure safety of the people and property we are committed to follow the standard and methods like Procure and use standard (BIS) electrical tools and equipments All the cable joints will be properly lapped to prevent exposure to live wires. Follow site-specific permit procedures. Train our employees involved in carrying out electrical works to ensure utmost safety. Use three pin plug tops or double insulation power tools.

FALL PROTECTION PROCEDURE:Work at height is a high-risk activity. Major Electrical management is aware of the hazards associated with work at height. Any work above 6ft from the nearest floor level is considered as work at height. We take the following precautions to ensure the safety of the people whileworking at height.

Use standard (BIS) ladders to work at height. Provide scaffold with proper working platform for our people to work safely. Provide safety belt with lifeline to our employees working at height. Train our employees on correct usage of personal protective equipments. Provide hard hats conforming to BIS. Provide safety shoes and safety glasses based on the hazard.

PROJECT ROJECT PHOTO GALLERY:-

GMR 5 STAR HOTEL,HYDERABAD, A.P.

RECEPTION & LOBBY BAR, GMR HOTEL,HYDERABAD

ROOMS & EXTRNAL AREA,GMR HOTEL,HYDERABAD

.. ELRCTRICAL ROOM

ASTER PEB & SHELTER BUILDING,MEHBOOB NAGAR, HYDERABAD

INTERNAL AREA OF FACTORY, MEHBOOB NAGAR, HYDERABAD

TRANSFORMER & L.T PANEL,S , MEHBOOB NAGAR,HYDERABAD

LANCO TOLL PLAZA NH-48, BANGLURU

TOLL PLAZA BEFOR COMPLETION & FOUNDATION FOR HIGH MAST

ERECTION OF HIGH MAST AT NH-48,BANGLURU.

40 MTR MONOPOLE ARSHIYA GROUP AT KHURJA, U.P

Strategic Planning Questionnaire

Company Culture
1. What are the core values for your company? 2. How would you describe the values of your major clients? 3. What types of projects do you like to go after? 4. What projects would you rather pass on? 5. What does executive management perceive as your companys greatest strength? 6. What does executive management perceive as your companys greatest weakness? 7. What does project management perceive as your companys greatest strength? 8. What does project management perceive as your companys greatest weakness? 9. What do long-term employees perceive as your companys greatest strength? 10. What do long-term employees perceive as your companys greatest weakness? 11. Are adequate resources provided to all employees (enough tools, equipment, computers, etc.?)? 12. Are you proud of your facilities (offices, warehouse, field offices, etc.)? 13. How are decision making, responsibility, and authority assigned (Do employees have to ask permission or forgiveness)? 14. What is the average length of service for the following positions:

a. Office personnel b. Field supervisors c. Electricians 15. Why do individuals leave our company? 16. What traits are most important for individuals to succeed in your organization? a. For success in executive management? b. For success in project management? c. For success in business operations? d. For success in field operations / management? e. For success as an electrician? 1. In general, have you seen a change in the typical traits available to you from your hiring pool? If yes, in what way? 2. What skills are the most important for individuals to succeed in your organization? a. For success in executive management? b. For success in project management? c. For success in business operations? d. For success in field operations / management?
e. For success as an electrician?

Current Customers:

1. Who are your customers? How many different market segments do you serve? How do customer needs shape your organization? Has this changed in the past decade? 2. How do you know what your current customers think of you (in terms of quality, service, price, responsiveness, value added, etc.)? 3. What special knowledge does your company have regarding your major clients? 4. What do customers perceive as your companys greatest strength (in terms of quality, service, price, responsiveness, etc.)? 5. What do customers perceive as your companys greatest weakness (in terms of quality, service, price, responsiveness, etc.)? 6. Have your customers recently asked you to provide a service that you couldnt? If so, why? 7. How are your customers classified in terms of your volume? 8. How does your company compare to the industry average for: a. Repeat sales b. Geographic concentration c. Service work d. Negotiated work 9. Are any of your major clients at risk for downsizing? What plans have you made for that possibility? 10. Is there anything our customers currently do themselves that they could our source to you?

Technologies:

1. What soft technologies (for example, new management techniques) are you using that you didnt use 5 years ago? 10 years ago? 2. What hard technologies (for example, computer equipment) are you using that you didnt use 5 years ago? 10 years ago? 3. Are technologies available (from reading trade magazines or attending a NECA show) that would improve your business (profitability, productivity, safety, etc.) but you have yet to implement? If so, why? What is your implementation plan? 4. List five new technologies that you think will affect electrical contracting in the next 5 years? List five other new technologies that you think will affect electrical contracting in the next 10 years? 5. What new training are apprentices being provided that wasnt available 10 years ago? 6. What new training are journeymen being provided (through Journeymen Upgaring programs) that wasnt available 10 years ago?

Workforce:1. What is the most problematic issue with your current workforce? 2. What skills do you most need more of within your company? 3. What training do you provide to your executive managers? 4. What training do you provide to your project managements? 5. What training do you provide to your field managers? 6. How are training decisions made?

7. How are technologies incorporated into business operations? 8. How are new technologies incorporated into project management? 9. How are new technologies incorporated into field operations?

New Products:1. How many new products are you using today; products that you didnt use 10 years ago that have greater embedded labor in them? (Embedded labor refers to using a manufacturing process to assemble parts and pieces together in a controlled environment rather than in the field). 2. How many times a year do you have manufacturers representatives train your electricians on how to properly use their product? Are there additional representatives that you should invite? (Make a list)

New Services:1. What services do you currently provid

BIBLOGRAPHY

www.zodiaconline.com www.google.co.in www.scribed.com www.yahoosearch.com www.ask.com Esquire Magazine Indochino Magazines Business Today - Magazine www.mespl.in

You might also like