369 Days Tue 3/5/13 Sat 3/8/14: Manufacturing and Erection of Tank 001 (2121m3) Tank With Its Accessories
369 Days Tue 3/5/13 Sat 3/8/14: Manufacturing and Erection of Tank 001 (2121m3) Tank With Its Accessories
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Task Name Duration 369 days 7 days 7 days 3 days 50 days 4 days 7 days 14 days 7 days 5 days 14 days 7 days 5 days 14 days 7 days 5 days 10 days 30 days 145 days 45 days 4 days 20 days 7 days 25 days 25 days 7 days 12 days 145 days 45 days 4 days 20 days 7 days 25 days 25 days 7 days 12 days 145 days 45 days 4 days 20 days 7 days Start Tue 3/5/13 Tue 3/5/13 Tue 3/5/13 Tue 3/12/13 Fri 3/15/13 Sat 5/4/13 Wed 5/8/13 Mon 3/11/13 Mon 3/25/13 Mon 4/1/13 Mon 3/25/13 Mon 4/8/13 Mon 4/15/13 Sat 4/20/13 Sat 5/4/13 Sat 5/11/13 Tue 3/5/13 Fri 3/15/13 Tue 3/12/13 Tue 3/12/13 Fri 4/26/13 Tue 4/30/13 Mon 5/20/13 Mon 5/27/13 Fri 6/21/13 Tue 7/16/13 Tue 7/23/13 Tue 3/12/13 Tue 3/12/13 Fri 4/26/13 Tue 4/30/13 Mon 5/20/13 Mon 5/27/13 Fri 6/21/13 Tue 7/16/13 Tue 7/23/13 Mon 5/27/13 Mon 5/27/13 Thu 7/11/13 Mon 7/15/13 Sun 8/4/13
Total Ethiopia mechanical works Material specification,manufacturing and erection project methodology approval by customer
Finish Qtr 1, 2013 Feb Sat 3/8/14 Mon 3/11/13 Mon 3/11/13 Thu 3/14/13 Fri 5/3/13 Tue 5/7/13 Tue 5/14/13 Sun 3/24/13 Sun 3/31/13 Fri 4/5/13 Sun 4/7/13 Sun 4/14/13 Fri 4/19/13 Fri 5/3/13 Fri 5/10/13 Wed 5/15/13 Thu 3/14/13 Sat 4/13/13 Sat 8/3/13 Thu 4/25/13 Mon 4/29/13 Sun 5/19/13 Sun 5/26/13 Thu 6/20/13 Mon 7/15/13 Mon 7/22/13 Sat 8/3/13 Sat 8/3/13 Thu 4/25/13 Mon 4/29/13 Sun 5/19/13 Sun 5/26/13 Thu 6/20/13 Mon 7/15/13 Mon 7/22/13 Sat 8/3/13 Fri 10/18/13 Wed 7/10/13 Sun 7/14/13 Sat 8/3/13 Sat 8/10/13
Mar
Jun
Sep
Dec
Mar
Drawing and erection methodology approval for Ethanol tank by customer Making corrections if any on ethanol tanks' drawings and submit it to manufacturing Fabrication of ethanol tanks(4*100m3+1*50m3) Transportation of ethanol tanks Erection of ethanol tanks(4*100m3+1*50m3) Drawing preparation for bottom and shell of 1150m3,650m3 and 2121m3 capacity tanks Bottom and shell drawing approval by customer Making corrections if any on bottom and shell drawings and submit it preparation to manufacturing Drawing for roof of 1150m3,650m3 and 2121m3 capacity tanks Roof drawing approval by customer Making corrections if any on roof drawings and submit it to manufacturing Drawing preparation for stair and accessories of 1150m3,650m3 and 2121m3 capacity tanks Stair and accessories drawing approval by customer Making corrections if any on stairs and accessories drawings and submit it to manufacturing Approval of sample isometric drawing by customer Completing preparation of isometric drawing
Manufacturing and erection of Tank 001 Manufacturing of tank and accessories (2121m3) tank with its its accessories
Transportation ( Mekelle- Addis) Annular, Bottom plates and central sump installation Erection of Vertical shell Erection of Roofing structures Installation of tank accessories ( nozzles, vents, stairs) Painting Testing
Manufacturing and erection of Tank 002 Manufacturing of tank and accessories (2121m3) tank with its its accessories
Transportation ( Mekelle- Addis) Annular, Bottom plates and central sump installation Erection of Vertical shell Erection of Roofing structures Installation of tank accessories ( nozzles, vents, stairs) Painting Testing
Manufacturing and erection of Tank 003 Manufacturing of tank and accessories (2121m3) tank with its its accessories
Transportation ( Mekelle- Addis) Annular, Bottom plates and central sump installation Errection of Vertical shell
Manufacturing of Tank 004 (650 m3) tank with of tank and its accessories itsManufacturing accessories
Transportation ( Mekelle- Addis) Annular, Bottom plates and central sump installation Errection of Vertical shell Errection of Roofing structures Installation of tank accessories ( nozzles, vents, stairs) Painting Testing
Manufacturing of Tank 005 (650 m3) tank with of tank and its accessories itsManufacturing accessories
Transportation ( Mekelle- Addis) Annular, Bottom plates and central sump installation Errection of Vertical shell Errection of Roofing structures Installation of tank accessories ( nozzles, vents, stairs) Painting Testing
Manufacturing of Tank 100 (1150 m3) tank Manufacturing of tank and its accessories with its accessories
Transportation ( Mekelle- Addis) Annular, Bottom plates and central sump installation Errection of Vertical shell Errection of Roofing structures Installation of tank accessories ( nozzles, vents, stairs) Painting Testing LPG Bullet Transport and Installation Structural steel works Hydrocarbon pumping station Workshop fabrication of Structural elements Transport and Erection of structures Roofing and platforms Loading and unloading area shed Workshop fabrication of Structural elements Transport and Erection of structures