Professional Documents
Culture Documents
TREX-04934: Exhibit No. Worldwide Court Inc
TREX-04934: Exhibit No. Worldwide Court Inc
21 October20L0
We arewaitingfor a PETUwhichwe haveborrowed from theDeepwater Navigator to assist with our testing of the SEM from theDeepwater Nautilusat WestEngineering's facility in Brookshire.This is scheduled to arriveThursday evening.We haveproceeded with AMF cardtesting and somelimitedtesting of the SEM. Currentlywe havefound a hiddenfault with the AMF circuitson this DWN SEM that is related to the condition of oneninevolt batteryandwas probably personnel. DWN unknown to the We foundthatoneAMF circuitfired andthendisarmed while the othercontinued to cycle. We switched the batteries and found that the problemmovedwith the batterythat measured lower voltage. This same condition couldhavecontributed to the results thatCameron found whenthe DWH Blue POD wasretrieved.We arecontinuing to testandwill need to developa test procedure for submission to DNV so that similartestingmay be usedto verify whetheror not this samefault could haveoccurredon the DWH BluePod.- [n progress WestEngineering hasagreed thatprimarilyBrian LeachandthenMike Van Gemertwill be available to backup ChrisTolleson asrequired.
DACTED: PRIVILEGED
Continued assistance with flow line,overboard diverterlinesandgumbobox pipingandarrangement to assist with support for Stress calculations. A response
_4 q3q
Exhibit No. Worldwide Court Inc.
TRN-tNV-03405120
TREX-04934
TDRl02-003483
from NOV confirmed thatthey haveneverbeenrequested to installa level sensor in the gumbobox to calculate flow. We received procedure theupdated from Stress for removalof the drill pipefrom the riserfor furtheranalysis.This hasbeenpassed on to Dan andis awaiting reviewor his decision progress to pass on to DNV andthe JIT. No evident for thisweek.- [n progress We arecontinuing work on thenecessary itemsfor Cameron software testing on theDeepwater Nautilus.,nfOACfeO : pRtVtLEGED
work on our previous Continued interpretation for reof the API 53 requirements certification is still required.In addition to the work beingcarried out by Greg policy andrequirements Childs,Rodney will look into otr company that are calledout on our PM system to seeof we arein compliance with our own requirements. Continuing a reviewof theModu Spec reportto determine what itemswereout of certification andwhether the itemsnotedin thereportwere beingmaintained to meetclass andor Transocean requirements. Awaitinginput from Rob Turlak andgroupon Transocean policy. Rob is presently in Singapore - In progress
People during this period: WestEngineers: GregChildsout Tuesday afternoon andWednesday at West ChrisTolleson andHarshal wereat Weston Tuesday, Wednesday andpartof Thursday to work on AMF testing with the DWN SEM. Transocean: EwenFlorence out on vacation. Bob Walshwasout Tuesdav
Sharepointltems Status- TechnicalGroup Assigned Dan Farr GeoffBoughton GregChilds ChrisTolleson EwenFlorence James Kent Robert Tiano Open 4 l0 l3 26 11 I 2 1 3 6 3 I 2 5 100%readyfor signoff App - closed
TRN-rNV-o3405121
TDRl02-003484
13 2 I
TRN-tNV-o3405122
TDRl 02-003485