Comp - Programme - Civil - 160412
Comp - Programme - Civil - 160412
Description of work
Work
Group
Name of
the S/c
Target
Completi
on
Site
Engineer
1
2
3
4
5
APK Station
Septic Tank Work
White washing of Toilet
Window fixing for Off duty room
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms
PF
PF
PF
PF
PF
Mintu pal
Ravi
Dept
Mintu pal
Dept
25.04.13
20.04.13
25.04.13
20.04.13
18.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
PF
Mintu pal
30.04.13
Manikantan
PF
PF
PF
PF
PF
PF
PF
PF
Dept
Dept
Mintu pal
Dept
Dept
Syed
Dept
Mintu pal
25.04.13
20.04.13
25.04.13
25.04.13
25.04.13
30.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
PF
Ghosh
20.04.13
Manikantan
PF
PF
PF
PF
PF
Mintu pal
Mintu pal
Ravi
Dept
Dept
completed
completed
20.04.13
30.04.13
15.04.13
Manikantan
Manikantan
Manikantan
pagiyam
pagiyam
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Page 1 of 16
Remarks
Completed
Before CRS
Before CRS
Completed
Sl.
No.
Description of work
Work
Group
Name of
the S/c
Target
Completi
on
Site
Engineer
Ghosh
Ghosh
Ghosh
Ghosh
Ghosh
30.04.13
18.04.13
25.04.13
25.04.13
20.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
1
2
3
4
5
NKK Station
Septic tank connection works
Plumbing works inside public toilet(Fitting & fixing)
Rain water down pipe from building top to be provided
Chamber towards VPT end of building for collecting rain
water
Indian closet in off duty room toilet to be replaced
PF
PF
PF
PF
PF
PF
7
8
9
10
11
12
PF
PF
PF
PF
PF
PF
Ghosh
Ghosh
Ghosh
Ghosh
Ghosh
13
PF
Gopi
14
15
16
17
18
19
20
PF
PF
PF
PF
PF
PF
PF
Syed
Dept
Dept
Murugaya
M.Krisnan
Ravi
Ghosh
20.04.13
30.04.13
30.04.13
25.04.13
25.04.13
20.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
PF
Murugaya
25.04.13
Manikantan
21
Page 2 of 16
Manikantan
20.04.13
20.04.14
25.04.13
30.04.13
25.04.13
30.04.13
Remarks
During CRS
New proposal given on
10.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
To be discussed with
clients
During CRS
Item to be confirmed
Sl.
No.
Description of work
TIRUCHULI
Septic Tank Work
White washing of Toilet
Facia board fixing
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms
Duct slab finishing and pointing inside Station Building
Ticket counter window work at booking office
Door for public toilet
Roof tiles for public toilet
Broken glass refixing for windows
Glass fixing for ventilator
Hand rails for toilet ramp
Tap fixing for water cubicle
Facia board fixing
Balance slab for cable duct in PF. No.2 to be cast and all
slabs to be pointed
Dressing of platform
Soil filling for ramp at VPT end
Target
Completi
on
Work
Group
Name of
the S/c
Building
Building
PF
Building
Building
Building
Building
Building
Building
Building
Building
Building
PF
PF
Mintu pal
Ravi
syed
Mintu pal
Mintu pal
Mintu pal
Dept
RAJA
Mintu pal
Mintu pal
Mintu pal
Syed
Mintu pal
Syed
completed
22.04.13
25.04.201
3
20.04.13
20.04.13
PF
Site
Engineer
Remarks
Work in progress
20.04.13
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Mintupal
22.04.13
Damodharan
WIP
PF
PF
Mintupal
Mintupal
20.04.13
20.04.13
Damodharan
Damodharan
WIP
PF
Gopi
20.04.13
Damodharan
Post - 250/250;
Walling- 200/250
PF
Gopi
30.04.13
Damodharan
To commence by
23.04.13
Page 3 of 16
30.04.13
19.04.13
18.04.13
20.04.13
20.04.13
22.04.13
Before CRS
Before CRS
Fixing of coping
slab for PF no.: 2,3
&5
Construction of PF
wall in the portion
of exg. Trolly path
PCC
CC wall
Carballing
Fixing
Attending PF wall
& coping so as to
be keep distance
of 1.67m to 1.68m
from c/l of track to
face of coping
and .76m to .84m
from top of rail
level to coping
Start
Date
End
Date
12.04.13 17.04.13
Name of
the S/c
REMARKS
Muthupand
i
Muthupand
i
Muthupand
i
Muthupand
i
Muthupand
i
Muthupand
i
6.75
21.6
1.69
120
Site
Engg.
Alwin
Alwin
Alwin
Alwin
Muthupand
i
Balance 40m
Alwin alignment detail to
be given by clients
Muthupand
i
Tiling work
completed,
Alwin
drainage connection
not in our scope
5 Nos.
11.04.13 18.04.13 Mintupaul
Each
Since width of
platform is less on
Tvnli end , we can
construct only 2nos
Alwin
immediately balance
will be done after
completing FOB
foundation works
Gopi
Alwin
Colour washing of
pale fencing
20.04.13
Gopi
Colour washing of
toilet building
17.04.13 19.04.13
Ravi
Alwin
Page 4 of 16
Alwin
Alwin
Alwin
SI
No.
Description
12
Physically
challenged portion
13
14
Connection of
2 Nos. 15.04.13 20.04.13 Murugaiya
leach pit in lc gate
Qty
Start
Date
End
Date
17.04.13 Mintupaul
Name of
the S/c
Kuppan
Departmen
t
Site
Engg.
REMARKS
Nagampatti,
Thottiyankulam
Alwin
Colour washing of
fencing
Gopi
Alwin
Irrunchirai , Narikudi
balance
2 Nos.
100cu
14.04.13 22.04.13
m
each
Dept
Alwin
Keelapasali,
Chinnakannanur.
Page 5 of 16
Alwin Irrunchirai
12.04.2013
Sl. No.
Br. No.
Location
294
589/11-12
9.00
20.04.13
296
590/14-15
33.00
27.04.13
299
591/10-11
3.00
28.04.13
300
591/12-13
1.38
29.04.13
302
592/15-593/1
4.50
30.04.13
308
595/3-4
3.60
2/05,13
313
595/12-13
11.00
03.05.13
329
608/9-10
5.00
04.05.13
330
609/5-6
4.50
06.05.13
10
331
611/12-13
5.00
07.05.13
11
333
612/9-10
12.30
10.05.13
12
338A
613/14-15
6.10
11.05.13
13
340
613/15-614/1
5.00
12.05.13
14
348
618/12-13
12.00
13.05.13
115.38
Page 6 of 16
Sl. No.
BR.No
LOCATION
PROPOSED SPAN
BARREL
WRIDTH
DEPTH
199
55613-14
1 x2x 3 RCB
8.000
0.30
200
556/14-15
1x1.2x1.2 RCB
201
556/16-17
1x1.2x1.2 RCB
202
557/2-3
1x1.2x1.2 RCB
7.650
1.2
0.40
203
557/5-6
1x1.2x1.2 RCB
7.650
1.2
0.50
204
557/6-7
1x6x2.3 RCB
6.850
0.37
205
557/9-10
1x1.2x1.2 RCB
7.650
1.2
0.23
206
557/10-11
1x1.2x1.2 RCB
7.650
1.2
0.33
207
559/3-4
1x6x3.1 RCB
6.850
0.40
10
208
559/6-7
1x6x2.4 RCB
6.850
0.50
11
209
559/8-9
1x4x2.5 RCB
6.850
0.57
12
210
559/9-10
1x1.2x1.2 RCB
7.650
1.2
0.30
13
211
559/11-12
1x1.2x1.2 RCB
7.650
1.2
0.40
14
212
559/14-15
1x1.2x1.2 RCB
7.650
1.2
0.57
15
212A
559/16-17
1x1.2x1.2 RCB
7.650
1.2
0.10
16
213
559/16-560/1
1x1.2x1.2 RCB
7.650
1.2
0.50
17
214
560/4-5
1x1.2x1.2 RCB
10.710
1.2
0.53
18
215
560/5-6
1x1.2x1.2 RCB
9.180
1.2
0.40
19
216
560/10-11
1x1.2x1.2 RCB
7.650
1.2
0.53
20
217
561/1-2
1x4.5x3 RCB
6.850
4.5
0.50
21
218
561/3-4
6x12.2 PSC
22
219
561/5-6
Constructed in MNM
Major Bridge
Closed Bridge
23
220
561/11-12
1x1.2x1.2 RCB
9.180
1.2
0.47
24
221
562/1-2
1x4x2.4 RCB
6.850
0.47
25
222
562/3-4
1x1.2x1.2 RCB
7.650
1.2
0.50
26
223
562/6-7
1x1.2x1.2 RCB
7.650
1.2
0.27
27
224
562/8-9
1x1.2x1.2 RCB
7.650
1.2
0.50
28
225
563/7-8
1x6x2.2 RCB
6.850
0.50
29
226
563/8-9
1x6x3 RCB
6.850
0.67
30
227
563/10-11
1x4x3 RCB
6.850
0.50
31
228
564/1-2
2x4x1.7 RCB
7.000
0.50
32
229
564/15-565/1
1x1.2x1.2 RCB
7.650
1.2
0.60
33
230
565/7-8
1x4x1.6 RCB
6.85
0.53
34
231
565/8-9
1x4.5x1.8 RCB
6.850
4.5
0.60
35
232
565/9-10
1x1.2x1.2 RCB
7.650
1.2
0.27
36
233
565/13-14
1x1.2x1.2 RCB
7.650
1.2
0.50
37
234
566/1-2
1x1.2x1.2 RCB
7.650
1.2
0.47
38
235
566/3-4
1x1.2x1.2 RCB
7.650
1.2
0.50
39
236
566/3-4
1x1.2x1.2 RCB
7.650
1.2
0.60
40
237
567/4-5
1x4.5x1.8 RCB
6.850
4.5
0.47
41
238
568/1-2
1 x4x 2 RCB
6.850
0.40
42
239
568/2-3
1x4x2.3 RCB
6.850
0.50
43
240
568/7-8
4x12.2 PSC
44
241
568/8-9
1x4.5x2.6
6.850
4.57
0.27
45
242
569/3-4
1x1.2x1.2 RCB
9.180
1.2
0.50
46
243
569/5-6
1x1.2x1.2 RCB
10.710
1.2
0.20
47
244
569/6-7
1x1.2x1.2 RCB
10.710
1.2
0.27
48
245
569/7-8
1x2.5x2.6 RCB
6.850
2.5
0.33
49
246
569/8-9
1x4.5x4.4 RCB
6.850
4.5
0.40
Major Bridge
50
247
569/14-15
1x1.2x1.2 RCB
9.180
1.2
0.27
51
248
570/14-15
6.850
0.20
52
249
572/3-4
1x1.2x1.2 RCB
7.650
1.2
0.17
53
250
572/13-14
1x 6x 3 RCB
6.850
0.10
54
251
572/14-15
1x6x5.3 RCB
6.850
0.37
55
252
573/3-5
9x12.2 PSC
56
252 A
573/5-6
57
253
573/8-9
1x1.2x1.2 RCB
10.710
1.2
0.23
58
254
573/9-10
1x1.2x1.2 RCB
9.180
1.2
0.10
59
255
573/11-12
1x1.2x1.2 RCB
7.650
1.2
0.17
60
256
573/14-15
1x1.2x1.2 RCB
7.650
1.2
0.17
61
257
574/2-3
1x1.2x1.2 RCB
7.650
1.2
0.38
62
258
574/4-5
1x1.2x1.2 RCB
7.650
1.2
0.20
63
259
574/5-6
1x6x2.3 RCB
6.850
0.27
64
260
574/12-13
1x1.2x1.2 RCB
7.650
1.2
0.27
65
261
575/5-6
1x4.5x3 RCB
6.850
4.5
0.53
66
262
575/15-576/1
1x1.2x1.2 RCB
7.650
1.2
0.27
67
263
575/15-576/1
68
264
576/7-8
1x1.2x1.2 RCB
32.130
1.2
0.20
69
265
576/10-11
1x2x2.3 RCB
32.325
0.17
70
266
577/6-7
1x4.5x3.4 RCB
6.850
4.5
0.17
71
267
577/9-10
1x1.2x1.2 RCB
10.710
1.2
0.33
72
268
577/12-13
1x1.2x1.2 RCB
9.180
1.2
0.23
73
269
577/12-13
1x2.5x2.8 RCB
6.850
2.5
0.30
74
270
577/14-15
2x4x2.1 RCB
6.850
0.17
75
271
577/16-578/1
1x2x1.2 RCB
6.850
0.50
76
272
579/7-8
1x3x1.2 RCB
6.850
0.40
Major Bridge
Closed Bridge
Closed Bridge
77
273
580/3-4
1x4.5x1.4 RCB
6.850
4.5
0.37
78
274
580/13-14
1x1.2x1.2 RCB
7.650
1.2
0.20
79
275
581/2-3
1x1.2x1.2 RCB
7.650
1.2
0.43
80
276
581/5-6
1x1.2x1.2 RCB
7.650
1.2
0.50
81
277
581/7-8
1x1.2x1.2 RCB
7.650
1.2
0.43
82
278
581/13-14
1x1.2x1.2 RCB
7.650
1.2
0.47
83
279
581/15-582/1
1x4.5x1.6 RCB
6.850
4.5
0.37
84
280
582/8-9
1x1.2x1.2 RCB
7.650
1.2
0.43
85
281
582/10-11
1x1.2x1.2 RCB
7.650
1.2
0.40
86
282
583/11-12
87
283
583/12-13
1x1.2x1.2 RCB
9.180
1.2
0.38
88
284
583/12-13
1x1.2x1.2 RCB
9.180
1.2
0.47
89
285
583/14-15
1x1.2x1.2 RCB
10.710
1.2
0.50
90
286
584/1-2
1x1.2x1.2 RCB
10.710
1.2
0.37
91
287
584/4-5
1x6x2.3 RCB
13.760
0.24
92
288
584/7-8
5X12.2 PSC
93
288A
584/8-9
1x1.2x1.2 RCB
13.000
1.2
0.30
94
289
585/5-6
1x1.2x1.2 RCB
9.180
1.2
0.17
95
290
585/6-7
1x4.5x3.1 RCB
6.850
4.5
0.43
96
291
587/1-2
1x1.2x1.2 RCB
7.650
1.2
0.38
97
292
588/5-6
1x4.5x3.7 RCB
6.850
4.5
0.67
98
293
588/7-9
11 x12.2 PSC
Retained
Major Bridge
Major Bridge
Total
CUM
Date-17-04-13
Status
4.80
Required
Labours
Completed
Date of
completion
Completed
3.67
Completed
Completed
4.59
Completed
Completed
15.07
Completed
Completed
2.14
Completed
Completed
3.06
Completed
Completed
16.44
Completed
20.55
Completed
15.53
Completed
2.75
Completed
3.67
Completed
5.20
Completed
0.92
Completed
4.59
Completed
6.85
Completed
4.41
Completed
4.90
21.04.13
15.41
21.04.13
11
Completed
Closed Bridge
Pitching
work was
executed
by other
agency
5.14
21.04.13
12.79
20.04.13
4.59
20.04.13
2.45
19.04.13
4.59
19.04.13
20.55
Completed
27.40
Completed
7.5
13.70
Completed
14.00
Completed
5.51
29.04.13
14.61
29.04.13
10
18.50
30.04.13
13
2.45
30.04.13
4.59
01.05.13
4.28
01.05.13
4.59
02.05.13
5.51
02.05.13
14.39
03.05.13
10
6.5
10.96
03.05.13
5.5
13.70
04.05.13
10
5.5
Pitching
work was
executed
by other
agency
04.05.13
Completed
8.35
05.05.13
5.51
05.05.13
2.57
06.05.13
3.43
06.05.13
5.71
07.05.13
12.33
07.05.13
Pitching
work was
executed
by other
agency
executed
by other
agency
2.94
08.05.13
5.48
08.05.13
1.53
09.05.13
09.05.13
4.11
09.05.13
09.05.13
15.07
10.05.13
11
10.05.13
Completed
Closed Bridge
3.00
Completed
1.10
Completed
1.53
Completed
1.53
Completed
3.52
Completed
1.84
Completed
10.96
Completed
2.45
11.05.13
11.05.13
16.44
11.05.13
12
11.05.13
2.45
12.05.13
12.05.13
7.71
12.05.13
6.5
12.05.13
10.78
12.05.13
12.05.13
5.14
13.05.13
13.05.13
4.28
13.05.13
13.05.13
2.57
13.05.13
13.05.13
5.14
14.05.13
14.05.13
4.57
14.05.13
14.05.13
Closed Bridge
6.85
Completed
8.22
Completed
11.30
15.03.13
15.03.13
1.84
16.05.13
16.05.13
3.98
16.05.13
16.05.13
4.59
16.05.13
16.05.13
3.98
17.05.13
17.05.13
4.28
17.05.13
17.05.13
11.30
18.05.13
18.05.13
3.98
19.05.13
19.05.13
3.67
19.05.13
19.05.13
19.05.13
Completed
4.22
19.05.13
5.14
Completed
6.43
Completed
4.71
Completed
19.81
Completed
Completed
4.68
20.05.13
20.05.13
1.84
20.05.13
20.05.13
13.36
3.52
20.55
Completed
20.05.13
20.05.13
Completed
Completed
634.31
244
416.5
REACH - II
( THIRUCHULI - VIRUDHNAGAR )
MINOR BRIDGES DETAILS
AS ON : 17.04.13
SI. NO
BR. NO
293 A, RUB
BARREL WRIDTH
Location PROPOSED
SPAN
294
589/11-12
1X2.0X1.2
296
590/14-15
2X6.0X2.3
297
590/14-15
1X1.2X1.2
298
299
CUM
591/5-6
1X1.2X1.2
591/10-11
1X6.0X2.3
300
591/12-13
1X1.2X1.2
301
592/2-3
1X4.0X1.8
302
592/15-593/1
10
303
593/7-8
1X4.5X3.4
11
304
594/2-3
1X1.2X1.2
12
305
15-595/1
1X1.2X1.2
13
306
595/1-2
1X1.2X1.2
14
307
595/2-3
1X1.2X1.2
15
308
595/3-4
1X1.2X1.2
0.45
27.00
12.000
0.300
66.06
7.680
1.200
0.20
1.84
9.180
1.200
0.150
1.65
6.850
6.000
0.200
8.22
7.650
1.200
0.300
2.75
6.850
4.000
0.250
6.85
15.000
2.000
0.300
9.00
6.850
4.500
0.300
9.25
9.180
1.200
0.100
1.10
12.240
1.200
0.200
2.94
9.180
1.200
0.300
3.30
6.850
1.200
20.000
1.200
0.300
7.20
12.240
1.200
0.300
0.00
4.41
16
309
595/5-6
1X1.2X1.2
310
595/8-9
1X1.2X1.2
20.000
1.200
0.100
2.40
18
311
595/11-12
1X1.2X1.2
10.710
1.200
0.300
3.86
595/12-13
9.180
1.200
0.300
3.30
19
312
313
21
314
1X1.2X1.2
2X4.0X3.3
22
315
596/9-10
23
316
597/1-2
1X1.2X1.2
24
317
597/4-5
1X1.2X1.2
6.850
4.000
16.000
2.000
0.00
0.350
11.20
16.000
2.000
0.350
11.20
12.240
1.200
0.350
5.14
12.240
1.200
0.500
7.34
25
318
597/6-7
1X1.2X1.2
12.240
1.200
0.500
7.34
26
319
598/6-7
1X1.2X1.2
9.180
1.200
0.300
3.30
27
320
598/14-15
1X2.5X2.0
6.850
2.500
0.250
28
321
29
322
30
30
18.350
17
20
Status
Required
Labours
completed
2
3
DEPTH
589/3-4
599/7-8
1X1.2X1.2
600/13-14
1X1.2X1.2
324
600/15-16
1X4.0X3.0
31
325
602/14-15
1X4.0X3.0
32
326
604/5-6
1X4.5X2.5
33
327
605/2-3
1X4.5X1.6
34
328
608/1-2
1X1.2X1.2
35
329
608/9-10
1X2.0X2.0
36
330
609/5-6
1X1.2X1.2
37
331
611/12-13
1X1.2X1.2
38
333
612/9-10
39
334
612/13-14
1X1.2X1.2
40
335
613/6-7
1X2.0X1.75
2X6.0X3.5
completed
completed
4.28
7.650
1.200
0.300
21.420
1.200
0.350
9.00
6.850
4.000
0.800
21.92
2.75
6.850
4.000
0.200
5.48
6.850
4.500
0.850
26.20
6.850
4.500
0.850
26.20
7.650
1.200
0.250
2.30
19.000
2.000
0.250
9.50
19.000
1.200
0.250
5.70
19.000
1.200
0.250
7.650
1.200
0.300
2.75
18.000
2.000
0.300
10.80
6.850
completed
Pitching work
was
executed by
other agency
5.70
0.00
completed
completed
41
336
42
337
43
338
44
339
45
340
613/7-8
1X1.2X1.2
613/10-11
1X1.2X1.2
613/13-14
1X1.2X1.2
613/14-15
1X6.0X2.7
613/15-614/1 1X1.2X1.2
46
341
47
342
614/8-9
1X2.0X1.5
48
343
617/5-6
1X1.2X1.2
49
344
618/7-8
1X4.0X1.5
615/15-616/1 1X4.0X1.3
50
345
618/8-9
1X4.0X1.5
51
346
618/10-11
1X1.2X1.2
52
347
618/12-13
1X1.2X1.2
53
348
2X4.0X2.5
7.650
1.200
0.350
7.650
1.200
0.300
7.650
1.200
0.250
2.30
0.450
10.26
0.450
17.10
27.40
6.850
6.000
19.000
1.200
19.000
2.000
0.30
2.75
0.00
6.850
4.000
1.000
6.850
1.200
0.300
2.47
6.850
4.000
1.000
27.40
10.000
4.000
1.000
40.00
10.000
1.200
1.000
12.00
10.000
1.200
0.100
1.20
9.000
4.000
1.000
36.00
518.43
completed
Pitching work
was
executed by
other agency