LARSEN & TOUBRO LIMITED

MANAMADURAI - TIRUCHULI - VIRUDHUNAGAR RC PROJECT


ACTION PLAN FOR COMPLETING BALANCE WORKS
As on : 20.04.2013
Sl.
No.

Description of work

Work
Group

Name of
the S/c

Target
Completi
on

Site
Engineer

1
2
3
4
5

APK Station
Septic Tank Work
White washing of Toilet
Window fixing for Off duty room
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms

PF
PF
PF
PF
PF

Mintu pal
Ravi
Dept
Mintu pal
Dept

25.04.13
20.04.13
25.04.13
20.04.13
18.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

Duct slab finishing and pointing inside Station Building

PF

Mintu pal

30.04.13

Manikantan

Ticket counter window work at booking office


Door for public toilet
Roof tiles for public toilet
Broken glass refixing for windows
Glass fixing for ventilator
Hand rails for waiting hall ramp & toilet ramp
Tap fixing for water cubicle
Tiles broken by local people to be replaced in water cubicle
Balance slab for cable duct in PF. No.2 to be casted and all
slabs to be pointed
Finishing of flooring in Equipment room
Finishing of steps in battery room
Painting of relay room and equipment room
Dressing of platform
Soil filling for ramp at VPT end

PF
PF
PF
PF
PF
PF
PF
PF

Dept
Dept
Mintu pal
Dept
Dept
Syed
Dept
Mintu pal

25.04.13
20.04.13
25.04.13
25.04.13
25.04.13
30.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

PF

Ghosh

20.04.13

Manikantan

PF
PF
PF
PF
PF

Mintu pal
Mintu pal
Ravi
Dept
Dept

completed
completed
20.04.13
30.04.13
15.04.13

Manikantan
Manikantan
Manikantan
pagiyam
pagiyam

7
8
9
10
11
12
13
14
15
16
17
18
19
20

Page 1 of 16

Remarks

Completed

PVC or rubber sheet to


be ordered
To be enquired
Awaiting approval
To be enquired

Before CRS
Before CRS

Completed

Sl.
No.

Description of work

Work
Group

Name of
the S/c

Target
Completi
on

Site
Engineer

Ghosh
Ghosh
Ghosh
Ghosh
Ghosh

30.04.13
18.04.13
25.04.13
25.04.13
20.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

1
2
3
4
5

NKK Station
Septic tank connection works
Plumbing works inside public toilet(Fitting & fixing)
Rain water down pipe from building top to be provided
Chamber towards VPT end of building for collecting rain
water
Indian closet in off duty room toilet to be replaced

PF
PF
PF
PF
PF

New physically challenged toilet to be constructed

PF

7
8
9
10
11
12

Broken glass for windows to be replaced


Glass fixing for ventilator
Door for ticket store room
Finishing of slab broken for electrical works in booking office
room
Plastering for CC Blocks steps infront of new station bulding
Flooring in rear side and VPT side of toilet

PF
PF
PF
PF
PF
PF

Ghosh
Ghosh
Ghosh
Ghosh
Ghosh

13

Pale fencing fixing surrounding toilet in ground floor

PF

Gopi

14
15
16
17
18
19
20

Roof shelter provision between new and old station building


Ticket counter window work at booking office
Tap fixing for water cubicle
Paving for water cubicle
Pointing of precast slab in PF. No.2 cable duct
Painting of relay room and equipment room
Finishing of flooring in rooms broken for S&T and electrical
works
Pointing & finishing of precast slab for cable duct inside
station building

PF
PF
PF
PF
PF
PF
PF

Syed
Dept
Dept
Murugaya
M.Krisnan
Ravi
Ghosh

20.04.13
30.04.13
30.04.13
25.04.13
25.04.13
20.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

PF

Murugaya

25.04.13

Manikantan

21

Page 2 of 16

Manikantan
20.04.13
20.04.14
25.04.13
30.04.13
25.04.13
30.04.13

Remarks

During CRS
New proposal given on
10.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

To be discussed with
clients

During CRS
Item to be confirmed

Sl.
No.

Description of work
TIRUCHULI
Septic Tank Work
White washing of Toilet
Facia board fixing
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms
Duct slab finishing and pointing inside Station Building
Ticket counter window work at booking office
Door for public toilet
Roof tiles for public toilet
Broken glass refixing for windows
Glass fixing for ventilator
Hand rails for toilet ramp
Tap fixing for water cubicle
Facia board fixing
Balance slab for cable duct in PF. No.2 to be cast and all
slabs to be pointed
Dressing of platform
Soil filling for ramp at VPT end

Target
Completi
on

Work
Group

Name of
the S/c

Building
Building
PF
Building
Building
Building
Building
Building
Building
Building
Building
Building
PF
PF

Mintu pal
Ravi
syed
Mintu pal
Mintu pal
Mintu pal
Dept
RAJA
Mintu pal
Mintu pal
Mintu pal
Syed
Mintu pal
Syed

completed
22.04.13
25.04.201
3
20.04.13
20.04.13

PF

Site
Engineer

Remarks

Work in progress

20.04.13

Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan

Mintupal

22.04.13

Damodharan

WIP

PF
PF

Mintupal
Mintupal

20.04.13
20.04.13

Damodharan
Damodharan

WIP

Pale fencing casting

PF

Gopi

20.04.13

Damodharan

Post - 250/250;
Walling- 200/250

Pale fencing erection

PF

Gopi

30.04.13

Damodharan

To commence by
23.04.13

Page 3 of 16

30.04.13
19.04.13
18.04.13
20.04.13
20.04.13
22.04.13

Before CRS

Before CRS

LARSEN & TOUBRO LIMITED


TIRUCHULI - VIRUDHUNAGAR RC PROJECT
ACTION PLAN FOR COMPLETING BALANCE WORKS
As on : 06.04.13
SI
Description
Qty
No.
VIRUDHUNAGAR YARD
1

Fixing of coping
slab for PF no.: 2,3
&5

Construction of PF
wall in the portion
of exg. Trolly path

PCC
CC wall
Carballing
Fixing
Attending PF wall
& coping so as to
be keep distance
of 1.67m to 1.68m
from c/l of track to
face of coping
and .76m to .84m
from top of rail
level to coping

Start
Date

End
Date

12.04.13 17.04.13

Name of
the S/c

Tiling work for the


proposed toilet @
vpt and drainage
connection

REMARKS

Muthupand
i

PF no: 5 after wall


Alwin clearance by client
side

Muthupand
i

PF no: 5 after wall


Alwin clearence by client
side

Muthupand
i
Muthupand
i
Muthupand
i
Muthupand
i

6.75
21.6
1.69
120

Site
Engg.

Alwin
Alwin
Alwin
Alwin

Muthupand
i

Balance 40m
Alwin alignment detail to
be given by clients

Muthupand
i

Tiling work
completed,
Alwin
drainage connection
not in our scope

Water cubical &


benches

5 Nos.
11.04.13 18.04.13 Mintupaul
Each

Since width of
platform is less on
Tvnli end , we can
construct only 2nos
Alwin
immediately balance
will be done after
completing FOB
foundation works

Pale fencing left


out in the
proposed PF no:5

35 Mtr 14.04.13 20.04.13

Gopi

Alwin

Colour washing of
pale fencing

20.04.13

Gopi

Alwin Work in progress

Colour washing of
toilet building

17.04.13 19.04.13

Ravi

Alwin

Toilet building, pvc


7 Nos. 12.04.13 14.04.13
Raja
door fixing
10 Roof tiles fixing
15.04.13 17.04.13 Mintupaul
11 Water tap fixing
12.04.13 14.04.13 Mintupaul
9

Page 4 of 16

Alwin
Alwin
Alwin

SI
No.

Description

12

Physically
challenged portion

13

Name board in the


2 Nos. 13.04.13 20.04.13
PF no:5

14

Connection of
2 Nos. 15.04.13 20.04.13 Murugaiya
leach pit in lc gate

Qty

Start
Date

End
Date

17.04.13 Mintupaul

15 LC gate toilet room 2 Nos. 15.04.13 25.04.13


Gate lodge building
Sanitary
connection and
1
construction of
leach pit
Paving from gate
2
lodge to road

Name of
the S/c

Kuppan

Departmen
t

Site
Engg.

REMARKS

Alwin Work in progress


Alwin
Alwin Perali, Villipathiry
Alwin

Nagampatti,
Thottiyankulam

4 Nos. 13.04.13 20.04.13 Murugaiya

Alwin Leach Pit Completed

4 Nos. 13.04.13 30.04.13 Murugaiya

Alwin

Colour washing of
fencing

2 Nos. 18.04.13 19.04.13

Gopi

Alwin

Irrunchirai , Narikudi
balance

Level crossing filling the


surroundings with
Earth b/w pale
fencing and gate
lodgee

2 Nos.
100cu
14.04.13 22.04.13
m
each

Dept

Alwin

Keelapasali,
Chinnakannanur.

New toilet room

1 No. 13.04.13 20.04.13 Murugaiya

Page 5 of 16

Alwin Irrunchirai

LARSEN & TOUBRO LIMITED


TIRUCHULI - VIRUDHUNAGAR RC PROJECT
ACTION PLAN FOR COMPLETING BALANCE WORKS - WEARING COAT
Date :

12.04.2013

Sl. No.

Br. No.

Location

Wearing Coat (Cum) Completion date

294

589/11-12

9.00

20.04.13

296

590/14-15

33.00

27.04.13

299

591/10-11

3.00

28.04.13

300

591/12-13

1.38

29.04.13

302

592/15-593/1

4.50

30.04.13

308

595/3-4

3.60

2/05,13

313

595/12-13

11.00

03.05.13

329

608/9-10

5.00

04.05.13

330

609/5-6

4.50

06.05.13

10

331

611/12-13

5.00

07.05.13

11

333

612/9-10

12.30

10.05.13

12

338A

613/14-15

6.10

11.05.13

13

340

613/15-614/1

5.00

12.05.13

14

348

618/12-13

12.00

13.05.13

115.38

Page 6 of 16

REACH-I MANAMADURAI-THIRUCHCHULI VENT WAY DETAILS

Sl. No.

BR.No

LOCATION

PROPOSED SPAN

BARREL

WRIDTH

DEPTH

199

55613-14

1 x2x 3 RCB

8.000

0.30

200

556/14-15

1x1.2x1.2 RCB

201

556/16-17

1x1.2x1.2 RCB

202

557/2-3

1x1.2x1.2 RCB

7.650

1.2

0.40

203

557/5-6

1x1.2x1.2 RCB

7.650

1.2

0.50

204

557/6-7

1x6x2.3 RCB

6.850

0.37

205

557/9-10

1x1.2x1.2 RCB

7.650

1.2

0.23

206

557/10-11

1x1.2x1.2 RCB

7.650

1.2

0.33

207

559/3-4

1x6x3.1 RCB

6.850

0.40

10

208

559/6-7

1x6x2.4 RCB

6.850

0.50

11

209

559/8-9

1x4x2.5 RCB

6.850

0.57

12

210

559/9-10

1x1.2x1.2 RCB

7.650

1.2

0.30

13

211

559/11-12

1x1.2x1.2 RCB

7.650

1.2

0.40

14

212

559/14-15

1x1.2x1.2 RCB

7.650

1.2

0.57

15

212A

559/16-17

1x1.2x1.2 RCB

7.650

1.2

0.10

16

213

559/16-560/1

1x1.2x1.2 RCB

7.650

1.2

0.50

17

214

560/4-5

1x1.2x1.2 RCB

10.710

1.2

0.53

18

215

560/5-6

1x1.2x1.2 RCB

9.180

1.2

0.40

19

216

560/10-11

1x1.2x1.2 RCB

7.650

1.2

0.53

20

217

561/1-2

1x4.5x3 RCB

6.850

4.5

0.50

21

218

561/3-4

6x12.2 PSC

22

219

561/5-6

Constructed in MNM

Major Bridge
Closed Bridge

23

220

561/11-12

1x1.2x1.2 RCB

9.180

1.2

0.47

24

221

562/1-2

1x4x2.4 RCB

6.850

0.47

25

222

562/3-4

1x1.2x1.2 RCB

7.650

1.2

0.50

26

223

562/6-7

1x1.2x1.2 RCB

7.650

1.2

0.27

27

224

562/8-9

1x1.2x1.2 RCB

7.650

1.2

0.50

28

225

563/7-8

1x6x2.2 RCB

6.850

0.50

29

226

563/8-9

1x6x3 RCB

6.850

0.67

30

227

563/10-11

1x4x3 RCB

6.850

0.50

31

228

564/1-2

2x4x1.7 RCB

7.000

0.50

32

229

564/15-565/1

1x1.2x1.2 RCB

7.650

1.2

0.60

33

230

565/7-8

1x4x1.6 RCB

6.85

0.53

34

231

565/8-9

1x4.5x1.8 RCB

6.850

4.5

0.60

35

232

565/9-10

1x1.2x1.2 RCB

7.650

1.2

0.27

36

233

565/13-14

1x1.2x1.2 RCB

7.650

1.2

0.50

37

234

566/1-2

1x1.2x1.2 RCB

7.650

1.2

0.47

38

235

566/3-4

1x1.2x1.2 RCB

7.650

1.2

0.50

39

236

566/3-4

1x1.2x1.2 RCB

7.650

1.2

0.60

40

237

567/4-5

1x4.5x1.8 RCB

6.850

4.5

0.47

41

238

568/1-2

1 x4x 2 RCB

6.850

0.40

42

239

568/2-3

1x4x2.3 RCB

6.850

0.50

43

240

568/7-8

4x12.2 PSC

44

241

568/8-9

1x4.5x2.6

6.850

4.57

0.27

45

242

569/3-4

1x1.2x1.2 RCB

9.180

1.2

0.50

46

243

569/5-6

1x1.2x1.2 RCB

10.710

1.2

0.20

47

244

569/6-7

1x1.2x1.2 RCB

10.710

1.2

0.27

48

245

569/7-8

1x2.5x2.6 RCB

6.850

2.5

0.33

49

246

569/8-9

1x4.5x4.4 RCB

6.850

4.5

0.40

Major Bridge

50

247

569/14-15

1x1.2x1.2 RCB

9.180

1.2

0.27

51

248

570/14-15

1 x4x 1.9 RCB

6.850

0.20

52

249

572/3-4

1x1.2x1.2 RCB

7.650

1.2

0.17

53

250

572/13-14

1x 6x 3 RCB

6.850

0.10

54

251

572/14-15

1x6x5.3 RCB

6.850

0.37

55

252

573/3-5

9x12.2 PSC

56

252 A

573/5-6

57

253

573/8-9

1x1.2x1.2 RCB

10.710

1.2

0.23

58

254

573/9-10

1x1.2x1.2 RCB

9.180

1.2

0.10

59

255

573/11-12

1x1.2x1.2 RCB

7.650

1.2

0.17

60

256

573/14-15

1x1.2x1.2 RCB

7.650

1.2

0.17

61

257

574/2-3

1x1.2x1.2 RCB

7.650

1.2

0.38

62

258

574/4-5

1x1.2x1.2 RCB

7.650

1.2

0.20

63

259

574/5-6

1x6x2.3 RCB

6.850

0.27

64

260

574/12-13

1x1.2x1.2 RCB

7.650

1.2

0.27

65

261

575/5-6

1x4.5x3 RCB

6.850

4.5

0.53

66

262

575/15-576/1

1x1.2x1.2 RCB

7.650

1.2

0.27

67

263

575/15-576/1

68

264

576/7-8

1x1.2x1.2 RCB

32.130

1.2

0.20

69

265

576/10-11

1x2x2.3 RCB

32.325

0.17

70

266

577/6-7

1x4.5x3.4 RCB

6.850

4.5

0.17

71

267

577/9-10

1x1.2x1.2 RCB

10.710

1.2

0.33

72

268

577/12-13

1x1.2x1.2 RCB

9.180

1.2

0.23

73

269

577/12-13

1x2.5x2.8 RCB

6.850

2.5

0.30

74

270

577/14-15

2x4x2.1 RCB

6.850

0.17

75

271

577/16-578/1

1x2x1.2 RCB

6.850

0.50

76

272

579/7-8

1x3x1.2 RCB

6.850

0.40

Major Bridge
Closed Bridge

Closed Bridge

77

273

580/3-4

1x4.5x1.4 RCB

6.850

4.5

0.37

78

274

580/13-14

1x1.2x1.2 RCB

7.650

1.2

0.20

79

275

581/2-3

1x1.2x1.2 RCB

7.650

1.2

0.43

80

276

581/5-6

1x1.2x1.2 RCB

7.650

1.2

0.50

81

277

581/7-8

1x1.2x1.2 RCB

7.650

1.2

0.43

82

278

581/13-14

1x1.2x1.2 RCB

7.650

1.2

0.47

83

279

581/15-582/1

1x4.5x1.6 RCB

6.850

4.5

0.37

84

280

582/8-9

1x1.2x1.2 RCB

7.650

1.2

0.43

85

281

582/10-11

1x1.2x1.2 RCB

7.650

1.2

0.40

86

282

583/11-12

87

283

583/12-13

1x1.2x1.2 RCB

9.180

1.2

0.38

88

284

583/12-13

1x1.2x1.2 RCB

9.180

1.2

0.47

89

285

583/14-15

1x1.2x1.2 RCB

10.710

1.2

0.50

90

286

584/1-2

1x1.2x1.2 RCB

10.710

1.2

0.37

91

287

584/4-5

1x6x2.3 RCB

13.760

0.24

92

288

584/7-8

5X12.2 PSC

93

288A

584/8-9

1x1.2x1.2 RCB

13.000

1.2

0.30

94

289

585/5-6

1x1.2x1.2 RCB

9.180

1.2

0.17

95

290

585/6-7

1x4.5x3.1 RCB

6.850

4.5

0.43

96

291

587/1-2

1x1.2x1.2 RCB

7.650

1.2

0.38

97

292

588/5-6

1x4.5x3.7 RCB

6.850

4.5

0.67

98

293

588/7-9

11 x12.2 PSC

Retained

Major Bridge

Major Bridge

Total

LI VENT WAY DETAILS

CUM

Date-17-04-13

Status

Inside vent way


cleaning
Date of
completion

4.80

Required
Labours

Completed

Outside vent way


Cleaning
JCB hours
required

Date of
completion

Completed

Constructed in MNM-RMM GC Project

3.67

Completed

Completed

4.59

Completed

Completed

15.07

Completed

Completed

2.14

Completed

Completed

3.06

Completed

Completed

16.44

Completed

20.55

Completed

15.53

Completed

2.75

Completed

3.67

Completed

5.20

Completed

0.92

Completed

4.59

Completed

6.85

Completed

4.41

Completed

4.90

21.04.13

15.41

21.04.13

11

Completed
Closed Bridge

Pitching
work was
executed
by other
agency

5.14

21.04.13

12.79

20.04.13

4.59

20.04.13

2.45

19.04.13

4.59

19.04.13

20.55

Completed

27.40

Completed

7.5

13.70

Completed

14.00

Completed

5.51

29.04.13

14.61

29.04.13

10

18.50

30.04.13

13

2.45

30.04.13

4.59

01.05.13

4.28

01.05.13

4.59

02.05.13

5.51

02.05.13

14.39

03.05.13

10

6.5

10.96

03.05.13

5.5

13.70

04.05.13

10

5.5

Pitching
work was
executed
by other
agency

04.05.13

Completed
8.35

05.05.13

5.51

05.05.13

2.57

06.05.13

3.43

06.05.13

5.71

07.05.13

12.33

07.05.13

Pitching
work was
executed
by other
agency

executed
by other
agency

2.94

08.05.13

5.48

08.05.13

1.53

09.05.13

09.05.13

4.11

09.05.13

09.05.13

15.07

10.05.13

11

10.05.13

Completed
Closed Bridge
3.00

Completed

1.10

Completed

1.53

Completed

1.53

Completed

3.52

Completed

1.84

Completed

10.96

Completed

2.45

11.05.13

11.05.13

16.44

11.05.13

12

11.05.13

2.45

12.05.13

12.05.13

7.71

12.05.13

6.5

12.05.13

10.78

12.05.13

12.05.13

5.14

13.05.13

13.05.13

4.28

13.05.13

13.05.13

2.57

13.05.13

13.05.13

5.14

14.05.13

14.05.13

4.57

14.05.13

14.05.13

Closed Bridge

6.85

Completed

8.22

Completed

11.30

15.03.13

15.03.13

1.84

16.05.13

16.05.13

3.98

16.05.13

16.05.13

4.59

16.05.13

16.05.13

3.98

17.05.13

17.05.13

4.28

17.05.13

17.05.13

11.30

18.05.13

18.05.13

3.98

19.05.13

19.05.13

3.67

19.05.13

19.05.13

19.05.13

Completed
4.22

19.05.13

5.14

Completed

6.43

Completed

4.71

Completed

19.81

Completed
Completed

4.68

20.05.13

20.05.13

1.84

20.05.13

20.05.13

13.36
3.52
20.55

Completed
20.05.13

20.05.13

Completed
Completed

634.31

244

416.5

REACH - II

( THIRUCHULI - VIRUDHNAGAR )
MINOR BRIDGES DETAILS
AS ON : 17.04.13

SI. NO

BR. NO

293 A, RUB

BARREL WRIDTH
Location PROPOSED
SPAN

294

589/11-12

1X2.0X1.2

296

590/14-15

2X6.0X2.3

297

590/14-15

1X1.2X1.2

298
299

CUM

591/5-6

1X1.2X1.2

591/10-11

1X6.0X2.3

300

591/12-13

1X1.2X1.2

301

592/2-3

1X4.0X1.8

302

592/15-593/1

10

303

593/7-8

1X4.5X3.4

11

304

594/2-3

1X1.2X1.2

12

305

15-595/1

1X1.2X1.2

13

306

595/1-2

1X1.2X1.2

14

307

595/2-3

1X1.2X1.2

15

308

595/3-4

1X1.2X1.2

0.45

27.00

12.000

0.300

66.06

7.680

1.200

0.20

1.84

9.180

1.200

0.150

1.65

6.850

6.000

0.200

8.22

7.650

1.200

0.300

2.75

6.850

4.000

0.250

6.85

15.000

2.000

0.300

9.00

6.850

4.500

0.300

9.25

9.180

1.200

0.100

1.10

12.240

1.200

0.200

2.94

9.180

1.200

0.300

3.30

6.850

1.200

20.000

1.200

0.300

7.20

12.240

1.200

0.300

0.00

4.41

16

309

595/5-6

1X1.2X1.2

310

595/8-9

1X1.2X1.2

20.000

1.200

0.100

2.40

18

311

595/11-12

1X1.2X1.2

10.710

1.200

0.300

3.86

595/12-13

9.180

1.200

0.300

3.30

19

312
313

21

314

1X1.2X1.2
2X4.0X3.3

22

315

596/9-10

23

316

597/1-2

1X1.2X1.2

24

317

597/4-5

1X1.2X1.2

6.850

4.000

16.000

2.000

0.00
0.350

11.20

16.000

2.000

0.350

11.20

12.240

1.200

0.350

5.14

12.240

1.200

0.500

7.34

25

318

597/6-7

1X1.2X1.2

12.240

1.200

0.500

7.34

26

319

598/6-7

1X1.2X1.2

9.180

1.200

0.300

3.30

27

320

598/14-15

1X2.5X2.0

6.850

2.500

0.250

28

321

29

322

30

Inside vent way


cleaning
Date of
completion

30
18.350

17

20

Status

Required
Labours

Outside vent way


Cleaning
JCB hours
Date of
required
completion

completed

2
3

DEPTH

589/3-4

599/7-8

1X1.2X1.2

600/13-14

1X1.2X1.2

324

600/15-16

1X4.0X3.0

31

325

602/14-15

1X4.0X3.0

32

326

604/5-6

1X4.5X2.5

33

327

605/2-3

1X4.5X1.6

34

328

608/1-2

1X1.2X1.2

35

329

608/9-10

1X2.0X2.0

36

330

609/5-6

1X1.2X1.2

37

331

611/12-13

1X1.2X1.2

38

333

612/9-10

39

334

612/13-14

1X1.2X1.2

40

335

613/6-7

1X2.0X1.75

2X6.0X3.5

completed

completed

4.28

7.650

1.200

0.300

21.420

1.200

0.350

9.00

6.850

4.000

0.800

21.92

2.75

6.850

4.000

0.200

5.48

6.850

4.500

0.850

26.20

6.850

4.500

0.850

26.20

7.650

1.200

0.250

2.30

19.000

2.000

0.250

9.50

19.000

1.200

0.250

5.70

19.000

1.200

0.250

7.650

1.200

0.300

2.75

18.000

2.000

0.300

10.80

6.850

completed

Pitching work
was
executed by
other agency

5.70
0.00

completed

completed

41

336

42

337

43

338

44

339

45

340

613/7-8

1X1.2X1.2

613/10-11

1X1.2X1.2

613/13-14

1X1.2X1.2

613/14-15

1X6.0X2.7

613/15-614/1 1X1.2X1.2

46

341

47

342

614/8-9

1X2.0X1.5

48

343

617/5-6

1X1.2X1.2

49

344

618/7-8

1X4.0X1.5

615/15-616/1 1X4.0X1.3

50

345

618/8-9

1X4.0X1.5

51

346

618/10-11

1X1.2X1.2

52

347

618/12-13

1X1.2X1.2

53

348

2X4.0X2.5

7.650

1.200

0.350

7.650

1.200

0.300

7.650

1.200

0.250

2.30

0.450

10.26

0.450

17.10
27.40

6.850

6.000

19.000

1.200

19.000

2.000

0.30
2.75

0.00

6.850

4.000

1.000

6.850

1.200

0.300

2.47

6.850

4.000

1.000

27.40

10.000

4.000

1.000

40.00

10.000

1.200

1.000

12.00

10.000

1.200

0.100

1.20

9.000

4.000

1.000

36.00
518.43

completed

Pitching work
was
executed by
other agency