Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Varius Stem Service Instructions

Service Instructions

Congratulations on your Full Speed Ahead product. Please read these

instructions and follow them for correct use. Since specific tools and experience

are necessary for proper installation, it is recommended that the stem be

installed by a qualified bicycle technician. These instructions and instructions

for other FSA products are available for download at

http://www.fullspeedahead.com/techdoc

Specification

Item Number / Model Name ST-OS-150Adj / Varius Stem

Components

Follow the assembly order in the illustration:


① Stem Steerer Clamp

② Stem Main Body

③ M5 Steerer Fixing Bolts x2

④ M7 Adjustable Pivot Bolt x1

⑤ Stem Face Plate x1

⑥ M5 Face Plate Fixing Bolts x4

Revision Date 13-Jan-09 www.fullspeedahead.com ZS040-v0 Page 1 of 2


Warranty Contact

Full Speed Ahead (FSA) warrants all FSA, Gravity, Vision and RPM products to be free from defects in If you have questions, please visit our web site contact page at :

materials or workmanship for a period of two years after original purchase unless otherwise stated in the http://www.fullspeedahead.com/contact

full warranty policy. The warranty is non-transferable and valid to the original purchaser of the product

only. Full warranty policy is available at www.fullspeedahead.com


Stem installation

1. Ensure that the steerer tube is clean and free of burrs or chips.

2. Install the stem steerer clamp ① to fork and tighten M5 steerer fixing bolts ③ to a torque of 60 kgf.cm / 6 Nm / 53 in.lbs.

Note: Alternately tighten the M5 fixing bolts so both bolts reach recommended torque simultaneously. Ensure that bolt threads have a light layer of grease.

3. Loosen M7 adjustable pivot bolt ④ counter-clockwise to allow the stem main body ② to adjust up and down (-20°, +40°). After reaching to your desired position, tighten pivot bolt ④ to

a torque of 170-180 kgf.cm / 17-18 Nm / 150-159 in.lbs.

4. Place the handlebar between the stem main body ② and stem face plate ⑤. Tighten M5 face plate fixing bolts ⑥ to a torque of 60 kgf.cm / 6 Nm / 53 in.lbs.

Note: Gradually and evenly tighten the M5 face plate fixing bolts in a diagonal pattern so all bolts reach recommended torque simultaneously. Ensure that bolt threads have a light

layer of grease.

Full Speed Ahead, USA Full Speed Ahead, Europe TH INDUSTRIES / FSA Asia
12810 NE 178th St. Suite 102 Via Del Lavoro, 56 487 Ko-Chung Rd. Ta-Li City 412
Woodinville, WA 98072 20040 Busnago, Milan, ltaly Taichung County, Taiwan
Tel: 1_425_488_8653 Tel: +39_039_688_5265 Tel: +886_4_2406_8641
Fax: +39_039_682_3336 Fax: +886_4_2406_8076
Fax: 1_425_489_1082

Revision Date 13-Jan-09 www.fullspeedahead.com ZS040-v0 Page 2 of 2

You might also like