LARSEN & TOUBRO LIMITED - RLBU Division

VENDOR DRAWING APPROVAL STATUS


PROJECT:

CLIENT:

CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

INDIAN RAILWAYS (EAST CENTRAL)


Status upto 15/04/2010

DOCUMENT NO

R-0001-143-MRS-EL-DCI

DRG. / DOC. No.

DESCRIPTION

S.No

Latest Submission
to Client

Clients
Comment

L&T's Reply/
Comment

Clients Comment
Date

L&T's Reply/
Comment

Clients Approval

Remarks

Date

Date

Date

R-0001-143-MRS-EL-VD-0002

132 kV Disconnecting Switches with out Insulators

6-Nov-2008

29-Dec-2008

5-Jan-2009

13-Jan-2009

Final approval received

R-0001-143-MRS-EL-VD-0003

LV Switch Boards (8Nos) (L&T EBG Make)

7-Nov-2008

08/12/2008
19/12/2008

11/02/2008
07/01/2009

24.02.2009

Final approval received

R-0001-143-MRS-EL-VD-0004

132 kV SF6 Circuit Breaker with support structures.

10-Nov-2008

29-Dec-2008

12-Jan-2009

R-0001-143-MRS-EL-VD-0005

Light Fixtures(12 Nos)

17-Nov-2008

16-Dec-2008

16-Jan-2009

03.02.2009

Final approval received

R-0001-143-MRS-EL-VD-0007

132 kV CVT for Metering and protection.

24-Nov-2008

29-Dec-2008

31-Dec-2008

02.02.2009

Final approval received

R-0001-143-MRS-EL-VD-0008

LV Distribution Board (51 Nos) (Tricolite Make)

24-Nov-2008

18-Dec-2008

12-Jan-2009

10.02.2009

Final approval received

R-0001-143-MRS-EL-VD-0009

9.5 M Long steel tubular pole.

25-Nov-2008

29-Dec-2008

12-Jan-2009

R-0001-143-MRS-EL-VD-0010

11 kV Capacitor Bank

1-Dec-2008

1/7/2009
29.01.2009

13/01/2009

R-0001-143-MRS-EL-VD-0011

Oil Filtering machine 6000 LPH

2-Dec-2008

7-Jan-2009

23-Jan-2009

10

R-0001-143-MRS-EL-VD-0012

Early Streamer Emission (ESE) air terminal.

3-Dec-2008

6-Jan-2009

11

R-0001-143-MRS-EL-VD-0013

30 METER HIGH MAST (BOQ REF: EL1/B/13)

4-Dec-2008

22-Dec-2008

07/01/2009
&
23/01/2009

10.02.2009

12

R-0001-143-MRS-EL-VD-0014

11 kV OUT DOOR VCB.


A) 800 Amps, 25 kA (BOQ Item 15)
B) 1250 Amps, 25 kA (BOQ Item 16)

12-Dec-2008

27-01-2009

2-Feb-2009

10.02.2009

Final approval received

13

R-0001-143-MRS-EL-VD-0015

Capacitor panel for various sub stations.


400 kVAR, 300 kVAR, 150 kVAR, 110 kVAR

15-Dec-2008

06.04.09

12.11.09

10.12.09

Final approval received

14

R-0001-143-MRS-EL-VD-0016

132 kV, 10 kA LA.

22-Dec-2008

12-Jan-2009

2-Feb-2009

26.02.09

Final approval received

15

R-0001-143-MRS-EL-VD-0017

132 kV Current Transformer.

21-Jan-1900

28.04.2009

Final approval received

16

R-0001-143-MRS-EL-VD-0018

132/11 kV, 10 MVA transformer.

17-Dec-2008

2-Feb-2009

Final approval received

Page 1

Date

12.02.20096

Final approval received

09.02.09

13.02.2009

26.02.2009

Final approval received

27.01.2009

2-Feb-2009

10.02.2009

Final approval received

10.02.2009

Final approval received

16.02.2009

Final approval received

21/01/09

18.02.2009
&
18.04.2009

17.02.2009

21.04.2009

Final approval received

LARSEN & TOUBRO LIMITED - RLBU Division


VENDOR DRAWING APPROVAL STATUS
PROJECT:

CLIENT:

CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

INDIAN RAILWAYS (EAST CENTRAL)


Status upto 15/04/2010

DOCUMENT NO

R-0001-143-MRS-EL-DCI

DRG. / DOC. No.

DESCRIPTION

Latest Submission
to Client

Clients
Comment

L&T's Reply/
Comment

11.02.2009

Clients Comment

L&T's Reply/
Comment

Clients Approval

16.02.2009
&
23.02.2009

16.03.2009

Final approval received

13-Jan-2009

Final approval received

04.05.2009

Final approval received

Remarks

17

R-0001-143-MRS-EL-VD-0019

11 kV, 10 kA Station class LA.

19-Dec-2008

12-Jan-2009

18

R-0001-143-MRS-EL-VD-0020

11 kV, P.T.

23-Dec-2008

13-Jan-2009

19

R-0001-143-MRS-EL-VD-0021

11kV C.T.

17-Feb-2009

20

R-0001-143-MRS-EL-VD-0022

11 kV Gang operated AB Switch

22.09.09

Final approval received

21

R-0001-143-MRS-EL-VD-0023

11 kV Double break isolator.

28.04.2009

19.05.2009

03.07.2009

09.07.2009

Final approval received

22

R-0001-143-MRS-EL-VD-0024

132 kV control & relay panel.

26.12.2008

11.02.09

21.05.2009

08.07.2009

Final approval received

23

R-0001-143-MRS-EL-VD-0025

110 & 24 V battery and battery charger.

10.06.2009

03.07.2009

16.07.2009

06.08.2009

Final approval received.

24

R-0001-143-MRS-EL-VD-0026

Distribution transformers of different ratings:1600 kVA, 1000kVA, 750 kVA, 250 kVA.

21.02.2009

06.03.2009
20.04.2009

Final approval received.

25

R-0001-143-MRS-EL-VD-0027

5 kVA UPS

26

R-0001-143-MRS-EL-VD-0028

HT Panel (11KV Switch Board)

12.02.2009

23.02.2009

27

R-0001-143-MRS-EL-VD-0029

LV Switch boards (Balance Qty)


1) Mould Preheat S/S
2) MCC Panel for DG-1
3) MCC Panel for DG-2
4) PDB for DG S/S

27.02.2009

03.06.2009

17-Dec-2008

ECC Electrical to submit the details

03.03.2009

24.03.2009
&
25.08.2009

10.09.2009

Final approval received.

24.07.2009
13.07.2009
12.08.2009

28

R-0001-143-MRS-EL-VD-0030

2500 A LT Bus Duct.

21.05.2009

29

R-0001-143-MRS-EL-VD-0031

HT Cables of Various sizes.

29-Jan-2009

30

R-0001-143-MRS-EL-VD-0032

LT & Control Cables of Various sizes.

29-Jan-2009

31

R-0001-143-MRS-EL-VD-0034

AAA Conductor

32

R-0001-143-MRS-EL-VD-0035

Aluminium tubes

12.06.2009
15.07.2009
05.08.2009

18.06.2009
21.07.2009
11.08.2009

nd

Final approval received

18/09/2009

Final approval received

21.04.2009

Final approval received

25.03.2009

Final approval received

22.04.2009

Final approval received

08.04.2009

13.04.2009

29-Jan-2009

08.04.2009

15.04.2009

02.06.2009

07.07.2009

23.07.2009

06.08.2009

13.08.2009

01.09.2009

08.05.2009
&
11.06.2009

24.06.2009

24.07.2009

Final approval received

01.09.2009

Final approval received

24.07.2009

Final approval received

33

R-0001-143-MRS-EL-VD-0035

132/11 KV Insulator Hardware

08.04.2009

20.04.2009

23.04.2009
&
21.05.2009

34

R-0001-143-MRS-EL-VD-0043

132 & 11 KV Insulators

15.07.2009

10.08.2009

11.08.2009

35

R-0001-143-MRS-EL-VD-0044

132 & 11KV Clamps and connectors

17.07.2009

Page 2

Final approval received.

LARSEN & TOUBRO LIMITED - RBU Division


EDRC'S DRAWING APPROVAL STATUS
PROJECT:
CLIENT:

CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR


INDIAN RAILWAYS (EAST CENTRAL)

Status upto 15/04/2010

DOCUMENT NO R-0001-143-MRS-EL-DCI
DRG. / DOC. No.

DESCRIPTION

Latest Submission
to Client

Clients
Comment

L&T's Reply/
Comment

Clients
Comments

Clients
Approval

Remarks

A 132/11kV Outdoor Switchyard


1

R-0001-143-MRS-EL-CS-0001

132/11kV Switchyard - Single Line Diagram

8-Sep-08

27-Nov-08

17-Dec-08

11-Feb-09

Final approval received

R-0001-143-MRS-EL-GA-0002

132/11kV Switchyard - Layout Plan & section

8-Sep-08

27-Nov-08

17/12/2008, 19/01/09

11-Feb-09

Final approval received

R-0001-143-MRS-EL-EA-0004

132/11kV Switchyard Earth mat & Lightning protection layout

R-0001-143-MRS-EL-LL-0005

132/11kV Switchyard Lighting Layout

R-0001-143-MRS-EL-CT-0006

132/11kV Switchyard Cable Trench & Tray Layout

R-0001-143-MRS-EL-CS-0010

Single Line Diagram - Switchyard ACDB / DCDB

R-0001-143-MRS-EL-CS-0011

Typical SCADA Architecture

29/12/2008

18-Nov-08

22/12/2008

31-Oct-08
30-Sep-08

Page 3 of 6

16-Feb-09

15-Dec-08

Final approval received

5-Jan-09
19-02-09
15.04.2009

09.04.2009

07.08.2009

Final approval received

19.02.2009
17.04.2009
&
11.05.2009

29.04.2009
&
15.06.2009

15.06.2009

Final approval received

16-Dec-08

Final approval received


Meeting with M/s Seimens &Client
was held on 26th Nov.M/s Metec has
to submit the pouring control detail

LARSEN & TOUBRO LIMITED - RBU Division


EDRC'S DRAWING APPROVAL STATUS
PROJECT:
CLIENT:

CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR


INDIAN RAILWAYS (EAST CENTRAL)

Status upto 15/04/2010

DOCUMENT NO R-0001-143-MRS-EL-DCI
DRG. / DOC. No.

DESCRIPTION

Latest Submission
to Client

Clients
Comment

L&T's Reply/
Comment

Clients
Comments

17.02.2009
15.04.2009

08.04.2009

Clients
Approval

Remarks

B Main Receving Station


1

R-0001-143-MRS-EL-GA-0021

132/11kV Switchyard -Control Building Equipment Layout

12/31/2008
20/01/2009

R-0001-143-MRS-EL-CT-0022

132/11kV Switchyard -Control Building Cable Routing Layout

21.02.2009

R-0001-143-MRS-EL-LL-0023

132/11kV Switchyard - Control Building Lighting Layout

31-Dec-08

R-0001-143-MRS-EL-EP-0024

132/11kV Switchyard - Control Building Earthing & Lightning Layout

30/01/2009

Final approval received


15.06.2009

Final approval received

19.02.2009

06.03.2009
&
27.04.2009

17.06.2009

Final approval received

21.02.2009
&
09.06.2009
&
04.08.2009

29.05.2009
14.07.2009
04.09.2009

12.10.09

Final approval received

7-Nov-08

Final approval received

C Calculation / Reports
1

R-0001-143-MRS-EL-CA-0002

Earthing Design Calculation

R-0001-143-MRS-EL-CA-0003

Relay Setting Calculation & Co-ordination

19-Sep-08

R-0001-143-MRS-EL-CA-0004

132/11kV Switchyard-Outdoor Lighting Design Calculation(MRS)

R-0001-143-MRS-EL-CA-0005

Indoor Lighting Design Calculation Switchyard Control Building

31-Dec-08

R-0001-143-MRS-EL-CA-0006

Battery Sizing Calculation

21.02.2009

R-0001-143-MRS-EL-DB-0007

Proposal for SCADA Based Power Management System

23-Sep-08

Final approval received


11/18/2008

Page 4 of 6

15-Dec-08

1/5/2009
20/01/2009
19.02.2009

30/01/2009

19.02.2009

06.03.2009

13.07.2009

Final approval received

08.07.2009

Final approval received


Final approval received

7-Nov-08

11/12/2008
08.07.2009
18/03/2010

1/27/2009
22.07.2009

Meeting with M/s Seimens &Client


was held on 26th Nov.M/s Metec has
to submit the pouring control detail

APPROVAL STATUS OF TRENCH & EQUIPMENT LAYOUT AND LIGHTING & SMALL POWER SOCKET ARRANGEMENT

CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

PROJECT:

INDIAN RAILWAYS (EAST CENTRAL)

CLIENT:

DOCUMENT NO

Status upto 15/04/2010

R-0001-143-EL-DCI

DRG. / DOC. No.

DESCRIPTION

Latest
Submissio
n to Client

Clients
Comment

L&T's
Reply/
Comment

Clients Approval

R-0001-143-MLT-EL-GA-0031

Approval of Melt S/s Trench & Equipment Layout

Date

Date

Date

Date

20-Jan-09

1st Week of
March

Final approval received

1st Week of
March

Final approval received

Remarks

R-0001-143-PRE-EL-GA-0032

Aproval of TPO & MPO Trench & Equipment Layout

20-Jan-09

R-0001-143-CR-EL-GA-0034

Approval of Compressor room


Trench & Equipment Layout

9-Jan-09

R-0001-143-FE-EL-GA-0035

Approval of Fume Extraction


Trench & Equipment Layout

20-Jan-09

Final approval received

R-0001-143-PHS-EL-GA-0036

Approval of Pump house


Trench & Equipment Layout

20-Jan-09

Final approval received

R-0001-143-PCS-EL-GA-0037

Approval of Plant care shop


Trench & Equipment Layout

9-Jan-09

Last Week of Feb

Last Week of Feb

R0001-143-DG-EL-GA-0038

Approval of DG Building Trech & Equipment Layout

1/19/2009/
20/01/09
23/1/2009

R-0001-143-ADS-EL-GA-0039

Approval of Administrative building


Trench & Equipment Layout

9-Jan-09

R - 0001-144-EL2-EL-LL-001

Approval of Lighting & Small


power layout of Training school building

21.02.2009

13.02.2009

10

R - 0001-144-EL2-EL-LL-002

Approval of Lighting & Small


power layout of Administrative building ground Floor

03.03.2009

13.02.2009

11

R - 0001-144-EL2-EL-LL-003

Approval of Lighting & Small


power layout of Administrative building first Floor

19.03.2009

06.07.2009
28.07.2009

12

R - 0001-144-EL2-EL-LL-004

Approval of Lighting & Small


power layout of Administrative building second Floor

13

R - 0001-144-EL2-EL-LL-005

14

23.01.2009

Final approval received

Final approval received

Final approval received

Last Week of Feb

Final approval received

26.02.2009

Final approval received

06.04.2009

Final approval received

13.08.2009

Final approval received

24.03.2009

12.10.2009

Final approval received

Approval of Lighting & Small


power layout of Administrative building third Floor

24.03.2009

11.03.2010

Final approval received

R - 0001-144-EL2-EL-LL-006

Approval of Lighting & Small


power layout of Main store 1

13.03-2009

27.01.2010

Final approval received

15

R - 0001-144-EL2-EL-LL-007

Approval of Lighting & Small


power layout of Oil barrel shed

05.03.2009

30.03.2009

Final approval received

16

R - 0001-144-EL2-EL-LL-008

Approval of Lighting & Small


power layout of Gas shed

05.03.2009

30.03.2009

Final approval received

17

R - 0001-144-EL2-EL-LL-009

Approval of Security & time office


Lighting & Power socket arrangement

05.05.2009

18

R - 0001-144-EL2-EL-LL-010

Approval of Lighting & Small


power layout of Store shed

05.05.2009

19

R - 0001-144-EL2-EL-LL-011

Approval of Lighting & Small


power layout of Main Store-2

05.05.2009

20

R - 0001-144-EL2-EL-LL-012

Approval of Lighting & Small


power layout of Admin S/s

07.03.2009

08.04.2009

Final approval received

21

R - 0001-144-EL2-EL-LL-013

Approval of Lighting & Small


power layout of Melt shop

5.11.2009

4/1/2010

Final approval received

22

R - 0001-144-EL2-EL-LL-014

Approval of Lighting & Small


power layout of Melt Stores

5.11.2009

4/1/2010

Final approval received

23

R - 0001-144-EL2-EL-LL-015

Approval of Lighting & Power socket layout of Office


block Maint/ Melt/ Mould

06.10.09

25/02/2010

Final approval received

24

R - 0001-144-EL2-EL-LL-016

Approval of Lighting & Power socket layout of Melt


Sub-Station

06.10.09

9/3/2010

Final approval received

25

R - 0001-144-EL2-EL-LL-017

Approval of Mould office block


Lighting & Power socket arrangement

26

R - 0001-144-EL2-EL-LL-018

Approval of Mould shop 1&2


Lighting & Power socket arrangement

5.11.2009

4/1/2010

Final approval received

27

R - 0001-144-EL2-EL-LL-019

Approval of TPO & MPO


Lighting & Power socket arrangement

18.06.2009

08.07.2009

Final approval received

28

R - 0001-144-EL2-EL-LL-020

Approval of Mould storage area & Repair shop


Lighting & Power socket arrangement

5.11.2009

4/1/2010

Final approval received

29

R - 0001-144-EL2-EL-LL-021

Approval of Acetylene mainfold room


Lighting & Power socket arrangement

01.07.2009

30

R - 0001-144-EL2-EL-LL-022

Approval of Office block & WPS- Maint


Lighting & Power socket arrangement

06.10.09

04.05.2009

23.02.2009

30.07.2009

06.08.2009

Final approval awaited from


Railways

12.03.2010

03.09.2009

Final approval received.


EDRC yet to submitted the
revised drawing as per Railways
comments.

01.10.09

EDRC yet to submit

Page 5 of 6

08.09.2009
06.01.10

Location of the Equipment not


yet finalized by Railways
25/02/2010

Final approval received

DRG. / DOC. No.

DESCRIPTION

Latest
Submissio
n to Client

31

R - 0001-144-EL2-EL-LL-023

Approval of Wheel processing shop & Dispatch area


Lighting & Power socket arrangement

32

R - 0001-144-EL2-EL-LL-025

33

Clients
Comment

L&T's
Reply/
Comment

Clients Approval

Remarks

5.11.2009

4/1/2010

Final approval received

Approval of Compressor Room Substation


Lighting & Power socket arrangement

18.06.2009

08.07.2009

Final approval received

R - 0001-144-EL2-EL-LL-026

Approval of Pump House & Substations


Lighting & Power socket arrangement

04.05.2009

34

R - 0001-144-EL2-EL-LL-027

Approval of Fume Extraction Plant & Substations


Lighting & Power socket arrangement

35

R - 0001-144-EL2-EL-LL-028

Approval of Plant care shop & substation


Lighting & Power socket arrangement

05.05.2009

36

R - 0001-144-EL2-EL-LL-029

Approval of Diesel Generator Room


Lighting & Power socket arrangement

15.05.2009

15.07.2009

37

R - 0001-144-EL2-EL-LL-030

Approval of Metallurgical laboratory Lighting &


Power socket arrangement

05.05.2009

05.08.2009
16.10.2009

38

R - 0001-144-EL2-EL-LL-031

Approval of Canteen Lighting &


Power socket arrangement

04.05.2009

22.05.2009

Final approval received

39

R - 0001-144-EL2-EL-LL-032

Approval of Road Transport Shop


Lighting & Power socket arrangement

05.05.2009

17.09.09

Final approval received

40

R - 0001-144-EL2-EL-LL-034

Approval of Scrap Preconditioning shop


Lighting & Power socket arrangement

19.05.2009

22.05.2009

Final approval received

41

R - 0001-144-EL2-EL-LL-035

Approval of Engg Office & Stores


Lighting & Power socket arrangement

05.05.2009

29.07.2009

Final approval received

42

R - 0001-144-EL2-EL-LL-036

Approval of Incinerator Shed


Lighting & Power socket arrangement

05.05.2009

29/05/2009

43R - 0001-144-EL2-EL-LL-037

Approval of Transformer repair shed


Lighting & Power socket arrangement

05.05.2009

Comment
received from
client on
01.06.2009

30.07.2009

44

R - 0001-144-EL2-EL-LL-038

Approval of Basement area


Lighting & Power socket arrangement

04.06.2009

12.08.2009

23/07/2009

45

R - 0001-144-EL2-EL-LL-039

Approval of Tunnel
Lighting & Power socket arrangement

18.05.2009

15.07.2009

23.07.2009

15.05.2009
10.08.2009
14.10.09

1) 27.05.2009
2) 07.10.2009
3)
17.11.2009 4)
4/2/2010

22.05.2009

5.3.2010

Approval awaited from Railways

Drwg Send to EDRC

46

R - 0001-144-EL2-EL-LL-040

Overall street light layout

19.03.2009

47

R - 0001-144-EL2-EL-LL-046

High Mast Layout

18.08.2009

48

R - 0001-144-EL2-EL-CT-041

Overall plant tunneling & cable trench routing

15.05.2009

49

R - 0001-144-EL2-EL-RL-015

Overall plant road crossing detail layout

28.01.2009

16.09.09

EDRC to submit revised


drawings
16.03.2010

Approval awaited from Railways

Drwg to be sent to EDRC


(Location not finalized)

4/2/2010

01.09.2009
03.11.2009

Final approval received

10.08.2009

Final approval received

EDRC to submit revised


drawings as per comments

23.09.09

Final approval received

Approval awaited

30.11.09

11.09.2009
12.10.09

Final approval received

L&T to submit the revised


drawing/clarification.

22.04.2009

50

R - 0001-144-EL2-EL-EA-042

Overall Plant earthing Layout

30.07.2009

08.12.09

51

R-0001-144-EL2-EL-EA-0045

Unit Substation Earthing layout

28.07.2009

02.09.09

08.02.2010

Final approval received

52

RBUPNBE-IR-EL-00141

Fire alarm system-Admin Building-1st, 2nd & 3rd


Floor

31.07.2009

05.08.2009

22/02/2010

Final approval received

53

RBUPNBE-IR-EL-00050

Fire alarm system of ground floor

20.04.2009

22.04.2009

Final approval received

Page 6 of 6

29/12/2009

Final approval received


Approval awaited from Railways