Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Memo

For Attention of: . Minutes from the 27th Contracts Current status o Aaron already submitted back and executed TA o Once Cerso has LIME PALANTIR, will submit proposal to John Cerso / H&W NDA still outstanding - URGENT o Sean has action, will return to Cerso by COB tomorrow for response System (Palantir) Hardware status hardware is g2g, system is installed. Oracle is active. Install status in progress, Alec has action Hardware is dedicated hostname will be pass.ibis.cck need to check on port configuration Once system up, will need to distribute admin and account passwords to all Deliverables Workshop on 4th who is at this? Richard presenting to client. Push to have team representative there, or a demo video? What are they expecting to see? Integration and network of system solution requires all sites and field offices must run Patch #229T11.4 need to co-opt agents assigned to field to complete check of all hardware and update distribution manually Need to sync with Brian and Peter prior to field service to ensure that they have clarity on priority pending LIME PALANTIR

ISO 9001:2008 is the International standard against which the quality management and quality assurance system of a business is evaluated. This certification confirms that the processes, implementation and summoning management procedures of The Laundry, as well as its customer support, adhere to the quality policy described in detail in the Quality Management Manual. With ISO certification implemented, The Laundry demonstrates its commitment to being a reliable and technically competent partner for our customers, suppliers and future collaborators. The use of the Accreditation Mark indicates accreditation in respect of those covered by the accreditation Certificate No. 814C This document is intended for internal use only. Access and availability of this document and the content therein should be restricted to those of the relevant clearance. Print of this document should be construed as setting finite limitation on the accuracy and relevancy of the document, and all documents produced, as such, should be marked as Access and Time Sensitive Content Uncontrolled. The responsibility of controls over the printed document lies with the original author. Versioning or access issues should be communicated in writing by filing a signed form HZ-772, counter-approved by your line manager, submitted to the Absolute Quality Management Hotline. Specific Retention Medium #2010-298. This document replaces SRM #2005-351 and SRM #1998-033.

You might also like