Professional Documents
Culture Documents
Methods Structures
Methods Structures
Aboulderweirisagradecontrolstructurethatisconstructedwithasinglelayerof boulderslayingonthechannelbed.Thesinglelayerofbouldersisbuilttocovera relativelylargesurfaceareaofthechannel.Thisallowsthestructuretoactasa constructedriffle,addingroughnesstothechannel,slowingflowsandencouragingthe depositionofsedimentonandnearthestructure.Thesinglelayerofbouldersalso actsasamulchandretainsmoistureinthebedofephemeralchannelsthatcan supportvegetation,whichultimatelyaddsstrengthandlongevitytothestructure. Boulderweirsareintendedtobebuiltlow,dropsrarelyexceed1.5 2inheight.This minimizesthechanceofscouronthedownstreamsideofthestructureandensures thatnoonestructurecausesabruptchangesinthegeomorphologyofthechannel.A OneRockDamisessentiallythesamestructurethatishandbuiltwithsmallerrocks.
Boulder Weir
Crossover=Deposition Pool=Scour
PlanView
Crossover=Deposition
Profile
2010CS
Cross Vane
Acrossvaneisusedtoprovidebothgradecontrolandbankprotection.Thestructure isessentiallyshapedlikeaV.Thecenterofthestructureisknownastheinvert.The invertsetstheintendedgradeofthechannelupstreamfromthestructure.Eacharm oftheVisangledandslopedawayfromtheinvertandupintothebanks.The slopedarmssteerwaterawayfromthebanksandtowardthecenterofthechannel. Theareaimmediatelydownstreamfromtheinvertisdesignedtoformascourpool. Thispoolallowstheconcentrationofflowinthecenterofthechannelanddissipates theenergyofthewaterasitfallsovertheinvertandarms.Thedegreeofscouris controlledbytheheightoftheinvertandtherelationofthewidthofthestructureto thechannelformingflood.Crossvanesarebuiltwithdeepfooterstopreventthe structurefrombeingundermined.
Cross Vane
2010CS
2010CS
Boulder Vane
Bouldervanesareusedtostabilizebankerosion.Abouldervaneisessentiallyone armofacrossvanepositionedingroupsof2 5onerodingoutsidemeanderbends. Theupstreamtipofthearmisthelowestpointofthestructureandispositionedas closetobedelevationaspossible.Thedownstreambaseofthestructureisanchored intothebankandtheelevationofthispointisdeterminedbytheheightofthe channelformingflood.Thestructuregraduallyslopesuphill,intothebankfrom upstreamtodownstream.Thegradualslopeslowswaterthatflowsacrossthe structurebecausethewaterhastoflowagainsttheslopeasitapproachesthebank. Thiscausesaslowmovingcushionofwatertoformnearthebankthatsteersthe fastermovingcurrenttowardthecenterofthechannel.Theslowmovingwaternear thebankdepositssedimentandgraduallyallowsastablebanktoforminplaceofthe onceerodingoutsidebend.
Boulder Vane
2010CS
BoulderVanedeflectingfloodflowsawayfrombank
J-Hook Vane
2010CS
2010CS
Erodingoutsidemeanderbend
PointBar
Thalwag current