Well Test Equipment

LAYOUT FOR TESTING GAS CONDENSATE OR OIL WELLS

Burner
Manifold
Air
Burner Gas
Manifold Water to
Air Smoke
Oil Suppressor
Water to Gas
Smoke
Suppressor
Water Burner

Separator
Burner Oil SSV Actuator Pressure Water to
Heat Shield

Water to Surface Safety Valves


Heat Shield Flowline
Manifold*
Water
Header
Pump

Surface
Choke Manifold Test Tree
Manifold

Tuning
Head
Swivel

OBJECTIVES OF WELL TEST OPERATIONS

Following important data & samples to be obtained from well test :

! Gas production rate in MMSCF/D.


! Oil or Condensate production rate in barrels per day.
! B&W percentage of crude.
! Gravities of oil , gas & water
! Salinity of water with further compositional analysis if possible.
! Viscosity of condensate or crude.
! Pourpoint of condensate or crude, determined from fresh wellhead samples.
! Rough wellhead composition of produced gas, including H2S,CO2, CO&N2 content.
! Bottom hole pressures, build-ups and draw-downs.
! Bottom hole temperature.
! Accurate recording of surface pressures, temperatures and flow data versus time.
! Separator gas samples, Oil samples , under pressure
! Bottom hole PVT samples.

Above introductory figure shows typical well testing layout for a very complete set of equipment. The equipment
requirements and design for successful well testing obviously vary according to the specific requirement of operators.
PARVEEN
Well Test Equipment

MODEL ANSHOO BURNER WITH 60’/75’/90’ BOOM

Capacity : 12000 BOPD


Features : Designed to dispose off crude oil /diesel, pollution free Pilot ignition system for each
burner head.
Consist of Atomizers for multistage automization.
Specially designed nozzle and high velocity of effluent gives flame narrow shape , resulting in
reducing heat radiation.
Flow rates up to 12,000 STBD at any water percentage.
Swivel provided in structure allows a rotation in 30 º each side of boom axis.
Total length of boom available :
60' - 75' - 90' in 2 - 3 sections
Booms comprises of :
Oil line 3” SCH 80
Gas line 4' / 5” SCH 80
Air 2” SCH 40
Water line 3” SCH 40
Diesel line 1.50 “ SCH 40
Relief Line 4” SCH 40
Propane line ½” SCH 40
Electric cable
Material of construction :
Suitable for H2S Service asper NACE MR-01-75
PARVEEN
Well Test Equipment

GAUGE TANK / SURGE TANK

Gauge Tank Surge Tank

Capacity : 100 BBL ( Twin Compartment) Capacity : 100 BBL (Twin Compartments)

Features : Features :
Supplied with Centrifugal pump with electric driven Design pressure : 150 PSI / W.P. : 50 PSI
motor (chemical proof) w/ HP Flame proof console. Magnetic level controllers with High/Low level alarm.
Complete with piping, flanges, valves , instrumentation Complete with piping, flanges, valves, instrumentation
& union Connections. & union connections With automatic control valve to
control pressure in tank up to 50 psi.
Supplied with Centrifugal pump with electric driven
motor (chemical proof) w/ HP Flame proof console.
PARVEEN
Well Test Equipment

MANIFOLDS / UNITIZED WELL CONTROL HEAD / DATA HEADER

3.1/8” x 5000 PSI CWP - 3.1/16” X 100000 PSI CWP


Construction :
Skid mounted suitable for H2S Service asper NACE
MR-01-75.
Complete with 4-5 Gate Valves / Adjustable & Positive
Chokes, 3” Thru bore.
With provision for measuring pressure, temperature &
sampling both Upstream & Downstream of chokes.

Choke Manifold

2.1/16 x 5000 PSI CWP - 3.1/8”X 5000 - 3.1/16” -10000


PSI CWP
Construction :
Skid mounted suitable for H2S Service asper NACE
MR-01-75.
Complete with 8 Gate Valves / Adjustable & Positive
Chokes, 2” / 3” Thru bore.
Orientation of Gate Valves, Chokes asper
customer requirement.
With provision for measuring pressure, temperature &
sampling both Upstream & Downstream of chokes.
Eruption Manifold

3.1/16” x 10000 PSI CWP


Construction :
Skid mounted - Unitized type.
Suitable for H2S Service asper NACE MR - 01- 75.
Complete with two side outlets one for connection to
Kill line & other for production testing.

2” /3” /4” 5000 PSI & 10000 PSI WP


3’ to 8’ Length
Material :
Utilized Well Control Head
Suitable for H2S Service asper NACE MR-01-75.
With Union / Gray Lock End Connections.
Supplied with multiple ports Plugged or Flanged at
specified intervals and degrees.
Supplied with Thermowell , Pressure Gauges as
Data Header
required by customer.