Cbip Element Final
1
Columbia Building Intellegence Project | Integrated Design Studio Spring 12
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PHOTOBIOREACTOR
Bioreactor: an engineered device which supports a biologically active environment Photobioreactor: incorporates some kind of light source to provide photonic energy input into the reactor
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PHOTOBIOREACTOR
Bioreactor: an engineered device which supports a biologically active environment Photobioreactor: incorporates some kind of light source to provide photonic energy input into the reactor
DESIGN GOAL # 2 Metabolic *Living system that thrives of "waste" of building industry * Digests CO2 emissions, stormwater *Provides nutrients for the building *Oxygen and energy
DESIGN GOAL # 3 Adaptive *Can be used as rooftop canopy or in light well as chandelier *Accommodates passive (solar) and active (LED) approaches
DESIGN GOAL # 4 Didactic *Environmental impacts of building industry *Architecture reconceived as a therapeutic technology *Chemically active gradients which alter microclimates *Can buildings become a part of the biosphere? *Can biological systems fulfill architectural functions?
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PHOTOBIOREACTOR
Bioreactor: an engineered device which supports a biologically active environment Photobioreactor: incorporates some kind of light source to provide photonic energy input into the reactor
DESIGN GOAL # 2 Metabolic *Living system that thrives of "waste" of building industry * Digests CO2 emissions, stormwater *Provides nutrients for the building *Oxygen and energy
DESIGN GOAL # 3 Adaptive *Can be used as rooftop canopy or in light well as chandelier *Accommodates passive (solar) and active (LED) approaches
DESIGN GOAL # 4 Didactic *Environmental impacts of building industry *Architecture reconceived as a therapeutic technology *Chemically active gradients which alter microclimates *Can buildings become a part of the biosphere? *Can biological systems fulfill architectural functions?
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PHOTOBIOREACTOR
Bioreactor: an engineered device which supports a biologically active environment Photobioreactor: incorporates some kind of light source to provide photonic energy input into the reactor
DESIGN GOAL # 2 Metabolic *Living system that thrives of "waste" of building industry * Digests CO2 emissions, stormwater *Provides nutrients for the building *Oxygen and energy
DESIGN GOAL # 3 Adaptive *Can be used as rooftop canopy or in light well as chandelier *Accommodates passive (solar) and active (LED) approaches
DESIGN GOAL # 4 Didactic *Environmental impacts of building industry *Architecture reconceived as a therapeutic technology *Chemically active gradients which alter microclimates *Can buildings become a part of the biosphere? *Can biological systems fulfill architectural functions?
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PHOTOBIOREACTOR
Bioreactor: an engineered device which supports a biologically active environment Photobioreactor: incorporates some kind of light source to provide photonic energy input into the reactor
DESIGN GOAL # 2 Metabolic *Living system that thrives of "waste" of building industry * Digests CO2 emissions, stormwater *Provides nutrients for the building *Oxygen and energy
DESIGN GOAL # 3 Adaptive *Can be used as rooftop canopy or in light well as chandelier *Accommodates passive (solar) and active (LED) approaches
DESIGN GOAL # 4 Didactic *Environmental impacts of building industry *Architecture reconceived as a therapeutic technology *Chemically active gradients which alter microclimates *Can buildings become a part of the biosphere? *Can biological systems fulfill architectural functions?
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 30 30 0 5 35 25
Y 0 30 30 0 0 35 30 5
Z 0 0 0 0 10 15 2 -5
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
1,012,000 10,000 47.25 48.72" 2 6' 3" 1" 30 8 Off Canopy High
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
1,012,000 10,000 47.25 48.72" 2 6' 1 1" 30 8 Off Chandelier Canopy High
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
Legend (inches)
>5 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-50 50-60 60-70 70-80 80-100 100-140 140-180 180+
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
PARAMETER OUTPUT NAME CARBON DIOXIDE Building CO2emissions System % Reduction WATER System Surface Area Gallons Caught per Year ENERGY Building Energy Consumption
PARAMETER OUTPUT DESCRIPTION C02 emissions produced by building/year % of Building CO2 emissions sequestered by system Surface area of canopy Rainwater capture of given configuration/year Amount of energy consumed by building/year
METRICS Square Footage of Building * 20 -Standard office: 20lb of c02/sq ft per year
Output from Catia Square Footage of Building X Collection Constant (.623) X Annual Precipitation Square Footage of Building * 70,000 -The average commercial building uses 90,000 btu/sf/yr. -The average commercial building built to the latest national energy standards uses 70,000 btu/sf/yr Building CO2 Emissions/2 -1 lbs-Algae is fed by 2 lb-CO2 Algae Pounds/20 -20 lbs-Alage produce 1 lb Biofuel Biofuel Pounds/6 -6 lbs biofuel = 1 gallon Biofuel Gallons* 139,000 1gallon of biofuel = 139,000 BTU Algae Pounds/7.7 * 35 35 cubic feet space produces 7.7 lb of algae Total Tube Volume Needed/Pi(r2) Volume of a cylinder =pi(r2)X height Output from Catia Output from Catia Biofuel BTU/Building Energy Consumption
Algae Pounds Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System % Contribution
Amount of algae produced/ year Amount of biofuel produced/year Amount of biofuel produced/year Amount of biofuel produced/year Volume of system to produce required metrics Amount of feet at Tube Radius x needed to accommodate Total Tube Volume Needed Total volume of all instantiated tubes Total length of all instantiated tubes Percent of building energy need supplied by algae
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X 0 0 0 0 0 0 0 0
Y 0 0 0 0 0 0 0 0
Z 0 0 0 0 0 0 0 0
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
0 0 0 0 0 0 0 0
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
0 0 0 0 0 0 0 0
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
LO-RES
ROOFTOP
X+
DESIGN INTENTION
MED-RES
RAINWATER ELEMENT PROVIDE SYSTEM GREYWATER ANY AIR QUALITY ELEMENT PROVIDE SYSTEM C02
X-
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Launch Grasshopper
Link to Ecotect
Create Database
Organize Spreadsheet
GRASSHOPPER
Call Spreadsheet
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Launch Grasshopper
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Collect Data
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Call Spreadsheet
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
low-res
med-res
high-res
+ solar
v1.0
v2.0
v3.0
v4.0
Phase1
Timeline Week 1
Phase 2
Week 5
Phase 3
Week 11
Initiatives
Rainwater Catchment Solar Optimization Photobioreactor Element Ecology Rhino Grasshopper Geco Ecotect Excel vb Script Catia vault sketches
low-res highest-res high-res med-res canopy sketches performance metrics make low-res v.1 a mesh make low-res v.1 a mesh solar radiation study performance metrics vault scheme canopy and chandelier scheme instantiate UDF instantiate UDF
Software
Collaboration
Emilie
Victor Adam
Emilie
Jonathan
Jonathan
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
FEATURE REQUEST
*** med-res, 4 input points
4-pt
v2.1
Phase1
Timeline Week 1
Phase 2
Week 5
Phase 3
Week 11
Initiatives
Rainwater Catchment Solar Optimization Photobioreactor Element Ecology Rhino Grasshopper Geco Ecotect Excel vb Script Catia vault sketches
low-res highest-res high-res med-res canopy sketches performance metrics make low-res v.1 a mesh make low-res v.1 a mesh solar radiation study performance metrics vault scheme canopy and chandelier scheme instantiate UDF instantiate UDF
Software
Collaboration
Emilie
Victor Adam
Emilie
Jonathan
Sam
Jonathan
Intention
Precedence
Inputs
Outputs
Design Map
Mutations
SCORECARD
16
GEOMETRICAL INPUTS GRID SPECIFICATION InputPoint 1 InputPoint 2 InputPoint 3 InputPoint 4 Input Point 5 Input Point 6 Input Point 7 Input Point 8
X V V V V V V V V
Y V V V V V V V V
Z V V V V V V V V
INPUT PLANE
PARAMETER INPUTS Square Footage of Building (ft2) Annual Precipitation (in2) Center Radius (ft) Tube Radius (in) Vertical Divisions Horizontal Divisions Toggle Surface Desired Program Desired Resolution
PARAMETER OUTPUTS CARBON DIOXIDE Building CO2 Emissions System % Reduction WATER System Surface Area Gallons Caught Per Year ENERGY Building Energy Consumption Algae Pounds
ENERGY CONTINUED Biofuel Pounds Biofuel Gallons Biofuel BTU Total Tube Volume Needed Total Tube Length Needed System Tube Volume System Tube Length System %Contribution
Intention
Precedence
Inputs
Outputs
Design Map
Mutations