Professional Documents
Culture Documents
Daily Endline RFT Control Chart
Daily Endline RFT Control Chart
10 9 8 7 6 5 4 3 2 1 8.30am Time 9.30am 10.30am X X X 11.30am 12.30pm 1.30pm 2.30pm Lunch Break X Lunch Break
Immediate Improvement Plan (Initiate by RFT Committee) 1. Check Neck Band Length 2. Mechanic to check the tension. 1. Neck Band Operation Stop and Inform Chief Sewing. 2. Train the Operator to drive follow curve, no stretching allowed. 3. Resume Sewing Operation.
10.30am
1.30pm
1. 2. 3. 4.
Remark 1. RFT Committee to come out with immediate action plan when problem found above upper control limit 2. If found same issue occurs for the second time, RFT committee to inform Chief Sewing to improve the action plan. 3. If found same issue occurs for the third time, RFT committee to inform Chief Sewing, Sewing Manager, QA Manger and Mechanic Manager to improve the action plan.
10 9 8 7 6 5 4 3 2 1 8.30am Time 9.30am 10.30am 11.30am 12.30pm 1.30pm 2.30pm 3.30pm 4.30pm 5.30pm Acknowledge By Chief Upper Control Limit
SPV
1. 2. 3. 4.
Remark 1. RFT Committee to come out with immediate action plan when problem found above upper control limit 2. If found same issue occurs for the second time, RFT committee to inform Chief Sewing to improve the action plan. 3. If found same issue occurs for the third time, RFT committee to inform Chief Sewing, Sewing Manager, QA Manger and Mechanic Manager to improve the action plan.
Daily Endline RFT Control Chart/ Diagram Kontrol RFT Endline Harian Tanggal
20 18 16 14 12 10 8 6 4 2 8.30am Time/ Jam 9.30am 10.30am 11.30am 12.30pm 1.30pm 2.30pm 3.30pm 4.30pm 5.30pm Acknowledge By SPV Chief Lunch Break/ Istirahat Siang
Line
Buyer
Style
Issue (Above the Upper Control Limit)/ Masalah (Diatas Upper Control Limit)
Immediate Improvement Plan (Initiate by RFT Committee)/ Rencana Perbaikan langsung (Lakukan oleh Komite RFT)
1. 2. 3. 4.
Remark 1. Komite RFT untuk mengadakan rencana tindakan segera ketika masalah ditemukan di atas batas kendali atas 2. Jika ditemukan masalah yang sama terjadi untuk kedua kalinya, Komite RFT untuk menginformasikan Chief Sewing untuk meningkatkan rencana aksi. 3. Jika ditemukan masalah yang sama terjadi untuk ketiga kalinya, Komite RFT untuk menginformasikan Kepala Produksi/ Chief Sewing, Sewing Manager, QA Manger dan Mechanic Manager untuk meningkatkan rencana aksi.