SECTOR WISE YEARLY RELEASE OF FUNDS FOR NLCPR PROJECT IN Assam

(Rs. in Lakh)
Sl
.
NLCPR Project
N
o.

Release
Approve
d cost

'98-99'

'99-00'

'00-01'

'01-02'

'02-03'

'03-04'

'04-05'

'05-06'

'06-07'

'07-08'

'08-09'

'09-10'

'10-11'

'11-12'

Total

Status

Education

Construction of
15 HSS
Buildings
(BAC Area)

150.00

0.00

0.00

75.00

0.00

75.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

150.00

Guwahati
University
Campus.
Kokrajhar

500.00

0.00

0.00

0.00

0.00

250.00

0.00

0.00

211.50

0.00

0.00

0.00

0.00

0.00

0.00

461.50

Assam
University
Silchar
(including
Diphu Campus)
- CS

1300.00

0.00

1300.0
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fully
1300.00 Release
d

I.I.T.
Guwahati-CS

3400.00

0.00

3400.0
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3400.00

Comple
ted

New
Infrastrucutre
for Cotton
College.

300.00

0.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.00

Comple
ted

Tezpur
University-CS

2433.00

0.00

1000.0
0

0.00

0.00

1433.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Comple
ted

Project
treated
as
complet
ed (as
far as
2433.00
DONE
R is
concern
ed) on
21.8.20
06

Sarva Shiksha
Abhiyan for
Assam

Infrastructure
Development
of North
Eastern Judicial
Officers
Training
Institute,
Guwahati
(Assam)

Sarva Shiksha
Abhiyan for
Assam (200607)

Comple
ted

2770.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2770.00

0.00

0.00

0.00

0.00

0.00

0.00

2770.00

354.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

111.60

0.00

0.00

0.00

137.99

0.00

62.40

311.99

10293.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7283.67

3009.27

0.00

0.00

0.00

Fully
0.00 10292.94 Release
d

1
0

Modernisation
&
Augmentation
of
Infrastructure
Development
of Assam
Textile Institute
at Guwahati

741.49

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

233.57

0.00

0.00

0.00

0.00

0.00

233.57

1
1

construction of
academic - cum
Administrative
building of K.K
Handique
Government
Sanskrit
College

238.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

93.37

0.00

0.00

0.00

0.00

93.37

1
2

Development
of
infrastructure
facilities of
Kahrupetia
college, i.e
construction of
class rooms ,
computer
labratory with
Ac, hostel for
tennis,

175.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55.33

0.00

0.00

0.00

55.33

elctricity
facilities, water
supply and
sanitary
installation in
darrang distt.

1
3

Infrastructure
Development
of Assam
SLET
Commission

334.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

118.04

0.00

118.04

1
4

Infrastructure
Development
of Assam
Institute of
Management,
Guwahati

1461.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

515.68

0.00

515.68

1
5

Bodo Language
Research and
Development
centre for
Gauhati
University,
Kokrajhar(BTC
Package-2)

295.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

47.90

100.00

147.90

1
6

Construction of
Govt college of
Arts & Crafts
in Kamrup
District

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

178.61

178.61

Total of
Education
sector (16
Projects)

25247
.33

0.00

6000
.00

75.0
0

0.00

1758.
00

0.00

0.00

3093.
10

7517.
24

3102.
64

55.33

137.9
9

681.6
2

341.
01

22761
.93

Flood Control & Irrigation


1
7

Amreng Minor
irrigation
Scheme (Karbi
Anglong)

1200.00

0.00

0.00

0.00

600.00

0.00

300.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1200.00

Comple
ted

1
8

Flood Control
scheme (5 No.)

210.00

0.00

0.00

0.00

210.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

210.00

Comple
ted

- Protection of
different
reaches from
the erosion of
river Dhansiri
at Assam, K.A.
Distt. Phase-I

1
9

Flood Control
scheme (5 No.)
- Protection of
different
reaches from
the erosion of
river Dhansiri
at Assam, K.A.
Distt. Phase-II

165.00

0.00

0.00

0.00

165.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

165.00

Comple
ted

2
0

Flood Control
scheme (5 No.)
- Protn. Of
Harinagar PtIII area cum
dyke along R/B
of river Surma
(international
boundary) from
Harinagar to
Nathanpur

364.98

0.00

0.00

0.00

150.00

214.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

364.98

Comple
ted

2
1

Flood Control
scheme (5 No.)
- Strengthening
of Kahai spur
(stone spur no.
2) to protect
Dibrugarh town
from the
erosion of river
Brahmaputra

655.00

0.00

0.00

0.00

255.00

206.02

163.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

624.98

2
2

Washillinghadi
ELIS, NC Hills
minor irrigation
schemes.

270.00

0.00

0.00

0.00

270.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

270.00

2
3

Raising &
strengthening
Brahmaputra
Dyke from
Dizmore to

1151.00

0.00

0.00

0.00

0.00

0.00

500.00

0.00

270.00

77.76

134.62

0.00

0.00

0.00

0.00

982.38

Comple
ted

Sonarigaon
from 14th
to23.15th
including
closing of
Amguri and
Arney Nalla.
2
4

Installation of
one Lakh
Shallow tube
wells

2
5

Flood Control
Scheme (5 No.)
- Protn. of
Guwahati town
from erosion of
river
Brahmaputra
from Kachari
Bazaar to D.C.
Court

2
6

AntiErosion/Flood
control
Schemes in 25
different
locations of
Brahmaputra
and Barak
Valley

6895.00

0.00

1000.0
0

4500.0
0

0.00

1395.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6895.00

Comple
ted

333.21

0.00

0.00

0.00

120.00

0.00

213.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

333.21

Comple
ted

6066.61

500.00

500.00

0.00

3000.0
0

2236.00

0.00

0.00

0.00

-169.39

0.00

0.00

0.00

0.00

0.00

Earlier
the
approve
d cost
of the
project
was Rs.
6236.0
0 lacs.
Howev
er,
Govt of
Assam
6066.61
informe
d that
only
Rs.
6066.6
1 have
been
utilised
for
these
projects
. The
savings

of Rs.
169.39
lacs
have
been
diverte
d to
'Assam
Medica
l
College
' on
19.7.20
06

2
7

Borjan
Composite
Irrigation
Scheme in
Assam (Karbi
Anglong)

2228.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

720.00

0.00

1018.00

0.00

267.78

0.00

0.00

Fully
2005.78 Release
d

2
8

Champamati
Irrigation
Project (BTC
Package)

4385.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1973.25

0.00

1973.25

0.00

438.50

0.00

0.00

4385.00

Comple
ted

2
9

Sukla Irrigation
Project (BTC
Package)

812.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

365.85

0.00

365.60

81.27

0.00

0.00

0.00

812.72

Comple
ted

3
0

89 Nos. of
minor irrigation
schemes

2520.00

1121.0
0

500.00

0.00

899.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3
1

Construction of
dakhindol Lift
Irrigation
Scheme at
Sonitpur and
Joisidhi, Assam

211.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66.53

0.00

0.00

85.54

0.00

152.07

3
2

Belsiri Lift
Irrigation
Scheme

217.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

68.48

0.00

0.00

0.00

0.00

68.48

3
3

LIS over river


Buriduhing in
Tengakhat
Kheremia
Mouza in
Dibrugarh

291.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

92.32

0.00

112.00

0.00

53.00

257.32

Fully
2520.00 Release
d

Distt.

3
4

LIS over river


Buridihing in
Sassoni Mouza
in Dibrugarh
Dist.

239.79

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

77.82

0.00

91.44

0.00

42.32

211.58

3
5

Deithor Minor
Irrigation cum
Community
Development
Project(Karbi
Anglong)

222.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

78.42

0.00

0.00

78.42

3
6

Flow Irrigation
Scheme from
River Kulsik at
Palashgarh

1927.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

687.16

687.16

3
7

Burinagar Lift
Irrigation
scheme
(Nalbari
Division)

215.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

73.47

73.47

3
8

Phumen
Phangcho
Minor
Irrigation
Scheme (Karbi
anglong)

609.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

218.67

218.67

31192 1621 2000 4500 5669


.39
.00
.00
.00
.00

4052.
00

1177.
17

300.0
0

3329.
10

91.63

3796.
62

81.27

988.1
4

85.54

1074
.62

28582
.83

Total of Flood
Control &
Irrigation
sector (46
Projects)

Health
3
9

Sankaradeva
Netralaya

100.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

Comple
ted

4
0

Upgradation of
hospital at
Udalguri to 100
bedded
Hospital.

169.00

0.00

0.00

85.00

0.00

0.00

84.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

169.00

Comple
ted

4
1

Assam Medical
College
(HOPE)

4
2

Shankar Dev
Netralaya
(equipments)

4
3

The
savings
of Rs.
169.39
lacs in
"25 no.
of
Flood
Control
Scheme
s in
differen
t
1840.10 location
s of
Brahma
putra &
Barak
valley"
have
been
diverte
d to this
project
on
19.07.2
006

2000.00

0.00

0.00

0.00

0.00

22.00

379.00

0.00

900.00

539.10

0.00

0.00

0.00

0.00

0.00

82.00

0.00

0.00

0.00

0.00

82.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

82.00

Comple
ted

Shankar Dev
Netralaya (OT)

153.00

0.00

0.00

0.00

0.00

153.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

153.00

Comple
ted

4
4

Conversion of
100 bedded
Civil Hospital
to 200 Bedded
Hospital with
construction of
Staff Quarters
and
improvement &
renovation of
existing
buildings at
Haflong(NC
Hills)

1119.81

0.00

0.00

0.00

0.00

0.00

0.00

420.00

0.00

0.00

592.64

0.00

0.00

0.00

0.00

1012.64

Upgradation of

800.00

0.00

800.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

800.00

Full

Guwahati
Medical
College.

UC
awaited

4
6

Renovation/Reconstruction of
RNB Civil
Hospital at
Kokrajhar
(BTC Package)

758.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

334.35

0.00

347.93

0.00

75.81

0.00

0.00

4
7

Construction of
100 bedded
hospital at
Kajalgaon in
BTC area(BTC
Package)

3851.61

0.00

0.00

0.00

0.00

0.00

0.00

799.24

800.00

366.53

1580.60

305.24

0.00

0.00

0.00

3851.61

4
8

Construction of
two storeyed
building of SJN
Government
Homoeopathic
Medical
College and
Hospital at
Panjabari,
Guwahati

265.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

82.06

0.00

0.00

105.48

187.54

Total of
Health sector
(10 Projects)

9299.
22

0.00

800.
00

185.
00

0.00

257.0
0

463.0
0

1219.
24

2034.
35

905.6
3

2521.
17

387.3
0

75.81

0.00

105.
48

8953.
98

Fully
758.09 Release
d

Miscellaneous
4
9

1250 Capacity
Auditorium at
Guwahati.

2000.00

0.00

0.00

0.00

500.00

151.72

1300.00

0.00

0.00

0.00

40.10

0.00

0.00

0.00

0.00

Fully
1991.82 Release
d

5
0

Construction of
Multi-Storey
Secretariat
Complex

6900.00

0.00

0.00

0.00

0.00

1579.00

0.00

4646.00

607.95

0.00

0.00

0.00

0.00

0.00

0.00

6832.95

5
1

Kamakhya
Temple Road
Development

489.00

0.00

0.00

0.00

0.00

200.00

289.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

489.00

Srimanta

485.00

485.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

485.00 Comple

Comple
ted

5
3

Sankardev
Kalakshtra
project
Centre for
Plasma
Physics,
Guwahati.

ted

450.00

0.00

151.00

0.00

136.00

81.00

82.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

450.00

Comple
ted

Cost
approve
d by
SLSC =
Rs.
1844.0
0 lacs
1844.00
against
an
indicati
ve cost
of Rs.
1000.0
0 lacs

5
4

Construction of
Bodofa
Cultural
Complex at
Kokrajhar
(BTC Package)

1844.00

0.00

0.00

0.00

0.00

0.00

0.00

500.00

0.00

450.00

0.00

50.00

844.00

0.00

0.00

5
5

Construction of
Cold Storage at
Udalguri
district(BTC
Package)

413.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

195.76

0.00

176.53

41.36

0.00

0.00

0.00

413.65

5
6

Construction of
Cold storage at
Kokrajahar
district(BTC
Package)

413.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

195.76

0.00

176.53

41.36

0.00

0.00

0.00

413.65

5
7

Construction of
North East
Gate Way Bus
Terminus at
Srinwgai
Gossaigaon(BT
C Package)

144.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

64.99

0.00

64.99

14.44

0.00

0.00

0.00

144.42

5
8

Construction of
Joisingh Doloi
Audotorium
Hall at Diphu
(Karbi
Anglong)

379.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

111.54

0.00

115.74

0.00

108.94

0.00

336.22

Construction of

401.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

126.45

0.00

0.00

0.00

126.45

Comple
ted

Sankar Madhab
Cultural
Complex at
Letekupukhuri
at Bhogpur
Chariali
Lakhimpur
iDistrict n
Assam

6
0

Cashew
processing
Plant at
Mankachar in
Dhubri District
in Assam

248.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

104.15

0.00

0.00

99.29

0.00

203.44

6
1

Development
and
Upgradation of
Jyoti Chitraban
Film and
Television
Institute

1346.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

424.23

0.00

0.00

0.00

0.00

424.23

6
2

Bodoland
Indigenous
Tribal Art &
Cultural
ComplexcumFilm
Studio at
Kathalguri,
Kokrajhar

495.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

160.66

0.00

0.00

0.00

0.00

160.66

6
3

Construction of
Cultural
Centre/Comple
x at Dotma in
Kokrajhar

221.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

99.05

0.00

0.00

0.00

0.00

99.05

6
4

Multi Level
Parking in
different parts
of Guwahati

2024.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

638.00

0.00

365.00

0.00

Total
project
cost is
Rs.
3289.0
1003.00
0 lakhs
but
support
from
NLCPR

restricte
d to Rs.
2024.0
0 lakhs
only

6
5

Construction of
Roadside drain
cum footpath
and provision
of roadside
streetlight
illumination in
Naharkatia
town in
Dibrugarh
Rural Road
Division

644.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

199.10

0.00

255.43

0.00

454.53

6
6

Preservation of
cultural
Heritage of
Majuli Natun
Kamalabari
satra (Phase-I)

618.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

218.46

0.00

0.00

218.46

6
7

Street Lighting
in Jorhat City
leading to
Jorhat Airport

213.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

75.34

0.00

75.34

6
8

Comprehensive
Development
Plan for college
of Fisheries for
augmenting
Human
Resources in
Assam

874.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

308.76

0.00

308.76

6
9

Construction of
Bus Terminals
at Barpeta town

185.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

65.63

0.00

65.63

7
0

Infrastructure
Development
of Road
Transport
system under
Karbi Anglong
Autonomous

183.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

64.85

0.00

64.85

Council (Karbi
Anglong) Part-I

7
1

Socio-Literary
Cultural
Complex of
Bodo Sahitya
Sabha at
Bathooupuri,
Gorchuk,
Guwahati

841.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

296.82

0.00

296.82

7
2

Construction of
Multistoried
Car Parking
cum City Hall,
Jorhat

1051.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

371.06

0.00

371.06

7
3

Bodoland
Bhawan at
Dwarka, New
Delhi(BTC
Package-2)

909.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

454.92

0.00

454.92

7
4

Setting up of
Integrated
AgroProcessing
Park at Lalpool
(Udalguri))(BT
C Package-2)

907.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

453.50

0.00

453.50

7
5

construction of
cold storage ar
Barama
(Baska))(BTC
Package-2)

890.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

445.00

0.00

445.00

7
6

Enhancement
of existing
facility in
Verteniary
hospital at
titaguri
(Kokrajhar),
Samthaibari(Ch
irang) and
Bornagaon in
Udalguri
Distict.)(BTC

901.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.95

250.00

450.95

Package-2)

7
7

Proposed
Integrated
textile Park at
Kharujan,
Mushalpur(BT
C Package-2)

1158.8
7

2050.00

4456. 1408
62
.87

21127
.36

4100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30578
.18

485.
00

151.
00

0.00

636.
00

2011.
72

1671.
00

5146.
00

1064.
46

561.5
4

1246.
24

1226.
45

1062.
46

7
8

ST&D Construction
of11/0.4 KV
distribution S/S
11 KV lines
and LT linesLT lines- 100
km

100.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

Comple
ted

7
9

ST&DConstruction of
11/.4 KV
distribution S/S
11 KV lines
and LT lines 11/0.4 KV
substation (500
KVA - 10 Nos.,
315 KVA - 10
Nos., 250 KVA
- 100 Nos., 100
KVA - 100
Nos., & 63
KVA - 50 Nos.

688.00

0.00

0.00

600.00

0.00

88.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

688.00

Comple
ted

8
0

ST&DConstruction of
11/0.4 KV
distribution S/S
11 KV lines
and LT lines 11 KV line 100km

100.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

Comple
ted

Total of
Miscellaneous
sector (29
Projects)

891.13

Power

8
1

Subtransmission
and
Distribution
lines (ST&D)Construction of
33 KV, 30 Km
D/C line from
Chandrapur to
Narengi

200.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

8
2

Renovation of
BTPS-AgiaSarusajai 220
kV D/C
Transmission
Line

2838.00

0.00

0.00

0.00

0.00

1000.00

0.00

1664.10

0.00

156.51

0.00

0.00

0.00

0.00

0.00

2820.61

8
3

Electrification
of Tribal
Villages

136.00

0.00

0.00

0.00

68.00

0.00

0.00

67.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

135.00

8
4

2x50 MVA ,
220/132 KV
Balipara
(Tezpur ) Substation and a
132 KV
Gohpur-Depota
Line

1371.00

65.30

0.00

0.00

0.00

150.00

400.00

410.60

0.00

310.32

0.00

0.00

0.00

0.00

0.00

1336.22

8
5

ST&D Augmentation
of 33/11 kV
Garbhanga S/S
from 2x5 MVA
to 2x10 MVA

96.00

0.00

0.00

0.00

0.00

96.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

96.00

Comple
ted

8
6

ST&D Augmentation
of Duliajan 33
kV S/S from
1x2.5 MVA to
1x5 MVA

90.00

0.00

0.00

0.00

0.00

90.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

90.00

Comple
ted

8
7

ST&D Augmentation
of Hailakandi
33 kV S/S from
2x2.5 MVA to
2x5 MVA

120.00

0.00

0.00

0.00

0.00

80.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

80.00

Comple
ted

8
8

ST&D Augmentation
of Hojai 33 kV
S/S from 1x2.5
MVA to 2x2.5
MVA

60.00

0.00

0.00

0.00

0.00

35.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

35.00

8
9

ST&D Augmentation
of Karimganj
33 kV S/S from
1x5 + 1x3.16
MVA to 2x5
MVA

75.00

0.00

0.00

0.00

0.00

55.00

0.00

0.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

75.00

9
0

ST&D Augmentation
of Tezpur 33
kV S/S from
(1x2.5+5)
MVA to 2x5
MVA

90.00

0.00

0.00

0.00

0.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

9
1

ST&D Augmentation
of Titabor 33
kV S/S from
2x2.5 MVA to
2x5 MVA

105.00

0.00

0.00

0.00

0.00

105.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

105.00

Comple
ted

9
2

ST&D Construction of
12 km 33 kV
Baitamari to
Chapar line
with
construction of
2x2.5 MVA
S/S at Chapar

72.00

0.00

0.00

0.00

0.00

30.00

0.00

0.00

42.00

0.00

0.00

0.00

0.00

0.00

0.00

72.00

Comple
ted

9
3

ST&D Construction of
14.5 km 33 kV
PathsalaNathkuchi line
with
augmentation
of Pathsala S/S
from 2x2.5
MVA to 2x5
MVA

181.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

81.00

0.00

0.00

0.00

0.00

0.00

0.00

181.00

Comple
ted

Comple
ted

9
4

ST&D Construction of
18 km long 33
kV line from
Garmur to
Pulibor
alongwith
2x2.5 MVA
S/S at Publibor

124.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

124.00

Comple
ted

9
5

ST&D Construction of
18 km long 33
KV line from
Latka tapping
poing to
Agamoni
alongwith
installation of
2.5 MVA S/S
at Agamoni

77.00

0.00

0.00

0.00

0.00

55.00

0.00

0.00

22.00

0.00

0.00

0.00

0.00

0.00

0.00

77.00

Comple
ted

9
6

ST&D Construction of
1x2.5 MVA, 33
kV S/S at
Gogamukh

45.00

0.00

0.00

0.00

0.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30.00

9
7

ST&D Construction of
22 km long 33
kV line from
Bordubi to
Tengakhat with
construction of
1x2.5 MVA
transformer

122.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

122.00

0.00

0.00

0.00

0.00

0.00

0.00

122.00

Comple
ted

9
8

ST&D Construction of
23 km 33 kV
line from
Rangia to
Tamulpur

47.00

0.00

0.00

0.00

0.00

35.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

47.00

Comple
ted

9
9

ST&D Construction of
26 km 33 kV
Agia - Mornoi
line with
construction of

163.00

0.00

0.00

0.00

0.00

80.00

0.00

0.00

83.00

0.00

0.00

0.00

0.00

0.00

0.00

163.00

Comple
ted

2x2.5 MVA
S/S at Mornoi

1
0
0

ST&D Construction of
37 km 33 kV
line from
Patharkandi to
Karimganj

119.00

0.00

0.00

0.00

0.00

50.00

0.00

0.00

69.00

0.00

0.00

0.00

0.00

0.00

0.00

119.00

Comple
ted

1
0
1

ST&D Construction of
45 km long 33
kV line from
Rowta Grid S/S
to Paneri and
augmentation
of Paneri S/S
from 2x3.16
MVA to 2x5
MVA

362.00

0.00

0.00

0.00

0.00

150.00

0.00

0.00

212.00

0.00

0.00

0.00

0.00

0.00

0.00

362.00

Comple
ted

1
0
2

ST&D Construction of
5 MVA 33 kV
S/S at
Biswanath
Chariali

98.00

0.00

0.00

0.00

0.00

60.00

0.00

0.00

13.40

0.00

0.00

0.00

0.00

0.00

0.00

73.40

1
0
3

ST&D Construction of
5 MVA, 33 kV
S/S at
Missamari

85.00

0.00

0.00

0.00

0.00

55.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55.00

1
0
4

ST&D Installation of
11 KV Auto
Reclosers in
S/S (40 Nos.)

317.00

0.00

0.00

0.00

0.00

217.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

317.00

Comple
ted

1
0
5

ST&D Reconductorin
g of
KahiliParaUlubari 33 kV
feeder from
raccoon to wolf
conductor

5.00

0.00

0.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.00

Comple
ted

1
0

ST&DConstruction of

214.00

0.00

0.00

0.00

0.00

112.00

0.00

0.00

102.00

0.00

0.00

0.00

0.00

0.00

0.00

214.00

Comple
ted

20 km 33 KV
line From
Garbhanga to
Borjhar and
interlink with
the existing 33
KV Mirza-Rani
line along with
augmentation
of 33/11 KV
Mirza S/S to
2x5 MVA

1
0
7

ST&D Construction of
28 km line
from Rowta to
Dhekiajuli on
double pole
suspension
with wolf
conductor

151.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

51.00

0.00

0.00

0.00

0.00

0.00

0.00

151.00

Comple
ted

1
0
8

ST&D Construction of
30 km 33 kV
line from
Pailapool to
Kabuganj

97.00

0.00

0.00

0.00

0.00

50.00

0.00

0.00

47.00

0.00

0.00

0.00

0.00

0.00

0.00

97.00

Comple
ted

1
0
9

ST&D Construction of
33/11 kV,
1x2.5 MVA
S/S with auto
recloser at
Manzai

28.00

0.00

0.00

0.00

0.00

21.00

0.00

0.00

7.00

0.00

0.00

0.00

0.00

0.00

0.00

28.00

Comple
ted

1
1
0

Installation of
Street Lights
from Lokpriya
Gopinath
Bordoloi
International
Airport upto
Jalukbari near
Guwahati
University for
National
Games 2005

239.16

0.00

0.00

0.00

0.00

0.00

0.00

83.16

0.00

0.00

133.70

0.00

0.00

0.00

0.00

216.86

1
1
1

Powerline to
Balipara
Industrial
Growth Centre,
Sonitpur

872.89

0.00

0.00

0.00

0.00

0.00

0.00

305.89

0.00

0.00

0.00

0.00

320.72

0.00

0.00

626.61

1
1
2

ST&D Augmentation
of Dibrugarh
33 kV S/S from
(3x5 + 1x2.5)
MVA to 2x10
MVA

76.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

76.00

0.00

0.00

0.00

0.00

0.00

0.00

76.00

Comple
ted

1
1
3

ST&D Construction of
16 km long 33
kV line from
Jorhat to
Kakajan
alongwith
installation of
2x2.5 MVA
S/S at Kakajan

90.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

90.00

0.00

0.00

0.00

0.00

0.00

0.00

90.00

Comple
ted

1
1
4

ST&D Construction of
38 km, 33 kV
line from
Balipara to
Dhalukpung

133.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

133.00

0.00

0.00

0.00

0.00

0.00

0.00

Fully
133.00 Release
d

1
1
5

220 KV/DC
Kathalguri
Tinsukia line
(30 Kms.)

640.00

200.00

0.00

140.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

640.00

1
1
6

Installation of
2x31.5 MVA
132/33 KV
transformers at
Sarusajai Sub
Station

526.00

21.42

0.00

0.00

0.00

60.00

200.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

481.42

1
1
7

Namrup Substation 2x50


MVA, 220/132
kV

10.57

10.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.57

Comple
ted

Project
withdra
wn.
Diverte
d Rs.
142.11
L to

Sarusaj
ai S/S,
Rs.
21.42 L
to
Sarusaj
ay
2X31.5
MVA
and Rs.
10.60
to
Balipar
a SS.
1
1
8

Tinsukia SubStation 2x50


MVA , 220/132
kV

1964.00

300.00

0.00

700.00

100.00

0.00

600.00

210.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1910.00

1
1
9

Construction of
220/132 Kv,
1x50 MVA,
132/33 Kv and
1x16 MVA
Agia S/S

738.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

227.30

422.50

0.00

0.00

0.00

649.80

1
2
0

Augmentation
of 1x63 and
1x59 MVA,
20/132 kv
Transformer by
2x100 mva at
sarusajai sub
station

780.00

0.00

0.00

0.00

0.00

60.00

500.00

77.89

142.11

0.00

0.00

0.00

0.00

0.00

0.00

780.00

1
2
1

Augmentation
of 220/132 kv
2x50 mva s/s to
2x100 s/s at
mariani

637.00

0.00

0.00

0.00

200.00

0.00

300.00

125.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

625.19

1
2
2

Replacement of
old 11 KV
MCCB by
VCB at
Beheting,
Hezalbank,doo
mdooma,
Duliajan, North
Lakhimpur,

510.00

0.00

0.00

0.00

0.00

245.00

0.00

0.00

265.00

0.00

0.00

0.00

0.00

0.00

0.00

510.00

Comple
ted

Comple
ted

Meherpur,
karimganj,
Tangla,
Amingaon,
Narangi,
Nagaon,Kaliab
or, Kathiatoli,
rupohi,
Samaguri,
bokajan, jorhat,
Balipara,
Tezpur,chapag
uri & Diphu
S/S

1
2
3

Construction of
220/132 KV,
2x50 MVA and
220/33 KV,
2x40 MVA
Azara Sub Station with
220 Kv LILO
line from one
circuit of 220
KV DC Agia Sarusajia line
along with
construction of
132 KV SC
line to Boko
with terminal
bay at 132/33
Boko Substation

3622.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1140.95

0.00

0.00

0.00

0.00

1140.95

1
2
4

Augmentation
of Transformer
Capacity of
132/33 KV
Panchgram Sub
Station from
2x16 MVA to
2x25 MVA in
Cachar
District

440.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

138.60

0.00

0.00

177.40

0.00

316.00

1
2
5

Strengthening
of 11 kV HT
and LT Line

520.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

260.14

0.00

0.00

0.00

260.14

with 12 Meter
Steel Tubular
Pole including
Illumination of
Kokrajhar
Town(BTC
Package)
Construction of
132 KV BTPS
- Kokrajhar
S/C line and
132 KV
Kokrajhar S/C
line 132
Kv/33Kv S/S at
Kokrajhar

4357.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1538.02

0.00

1538.02

Total of
Power sector
(49 Projects)

24533
.41

597.
29

0.00

1840
.00

668.
00

3364.
00

2000.
00

3143.
83

1713.
51

466.8
3

1640.
55

682.6
4

320.7
2

1715.
42

0.00

18152
.79

1
2
7

Construction of
RCC Bridge
No. 1/1, 3/1
and 5/1 on
Bahirjonai
Berachapari
Road in
Dhemaji
District
(Assam) with
approaches

552.17

0.00

0.00

0.00

0.00

0.00

0.00

0.00

173.93

0.00

0.00

0.00

0.00

222.10

0.00

396.03

1
2
8

Construction of
RCC Bridge
No. 1/1, 4/1
and 5/1 on
Sripani Jengrai
Road in
Dhemaji
District
(Assam) with
approaches

301.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

95.06

0.00

0.00

0.00

0.00

0.00

0.00

95.06

1
2

Recce of Road
in BAC Area

3.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

1
2
6

Road & Bridges

Comple
ted

9
1
3
0

Barpeta
Basbari Road,
Barpeta

90.00

0.00

0.00

0.00

24.00

63.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

87.00

1
3
1

KachubariNaokataPatharighat
Road, Nalbari
& Darrang

396.00

0.00

0.00

0.00

106.00

241.12

182.88

-134.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

396.00

1
3
2

KumarikataJalah Road,
Nalbari.

1508.00

0.00

0.00

0.00

704.00

628.36

332.64

-157.00

0.00

0.00

-11.60

0.00

0.00

0.00

0.00

1496.40

1
3
3

RowtaUdalguri Road,
Darrang.

832.00

0.00

0.00

0.00

244.00

139.51

448.49

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

832.00

Comple
ted

1
3
4

TamulpurGoreswar
Road, Nalbari.

473.41

0.00

0.00

0.00

251.00

253.51

183.49

-214.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

473.41

Comple
ted

1
3
5

Udalguri Kahibari road

366.00

0.00

0.00

0.00

128.00

60.74

198.26

-21.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

366.00

Comple
ted

1
3
6

UdalguriBhairabkunda
Road, Darrang.

586.00

0.00

0.00

0.00

488.00

126.00

0.00

-28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

586.00

Comple
ted

1
3
7

Ambagaon Barigaon Road

763.00

0.00

0.00

0.00

0.00

63.80

0.00

0.00

200.00

34.40

414.88

0.00

0.00

0.00

0.00

Fully
713.08 Release
d

1
3
8

BarangajuliKhairabari road

210.00

0.00

0.00

0.00

0.00

36.30

0.00

23.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1
3
9

Charuali Nagarijuli
Road

538.00

0.00

0.00

0.00

0.00

52.00

0.00

29.00

0.00

411.30

0.00

0.00

0.00

0.00

0.00

Fully
492.30 Release
d

1
4
0

HarduttaBirudatta road

133.00

0.00

0.00

0.00

0.00

133.00

0.00

0.00

-1.54

0.00

0.00

0.00

0.00

0.00

0.00

131.46

1
4
1

MangaldaiBhutiachang
Road, Darrang.

120.70

0.00

0.00

0.00

0.00

120.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

120.70

Rangiya

152.00

0.00

0.00

0.00

0.00

76.93

0.00

75.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

151.93

Comple
ted

59.30

4
2

Goreswar Road

1
4
3

tangla Dimakuchi
Road

1
4
4

Comple
ted

251.00

0.00

0.00

0.00

0.00

118.25

0.00

0.00

0.00

0.00

132.75

0.00

0.00

0.00

0.00

251.00

UdalguriTamulpur
Road, Darrang.

3632.00

0.00

0.00

0.00

0.00

125.45

252.52

393.92

0.00

392.14

1212.00

969.96

0.00

0.00

0.00

3345.99

1
4
5

Causeway Over
Kulsi, Darrang

100.00

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fully
100.00 Release
d

1
4
6

Chamuapara Purandia Road

485.00

0.00

0.00

0.00

0.00

0.00

247.00

0.00

-132.75

0.00

0.00

166.84

0.00

0.00

0.00

281.09

1
4
7

Construction of
RCC Bridge
No. 2/2 Haripur
Sansarghat
Road in
Nalbari District

226.37

0.00

0.00

0.00

0.00

0.00

126.37

0.00

0.00

56.62

0.00

0.00

0.00

0.00

0.00

182.99

1
4
8

Construction of
RCC Bridge
No. 20/1 Nalbari Palla
Road in
Nalbari District

144.36

0.00

0.00

0.00

0.00

0.00

74.36

0.00

0.00

0.00

0.00

39.38

0.00

0.00

0.00

113.74

1
4
9

Construction of
RCC Bridge
No. 42/5 &
74/1 on DLHS
Road in Karbi
Anglong
District

143.25

0.00

0.00

0.00

0.00

0.00

73.00

0.00

0.00

0.00

39.57

0.00

0.00

0.00

0.00

112.57

1
5
0

JagunKharsang
Road(11 KM)

303.94

0.00

0.00

0.00

0.00

0.00

150.00

0.00

0.00

106.61

0.00

0.00

0.00

0.00

0.00

256.61

1
5
1

Rcc Bridge on
Additional
Approach to
Airport
road(2nos)

173.39

0.00

0.00

0.00

0.00

0.00

123.27

0.00

0.00

41.24

0.00

0.00

0.00

0.00

0.00

164.51

1
5
2

Rcc Bridge on
Mandakata
North
Guwahati
Road(2 nos)

240.19

0.00

0.00

0.00

0.00

0.00

128.10

0.00

61.07

0.00

0.00

0.00

0.00

0.00

0.00

189.17

1
5
3

RCC Bridge
4/1 on
Hatigaon Betapara

153.84

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

33.97

0.00

0.00

0.00

0.00

0.00

133.97

1
5
4

Tangla - Deor
Road

379.00

0.00

0.00

0.00

0.00

0.00

379.00

0.00

-379.00

0.00

0.00

0.00

0.00

0.00

0.00

Project
droppe
d in
55th
NLCPR
Commi
-0.00
ttee
Meetin
g held
on
06.02.2
008
Project
droppe
d in
55th
NLCPR
Commi
0.00
ttee
Meetin
g held
on
06.02.2
008

1
5
5

Udalguri Kharupetia
Road

925.00

0.00

0.00

0.00

0.00

0.00

312.00

0.00

-200.00

0.00

-112.00

0.00

0.00

0.00

0.00

1
5
6

Construction of
RCC Bridge
No. 1/2 and 3/1
on Sarupeta
Bhuyapara in
Barpeta District

177.36

0.00

0.00

0.00

0.00

0.00

0.00

62.36

0.00

99.40

0.00

0.00

0.00

0.00

0.00

161.76

1
5
7

Construction of
RCC Bridge
No. 1/3, 2/1
and 3/1 on
Namti Ali in
Sivasagar
District

89.68

0.00

0.00

0.00

0.00

0.00

0.00

30.00

0.00

51.55

0.00

0.00

0.00

0.00

0.00

81.55

1
5
8

Construction of
RCC Bridge
No. 156/2,
159/1, 163/2,
165/3, 172/2,
174/2, 177/1
and 182/2 on
Dhodar Ali
Road in
Sivasagar
District

352.51

0.00

0.00

0.00

0.00

0.00

0.00

122.51

0.00

198.74

0.00

0.00

0.00

0.00

0.00

321.25

1
5
9

Construction of
RCC Bridge
No. 4/2, 9/2,
10/2 and 17/1
on Met Na-Ali
Jorhat Titabor
in Jorhat
District

142.60

0.00

0.00

0.00

0.00

0.00

0.00

50.00

0.00

80.39

0.00

0.00

0.00

0.00

0.00

130.39

1
6
0

Construction of
RCC bridge
No.1/1, 2/1 and
2/2 on Jonnai
Silapathar
Road in
Dhimaji
District

190.00

0.00

0.00

0.00

0.00

0.00

0.00

67.00

0.00

106.37

0.00

0.00

0.00

0.00

0.00

173.37

1
6
1

Construction of
RCC bridge
No.1/2 on
Manja to
Hidim Teron
Road in Karbi
Anglong
District

178.12

0.00

0.00

0.00

0.00

0.00

0.00

62.00

0.00

0.00

100.38

0.00

0.00

0.00

0.00

162.38

1
6
2

Construction of
RCC bridge
No.12/1 and
12/2 on
Bangaon Jagara
Road in
Nalbari District

174.81

0.00

0.00

0.00

0.00

0.00

0.00

62.00

0.00

97.50

0.00

0.00

0.00

0.00

0.00

159.50

1
6
3

Construction of
RCC bridge
No.12/3 on
Balkulia

173.51

0.00

0.00

0.00

0.00

0.00

0.00

60.00

0.00

0.00

98.14

0.00

0.00

0.00

0.00

158.14

Rajapathar
Road in Karbi
Anglong
District

1
6
4

Construction of
RCC bridge
No.13/1, 14/1,
15/1, 20/3 and
22/1 on Silchar
Kumbhirgram
Road in Cachar
District

567.87

0.00

0.00

0.00

0.00

0.00

0.00

200.89

0.00

316.63

0.00

0.00

0.00

0.00

0.00

517.52

1
6
5

Construction of
RCC bridge
No.24/1 on
BarpatharBokajan
DeithorChowkihola
(BBDC) Road
in Karbi
Anglong
District

54.42

0.00

0.00

0.00

0.00

0.00

0.00

22.00

0.00

0.00

27.00

0.00

0.00

0.00

0.00

49.00

1
6
6

Construction of
RCC bridge
No.26/3 on
Samar Ali Das
Road in Karbi
Anglong
District in
Assam

167.54

0.00

0.00

0.00

0.00

0.00

0.00

59.00

0.00

0.00

94.34

0.00

0.00

0.00

0.00

153.34

1
6
7

Construction of
RCC bridge
No.3/1,
3/2,6/3,6/4,
6/6,10/5,12/1,
13/1, 21/2 and
23/2 on Border
Roads (Gar
Ali) in Jorhat
District

397.56

0.00

0.00

0.00

0.00

0.00

0.00

140.00

0.00

222.84

0.00

0.00

0.00

0.00

0.00

362.84

1
6
8

Construction of
RCC bridge
No.35/2 and
53/2 on Moran
Naharkatia

114.16

0.00

0.00

0.00

0.00

0.00

0.00

40.28

0.00

63.92

0.00

0.00

0.00

0.00

0.00

104.20

Road in
Dibrugarh
District

1
6
9

Construction of
RCC Bridge
No.4/3, 10/2
and 14/1 on
Pengeri
Philobari Road
in Tinsukia
District with
approaches

233.66

0.00

0.00

0.00

0.00

0.00

0.00

113.66

0.00

102.63

0.00

0.00

0.00

0.00

0.00

216.29

1
7
0

Construction of
RCC bridge
No.40/1 on
Bagals Road in
Kamrup
District

128.88

0.00

0.00

0.00

0.00

0.00

0.00

44.00

0.00

73.32

0.00

0.00

0.00

0.00

0.00

117.32

1
7
1

Construction of
RCC bridge
No.40/2 on
CPDMDK
Road in Karbi
Anglong
District

131.82

0.00

0.00

0.00

0.00

0.00

0.00

46.70

0.00

0.00

73.57

0.00

0.00

0.00

0.00

120.27

1
7
2

Construction of
RCC Bridge
No.6/1 on
Udalguri
Barbengera
Road in
Darrang
District with
approaches

104.03

0.00

0.00

0.00

0.00

0.00

0.00

50.03

0.00

46.13

0.00

0.00

0.00

0.00

0.00

96.16

1
7
3

Construction of
RCC bridge
No.8/2, 20/1,
21/1, 23/3,
29/2, 32/1, 36/1
and 40/1 on
Mangaldoi
Bhutiachang
Road in
Darrang
District

684.70

0.00

0.00

0.00

0.00

0.00

0.00

240.15

0.00

375.74

0.00

0.00

0.00

0.00

0.00

615.89

1
7
4

Improvement
of Bhangagarh
- Bharalumukh
VIP Road for
National
Games 2005

982.80

0.00

0.00

0.00

0.00

0.00

0.00

344.00

0.00

0.00

548.99

0.00

0.00

0.00

0.00

892.99

1
7
5

Improvement
of Road
between
Hatigaon
Bhetapara
Road for
National
Games 2005

456.26

0.00

0.00

0.00

0.00

0.00

0.00

160.00

0.00

254.67

0.00

0.00

0.00

0.00

0.00

414.67

1
7
6

KaithalkuchiBarama
Subankhata
Road, North
Kamrup

61.00

0.00

0.00

0.00

0.00

0.00

0.00

61.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

61.00

Comple
ted

1
7
7

NamatiMasalpur
Road, Nalbari

31.00

0.00

0.00

0.00

0.00

0.00

0.00

31.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.00

Comple
ted

1
7
8

Tihu-Barama
Road, Nalbari.

64.00

0.00

0.00

0.00

0.00

0.00

0.00

64.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

64.00

Comple
ted

1
7
9

Tangla Bhergaon Road

1
8
0

0.00

0.00

0.00

0.00

0.00

29.33

0.00

-29.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-0.00

Project
closed
after
sanctio
n

DiguncherraAirport Road

25.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

Comple
ted

1
8
1

Road from
Jarighat to
Lakhichhera.

92.00

0.00

92.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

92.00

Comple
ted

1
8
2

Road from
Hatichhera
Dudpati
Mudrennamuk
h.

43.00

0.00

43.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

43.00

Comple
ted

1
8

Construction of
RCC Bridge

516.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

162.67

0.00

0.00

205.46

0.00

0.00

368.13

No.27/2,
28/1,29/1,30/2,
32/2,35/1 and
45/1 including
approaches on
DhubriKachugaon
Road in
Kokrajhar

1
8
4

Construction of
RCC Bridge
No. 1/1 and 4/1
with
approaches on
Nilbagan-Hojai
Road in
Nagaon District
(Assam)

191.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60.38

0.00

110.41

0.00

0.00

0.00

170.79

1
8
5

Construction of
RCC Bridge
No.3/1
including
approaches on
Pukia
Silapathar
Road in
Dhemaji
District.

136.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

43.08

0.00

78.81

0.00

0.00

0.00

121.89

1
8
6

Construction of
RCC Bridge
No. 4/1 and
15/1 including
approaches on
Nagaon Bhuragaon
Road in
Nagaon District

434.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

136.83

250.25

0.00

0.00

0.00

0.00

387.08

1
8
7

Construction of
RCC Bridge
No.38/1,
43/1,43/3 and
44/2 including
approaches and
subway on
Silchar Hailakandi
Road in

353.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

111.24

0.00

0.00

0.00

139.53

0.00

250.77

Hailakandi
District

1
8
8

Improvement
of KaurbahaNagrijuli Road
by metalling
and blacktopping
including
conversion of
SPT Bridges
into RCC
Minor Bridges
(BTC Package)

1450.00

0.00

0.00

0.00

0.00

0.00

0.00

285.50

0.00

256.95

0.00

903.05

0.00

0.00

0.00

Cost
approve
d by
SLSC =
Rs.
1450.0
0 lacs
1445.50
against
an
indicati
ve cost
of Rs.
571.00
lacs
Cost
approve
d by
SLSC =
Rs.
1595
lacs
1595.00
against
an
indicati
ve cost
of Rs.
1595
lacs

1
8
9

Metalling and
Black-topping
of Narabari
Dawkibari
Road (Narabari
to Florican
Garden via
Malgaon)(BTC
Package)

1595.00

0.00

0.00

0.00

0.00

0.00

0.00

797.50

0.00

717.75

0.00

79.75

0.00

0.00

0.00

1
9
0

Improvement
of North
Kajolgaon
Dangtol Road
(BTC Package)

592.67

0.00

0.00

0.00

0.00

0.00

0.00

299.21

0.00

264.11

0.00

29.35

0.00

0.00

0.00

1
9
1

Improvement
of Bhowraguri
Kachugaon
Road in
Kokrajhar
(BTC Package)

2373.45

0.00

0.00

0.00

0.00

0.00

0.00

1195.50

0.00

1060.15

0.00

117.80

0.00

0.00

0.00

592.67

Comple
ted

Cost
approve
d by
SLSC =
Rs.
2373.4
2373.45
5 lacs
against
an
indicati
ve cost
of Rs.

2391.0
0 lacs

1
9
2

Improvement
and
upgradation of
Kashikotra to
Basugaon
Road(BTC
Package)

1
9
3

Improvement
of Sundari
Bidyapur via
Kakragaon
Road(BTC
Package)

1
9
4

Metalling and
backtopping of
Gossaigaon to
Saraibil Road
including
improvement
of existing hard
crust and
conversion of
STP bridge to
Rcc
bridges(BTC
Package)

1
9
5

Widening and
Strengthening
of FakiragramSerfanguri
Road including
conversion of

550.69

0.00

0.00

0.00

0.00

0.00

0.00

278.00

0.00

245.42

0.00

27.27

0.00

0.00

0.00

Cost
approve
d by
SLSC =
Rs.
550.69
550.69
lacs
against
indicati
ve cost
of Rs.
556.00
lacs

921.36

0.00

0.00

0.00

0.00

0.00

0.00

465.25

0.00

410.50

0.00

45.61

0.00

0.00

0.00

Cost
approve
d by
SLSC =
Rs.
921.36
921.36
lacs
against
indicati
ve cost
of Rs.
930.50
lacs

1939.00

0.00

0.00

0.00

0.00

0.00

0.00

1041.19

0.00

0.00

808.03

89.78

0.00

0.00

0.00

Fully
1939.00 Release
d

0.00

Cost
approve
d by
2049.15
SLSC =
Rs.
2049.1

2049.16

0.00

0.00

0.00

0.00

0.00

0.00

1032.04

0.00

915.40

0.00

101.71

0.00

0.00

STP bridge to
Rcc
bridges(BTC
Package)

1
9
6

1
9
7

1
9
8

Improvement
of North
Kajolgaon
Bengtol
Sonitpur road,
Chirang(BTC
Package)

Construction of
Road from NH31 at Barama to
Masalpur,
Baska(BTC
Package)

Improvement
of Jalah Rupahi
Saudarbhitha
Gobardhana
road,
Baska(BTC
Package)

6 lacs
against
an
indicati
ve cost
of Rs.
2064.0
8 lacs

810.00

1443.00

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

405.15

543.00

500.00

0.00

0.00

0.00

364.36

488.70

450.00

0.00

0.00

0.00

40.48

54.30

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Cost
approve
d by
SLSC =
Rs. 810
lacs
809.99 against
an
indicati
ve cost
of Rs.
810.31
lacs

0.00

Cost
approve
d by
SLSC =
Rs.
1443.0
0 lacs
1086.00
against
an
indicati
ve cost
of Rs.
1086.0
0 lacs

0.00

Cost
approve
d by
SLSC =
Rs.
1000.0
1000.00
0 lacs
against
an
indicati
ve cost
of Rs.

1000.0
0 lacs

1
9
9

2
0
0

Improvement
of Udalguri
Bhakatpara
road via
Bhairaguri,
Udalguri(BTC
Package)

Improvement
of Barnagaon
Pakribari road,
Udalguri (BTC
Package)

444.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

221.98

75.00

0.00

0.00

199.81

67.50

0.00

0.00

22.20

7.50

0.00

0.00

0.00

0.00

0.00

Cost
approve
d by
SLSC =
Rs.
444.00
lacs
443.99
against
an
indicati
ve cost
of Rs.
443.96
lacs

0.00

Cost
approve
d by
SLSC =
Rs. 150
lacs
150.00 against
an
indicati
ve cost
of Rs.
150
lacs
Cost
approve
d by
SLSC =
Rs.
132.00
lacs
131.99
against
an
indicati
ve cost
of Rs.
131.91
lacs

2
0
1

Improvement
of Kalaigaon
Kundarbil road,
Udalguri (BTC
Package)

132.00

0.00

0.00

0.00

0.00

0.00

0.00

65.95

0.00

59.44

0.00

6.60

0.00

0.00

0.00

2
0
2

Improvement
of Dhamdhama
Tupalia
Subankhata

1372.00

0.00

0.00

0.00

0.00

0.00

0.00

294.50

0.00

265.05

293.73

518.72

0.00

0.00

0.00

1372.00

Cost
approve
d by
SLSC =

(DTS) Road
(Metalling and
black-topping
of remaining
stretches
including
improvement
of existing
metalled
surface(BTC
Package)

Rs.
1372
lacs
against
an
indicati
ve cost
of Rs.
589
lacs

2
0
3

Road
improvement
projects in NC
Hills (6 No.)

498.00

0.00

498.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

498.00

2
0
4

Construction of
RCC Bridge
No.2/2 and 4/2
including
approaches on
Gurnagar
Tikrikilla Road
in Goalpara
District

355.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

111.28

0.00

0.00

0.00

0.00

141.00

252.28

2
0
5

Goreswar to
Khoirabari
Road (BTC
Package)

657.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

295.78

0.00

295.78

65.72

0.00

0.00

0.00

657.28

2
0
6

BhergaonChouniKhagrabariDimakuchi
Road (BTC
Package)

131.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

59.40

0.00

59.05

13.16

0.00

0.00

0.00

131.61

2
0
7

LailongparaKopati Road
Via Boro
Bazar(BTC
Package)

131.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

59.40

0.00

58.54

13.10

0.00

0.00

0.00

131.04

2
0
8

Khowrang
Mahanpur
Road (BTC
Package)

250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

112.50

0.00

112.50

25.00

0.00

0.00

0.00

250.00

Comple
ted

2
0

ChapaguriKhagrabari

630.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

283.50

0.00

283.50

63.00

0.00

0.00

0.00

630.00

Comple
ted

Comple
ted

Comple
ted

Road(BTC
Package)

2
1
0

TulsijhyoraKailamaila
Road via
Amguri(BTC
Package)

900.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

405.00

0.00

405.00

90.00

0.00

0.00

0.00

2
1
1

Bijni-Panbari
Road(BTC
Package)

1558.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

701.36

0.00

701.36

155.86

0.00

0.00

0.00

Fully
1558.58 Release
d

2
1
2

Gossaigaon to
Kazigaon via
Bhukka, Tipkai
Road(BTC
Package)

1100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

495.00

0.00

0.00

605.00

0.00

0.00

0.00

Fully
1100.00 Release
d

2
1
3

Construction of
RCC Bridge
No. 2/1 on
Kokrajhar
Monakocha
Road over
River Gaurang
in Kokrajhar
District with
approaches

990.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

264.05

0.00

0.00

313.69

0.00

305.00

0.00

882.74

2
1
4

Construction of
RCC Bridge
No. 9/2 on
Borbhogia
Mikirbhata
Road in
Morigaon
District with
approaches

238.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

108.84

0.00

0.00

104.09

0.00

0.00

0.00

212.93

2
1
5

Construction of
RCC Bridge
No. 17/4, 19/4,
20/2 and 26/1
on Mt. Sepon
Sunpura Road
in Sivasagar
District
(Assam) with
approaches

377.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

175.81

0.00

0.00

160.91

0.00

0.00

0.00

336.72

Construction of

165.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

101.67

0.00

46.03

0.00

0.00

0.00

0.00

147.70

900.00

Comple
ted

1
6

RCC Bridge
No. 3/2 over
River Mansiri
on Charduar
Road with
approaches in
Sonitpur
District

2
1
7

Construction of
RCC Bridge
No. 4/1, 6/1
and 14/1 on
North
Lakhimpur
Kamalabari
Road

455.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

237.60

0.00

0.00

168.09

0.00

0.00

0.00

405.69

2
1
8

Construction of
RCC Bridge
No. 2/3, 5/1,
9/1, 11/1, 15/3,
16/1, 18/1 and
19/4 on
Itakhola Pavoi
Road in
Sonitpur
District
(Assam) with
approaches

875.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

456.41

0.00

0.00

0.00

0.00

0.00

0.00

456.41

2
1
9

Construction of
RCC Bridge
No. 1/1, 4/1,
8/1 and 9/2 on
Fakiragram
Sapatgram
Road in Dhubri
District with
approaches

514.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

284.36

0.00

0.00

174.12

0.00

0.00

0.00

458.48

2
2
0

Construction of
RCC Bridge
No. 6/1 on
Chariali Pavoi
Road in
Sonitpur
District with
approaches,
protection work
and sub-way

88.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

49.32

0.00

0.00

0.00

29.58

0.00

0.00

78.90

2
2
1

Construction of
RCC Bridge
No. 16/1, 19/1
and 19/3 on
Bagals Road in
Nalbari District
with
approaches

404.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

127.49

0.00

0.00

0.00

111.44

0.00

0.00

238.93

2
2
2

Construction of
Road from
Beltola Chariali
to Sarusajai
(Bishnu Rabha
Path),
Guwahati
(Assam)

777.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

244.85

447.81

0.00

0.00

0.00

0.00

0.00

692.66

2
2
3

Improvement
of Tihu
Doomni Road
leading to
Indo-Bhutan
foot hills from
7th to 25 km in
Baska
district(BTC
Package)

995.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

447.75

0.00

447.75

99.50

0.00

0.00

0.00

995.00

2
2
4

Improvement
of Khoirabari
MPK road
(Andherighat)
to Harisinga
via Bhergaon,
Tangla and
Purandia 42.25
km length with
conversion of
11 SPT bridges
to RCC(BTC
Package)

2650.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1192.62

0.00

1192.62

265.02

0.00

0.00

0.00

Fully
2650.26 Release
d

2
2
5

Construction of
Kashikotra
Bamungaon
Bengtol
Road(BTC
Package)

1169.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

526.45

0.00

525.65

116.90

0.00

0.00

0.00

Fully
1169.00 Release
d

Construction of

466.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

146.93

0.00

0.00

268.70

0.00

0.00

0.00

415.63

Comple
ted

2
6

RCC Bridge
No. 1/1, 3/1,
3/2 and 4/1 on
Bhairabpur to
Kulibazar Road
in Dhemaji
District
(Assam) with
approaches

2
2
7

Construction of
RCC Bridge
No. 6/1, 7/1,
8/1, 8/2, 9/1,
11/1 and 11/2
on Sepon
Suffry Road in
Sivasagar
District
(Assam) with
approaches

411.17

0.00

0.00

0.00

0.00

0.00

0.00

0.00

129.52

0.00

0.00

0.00

0.00

0.00

0.00

129.52

2
2
8

Construction of
RCC Bridge
No. 10/1 and
approaches on
Khowang
Bhamun Road
in Dibrugarh
District of
Assam

103.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32.52

0.00

0.00

59.51

0.00

0.00

0.00

92.03

2
2
9

Construction of
Additional Two
Lane RailOver-Bridge
(ROB) on A.T.
Road at
Maligaon,
Guwahati
(Assam)

1355.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

420.80

781.49

0.00

0.00

0.00

0.00

0.00

1202.29

2
3
0

Construction of
RCC Bridge
No. 5/1 on
Burhagohain
Tinthengia
Road in
Dibrugarh
District of
Assam

98.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.13

0.00

0.00

56.93

0.00

0.00

0.00

88.06

0.00

Project
droppe
d in
55th
NLCPR
Commi
0.00
ttee
Meetin
g held
on
06.02.2
008

0.00

0.00

Project
droppe
d in
55th
NLCPR
Commi
0.00
ttee
Meetin
g held
on
06.02.2
008

0.00

43.76

0.00

77.80

0.00

0.00

0.00

0.00

86.67

0.00

0.00

63.07

0.00

97.46

2
3
1

Construction of
RCC Bridge
No. 1/1, 3/2
and 5/3 on
Tupia Balijuri
Road in
Sonitpur
District of
Assam with
approaches

2
3
2

Construction of
RCC Bridge
No. 4/1, 10/1,
11/1, 11/2, 12/1
and 13/1 on
Dekapam to
Somkong via
Missamara
Road in
Dhemaji
District of
Assam with
approaches

688.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

216.75

0.00

0.00

-216.75

0.00

2
3
3

Construction of
RCC Bridge
No. 2/1 on
Bamunbari to
Jariguri Road
in Dibrugarh
District of
Assam with
approaches

108.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34.04

0.00

0.00

0.00

2
3
4

Construction of
RCC Bridge
No. 5/1 on
Sonakhira
Bubrighat Road
in Karimganj
District
(Assam) with
approaches and
protection work

97.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30.64

0.00

56.03

2
3
5

Construction of
RCC Bridge
No. 11/1 on

109.17

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34.39

0.00

0.00

271.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84.78

0.00

0.00

-84.78

0.00

0.00

Teok Boloma
Nakachari
Road in Jorhat
District
(Assam) with
approaches

2
3
6

Construction of
RCC Bridge
No. 24/2 and
32/2 on Mt.
Golaghat
Merapani Road
in Golaghat
District
(Assam) with
approaches and
protection work

185.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

58.48

0.00

0.00

0.00

74.98

31.99

0.00

165.45

2
3
7

Construction of
approach road
leading to
Industrial
Growth Centre
at Balipara in
Sonitpur
District
(Assam)

268.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84.63

0.00

0.00

157.16

0.00

0.00

0.00

Fully
241.79 Release
d

2
3
8

Construction of
RCC Bridge
No. 10/1 on
Gogamukh
Ghilamara
Road in
Dhemaji
District
(Assam) with
approaches

108.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34.15

0.00

0.00

40.30

0.00

0.00

0.00

74.45

2
3
9

Construction of
RCC Bridge
No. 5/1 on
river
Bharalkunda,
7/1 on Sisterpar Beel, 8/1
on Dulani Beel,
9/9 on
Distributary of
river

709.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

221.26

0.00

210.80

200.10

0.00

0.00

632.16

Champamati
and 11/1 on
Hill Canal
including
approaches on
Jogighopa
Chapar Road in
Bongaigaon
District in
Assam.

2
4
0

Construction of
RCC Bridge
No. 2/3 on
river Bhulla,
3/2 on river
Lakhi and 7/2
on river
Lakhimorasuti
on Bengbari
Ambagaon
Road in
Udalguri
District, Assam

632.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

191.70

0.00

184.23

188.00

0.00

0.00

563.93

2
4
1

Construction of
RCC Bridge
No. 2/4, 6/1
and 8/1 on river
Kaldia
including
approaches on
Dr. Jina Ram
Das Road in
Barpeta District
(Assam)

535.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

169.70

0.00

0.00

216.12

0.00

0.00

385.82

2
4
2

Improvement
of Nagaon
Morikolong
Nanoi
dakhinpath
Road under
Nagaon district

199.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

86.56

90.79

0.00

0.00

0.00

177.35

2
4
3

Project for
Road Network
of Jorhat
Master Plan
Area in Jorhat
District

461.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

141.61

0.00

261.23

0.00

0.00

0.00

402.84

2
4
4

Improvement
of Barpeta
Bashibari Road
leading to
Manas
Sanctuary from
km. 1st to Km.
21st in Barpeta
District in
Assam

1235.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

384.50

0.00

361.02

250.00

0.00

103.11

1098.63

2
4
5

Improvement
of Roads and
Natural
Drainage
System within
Greater Tezpur
Town

2551.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

348.13

0.00

0.00

0.00

0.00

348.13

2
4
6

construction of
RCC Br. No.
4/1 & 6/1 with
approaches on
J.B road in
Jorhat distt.

324.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

101.18

0.00

115.20

0.00

72.69

289.07

2
4
7

construction of
road and minor
bridge from
Motinagar to
Buban hill
Temple - Phase
I

326.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

102.71

0.00

0.00

0.00

131.16

233.87

2
4
8

Improvement
of Dalgaon
Kopti Road
(Orang Dalgaon Road)

235.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

106.26

0.00

0.00

0.00

0.00

106.26

2
4
9

Upgradation of
Dalgaon Town
to Sialmari via
Dekerigaon

251.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

113.82

0.00

0.00

0.00

0.00

113.82

2
5
0

Improvement
of NagaonBarapujia Road
under Nagaon
Dist.

298.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

93.87

0.00

85.63

86.04

0.00

265.54

Construction /

213.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

95.40

0.00

0.00

0.00

0.00

95.40

5
1

improvement
of Batabari
Kopati road

2
5
2

Construction of
Road from
Bhangarpar to
Chandranathpp
ur via babur
bazar (Length
5.5 KM)

249.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

79.73

0.00

0.00

100.00

0.00

179.73

2
5
3

Improvement
of roads in
Jorhat Town

250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

95.95

0.00

78.43

0.00

49.57

223.95

2
5
4

Improvement
of Roads in
Sivasagar
Town

242.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

108.05

0.00

108.00

0.00

0.00

216.05

2
5
5

Widening and
Raising of
Nazirakhat
Sonapur Road
(Length 6.00
km)

265.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

107.77

0.00

130.80

0.00

0.00

238.57

2
5
6

Construction of
Dibrugarh
Sapekhati road
from km 12 to
Km 18 along
with 2 RCC
bridges No.
18/1 and 19/1
with approches
(Bridge over
river
Buridihing at
Saraighat)

2116.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

666.54

0.00

828.72

0.00

0.00

1495.26

2
5
7

Improvement
of road from
Kahilipara to
Don Bosco
School at
Guwahati in
Assam

252.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

113.10

0.00

113.84

0.00

0.00

226.94

2
5

Improvement
of Rampur

224.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

70.74

0.00

129.39

0.00

0.00

200.13

Model Road
starting from
NH - 37 in
Kamrup
District

2
5
9

Construction of
RCC Br. No.
1/1 over River
Pota on
Hazuwa
Nalbari Road
in Baska
District in
Assam

264.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

83.16

0.00

0.00

0.00

106.92

190.08

2
6
0

Construction of
RCC Br. No.
1/1 over
regular
Channel
Gadadhar on
Silerpar Borshijhora
Road in dhubri
District

450.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

141.98

182.55

81.13

0.00

405.66

2
6
1

Construction of
RCC Br. No.
1/1 over
Santijan on
Srimanta
Sankardev
Govesona
Kendra Road in
Nagaon Road

280.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

88.37

0.00

50.00

111.62

0.00

249.99

2
6
2

construction of
RCC Br. No.
4/1 on Belguri Satrasal Road
in Dhrubri
District

273.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

86.09

0.00

110.69

49.20

0.00

245.98

2
6
3

Metalling and
Black Topping
of Swapanpur
to Ramchandi
Road of
Hailakandi
District.

379.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

119.62

0.00

153.50

0.00

0.00

273.12

2
6
4

Construction of
4 lane Tripura
road including
electrical works
from NH - 37
to GS Road

1136.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

690.42

332.43

0.00

0.00

1022.85

2
6
5

Construction of
RCC bridge at
7th Km of
Kathal Road
over river
Ghagra
including
approaches and
protection work
in Cachar
District.

250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

78.75

0.00

100.00

0.00

178.75

2
6
6

Construction of
RCC bridge no.
10/1 & 18/1 on
Bagals Road in
Nalbari District
with
approaches

308.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

96.10

0.00

0.00

123.45

219.55

2
6
7

Construction of
RCC bridge no.
18/2 over
stream
Bahanigaon &
bridge no. 19/1
over river
Kachikata on
LalukNarayanpur via
Bihpuria Road
in Lakhimpur
District

208.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

65.68

0.00

84.30

0.00

149.98

2
6
8

Construction of
RCC bridge
No. 4/1, 7/1,
8/1 and 11/1
over field canal
/ River Sakati
on Abhyapuri
Tilungia Road
with
approaches and

338.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

105.42

0.00

0.00

0.00

105.42

protection
works in
Bongaigaon
District

2
6
9

Construction of
RCC Bridge
no. 5/3 on
Bhorbhogia
Mikirbheta
Dhing Road
with
approaches in
Morigaon
District

241.17

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

75.22

0.00

0.00

96.69

171.91

2
7
0

Metalling and
Blacktopping
of Gunjung
Maibang Road
from 17th to
28.78 KM(NC
Hills)

640.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

198.71

0.00

0.00

198.71

2
7
1

Construction of
RCC bridge
No. 57/1 on
Gaurisagar
Moran Road
and
construction of
RCC bridge no.
15/2 over River
Disam on
Naharkatia Tinkhong Road
under
Dibrugarh
Rural Road
Division

406.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

126.65

0.00

0.00

0.00

126.65

2
7
2

Conversion of
SPT Bridge
20/1 over River
Gangia into
RCC Bridge on
Gosaigaon
Sapatgram
Road in
Kokrajhar
District(BTC

1082.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

541.34

0.00

0.00

0.00

541.34

Package)

2
7
3

Construction of
RCC Br. No.
32/1 on AT
road (old)
including
approaches
with protection
works in
Goalpara

739.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

230.51

0.00

0.00

0.00

230.51

2
7
4

Constn. of
Br.No. 28/1 on
Dehangi
Dayangmukh
Road over
thaijuwari Nala
& Langlodisa
Nala (PWD
Roads Haflong
Division)(NC
Hills)

355.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

111.76

0.00

0.00

0.00

111.76

2
7
5

Construction of
RCC Br. No.
7/1 on
Dharamtul
Dandua Road
with
approaches

248.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

77.48

0.00

99.60

0.00

177.08

2
7
6

Improvement
of Badlapara to
Dharamjuli
Road under
Udalguri Rural
Road division

403.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

124.58

0.00

231.32

0.00

355.90

2
7
7

Constn. of
RCC Br. No.
22/1 over river
Diffoloo on
Chowkihola
Panjan Deithor
Malasi Dirring
Kohora
(CPDMDK)
Road with
approaches and
protection

303.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

94.87

0.00

0.00

0.00

94.87

works(Karbi
Anglong)
2
7
8

Improvement
of BBDC Road
at 31 Km
(Karbi
Anglong)

4017.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1216.93

0.00

0.00

1216.93

2
7
9

Construction of
RCC Bridge
No. 8/6 over
river Dirring,
(b) Bridge No.
18/1 over river
Borjan, (c)
Bridge No.
19/1 over River
Borjan,(d)
Bridge No.
23/3 over River
Donjon, (e)
Bridge No.
27/3 Over
River
Kokosang (2)
Br. No. 2/1 ovr
river Kohra
(KarbiAnglon

1138.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

351.19

0.00

0.00

351.19

2
8
0

Construction of
RCC Bridge
No. 2/1 on
Nandini
Karaimari
Road in Assam

658.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

204.25

0.00

0.00

204.25

2
8
1

Construction of
RCC Bridge
No. 4/1 on
Garmari
Gagalmari
Road

233.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

72.81

0.00

95.21

168.02

2
8
2

Rupshir Ali
(Construction
of Bridge Nos.
3/2,5/2 &5/4)

210.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66.15

0.00

85.05

151.20

2
8

Construction of
RCC Bridge

465.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

146.00

0.00

0.00

146.00

No. 7/1,15/1
and 19/1 on
Nagaon
Barapujia
Road(NH-38)
Road division

2
8
4

Construction of
RCC Bridge
No. 12/1 on
Goroimari Dewaguri
Laharighat
Road with
approaches in
assam

317.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

113.11

0.00

0.00

113.11

2
8
5

Improvement
and
upgradation of
Chencoories
Elgin Road
including
construction of
Major RCC
bridge over
river Ghagra

1180.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

416.60

0.00

0.00

416.60

2
8
6

Improvement
of Municipal
Roads in
Narayanpur
Town in Assam

400.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

141.17

0.00

0.00

141.17

2
8
7

Construction of
RCC Br. No.
5/1 on Jajari Chabukdhara
Road over
River Sonai
under Nagaon
Rural Road
Division

236.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

85.52

0.00

83.41

168.93

2
8
8

Construction of
RCC Br. No.
6/1, 9/1 & 10/1
on Ambagaon
Kathpara
Solmari
Singiari Road

239.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

85.52

0.00

0.00

85.52

(NG-M-17) in
Nagaon District

2
8
9

Construction of
RCC Br. No.
8/1 on
Bhalukmari in
Mikirbheta
Bhurbandha
Road with
approaches and
protection work
in Morigaon
District

254.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

90.76

0.00

0.00

90.76

2
9
0

Improvement
of Tangla
Bhergaon
Ramgaon Road
from Ch.00 M
to 9400 M
including cross
drainage works
in Udalguri

1043.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

368.22

0.00

368.23

736.45

2
9
1

Metalling and
Blacktopping
of Road from
Dr. Fakaruddin
Ali Ahmed
Path To
Doulgobindapu
r via Nalbari
Hindu
Smashan,
Nalbari along
with Pucca
Drain and RCC
Slab culverts

227.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

81.21

0.00

0.00

81.21

2
9
2

Upgradation of
Nagaon Bhuragaon
Road via Dhing
(SH-10) under
Nagaon State
Road Division
(Nagaon
District)

1151.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

410.71

0.00

0.00

410.71

Improvement

747.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

268.79

0.00

0.00

268.79

9
3

of Road
Network
leading towards
DibruChaikhowa
National Park
under
Dibrugarh
Rural Road
division

2
9
4

Improvement
of Charigaon
Road under
Jorhat Road
Division

556.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

199.82

0.00

0.00

199.82

2
9
5

Construction of
RCC Bridge
No. 4/1 on
DimouRaidongia
Road over river
Sonai under
Nagaon Rural
Road Division
(Nagaon
District)

270.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

96.50

0.00

96.50

2
9
6

Metalling and
Blacktopping
of Road from
Borhapjan
samdang via
Nahoroni road
to Sukanguri
L.P School in
Tinsukia Rural
Road
Subdivision /
Division

321.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

114.15

115.00

229.15

2
9
7

Construction of
RCC Bridge
No. 3/1 on
Majgaon
Shantipur Road
over River
Sonai under
Nagaon rural
road Division

333.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

118.76

0.00

118.76

2
9
8

Improvement
of Jalah to
Kumarikata
including 2
Nos. of Bridges
over River
Kaldia and
Diring in Baska
District(BTC
Package)

2121.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1060.60

0.00

1060.60

2
9
9

Metalling &
Black Topping
of Road from
Circuit House
Tinsukia to
NH-37 via
Okanimuria
Borguri
Okanimuria
Nakhrai and
Lunpuria
Kaibortogaon
in Tinsukia
Rural Road
Subdivision/
Division

524.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

185.75

0.00

185.75

3
0
0

Construction of
Moran Netai
Road,
Dibrugarh

303.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

107.49

0.00

107.49

3
0
1

Construction of
road from
Hidipi to
Lahorijan goutom Basti
road in Karbi
anglong

485.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

170.76

0.00

170.76

3
0
2

Construction of
Tiphuk
Jajolipukhuri
Road with
RCC Bridge
No. 3/3 in
Sibsagar
District

559.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

199.64

0.00

199.64

Construction of

290.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

103.49

105.31

208.80

0
3

Bridge No. 1/2


& Bridge No.
4/1 on old AT
Road under
Dibrugarh
Rural Road
Division in
Dibrugarh
Distt.

3
0
4

Construction of
RCC Bridge
over River Aie

7883.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2810.01

0.00

2810.01

3
0
5

Construction of
Mohmora Ali
with RCC
Bridge No. 9/2
in Sibsagar
District

771.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

271.80

0.00

271.80

3
0
6

Improvement
of Tangla
Kachubil Road
(BTC area)

1079.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

384.90

0.00

384.90

3
0
7

Construction of
RCC Br. No.
2/2 and 2/3
(Renamed as
Br. Nos. 3/1
and 4/6) on
Shyamaprasadp
ur to Dossgram
Road via
Swapnargul
over stream
Singrai in
Cachar District

257.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

91.61

0.00

91.61

3
0
8

Const of RCC
Br. No. Over
river Aie at
Chillapara
Kahibari
villages on the
road from
Kokoijana 31National High
way to
Nagaon.Manik

4001.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1425.60

0.00

1425.60

pur 31 National
Highway via
Kirtanpara,
Numbarpara
villages under
Bongaigaon
rural road
Divn.

3
0
9

construction of
RCC Bridge
No. 8/1 over
Gurufella river
on Gossaigaon
- Sapatgram
Road)(BTC
Package-2)

792.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

396.00

0.00

396.00

3
1
0

Construction of
RCC Bridge
No. 6/3 over
Gongia river on
Dotoma Bhawraguri
Road)(BTC
Package-2)

800.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

400.00

0.00

400.00

3
1
1

Construction of
RCC Bridge
No. 3/1 over
Puthimari river
at Dolonghat
(Dhulabari))(B
TC Package-2)

800.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

400.00

0.00

400.00

3
1
2

Improvement
of Mahilapara
Dongapara
Barangajuli
PWD Road.

835.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

297.69

0.00

297.69

3
1
3

Construction of
Zoo Japorigog
Road (CH.0.00
to 1865.00 m
from R.G.
Baruah Road
near State Zoo
to Junction
Point of Dispur
Narengi Road

619.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

223.13

0.00

223.13

including
electrical works

3
1
4

Improvement
of Road
Network at
Sonari Town
under
Charaideo
Rural Road
Division

723.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

260.55

0.00

260.55

3
1
5

Construction of
RCC Br. (a)
No. 1/1 and 2/1
on Deroi
Rongoli road
(b) No. 2/1 on
Deopling
Ramuagar road
and No. 3/1
ghilaguri Road

391.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

138.06

0.00

138.06

3
1
6

Construction of
RCC Bridge
No. 24/1 on
Morigaon
Moirabari Road
in Morigaon
District

315.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

111.92

0.00

111.92

3
1
7

Constyruction
of RCC bridge
no. 13/1, 13/2
and 30/2 on
Mohbondha
Road

614.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

219.15

0.00

219.15

3
1
8

Construction of
Br. no 2/1&4/1
on Raha
Barapujia road
over river
Botamari and
Hatibandha
with
approaches in
Nagoan District

369.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

130.69

0.00

130.69

3
1

Improvement
of Roads in

1174.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

414.35

0.00

414.35

Biswanath
Chariali Town

3
2
0

Improvement
of Bezera
Balikuchi road

370.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

132.20

0.00

132.20

3
2
1

Improvement
of JB Road

297.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

105.82

105.82

3
2
2

upgradation of
NT road
through
Ramphalbil
Bazar to all
weather road
with
conversion of
SPT bridges
into RCC
bridge(Internati
onal Border
Areas)

764.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

269.71

269.71

3
2
3

Construction of
RCC Br. No.
1/1 over River
Kalang on
Ghahi Borjhora Road
under Nagaon
Rural Road
Division
(Nagaon
District)

281.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.22

100.22

3
2
4

Improvement
of Chintagaon
Botiamari Road
in Udalguri
District

898.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

321.72

321.72

3
2
5

Construction of
Road with
MTBT from
UT Road at
Dimakuchi
Donbosco
School to
Badlapara via

620.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

223.17

223.17

Kalikhola
Road, Udalguri
in Assam
Total of Road
& Bridges
sector (204
Projects)

12147
8.58

25.0
0

633.
00

3.00

1945
.00

2268.
00

3411.
38

9569.
35

7784.
69

1189
4.80

1082
0.89

9842.
58

8212.
33

1201 2697
3.46
.44

81120
.92

Sports
3
2
6

Apex Stadium
at Kokrajhar,
BAC

930.00

0.00

0.00

150.00

0.00

0.00

400.00

0.00

341.10

0.00

0.00

0.00

0.00

0.00

0.00

891.10

3
2
7

Mini Stadium
at Chapaguri,
Bongaigaon

20.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

8.83

0.00

0.00

0.00

0.00

0.00

18.83

3
2
8

Creation of
Main Athletic
Stadium
Complex
alongwith a
multi-purpose
Indoor Hall at
Guwahati for
National
Games 2005

7510.00

0.00

0.00

0.00

0.00

0.00

2200.00

3310.00

1800.00

0.00

0.00

0.00

0.00

0.00

0.00

7310.00

3
2
9

Diphu Sports
Complex at
Diphu in Karbi
Anglong
District

501.22

0.00

0.00

0.00

0.00

0.00

0.00

175.00

0.00

0.00

293.60

0.00

0.00

0.00

0.00

Fully
468.60 Release
d

3
3
0

Construction of
Indoor stadium
at Silchar

494.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

139.89

0.00

209.05

0.00

0.00

348.94

3
3
1

Development
of Jorhat
stadium at
jorhat

268.93

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84.70

0.00

0.00

0.00

108.40

193.10

3
3
2

Construction of
District Sports
Complex at
Jhagrapar in

377.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

116.66

0.00

0.00

0.00

116.66

Dhubri District
3
3
3

construction of
chandi barua
stadium at
barbapeta

290.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

89.67

0.00

0.00

0.00

89.67

3
3
4

Construction of
RCC Gallery of
District Sports
Association(Sta
dium
Complex,Haila
kandi)

177.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

63.76

0.00

63.76

3
3
5

Construction of
proposed
stadium at
Mushalpur in
Baska District

900.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

317.65

0.00

317.65

3
3
6

Up-gradation
of Sports
complex at
Kajalgaon in
chirang
(chirang)(BTC
Package-2)

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

250.00

0.00

250.00

11969
.74

0.00

0.00

160.
00

0.00

0.00

2600.
00

3485.
00

2141.
10

8.83

518.1
9

206.3
3

209.0
5

631.4
1

108.
40

10068
.31

Development
of Tourism
Infrastructure
at Bagori Entry
Point of
Kaziranga
National
Park(Karbi
Anglong)

329.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

116.32

0.00

0.00

116.32

Total of
Tourism &
Culture sector
(1 Projects)

329.5
7

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

116.3
2

0.00

0.00

116.3
2

Total of
Sports sector
(11 Projects)

Tourism & Culture

3
3
7

Water Supply
3
3
8

Drinking Water
supply,
Gossigaon

363.00

0.00

0.00

100.00

0.00

0.00

0.00

75.32

0.00

0.00

81.85

0.00

0.00

0.00

0.00

257.17

3
3
9

Greater Silchar
Town Water
Supply Scheme

1230.00

0.00

0.00

0.00

0.00

359.00

0.00

581.00

0.00

0.00

218.82

0.00

0.00

0.00

0.00

1158.82

3
4
0

Haflong Water
Supply Scheme
(NC Hills)

141.82

0.00

0.00

0.00

0.00

0.00

72.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

72.00

3
4
1

Stabilisation of
Silchar Water
Supply Scheme

386.00

0.00

0.00

0.00

0.00

0.00

0.00

135.00

215.54

0.00

0.00

0.00

0.00

0.00

0.00

350.54

3
4
2

kokrajhar water
supply scheme
(BTC Package)

2312.00

0.00

0.00

0.00

0.00

0.00

0.00

1155.99

0.00

1040.41

0.00

115.60

0.00

0.00

0.00

3
4
3

Golaghat Town
Water Supply
Scheme

504.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

152.93

203.00

0.00

0.00

0.00

355.93

3
4
4

Sibsagar Town
Water Supply
Scheme

1639.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

499.73

0.00

0.00

0.00

679.70

1179.43

3
4
5

Subankhata
Water Supply
Scheme (BTC
Package)

327.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

163.81

0.00

131.06

32.76

0.00

0.00

0.00

Fully
327.63 Release
d

3
4
6

Dhubri Town
Water Supply
Scheme

1026.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

323.20

0.00

304.43

0.00

0.00

296.25

Fully
923.88 Release
d

3
4
7

Greater Mahur
Town Water
Supply Scheme
in Assam (NC
Hills)

512.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

161.36

0.00

0.00

0.00

0.00

0.00

161.36

3
4
8

Udalguri Piped
Water Supply
Scheme(BTC
Package)

533.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

228.78

0.00

25.42

0.00

0.00

0.00

254.20

Fully
2312.00 Release
d

3
4
9

Bheragaon
Piped Water
Supply
Scheme(BTC
Package)

246.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

108.59

0.00

12.07

120.64

0.00

0.00

241.30

An
amount
of Rs.
120.64
lac has
been
adjuste
d from
Jalah
Rupohi
Saudar
vitha
Gobard
hana
Road.
An
amount
of Rs.
411.42
lac has
been
adjuste
d from
Jalah
Rupohi
Saudar
vitha
Gobard
hana
Road.

3
5
0

Uttarpar Piped
Water Supply
Scheme(BTC
Package)

864.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

370.26

0.00

41.14

411.42

0.00

0.00

822.82

3
5
1

Augmentation
of Greater
Diphu Water
Supply Scheme
in Karbi
Anglong
District(Karbi
Anglong)

2767.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

854.64

0.00

0.00

0.00

854.64

3
5
2

Stabilisation of
Dispur Water
Supply Scheme

729.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

225.29

0.00

0.00

289.66

514.95

3
5
3

Greater
Bokajan Water
Supply Scheme
(Karbi
anglong)

1003.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

310.02

0.00

0.00

0.00

310.02

3
5
4

Langklangvong
Water Supply
Scheme (Karbi
Anglong)

3
5
5

596.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

210.51

0.00

0.00

210.51

Mangaldoi
Water Supply
Scheme

1261.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

445.06

0.00

0.00

445.06

3
5
6

Margherita
Water Supply
Scheme in
Tinsukia
District

933.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

328.73

0.00

0.00

328.73

3
5
7

Bongaigaon
Town Water
Supply scheme
(Bongaigaon
District)

3202.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1129.46

0.00

1129.46

3
5
8

Kharupetia
Water Supply
Scheme

1981.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

699.23

0.00

699.23

3
5
9

Sarupathar
Piped water
Supply scheme

1029.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

363.30

0.00

363.30

3
6
0

Greater
dokmoka
Tekelangjan
Water supply
scheme for
fluoride,
Arsenic / iron
affected areas
from river
Dikrut(KA)

1865.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

670.74

670.74

3
6
1

Tamulpur
Piped Water
Supply Scheme

293.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

103.41

103.41

Total of Water
Supply sector
(24 Projects)

25752
.26

0.00

0.00

100.
00

0.00

359.0
0

72.00

1947.
31

379.3
5

2232.
60

1084.
39

2124.
37

1516.
36

2191. 2039
99
.76

14047
.13

GRAND TOTAL
(390
Projects)

28038 2728 9584 6863 8918


0.68
.29
.00
.00
.00

1406
9.72

1139
4.55

2481
0.73

2153
9.66

2349
5.84

2473
0.69

1460
6.27

1263
9.18

2177 7775
6.06
.58

20493
1.57

NOTE: 100% fund released => Release of 90% or more of project's approved cost.