Western LRT Study: Update
Western LRT Study: Update
UPDATE
National Capital Commission June 27, 2013
Overview
Background What we heard Rochester Field Alignment Richmond Underground Dominion Station to Cleary Station Lincoln Fields to Baseline Station Next steps
Pinecrest Creek
Bay view
Dows Lake Central Experimental Farm O-Train Confederation Station Lands Airport Link Capital Arrival along the Queensway 3
What we heard
Protect Capital Interest Protect the Byron Corridor Protect the Sir John A MacDonald Parkway Maintain access to the waterfront and pathway system Noise and Safety Concerns
Rochester Field
Rochester Field
modified
Cost
Rochester Field
Underground full length
$1.7 B $1.3 B
Rochester Field
Rochester Field
Not Acceptable At-grade in Byron Park
$960M $900M
Richmond Underground
Preferred Corridor
Richmond Underground
Lincoln Fields
Modifications
Skead St. to Cleary Station - Buried Natural Ventilation Options Dominion Station to Cleary Station
Dominion to Cleary
aerial view
Rochester Field
10
Berm
11
Feasibility
Maintenance of the watermain Control of groundwater Access to the construction zone
12
Feasibility
Maintenance of the watermain
Drawings and inspection reports available Typical support measures to be used Staged daylighting Evaluate short term closure
13
Feasibility
Control of groundwater
Various shoring systems available Pumping to manage water and keep site dry during construction Fairly shallow excavation needed
14
Feasibility
Access to the construction zone
No access from Parkway Via Cleary, Transitway & Rochester Field Work areas needed for laydown areas Areas to be fully restored after construction
15
Natural Ventilation
option
16
Natural Ventilation
view from the pathway looking east
17
Improvements
before
18
Improvements
after
19
Dominion Station
Today
20
Dominion Station
Today
Dominion Station
21
Dominion Station
aerial view
22
Rochester Field
Today
23
Rochester Field
proposed
Sir John A MacDonald Pkwy
Richmond Road
24
Cleary Station
view from the Parkway
25
Cleary Station
view from the Continental
26
27
28
Iris Station
preferred option
Shallow Trench
29
Next Steps
July 10 Transportation Committee July 17 City Council Functional Design and EA Documentation Decision included in 2013 TMP
30