Overview
Background What we heard Rochester Field Alignment Richmond Underground Dominion Station to Cleary Station Lincoln Fields to Baseline Station Next steps

Federal Interests in the Study Area


Tunneys Pasture Station LRT operational 2018
Parkway Lanark (CBC) Site Proposed Interprovincial Transit Crossing

Pinecrest Creek

Bay view

Booth Street Complex

Dows Lake Central Experimental Farm O-Train Confederation Station Lands Airport Link Capital Arrival along the Queensway 3

What we heard
Protect Capital Interest Protect the Byron Corridor Protect the Sir John A MacDonald Parkway Maintain access to the waterfront and pathway system Noise and Safety Concerns

Rochester Field

Rochester Field
modified

Cost
Rochester Field
Underground full length

$1.7 B $1.3 B

Rochester Field

Trench in Rochester Field, under Richmond Road

Rochester Field
Not Acceptable At-grade in Byron Park

$960M $900M

Richmond Underground

At-grade to Cleary, under Richmond Road


**costing does not include additional mitigation measures
7

Preferred Corridor

Richmond Underground

Dominion Cleary New Orchard

Lincoln Fields

Modifications
Skead St. to Cleary Station - Buried Natural Ventilation Options Dominion Station to Cleary Station

Dominion to Cleary
aerial view

Rochester Field

Dominion Station Sir John A MacDonald Pkwy Cleary Station

10

Berm

11

Feasibility
Maintenance of the watermain Control of groundwater Access to the construction zone

12

Feasibility
Maintenance of the watermain
Drawings and inspection reports available Typical support measures to be used Staged daylighting Evaluate short term closure

Typical construction activity

13

Feasibility
Control of groundwater
Various shoring systems available Pumping to manage water and keep site dry during construction Fairly shallow excavation needed

Typical construction activity

14

Feasibility
Access to the construction zone
No access from Parkway Via Cleary, Transitway & Rochester Field Work areas needed for laydown areas Areas to be fully restored after construction

Typical construction activity

15

Natural Ventilation
option

16

Natural Ventilation
view from the pathway looking east

17

Improvements
before

18

Improvements
after

19

Dominion Station
Today

20

Dominion Station
Today
Dominion Station

Sir John A MacDonald Pkwy

21

Dominion Station
aerial view

22

Rochester Field
Today

23

Rochester Field
proposed
Sir John A MacDonald Pkwy

Richmond Road

24

Cleary Station
view from the Parkway

25

Cleary Station
view from the Continental

26

Lincoln Fields to Baseline Stage 1

27

Lincoln Fields to Baseline Stage 2

28

Iris Station
preferred option
Shallow Trench

29

Next Steps
July 10 Transportation Committee July 17 City Council Functional Design and EA Documentation Decision included in 2013 TMP