Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Ref No. PIL-Bng/DEC-/2012: Date: 14.12.2012 Sub Quotation Kind Attention: Mr.

SHEKHAR BABU Respected Sir,

Sub Quotation for Epoxy flooring works at your site We acknowledge with thanks receipt of your enquiry for the subject work. In continuations to our discussions, please find enclosed formal offer for your approval. Hope you will find the same in line with your requirement, in case any clarification is required please feel free to contact the under signed. We are very much please to take up the order, kindly release the order. Thanking you and assuring you of our best services and attention at all time. Yours Sincerely, For Pidilite Industries Limited, Mr. Krishna Kumar Shetty Technical Engineer +91-7760789910

Pidilite Industries Limited.


HVS Apartments, Edward road. Banglore-560052(Karnataka) Phone-080-30563000 / 3001 .Fax: 22281579 Web: www.doctor-fixit.com

BOQ PLANT AND NON-PLANT BUILDINGS Sr. No. 107 TWD No. NEW Short Title Engineering Specification / Work Item Description

NON-PLNT BLDG

Unit

Apprx. quantity 127.00

Providing and applying Epoxy coating to existing concrete SQ.M. surface including making the concrete surface smooth and free from honeycomb, fixing of base liquid and hardener liquid to form epoxy liquid, at site, in mix proportion as per manufacturer's instruction , Protection of epoxy liquid from direct sun light, primer coating with Nito prime 25 of FOSROC Chemicals or Araldite of Ciba-GEIGY 250 - 100 Pbw and Hardener of Ciba-GEIGY HY 840 - 50 Pbw or equivalent, Applying under coating with Nitocote EP-410 of Fosroc Chemicals or Araldyte of Ciba-GEIGY GY 250 - 100 Pbw and Hardener of Ciba-GEIGY HY 830 - 45 Pbw and Hardener of Ciba-GEIGY HY850- 15 Pbw and Silica Flour of Ciba-GEIGY 20 Pbw and Flow Control Agent of Ciba-GEIGY - 2 Pbw or equivalent within pot life of formulation on the concrete surface in layers using brushes or rollers for under coating, Spreading glass cloth after applying one layer of epoxy liquid with minimum Overlap for glass cloth 10 cms at corners where required after inetrval of 20 minutes,applying finishing coating with two more coats of epoxy liquid over the glass cloth with brushes, curing etc. complete.

Sl. No. Surface Preparation

Description Prepare the dry concrete surface using proper grinding equipment to remove any loose material, contaminations and laitance to provide a sound, fine gripping surface. Clean the entire floor area using a powerful industrial vacuum cleaner

Unit

Area

Rate

Amount

SQM

127

100

12700

SQM
2 Providing and applying 2 component Dr. Fixit Novolac EP primer and allow it to dry for 5 6 hrs before application of Screed @ the rate of 0.15kg / sqm.

127

65

8255

SQM
3 Providing and applying 1 coats of Dr. Fixit Novolac TC, followed by installation of glass cloth and allow it to dry for 812 hrs before application of 2 coats of Dr. Fixit Novolac TC. Mixing of part A and Part B will be in the ratio of 4 :1. specific gravity of Dr. Fixit Novolac TC is 1.25 (+/- 0.05), Hardness Shore
D (ASTM D 2240) is 80.

127

350

44450

Pidilite Industries Limited.


HVS Apartments, Edward road. Banglore-560052(Karnataka) Phone-080-30563000 / 3001 .Fax: 22281579 Web: www.doctor-fixit.com

SQM
4 Providing and applying 2 coats of Dr. Fixit Novolac TC and allow it to dry for 812 hrs before application of Dr. Fixit Novolac Clear top coat. Mixing of part A and Part B will be in the ratio of 4 :1. specific gravity of Dr. Fixit Novolac TC is 1.25 (+/- 0.05), Hardness Shore D (ASTM D 2240) is 80.

127

250

31750

SQM
Providing and applying Dr.Fixit Novolac Clear coat in 2 coats @ 0.15 kg/sqm/ coat having Hardness Shore D 80 as per ASTM D 2240 Compressive strength, 70 N/mm2 @ 7 Days ASTM D 695, Flexural strength 40N/mm2 @7 Days ASTM C 580, Tensile strength 30N/mm2 @ 7 Days ASTM D 638, No Indentation as per MIL D 3134F, pH range withstands 113.5, flammability self extinguishing ASTM D 635. Service temp. 1200C 1500C, water absorption 0.1% as per ASTM C 570. All in complete as per the manufacturers specifications and directions of the engineer in charge.

127

250

31750

TOTAL RS 128905/Terms and conditions: 1) The above estimate is inclusive of all taxes and exclusive of service charge [12.30%] which will be charged extra. 2) Please prepare the work order in the name of our authorized applicator 3) Above quantity specified are only for reference the final bill will be made as per actual measurements. 4) We require techno commercial work order and clearance from site. 5) Water, Electricity, and staging shall be provided from the company free of cost. 6) We shall we provided sufficient time to complete the treatment as per standard practice. 7) Secured and covered storage space for storing our material and labor shed for accommodating our labor shall be provided free of cost at site. 8) The rate is valid for present marketing rates of the items any variation above 5% either way shall be taken into consideration while billing. 9) Payment: 50% advance, and rest will be taken as per running bills. 10) Validity 30 days.

Pidilite Industries Limited.


HVS Apartments, Edward road. Banglore-560052(Karnataka) Phone-080-30563000 / 3001 .Fax: 22281579 Web: www.doctor-fixit.com

You might also like