Professional Documents
Culture Documents
Performance N 2013 Work Program
Performance N 2013 Work Program
Performance N 2013 Work Program
AGENDA
1.
2.
3
3.
4.
5
5.
AGENDA
PEAK1977
PEAK1995
Plateau stage
1683
1631
1624
1612 1624
15891587
1575
1519
1506
1574
1539
1535
1557
1586
1537
1500
1491
1500
1522
1501
1407
1373
1338
1336
1305
1303
1288
13021302
1327
1264
1214
1408
1316
1267
1229
1375
1373
1366
1341
1364
15001500
14981496
1460
1415
1397 1404
1387
1362
1499
1468 1462
1445
1252
1240
MBOEPD
1147
1096
1082
1062
1056
1006
1000
966
904
889
853
977
1000 10101010
949 945
902
744
601
773
900
861
847
742
830
797
Decline 3-5%
585
569
500
954
550 544
488
466
512
401
266
153
52
57
57
51
53
59
74
91
99 109
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
YEAR
OilGas
PSC C
Contractors
t
t
Land acquisition
Change of Work Priority
Permit Postponed
Operational Disruption (Unfinished Completion)
Realization of development well production does not
fulfill target (Subsurface ability)
Abandonement of PUO and Gegerkalong Field
(not economically viable)
Limited Facilityy
39,7%
41OtherPSC
Contractors,
C t t
120,817
VicoInd.,15,236
Vico Ind 15 236
PetroChina
Jabung,16,345
MobilCepuLtd.,
24,083
ChevronPacific
Ind.;
327.692
CICO,26,910
ConocoPhillipsInd.,
35 146
35,146
PHE ONWJ
PHE
CNOOCSES
ConocoPhillipsInd.
CICO
MobilCepuLtd.
PetroChinaJabung
CNOOCSES,36,331
VicoInd.
PHE ONWJ,38,178
TotalE&P;
64.788
7,8%
41KKKSLainnya
PERTAMINA,
120,798
14,6%
PRIVATE AND CONFIDENTIAL
20,8%
PHE ONWJ,212.46
43OtherPSC
Contractors,
1,208
PetroChinaJabung,
264.99
TotalE&P
Total E&P
Indonesie,
1,693.98
TotalE&PIndonesie
Total E&P Indonesie
BPBerau
PERTAMINA
ConocoPhillipsGrissik
p
Kangean Energy,
294.99
ConocoPhillipsInd.Ltd.
VicoInd.
BPBerau,1,219.51
ExxonMobilOil,
369 22
369.22
KangeanEnergy
15,0%
Vico Ind.,
380.68
ConocoPhillipsInd.Ltd.,
432.94
ExxonMobilOil
PetroChinaJabung
PHE ONWJ
PERTAMINA,
ConocoPhillips
1,049.25
Grissik,
1,027.02
43KKKSLainnya
12,9%
12,6%
PRIVATE AND CONFIDENTIAL
AGENDA
18
33%
24%
KETIDAKTERSEDIAANALAT&JASA
UNAVAILABILITY
OF SUPPORTING
GOODS AND SERVICES
PENUNJANG
42
21%
10%
KETIDAKTERSEDIAANDATAG&G
UNAVAILABILITY
OF G&G DATA
54
8%
KOMPLEKSITASBAWAHPERMUKAAN
COMPLEXITY
OF SUB SURFACE NEEDS
YANGMEMERLUKANSTUDIGGR
MORE GGR STUDY
0%
ExplorationWAFulfilledFirmCommitment
ExplorationWAinTerminationProcess
ExplorationWAinFulfillingFirmCommitment
ExplorationWAEksplorasiHaveNotFulfilledFirmCommitment
PRIVATE AND CONFIDENTIAL
ACTIVITIES
WP&B 2012
REALIZATION
Exploration Drilling
236
119
50
Development Drilling
905
840
93
Workover Activities
767
740
96
13.719
11.323
83
Well Services
2011*terdapat1sumuryangmasihmempunyaikendalaoperasi
2012**Status31Desember 2012
*)Statusper31Desember2012
13
*)Statusper31Desember2012
14
180%
150%
130%
100%
69%
62%
50%
32% 35%
62%
127%
82%
52%
23%
0%
2007
2008
2009
RRR OIL(%)
2010BPMIGAS Allrightsreserved
2010
RRR GAS(%)
2011
2012
Gas (TSCF)
Oil (MMBO)
Gas (TSCF)
*)) Estimate Risked Reserve 2P from
50 POD approved in 2012
103.44
2012 Production
(+)
()
3742 52
3742.52
164.28
3.79
Oil (MMBO)
Gas (TSCF)
314.67
2.98
3592 13
3592.13
Gas (TSCF)
104.25
16
% Achiev
vement
US$34.9million
110%
104%
91%
92%
91%
Oil
Gas
90%
Rencana
Target
Realisasi
Actual
70%
50%
30%
10%
US$33.5million
GOI
Take
BOE
19
90,000
2,204
2,255
2,254
2,326
2,282
2,400
2,219
80,000
2,158
2,050
2,033
2,067
2,097
2,000
70,000
60,796
9,633
10,845
7 126
7,126
8,112
7,413
1,972
2,167
3,077
4,691
5,544
6,204
2002
2003
2004
2005
2006
2007
9,512
26,497
35,302
5,661
800
800
600
15,715
9,657
10,416
5,694
7,608
2009
2010
2011
2012*
10,109
1,200
1,000
15,341
9,339
8,710
4,463
NetContractorShare
19,950
16,665
19,797
24 153
24,153
19,019
22,638
8
,
30,000
23,79
93
32,051
35,752
1 400
1,400
MBOE/D
D
38,707
36,294
34,934
35,798
45 869
45,869
40,000
1,800
1,600
50,000
10,000
61,065
54,152
13,675
JutaUS$
60,000
20,000
2,200
400
11,763
200
200
CostRecovery
IndonesiaShare
2008
GrossRevenue
Lifting(Mboe/d) Inc.DC.Exc
Catatan:
*)2012dataistemporaryPSCContractorfinancialdataper21January2013(statementperiode JanDec12)
20052011dataisfromUnauditedPSCContractorJointFinancialStatement
20
90%
80%
80%
79%
72% 72%
71% 71% 71%
70%
69%
66% 66% 66%
63% 62% 62%
60%
AVERAGE:57%
58%
56%
54% 54%
50%
50% 50%
47% 47%
40%
45%
44%
37%
35%
30%
26%
20%
10%
8%
8%
8%
8%
8%
8%
7%
6%
0%
Catatan:
*)TemporaryPSCContractorsFinancialDataper28January2013(statementperiode JanDes12)
21
4,500
Tangguh
710BBTUD
4,000
Tangguh
846 BBTUD
3,500
4,560
3,8
850
4,,020
3,8
870
3,615
5
3,69
92
3,267
4,078
4
3,379
4,336
3,323
3,681
2,913
2,527
1,513
3
1,466
6
1,480
0
1,000
2,341
1,500
3,77
75
3,82
20
4,,008
4,202
4
2,000
,
4,416
2,500
4,397
BBTUD
3 000
3,000
500
2003
2004
2005
2006
2007
2008
Ekspor
Export
2009
2010
2011
2012*))
2012
2013
2014
Domestik
Domestic
*)2012databasedonactualdatauntil November2012
22
Realisasi
Actual
KepMen
p
ESDM
No22/2008on
NegativeList
BilliionRp
400
PP 79/2010
PP79/2010on
CostRecovery
300
186.7
200
100
311
231.1
305.2
178 5
178.5
169 7
169.7
97.5
86.2
0
2005
2006
2007
2008
2009
2010
2011
2012*
Notes:
1. In2008,withtheissuanceofMinisterialRegulationNo.22/2008oncoststhatnotincludedincostrecovery,resultedinthedeclineofCSR
activities
2. In2010,withtheissuanceofGovernmentRegulation79/2010oncostrecoveryandtaxintheupstreamsector,resultedinthedeclineofCSR
activities
ti iti
3. In2011,theChairmanofBPMIGASissed GuidelineNomor 0181,resultinginanincreaseofCSRactivities.
23
100%
16,000
90%
14,000
80%
63%
12,000
Million US$
8,000
60%
43%
43%
70%
60%
49%
54%
10,000
61%
50%
40%
6,000
30%
4,000
20%
2,000
10%
0
Jasa
Barang
%TKDN
2006
5862
995
43%
2007
4737
1846
54%
2008
6568
1400
43%
2009
5408
3577
49%
2010
6976
3811
63%
2011
8109
3706
61%
Dec-12
11388
4965
60%
0%
24
InventoryandAssetOptimalization (US$
Million)
140
124
50
120
43
103
40
40
100
80
71
30
37
3
28
Realisasi
60
Realisasi
20
40
33
10
20
0
2009
2010
2011
2012
0
2009
2010
2011
2012
25
April December2012(MillionUS$)
$16.29
0%
$522.35
2%
$491.29
2%
10,000
$5.82
$5
82
0%
$32.24
0%
9,337.90
$1,735.39
$1
735 39
7%
8,000
1 Mandiri
$3,670.02
15%
6,348.63
6,000
2 BNI
3 BRI
4,626.21
4,000
4 Syariah Mandiri
3,969.68
$17,809.01
74%
5 Mandiri/BNI
6 Mandiri & BRI
7 Muamalat
2,000
8 BUMD
0
2009
2010
2011
Dec-12
TotalTotal
fromApril
April2009
2009 s.d.
to December
Desember2012
2012:
US$24.28
Billion
US$
24,28 Miliar
26
350
301
300
250
$ 71,645,024.91
23.82%
232
$ 109
109,364,812.71
364 812 71
36.36%
200
BANK RAKYAT INDONESIA
167
150
BANK MANDIRI
134
100
$ 119,810,305.88
39.83%
50
0
2009
2010
*)Statusper30November2012
2011
30 Nov'12
Nov 12
27
AGENDA
TARGET 2013
2013APBNTARGET
OilLifting900MBOPD
GasLifting7890 BBTUD
WP&B
2013
Cost
CostRecovery
eco e y
USD15,5 Billion
GOITake
US$ 31,7 Billion
2260 MBOEPD
-CR & -Share
29
2013 TARGET
Revised@Januari 2013
No
PARAMETER
SATUAN
TARGET
Oil Lifting
[MBOPD]
830 - 850
Gas Lifting
[MMSCFD]
6.939
[BBTUD]
7.715
[MBOEPD]
1.240
[MBOEPD]
2.070 2.090
Cost Recovery
[Billion US$]
16,5 17,9
GOI Take
[Billion US$]
27,9 29,5
p
US$105/bbl
*)) OIL Price Assumption:
GAS Price Assumption : US$9,35/mmbtu
PRIVATE AND CONFIDENTIAL
30
Lapangan
2013
1
10
11
12
AVG2013
POD/POPonstream2013onward
1
2
Anoa(PremierOilNatunaSeaBV)
DuriArea13(ChevronPacificIndonesia)
3
4
5
6
7
8
9
10
11
Gundih(Kedungtuban,Randublatung,Kedunglusi)PertaminaEP
Letang,Tengah,rawa(ConocoPhilips(Grissik)Ltd)
PondokMakmurPhase1(PertaminaEP)
Ruby(PearlOilSebukuLtd)
KE38B(PHEWMO)
KE39(PHEWMO)
KE40(PHEWMO)
KE54(PHEWMO)
SouthMahakam(TotalE&PIndonesie)
POP/PODOnstreammundur2012ke2013
PODLapanganTonga/MOSESA
ProjectJetty/SELERAYA
POD Ridho 1 / ODIRA
PODRidho1/ODIRA
PODRinduArea7(Duri)/PTCPI
POPSumurTiungBiru1ST/PERTAMINAEP
PODBudi/TATELY
DuriArea12
POFDDuriArea8Rindu/PTCPI
EOR
Rantau(PertaminaEP )
TalangJimar(PertaminaEP )
1.5
1.5
1.5
1.5
1.5
1.0 1.0 1.0 1.0
1.5 1.5 1.5
6.0 6.0 6.0 12.0
1.5
1.5
1.0
1.5
12.0
1.5
1.5
1.0
1.5
12.0
0.9
0.04
1.5
1.5
1.0
1.5
16.0
0.9
0.04
1.5
1.5
1.0
1.5
16.0
0.9
0.04
1.5
1.5
1.0
1.5
16.0
0.5
0.9
3.3
0.04
1.5
1.5
1.0
1.5
18.0
0.5
0.9
3.3
0.04
1.5
1.5
1.0
1.5
18.0
0.5
0.9
3.3
0.04
1.5
1.5
1.0
1.5
18.0
0.13
0.45
0.82
0.02
1.50
1.13
1.00
1.38
13.00
0.9
0.2
0.2
2.4
0.9
0.2
0.2
2.4
0.9
0.2
0.2
2.4
0.9
1.0
0.3
03
0.2
0.2
0.2
2.4
0.9
1.0
0.3
03
0.2
0.2
0.2
2.4
0.9
1.0
0.3
03
0.2
0.2
0.2
2.4
0.9
1.0
1.1
11
0.6
0.2
0.2
0.2
2.4
0.9
1.0
1.1
11
0.6
0.2
0.2
0.2
2.4
0.9
1.0
1.1
11
0.6
0.2
0.2
0.2
2.4
0.9
1.0
1.1
11
0.6
0.2
0.2
0.2
2.4
0.9
1.0
1.1
11
0.6
0.2
0.2
0.2
2.4
0.9
1.0
1.1
11
0.6
0.2
0.2
0.2
2.4
0.88
0.75
0.61
0 61
0.28
0.20
0.15
0.20
2.37
0.7 0.7
0.7 0.7
0.7
0.7
0.7 0.7
0.7 0.7
0.7 0.35
0.7 0.35
2.5 2.5
2.5
2.5 2.5
2.5 1.25
12
14
14
23
12
13
14
15
16
17
18
19
20
21
FasProd
22
BanyuUrip(MCL )
POD/POPonstream2013onward
EORPEP
FasProd
TOTALPOD/POP+Fasprod&EORPEP
ExistingwithoutNewProject(Decline5%/tahun)
Total
23
23
29
29
29
35
35
35
12
14
14
23
23
822
818
815
811
808
PRIVATE
AND
CONFIDENTIAL
834
832
828
834
831
23
805
827
33
801
834
33
798
831
33
795
828
39
791
830
39
788
827
39
785
824
25
0.7
1.3
27
803
32
830
2013
Lapangan
1
AVG2013
7
10
11
12
POD/POPONSTREAM2013
1
Anoa(PremierOilNatunaSeaBV)
18.5
1 3 1.3
1.3
1 3 1.3
13
4 3 4.3
4.3
4 3 4.3
43
4 3 4.3
4.3
4 3 4.3
43
25
2.5
Gundih(PertaminaEP)
10.0
Letang,Tengah,rawa(COPIGrissikLtd)
20.6
PondokMakmurPhase1(PertaminaEP)
0.9
Ruby(PearlOilSebukuLtd.)
20
20
20.0
SouthMahakam(TotalE&PIndonesie)
191.3
SumpalPhase2(COPIGrissikLtd)
28.1
GrissikDebotlenecking(COPIGrissikLtd)
75.8
10
KampungBaru(EnergyEquityEpic(Sengkang))
20
12
12
12
18
18
18
18
18
18
18
18
18
16.5
POD/POPonstream2012RampUp
280
278
275
273
271
269
266
264
262
260
258
255
268
132
132
132
209
209
339
523
523
523
628
628
628
384
TOTALPOD/POP
412
410
407
482
480
608
790
788
785
888
886
884
652
EXISTINGtanpanewProject(Decline10.7%/tahun)
6601
6542
6484
6426
6369
6312
6256
6200
6145
6090
6036
5982
TOTAL
7013 PRIVATE
6952 AND
6891 CONFIDENTIAL
6909 6849 6920
7046
6988
6930
6978
6922
6866
6287
33
6939
EXPLORATION DRILLING
Program
g
And Realization - 2013
DEVELOPMENT DRILLING
Program
g
And Realization - 2013
WP&B 2013
Realization (**)
Additional Production
OIL
(BOPD)
GAS
(MMSCFD)
Seismic 2D
18.751 km
138 km
138km
Seismic 3D
22.298 km2
102km2
Surveyy andOthers
7Activities
2Activities
ExplorationDrilling
258wells
5wells
1.178wells
35wells
74.444
587
55wells
46.274
350
DevelopmentDrilling
(*)
(**)
(*)
(**)
AGENDA
5. Strategic Objectives
SKKMIGAS OBJECTIVE
PresidentReferrals
SKKMigasEffort
Objective
LONG TERM
1 Increase oil and gas reserve
1.
discovery through massive
exploration activity.
MIDDLE TERM
2. Objectify PSC Contractors effort to
increase oil and gas production
especially EOR.
3. Improve national capacity in oil and
gas industry.
SHORT TERM
4. Complete oil facility projects,
especially Banyu Urip Cepu field.
38
KPI
Reserve Replacement Ratio achieved
ReserveReplacementRatioachieved
EORactivityandoptimalizationofidleareacompleted
Improvenationalcapacityandcapabilitybuilding
(enabler)
SHORTTERM
4. Completeoilfacilityprojects,
especiallyBanyuUrip Cepu field.
5. Completegasfacilityprojects,
especiallyMasela,Tangguh,IDD,
Jangkrik, and DonggiSenoro
Jangkrik,andDonggi
Senoro
field.
6. Trimmingthewotking methodto
reducemicroproblems.
7 Adaptationoftheorganization
7.
Ad t ti
f th
i ti
andHR.
Accomplishprojecttargetsachieved
EnhanceSKKMigasorganizationcapability(enabler)
39
SKKMigasJointKPI
CollectiveeffortofalldivisiontoachieveSKKMigasKPI
Completed
realization of surveys
( i i geology
(seismic,
l
&
geophysics)
Completed realization
of exploration well
drilling
Permits approved on
time
Completed
EOR activities
and idle area
optimalization
Reserve
Replaceme
nt Ratio
achieved
OilandGas
Reserves
HoldNatural
Production
Production
Decline
Completed
realization of
d
development
l
t
well drilling
Completed
realization of work
over & well service
Completed assessment
of blueprint and
ammendment of law
and aligned to working
program
Oil d G
OilandGas
Production/
Lifting
Government Income
achieved consistent
to POD
Government
Income
CostRecovery
Control
HEAD OFFICE
Wisma Mulia Building Floor LG, 22, 23, 27, 28, 29, 30, 31, 33, 36, 38, 39, 40
Jl. Jend. Gatot Subroto Kav. 42, Jakarta 12710, INDONESIA
PRIVATE AND CONFIDENTIAL
PO BOX 4775
Telephone : +62 21 2924 1607
Facsimile : +62 21 2924 9999