Professional Documents
Culture Documents
6 Volume 4 Subsidy Quantum - Incremental Interventions
6 Volume 4 Subsidy Quantum - Incremental Interventions
Volume 4
2009
2009
2009
Integrated Residential Development Programme: R0 to R1 500 R1 501 to R3 500 Indigent: Aged, disabled and health stricken R0 to R3 500 Consolidation Subsidy Programme R0 to R1 500 R1 501 to R3 500 Indigent: Aged, disabled and health stricken R0 to R3 500 R54 650,00 R52 171,00 R54 650,00 None R2 479,00 None R54 650,00 R54 650,00 R54 650,00 R55 706,00 R53 227,00 R55 706,00 None R2 479,00 None R55 706,00 R55 706,00 R55 706,00
2009
The 2009/2010 housing subsidy guideline amounts Income category Top structure funding Own contribution Product price
Enhanced Peoples Housing Programme: R0 to R3 500 R55 706,00 None R55 706,00
Emergency Housing Assistance: Municipal Engineering Services Temporary Assistance R4 230.00 Repair of existing services Construction of temporary shelter R47 659.00 Reconstruction of existing houses Up to an amount equal to the prevailing Individual subsidy quantum.
Repair
R22 416.98
2009
Detailed breakdown of the subsidy amounts for the 2009/2010 financial year: Integrated Residential Development Programme
INTEGRATED RESIDENTIAL DEVELOPMENT PROGRAMME: The 2009/2010 housing subsidy guideline amounts ITEM DESCRIPTION Construction Cost of Housing a 40 sqm house Earthworks (provisional) Concrete, Formwork and Reinforcement Brickwork Roof structure Windows Doors and Frames Finishing and Paintwork Electrical Plumbing and Toilet Material Labour Sub Total P&G Overheads Transfer costs Beneficiary Administration Profit Total Total Const. Cost (Rounded Off) AMOUNT 790.07 4,291.13 14,236.75 3,736.14 1,388.94 1,657.35 2,212.40 1,100.45 6,607.10 36,020.34 9,732.37 45,752.71 4,968.14 2,095.32 800.00 255.95 1,833.40 55,705.52 55,706.00
2009
The funding for the provision of municipal engineering services As from 1 April 2007, the cost for the provision of internal municipal engineering services must be financed from alternative sources. The use of the housing subsidy allocation for the financing of such internal services may only be approved as an option of last resort. In cases where the provincial annual housing funding allocation is used for the provision of municipal engineering services as indicated, the subsidy amount and detailed cost breakdown are set out below.
2009
Detailed breakdown of the cost of a serviced stand for the 2009/2010 financial year: Integrated Residential Development Programme
INTEGRATED RESIDENTIAL DEVELOPMENT PROGRAMME: The 2009/2010 housing subsidy guideline amounts ITEM DESCRIPTION Serviced Stand Cost Indirect Cost Professional fees Safety Inspector (DoL) Environmental Control Officer Pre-planning Studies Project Management Geotechnical Evaluation Contour Survey Land Surveying and Site Pegging Land Survey examination fee Town Planning Civil Engineer : Services Site Supervision : Clerk of Works - Civil Social Facilitation Legal Fees Sub Total : Indirect Cost Direct Cost Water Reticulation (including meter) Sanitation Reticulation Roads Storm Water Street Lighting Sub Total Direct Cost Total Cost of a Serviced Stand: Sub Total : Indirect Cost Sub Total : Direct Cost Total : Total Cost (Rounded Off) 3,630.57 18,531.25 22,161.82 22,162.00 4,614.11 5,363.13 3,445.58 4,988.61 119.83 18,531.25 68.26 54.60 365.17 749.05 89.90 59.93 299.62 92.89 404.46 898.85 227.70 299.63 20.51 3,630.57 AMOUNT
2009
Detailed breakdown of the subsidy amounts for the 2009/2010 financial year: Emergency Housing Assistance Programme
EMERGENCY ASSISTANCE: The 2009/2010 housing subsidy guideline amounts TEMPORARY ASSISTANCE 1. Basic Municipal Engineering Services in respect of temporary assistance on a shared basis (Inc. VAT) a) Indirect Costs: Beneficiary Administration Safety inspector (DoL) Environmental Control Officer Pre-planning studies [1] Project Management Geo-technical Investigation (if [2] applicable) [3] Contour Survey [4] Land surveying and site pegging Land survey examination fee (Surveyor [5] General) Town Planning (i) Layout (ii) Township establishment Environmental Impact Assessment Civil Engineer: Services design & Site supervision: Social facilitation Legal Fees (if applicable) (rental [6] agreements) [7] Mediation & Conflict Resolution Sub-Total: Indirect Costs per stand b) Direct Cost: Water reticulation on shared basis Sanitation on shared basis Roads (Main access) Storm Water Sub-Total: Direct Cost Total cost of a serviced stand: (portion of an ordinary stand shared between 5 units) a) Sub-Total: Indirect Costs b) Sub-Total: Direct Cost TOTAL STAND COST: TOTAL STAND COST (portion of an ordinary stand shared between 5 units) (rounded off): 261.77 69.81 55.85 373.45 74.51 20.96 13.95 69.87 21.66 38.73 55.57 24.84 114.22 49.67 4.96 39.73 1,289.55 1,002.01 936.67 740.63 261.40 2,940.72 ITEM DESCRIPTION AMOUNT
2009
1 2 3 4 5 6 7
If the Municipality cannot manage the project Only if site is to be used for temporary settlement with a permanent housing solution, or for scoping study Only if site is to be used for temporary settlement with a permanent housing solution, or where the topography necessitate for services planning purposes Site pegging only for site to be used for temporary settlement with a permanent solution or permanent temporary area As in 4 above When applicable When applicable
Detailed breakdown of the subsidy amounts for the 2009/2010 financial year: Emergency Housing Assistance Programme
EMERGENCY ASSISTANCE: The 2009/2010 housing subsidy guideline amounts TEMPORARY ASSISTANCE 2. Construction Cost of temporary shelter (Inc. VAT). Roof sheeting / covering Side Cladding / Wall Cladding Columns and anchor bolts Column footings: Concrete bases for structure posts Rafters Purlins Door & Window posts and frames Side rails to support side cladding Flashings Door Window Flooring: Concrete Thermal improvement under roof Sub-Total: TOTAL SHELTER COST 5,275.88 8,689.28 5,151.71 1,239.46 2,389.61 3,101.92 2,078.12 2,544.27 744.99 1,916.92 1,853.75 6,208.19 2,234.96 43,429.05 43,429.00 ITEM DESCRIPTION AMOUNT
EMERGENCY ASSISTANCE: The 2009/2010 housing subsidy guideline amounts ITEM DESCRIPTION Existing services Existing houses Repair of services to National Norms and Standards Repair of existing formal structure according to National Norms and Standards AMOUNT 22,416.98 Up to an amount equal to the prevailing Individual subsidy quantum.
2009
Detailed breakdown of the subsidy amounts for the 2009/2010 financial year: Informal Settlement Upgrading Programme
INFORMAL SETTLEMENT UPGRADING: The 2009/2010 housing subsidy guideline amounts ITEM DESCRIPTION Phase 1 Survey, registration, participation, facilitation, dispute resolution etc Geotechnical investigation Land acquisition Pre-Planning Interim engineering services Phases 2 and 3 Detailed town planning Land surveying and pegging Contour survey Land survey examination fee Civil engineers fee Site supervision fees Permanent engineering services provision Project management Relocation grants Transportations and loading costs for people and household effects Social service support including support for the registration of social benefits, school registration and other welfare support Relocation food support to households Maximum cost per household 392.66 296.67 488.64 1,177.97 413.67 306.43 61.29 94.99 919.28 232.86 18,952.44 8% of total cost 3% of project cost 91.93 2,617.70 788.81 2,966.74 AMOUNT
10
2009
Detailed breakdown of the subsidy amounts for the 2009/2010 financial year: Enhanced Peoples Housing Process Programme
ENHANCED PEOPLES HOUSING PROCESS PROGRAMME: The 2009/2010 housing subsidy guideline amounts ITEM DESCRIPTION Construction Cost of Housing a 40 sqm house Earthworks (provisional) Concrete, Formwork and Reinforcement Brickwork Roof structure Windows Doors and Frames Finishing and Paintwork Electrical Plumbing and Toilet Material Labour Sub Total P&G Overheads Transfer costs Beneficiary Administration Profit Total Total Const. Cost (Rounded Off) AMOUNT 790.07 4,291.13 14,236.75 3,736.14 1,388.94 1,657.35 2,212.40 1,100.45 6,607.10 36,020.34 9,732.37 45,752.71 4,968.14 2,095.32 800.00 255.95 1,833.40 55,705.52 55,706.00
11
2009
The funding for the provision of municipal engineering services As from 1 April 2007, the cost for the provision of internal municipal engineering services must be financed from alternative sources. The use of the housing subsidy allocation for the financing of such internal services may only be approved as an option of last resort. In cases where the provincial annual housing funding allocation is used for the provision of municipal engineering services as indicated, the subsidy amount and detailed cost breakdown are set out below.
12
2009
Detailed breakdown of the cost of a serviced stand for the 2009/2010 financial year: Enhanced Peoples Housing Process Programme
INTEGRATED RESIDENTIAL DEVELOPMENT PROGRAMME: The 2009/2010 housing subsidy guideline amounts ITEM DESCRIPTION Serviced Stand Cost Indirect Cost Professional fees Safety Inspector (DoL) Environmental Control Officer Pre-planning Studies Project Management Geotechnical Evaluation Contour Survey Land Surveying and Site Pegging Land Survey examination fee Town Planning Civil Engineer : Services Site Supervision : Clerk of Works - Civil Social Facilitation Legal Fees Sub Total : Indirect Cost Direct Cost Water Reticulation (including meter) Sanitation Reticulation Roads Storm Water Street Lighting Sub Total Direct Cost Total Cost of a Serviced Stand: Sub Total : Indirect Cost Sub Total : Direct Cost Total : Total Cost (Rounded Off) 3,630.57 18,531.25 22,161.82 22,162.00 4,614.11 5,363.13 3,445.58 4,988.61 119.83 18,531.25 68.26 54.60 365.17 749.05 89.90 59.93 299.62 92.89 404.46 898.85 227.70 299.63 20.51 3,630.57 AMOUNT
13
2009
14