Acc LTD Laheri Cement Works
Acc LTD Laheri Cement Works
Agenda
Company Profile and Plant History Process & Business Growth Energy Conservation Activities Reduction on Specific energy figures Global Bench Mark Specific energy Innovative projects Environmental projects Involvement of Employees Team work in ENCON Monitoring, Reporting and implementation methodologies Renewable Energy Sources, Utilization of waste
2 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Company Profile
Name of plant Year of establishment I up-gradation, 1997 II up-gradation, 2007 Present capacity Process No of Kilns
: : : : : : :
Lakheri Cement Works 1905 Wet to Dry process 0.48 MTPA addn 1 PH with calciner string 1.5 MTPA Dry One (1) PPC and OPC 25 MW
Major suppliers of plant & machinery: Alstom, Pfeiffer, Siemens, ABB, SKF, FLSmidth, BHEL, ELGI, Elecon, MICO, GE, etc.
3 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Plant History
Plant History
1905 : Foundation of Lakheri started with four cylindrical, pillbox-shaped vertical Kilns to produce hydraulic lime 1917 : Installation of Indias first cement plant at barren foot hills of Arawali mountain installed capacity of 0.32 mtpa using wet process of manufacturing from 3 nos. of kilns. 1997 : Modernization and Expansion by replacing wet process kilns with a single dry process kiln of capacity 1200 TPD and raising its cement manufacturing capacity to 0.60 MTPA. 2000 : By adopting Kaizens as a way of life, Total productive maintenance (TPM) philosophy, employees innovations and dedications, The plant could achieve production to a level of 0.7 mtpa from the same establishment. 2007 : The capacity of the plant is raised by more than two folds to a level of 1.5 mtpa by adding second string of pre-heater with calciner to the existing kiln with replacement of grate cooler and addition of new close circuit cement grinding system. 2007 : Installation of 25 MW capacity Thermal power plant. The manufacturing process is supported by an economical and reliable captive thermal power source. 2009 : Conceived Shikhar Project, In plant R & D with TSS support in Kiln Calciner String Pre heater and cooler modification. Usage of AFR. Transformation of Lakheri. 2011 : No 1 performer in all ACC plants. Winner of National Level energy conservation award, Green Tech Environment Excellence award and Golden Peacock Environment Management award. IMEA Award, Green Manufacturing Excellence Award.
4 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Process Flow
Raw material extraction Raw meal preparation Clinker production Raw material preparation
Shipping station
Cement grinding
Shipping station
5 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Business Growth
1600000 1400000 1200000
Second Up gradation
1995-96
1998-99
2002-03
2005
2007
2008
2011
Clinker
Total Cement
PPC
6
Strength Performance
Passion
Energy Policy
Energy Policy
We, at Lakheri Cement works are committed to formulate and implement Total Energy Management System and in the process continuously strive to improve the energy performance in all its activities through Reduction in energy consumption by continuously improving the manufacturing process, without impairing productivity. Minimizing the waste and utilize the same for value addition. To adopt energy efficient technologies and optimize utilization of fuels and other resources. To increase the use of renewable sources of fuel and energy and optimization of raw material by the use of alternative material. Creating awareness among employees through various forums, upgrade their skills to conserve energy and natural resources, to achieve above goals. Date: 01.07.2009 Place: Lakheri (Director Plant) Lakheri Cement Works
7 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Electrical ,Thermal, Clinker factor, MTBF are formed at to enhance energy efficiency of all ACC plants.
An Energy Performance Cell
( Lakhelavya) is formed at plant level with Energy Manager as coordinator and participation of various HODs for implementation of identified projects
8 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
9 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
of the deviations is discussed in the daily production meeting which is headed by DGM (Prod) and weekly chaired by Sr GM/ Director Plant.
Internal and external training programme conducted for staff as well as
audits
by
TERI,
CII,
Orchid,
The specific power consumption for all the sections vis-a-vis their
respective targets and the deviations are analyzed and corrective actions are implemented.
Energy awareness prorgramme like poster, painting, quiz, slogan,
C O M M
GM Mining
Energy Manager
GM Engg.
DGM Production
I T T E E
Chairperson- Sr Sr GM
GM Mining Chief Mgr E&I DGM Production GM Engineering
O P E R A T
Energy Manager
I O N A L
HOD Mines
HOD CR
HOD VRM
HOD Kiln
HOD Packing
HOD E&I
HOD W/S
T E A M
11 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
12 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
13 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
14 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
15 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
16 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
17 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
18
19 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
2008
2009
2010
20 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
2.00 1.50 kWh/ ton 1.00 Mat. 0.50 0.00 2008 2009 2010 2011 2012 YTD 1.80 1.78 1.46 1.30 1.18
21 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
21.00 18.00 15.00 kWh/ ton 12.00 Mat. 9.00 6.00 3.00 0.00
18.92
17.25
15.31
14.27
14.02
2008
2009
2010
2011
2012 YTD
22 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
23 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Sp energy Section w ise, Grinding 40.00 38.00 kWh/ ton 36.00 Mat. 34.00 32.00 30.00 2008 2009 2010 2011 2012 YTD 38.72 37.83 37.93 37.15 36.77
24 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
800
667
709 660
Lakheri Cement
Ref: Report of the Working Group on Cement Industry for XIIth 5 year Plan 2012-2017 - Department of
Indian Policy & Promotion, Ministry of Commerce & Industry. December 2011 ACC Lakheri Cement Works Strength Performance Passion 25 22nd 23rd Aug 2012
1200 K cal/K g of C em ent 1000 800 600 400 200 0 2008 2009 2010 2011 2012 YTD Base line Target in data 2014-15 936.85 938.23 970 854.54 834.93 793.3 940
26 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Green Energy
7.5 MW Captive Wind Plant at Jodhpur
Wind Power Generation, Mwh
14000.00 12000.00 10000.00 8000.00 6000.00 4000.00 2000.00 0.00 2008 2009 2010 2011 2012 YTD
27 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
: 17 : 4.15 Million Kwh : 3569 Million Kcal : 32 : 27.077 Million Kwh : 23286 Million Kcal : 25452 Ts Co2 (Grid Emission factor 0.94 Tco2/MWh)
28
No of project implemented Equivalent Kwh Total Energy Saving Net CO2 reduction
Strength Performance
Passion
Modification in new P.H. lower(C-7) cyclone inlet ,top cyclone(C-1) inlet & dip tube height and Cooler IKN Horse shoe modification) Replacement of low efficiency pumps with a single high efficiency pump Installation of VFD for DC Fan in VRM, Packer 4, Primary Crusher Install Multi step capacity controller on selected compressors to optimize operating pressure Installation VFD drive for cooler fan no3, fan no -04
ACC Lakheri Cement Works Strength Performance
6.0
3.0
Operate 132 kW compressor and stop 160 kW compressor top reduce operating load/unload power Reduce operating pressure range for compressors (N0.332CP04,332CP03,442 CP 01) Rectify unloading system to reduce unload power for 160 kW screw compressor no.332 CP O4 Modify piping and operate coal conveying compressors at low pressure Dilution Air Fan operation, optimization in compound mode (New VRM running)
ACC Lakheri Cement Works Strength Performance
0.25
nil
0.32
nil
CFL for colony residence lighting (1500 nos) Mill out put and Sp power optimization through (1) Process optimization (increasing grinding press) (2) size of mill feed L/S (3) Usage of Marvel slurry 4) Mill fan inlet damper removal Idle running of dust separation group to be avoided by interlocking with wobbler group Energy Saving by reducing damper setting of Clinker silo bag filter fan Drive no.521FN01 Installation of GRR in E-mill Fan
0.40
0.135
8.56
nil
Strength Performance
Passion
Area increased by Removing inlet silencer of cooler fan ( High pressure drop in cooler fan3,5 & 8)* Saving=0.25unit/mmWg*3 PID control of cooler fan operation Reduction of cement-06 mill power by Optimization of output by chemical dosing Power saving by using 556CP01/CP02 air to old cement mill by providing separate CM06 GGLS compressor and stopping one old cement mill compressor. TOTAL
0.81
nominal
27.75
7.74
32
Strength Performance
Passion
Modification in Fan inlet box in order to minimize the velocity difference between duct and fan I/L Replacement of VRM1 main motor (1200 KW) with 1000 KW motor (Spare motor) Installation of VFD drive for cooler fan no3 Installation of VFD drive for cooler fan no 04
0.42
0.03
0.67
Nil
1.346 1.098
0.65 0.7
33 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Installation of VFD drive for cooler fan no -06 Installation of VFD for PD Blower of new high momentum burner Installation of GRR for E-mill vent fan E-mill fan casing modification as per new impeller
34 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Installation of VFD for cement mill separator fan Installation of High capacity PD blower in place of two PD blowers Installation of chemical mixing pump to increase the output of CM6 to 160 TPH from 154, hence reduce sp. power consumption Modify piping for low pressure compressor to reduce pressure drop and operate compressors at lower pressure
ACC Lakheri Cement Works Strength Performance
0.123 0.673
0.18 Nil
6.57
0.5
0.33
0.2
35
Passion
Modification of cyclone for improvement of collection efficiency and thermal efficiency Replacing kiln inlet seal with the iteca seal to improve thermal as well as electrical efficiency Installation of high momentum burner
72.0
3.0
2.0
1.5
2.64
6.0
Total
ACC Lakheri Cement Works
92.00
Strength Performance Passion
14.668
36 22nd 23rd Aug 2012
Replacement of E.E. Impeller for cooler Fan No. 4 Replacement of E.E. Impeller for cooler Fan No. 10 Connection of 930 KVAR capacitors with VRM-2 Main Drive Attending false air in graces in TA duct.
3.12
1.2
37 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Attending to cooler old panel, plate gaps, side casting gap and under grates. Replacing the Conventional chokes with Electronic Chokes for 30 No's Tube light Fittings. Reduce pressure drop in down comer duct Preheater 1000W halogen replaced with 400W MH
1.81
1.0
38 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Installation of VFD for PD blower no.351PD03 optimization of compressed air system Attending false air in graces in TA duct. Regarding of grinding media in second chamber of close circuit cement mill
5.17
4.5
39 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Attended Calciner tertiary air bend - for flap control open , false air (3%) Pressure Loss 30-40 mmwg In colony ordinary 100/60w bulb replaced with CFL Improvement in efficiency of VRM2
0.06
0.05
1.34 1.45
0.05 4.0
Total
20.79
14.07
40 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Saving in Power =12 kwh Run hrs. Per day = hrs. 20 Annual savings in Kwh = 79200 Annual cost savings = 3.56 Lakhs (@ unit cost of Rs.4.50/-) Simple Pay back period = Immediate
41 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
43 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
44 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Before
After
Medium Voltage Drives (HT VFD) for Calciner Fan - 1200 KW Retrofit impeller of high efficiency (78-80% at operating parameters) in VRM -1 Fan for Power saving Medium Voltage Drives (HT VFD) for Coal Mill Vent Fan - 650 KW Installation of Capacitor Banks to improve the Power factor and hence operating efficiency of TG TOTAL
Strength Performance
Passion
Investment Rs Lakh
Installation VFD with high efficiency impeller Retrofitting in Cooler fan no 471 FN06, 471FN07, 471FN09 Installation of VFD for Compressors Installation Heavy duty pressure regulating valve for all bag filters.
20.0 15.0
0.4 0.15
35.0 75.0
Investment Rs Lakh
Kcal/ kg clk
Modification of remaining Cyclone for improvement of collection efficiency and thermal efficiency Utilisation of waste heat from Preheater & cooler exhaust Installing rotoscale for Calciner coal feeding system
25 3000
8 (1.5 MW)
2 10
49 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Synopsis:
We have observed that clinker cooler and ESP exit temperature is in higher side 170-180 C and 280-300 C respectively. This is resulting a direct impact on thermal efficiency and cost of production. After so many ideation sessions following has been done for improving the cooler efficiency.
50 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Innovative Projects - 1
Modification in Cooler IKN Blocking of two rows of IKN out of eight rows. Sp. aeration distribution changed 02 rows for Fan No 01 and 04 rows for fan No 02, as against earlier 03 in Fan 01 and 05 in Fan 02. Reduced inlet width of IKN from more than 1200 mm to 1050 mm. Last 5 rows of cooler grate plate pattern changed from one moving one stationary to two moving one stationary . Horse shoe & sealing of gaps Changed in pattern of IKN horse shoe, less width of fines side and more width of coarse side (E mill), in original design it was just reverse
51 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Innovative Projects -1
Benefits:
By this cooler modification there is a substantial reduction in clinker temperature to 150-160 C from 170-180 C and ESP exit temperature decreased to 250-260 C from 280-300 C. Saving: Finally it is impacted reduction in sp thermal energy by 8 MJ/ton Clinker. Annual saving Rs17.6 Lac. Other Benefits: Conservation of natural resources by reducing coal consumption and helps to mitigate CO2 emission
52 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Innovative Projects - 2
Innovative Projects - 2
54 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Innovative Projects - 2
55 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Innovative Projects - 2
Innovative Projects - 3
Innovative Projects - 3
At Lakheri 100% Petcoke is being used in kiln firing. As petcock contains low VM hence some excess amount of oxygen required for proper combustion. This excess air leads to reduce thermal efficiency of the kin system. Increasing cost of Petcock and conventional coal is also a factor for considering Alternative Fuel (AF). But again the feeding of alternative fuel in kiln requires lot of arrangement and modification to be done. Due to improper availability of AF this capital expenditure looks some time unviable Looking above Lakheri plant after many ideation sessions and brain storming came with a unique solution to feed Saw dust in the Kiln by blending with Petcock itself.
58 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Innovative Projects - 3
The methodology used is Use of saw dust To increase VM of firing fuel Lab scale trial of grinding of pet coke with saw dust Check availability of saw dust in near by villages Plant scale trial Optimum storage of biomass Optimization of burning operation After many trials this feeding methodology found very successful this has resulted reduction in preheater temperatures from 285 c to 274 c and there is considerable amount of power saving due to less air require for kiln/calciner. The Saw dust is being grind with petcock in the Ball Mill
59 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Innovative Projects - 3
Analysis of Petcoke Proximate Analysis Sample Details Pet coke % Moisture (As recd.) 5.2 9.1 % VM 0.6 % Ash CV cal/gm (GOD) 8390
%S
5.4
Analysis of Saw Dust Proximate Analysis Sample Details % % Moisture VM (As recd.) 17.3 64.9 CV cal/gm (GOD) %S
% Ash
%Fixed C
Saw Dust
0.5
17.3
Passion
4440
0.1
60 22nd 23rd Aug 2012
Strength Performance
Innovative Projects - 3
Results :
Reduction in %O2 at kiln inlet by 0.4% (2.4 to 2.0%) Reduction in %O2 at PH outlet 0.6% (4.4 to 3.8%) Increase in AFR TSR from 0.65% to 1.8% , fuel replacement cost w.r.t Indian grade fuel = 800 Rs/ts (5.0 Lac) Reduction in sp thermal energy consumption from 2998 to 2965 , equivalent to 7.9 Kcal i.e. 94.6 Rs Lac by considering only 50% = 47.3 L Total Benefit = Rs 52.3 L
Strength Performance
Passion
Environmental Projects
RABH
RABH
ESP
ACC Lakheri Cement Works
Environmental Projects
63 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Environmental Projects
64 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
Environmental Projects
Jatropha Plantation
65 ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012
AFR feeding
Shredded Tires
Expired Products
Jatropha Plantation
Strength Performance
Passion
Thank You