CCTV Locations For 2 X 520 MW, IPP, HNPCL, Vishakhapatnam: BTG Unit-1
CCTV Locations For 2 X 520 MW, IPP, HNPCL, Vishakhapatnam: BTG Unit-1
Sl. No. Camera* Location BTG Unit-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 BTG Unit-2 TG Hall Elevation - 0m TG Hall Elevation- 8.5m MOT Room Raw Coal Feeders Air Pre-Heaters Boiler Firing Floor ESP Field Area Chimney HT Cable Vault at 0m LT Cable Vault at 5.1 m LT Cable Vault at 8.5 m LT Cable Vault at 24.0 m Cable Vault at 13.5 m (GRP, STRP, VIB) 11KV and 3.3 KV Switchgear Room at 3.5 m LT Switchgear Room at 12.0 m LT MCC Room at 27.5 m CCR Computer Room EER Room Transformer Yard Number 1 2 1 2 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 1 2 1 2 1 2 2 1 1 1 1 1 1 1 1 1
21 TG Hall Elevation - 0m 22 TG Hall Elevation- 8.5m 23 MOT Room 24 Raw Coal Feeders 25 Air Pre-Heaters 26 Boiler Firing Floor 27 ESP Field Area 28 HT Cable Vault at 0m 29 LT Cable Vault at 8.5 m 30 LT Cable Vault at 24.0 m 31 Cable Vault at 13.5 m (GRP, STRP, VIB) 32 11KV and 3.3 KV Switchgear Room at 3.5 m 33 LT Switchgear Room at 12.0 m 34 LT MCC Room at 27.5 m 35 Computer Room 36 EER Room Balance of Plant Coal Handling Plant 37 38 39 40 Track Hopper Wagon Tippler Truck Tippler Stacker Reclaimer-1 & 2 and Coal Yard
2 2 2 2
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Crusher House Drive House-1 Drive House-2 Transfer Point-1 Transfer Point-2 Penthouse Junction Tower-1 Junction Tower-2 Junction Tower-3 Junction Tower-4 Junction Tower-5 Junction Tower-6 Junction Tower-7 Junction Tower-8 BCN-1A & 1B BCN -2
2 1 1 2 2 1 2 2 2 2 1 1 2 2 2 2
57 58 59 60 61 62 63 64
BCN-3A & 3B BCN-4A & 4B BCN-5 BCN-6A & 6B BCN-7 BCN-8A & 8B BCN-9A & 9B BCN-10A & 10B
3 1 2 1 2 1 1 4 1 1 1 1 1 1 2 2 1 2 2 1 1 1
65 BCN-11A & 11B 66 BCN-12A & 12B 67 BCN-13A & 13B 68 BCN-14A & 14B 69 CHP Control Room Ash Handling Plant 70 71 72 73 74 75 76 77 78 Ash Water and Ash Slurry Pump House Ash Dyke Area Vacuum PH and AHP MCC-1 AHP MCC-2 Ash Water Recovery System Pump House & AHP MCC-4 AHP MCC-3 and Control Room Buffer Hopper Area Ash Silo Area Transport Air Compressor House
Fuel Oil System 79 HFO Tank Yard Area 80 LDO Tank Yard Area 81 Unloading Yard 82 Unloading Pump House 83 Forwarding Pump House CW System 84 CW Jetty 85 CW Pump House Rest of BOPs 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 Compressor House DG House Fire Water Pump House Raw Water Pump House DM Plant Hydrogen Generation Plant Switchyard Immovation Weigh Bridge Gate Compund and Security Office Admin Building Gate Permanent Store Material Store Yard Watch Tower Raw Water Reservoir CPU Regeneration Room Train Entry Point near Plant Boundary Train Exit Point near Plant Boundary Spare Total *Note 1 1 1 1 1 3 2 1 1 1 1 1 1 2 1 2 1 1 1 1 1 1 1 1 8 150
Cameras shall come along with motorized zoom lens, housings, PAN and Tilt Mechanism
One Elevation Two Elevations Two Elevations Length 250m Penthouse comes in between Truck Hopper and TP-2 TP-2 comes in between, BCN-3 length after TP-2 to Crusher house is high (100m horizontal, 200m slant)
Four for BTG area and Four for BOP area for future usages
Sl. No. 1 2 3 4 5 6 7
Item Video Switcher/ Control System Key Board Monitors On Site Receiver/ Driver Unit Digital Video Recorder Post Evaluation Video Amplifire Central Archiving Unit
Quantity On as required basis but minimum 6 in nos. On as required basis but minimum 1 no. for each unit and 10 nos. for BOP On as required basis but minimum 1 no. for each unit and 10 nos. for BOP One for each camera On as required basis but minimum 6 in nos. On as required basis On as required basis but minimum one no.