Appendix 9A - Monthly Site Photos March 2013
Appendix 9A - Monthly Site Photos March 2013
Appendix 9A - Monthly Site Photos March 2013
Location : Upper Changi Road South Bound near Sunbird Road Date: 07/03/2013
Activity :Noise Meter- Chainage 130 MCO2 East Bound: Noise Monitoring Meter Installed Near Lamp Post 50, relocated nearer to Residential Houses Location :Upper Changi Road East Bound Date : 08/03/2013
Activity : Trial Trench-Chainage MCO2 60 : New trial Hole to Locate alignment of 500mm Diameter Asbestos Pipe, Found approximately 1metre below footpath level. Location : Upper Changi Road West Bound Date : 08/03/2013
Activity : LTA Logo: Installed three (3 ) LTA Logo along Hoarding facing Upper Changi Road, One (1 ) BCA SignBoard and One (1) LTA Logo Facing Upper Changi Road East Location : Upper Changi Road West Bound Date : 8/03/2013
Activity : BCA Sign Board: Installed One (1 ) BCA SignBoard Near Main Entrance Gate at Upper Changi Road East
6
Location :Near Main Entrance Gate- Upper Changi Road East Date : 9/03/2013
Activity : Clearing of Existing U- Drains Location : Near 900mm wide Drain of the proposed New Road North Bound Side Date : 12/03/2013
Location : Along the Slope of the proposed New Link Road Date : 9/03/2013
Activity : Tree Cutting : 2 Trees cut near the existing Bus Stop
9 10
Activity : Warning Signs in Place and Workers signalling the Traffic during Tree Cutting Works Warning Signs in Place and Workers signalling the Traffic Date: 13/03/2013
Warning Signs in Place and Workers signalling the Traffic Date: 13/03/2013
Activity : Fixing of damaged Silt Fence near ECM Area Location : Near ECM Machine Date :14/03/2013
Activity : Wire Installation for Internet Connection Location : Along the Perimeter Fencing Date : 15/03/2013
Activity : Soil Samples taken for Laboratory testing Location : Upper Changi Road -CH 35 New Road North Bound Date: 19/03/2013
Activity : Precast 900mm RC Drain installed Location : Upper Changi Road-West Bound CH 190~170 Date : 2103/2013
Activity : On- going 900mm RC Drain works Location : Upper Changi Road -West Bound CH 160~190 Date : 22/03/2013
Activity : Pegging of Under Ground Water Pipe Location : Upper Changi Road -West Bound Date : 25/03/2013
Activity : Meeting on site with N-Parks Officer and PUB Officers: discusssed about PUB Pipe Diversion and protection of the tree near proposed RCBC Location : Upper Changi Road Date : 25/03/2013
Location : Upper Changi Road East, Near Proposed Road Junction Date: 26/03/2013
Activity : C5 in place - Benching Works Location : CH 150- 190 West Bound Upper Changi Road Date : 27/03/2013
Location : CH 150- 190 West Bound Upper Changi Road Date: 27/03/2013
Activity : Geo Textile in Place at 900mm RC Drain Prior to Back filling worksSilt Fence properly installed near ECM Area
27 28
Location : CH150- 160 West Bound Upper Changi Road Date: 27 March 2013
Activity : Meeting with SP Power Grid Mr.Chan Meng Hoe and Singtel Mr. Ronald Tan: regarding Diversion of underground Services Location : Upper Changi Road Date: 27 March 2013
Activity : Silt Fence properly installed near ECM Area Location : ECM AREA beside ULT Site officeCH150- 160 West Bound Upper Changi Road Date:
Location : CH150- 160 West Bound Upper Changi Roadworks Date: 30 March 2013