APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

Activity : Trial Trench for 500mm dia PUB Asbestos Pipe


1

Activity : Clearing of Tree Roots from the proposed New Road


2

Location : Upper Changi Road South Bound near Sunbird Road Date: 07/03/2013

Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL PARK Date: 07/03/2013

Activity :Noise Meter- Chainage 130 MCO2 East Bound: Noise Monitoring Meter Installed Near Lamp Post 50, relocated nearer to Residential Houses Location :Upper Changi Road East Bound Date : 08/03/2013

Activity : Trial Trench-Chainage MCO2 60 : New trial Hole to Locate alignment of 500mm Diameter Asbestos Pipe, Found approximately 1metre below footpath level. Location : Upper Changi Road West Bound Date : 08/03/2013

Activity : LTA Logo: Installed three (3 ) LTA Logo along Hoarding facing Upper Changi Road, One (1 ) BCA SignBoard and One (1) LTA Logo Facing Upper Changi Road East Location : Upper Changi Road West Bound Date : 8/03/2013

Activity : BCA Sign Board: Installed One (1 ) BCA SignBoard Near Main Entrance Gate at Upper Changi Road East
6

Location :Near Main Entrance Gate- Upper Changi Road East Date : 9/03/2013

Activity : Boundary Fencing


7 8

Activity : Clearing of Existing U- Drains Location : Near 900mm wide Drain of the proposed New Road North Bound Side Date : 12/03/2013

Location : Along the Slope of the proposed New Link Road Date : 9/03/2013

APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

Activity : Tree Cutting : 2 Trees cut near the existing Bus Stop
9 10

Activity : Warning Signs in Place and Workers signalling the Traffic during Tree Cutting Works Warning Signs in Place and Workers signalling the Traffic Date: 13/03/2013

Warning Signs in Place and Workers signalling the Traffic Date: 13/03/2013

Activity : Formwork Fabrication for 900mm RC Drain


11 12

Activity : Fixing of damaged Silt Fence near ECM Area Location : Near ECM Machine Date :14/03/2013

Location : Near Site office Date :14/03/2013

Activity : Excavation works. Preparation for 900mm RC Drain


13 14

Activity : Wire Installation for Internet Connection Location : Along the Perimeter Fencing Date : 15/03/2013

Location : Upper Changi Road East West Bound Date: 15/03/2013

Activity : Soil Sample taken for Laboraory testing


15 16

Activity : Soil Samples taken for Laboratory testing Location : Upper Changi Road -CH 35 New Road North Bound Date: 19/03/2013

Location : New Road CH 90 West Bound Date: 19/03/2013

APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

Activity : Working on 900mm RC Drain


17 18

Activity : Precast 900mm RC Drain installed Location : Upper Changi Road-West Bound CH 190~170 Date : 2103/2013

Location : Upper Changi Road CH 185 West Bound Date: 19/03/2013

APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP


Activity : Welded Wire Mesh and soil Samples sent to AL Technologies (Laboratory for Material Testing)
19 20

Activity : On- going 900mm RC Drain works Location : Upper Changi Road -West Bound CH 160~190 Date : 22/03/2013

Location : AL Technologies (Testing laboratory) Date: 21/03/2013

Activity : 900mm RC Drain excavation works


17 18

Activity : Pegging of Under Ground Water Pipe Location : Upper Changi Road -West Bound Date : 25/03/2013

Location : West Bound Upper Changi Road Date: 25/03/2013

Activity : Checking and identification of Excavator operator Registration Cert.


21 22

Activity : Meeting on site with N-Parks Officer and PUB Officers: discusssed about PUB Pipe Diversion and protection of the tree near proposed RCBC Location : Upper Changi Road Date : 25/03/2013

Location : Proposed New Road Date: 25/03/2013

Activity : Tree Cutting at Upper Changi Road East


23

Activity : C5 in place Prior to Benching Works


24

Location : Upper Changi Road East, Near Proposed Road Junction Date: 26/03/2013

Location : New Road: CH 20-30 Date : 27/03/2013

APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

Activity : On -going Benching works at 900mm RC Drain


25 26

Activity : C5 in place - Benching Works Location : CH 150- 190 West Bound Upper Changi Road Date : 27/03/2013

Location : CH 150- 190 West Bound Upper Changi Road Date: 27/03/2013

Activity : Geo Textile in Place at 900mm RC Drain Prior to Back filling worksSilt Fence properly installed near ECM Area
27 28

Location : CH150- 160 West Bound Upper Changi Road Date: 27 March 2013

Activity : Meeting with SP Power Grid Mr.Chan Meng Hoe and Singtel Mr. Ronald Tan: regarding Diversion of underground Services Location : Upper Changi Road Date: 27 March 2013

Activity : C5 in place Prior to Benching Works


29 30

Activity : Silt Fence properly installed near ECM Area Location : ECM AREA beside ULT Site officeCH150- 160 West Bound Upper Changi Road Date:

Location : CH150- 160 West Bound Upper Changi Roadworks Date: 30 March 2013