Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 11

Feederwise Energy Account of 11 KV Feeder for the Month of DEC- 12 o

No of connections
Others/
Bulk

Total

Dom

Com

Industial

State

EB-F1

Bilal Ahmad

1387 276

1674

750

244.344

19.682

21

OB-F2

Bilal Ahmad

845

106

957

462.75

75.053

2.238

OB-F1

Bilal Ahmad

990

137

1133

514.45

129.062

62.291

BP-F2

Md. Amin

697

115

818

396.45

180.55

SR-F5

Bilal Ahmad

962

233

1203

603.596

258.601

SR-F3

Bilal Ahmad

1362 307 14

Com

Name of
Feeder

Dom

State/PHE

Agreemented load(KW)

Ind

Name of
Feeder
Manager

S. No

130
14.928

1685

687.5

296.026

38.046

BAMK-F1 Md. Amin

65

99

173

0.25

216.206

1327.109

463.89

BAMK-F6 Md. Amin

145

SR-F1

Bilal Ahmad

665

132

809

382.5

71.928

7.087

10

SR-F2

Bilal Ahmad

692

138

841

332.4

140.886

14.92

11

SR-F4

Bilal Ahmad

608

146

761

312.85

52.54

9.698

12

EB-F2

Bilal Ahmad

667

68

742

278.75

9.662

14.92

0.5

13

BP-F1

Md. Amin

653

139

797

314.75

60.84

8.952

14

BP-F3

Md. Amin

655

43

700

308.05

12.879

23.126

7.46

15

MM-F1

Md. Amin

490

94

31

620

237.25

76.672

187.059

16

MM-F3

Md.Amin

687

96

10

796

343.7

44.871

281.488

ZN-F1

17

Md. Amin

822

101 15

943

360.25

64.148

47.26

18

BAMK-F2 Md. Amin

785

84

878

323

31.766

14.995

19

BAMK-F3 Md. Amin

1120 201

1330

502.123

86.146

8.206

20

BAMK-F4 Md. Amin

1122 312 17

1452

536.746

124.69

67.321

21

LB-F1

Md. Amin

1127 248 13

1393

621.2

221.37

61.609

322.5

22

LB-F2

Md. Amin

778

142

925

322.5

17.03

23

LB-F3

Md. Amin

772

220 12

1006

353.25

98.132

35.808

Name of
33 KV
Feeder

Name of
Feeder
Manager

SKIMS

Bilal ah

State

Industial

Com

Dom

Total

Agreemented load(KW)

Others/
Bulk

State

Ind

Com

Dom

S. No

No of connections

0 874.43

for the Month of DEC- 12 of Sdivision Hawal

ed load(KW)
Total

Total
Energy
billed Rs
(in lacs)

Others

Energ Input Energy


(LU)
Billed(LU)
(figures
from STD)

96

1035.03

17.86

4.13

76.88

8.26

7.42

79.22

36

540.04

11.55

1.99

82.77

3.98

4.63

79.95

60

705.80

13.61

2.62

80.74

5.24

4.29

84.23

48

707.00

7.23

2.60

64.08

5.19

4.70

67.48

48

877.13

13.45

4.50

66.52

9.01

9.79

63.59

48

1023.57

9.89

3.06

69.04

6.12

6.10

69.14

24

2007.46

2.84

1.74

38.70

6.09

6.77

31.89

12

145.00

1.12

0.41

63.05

2.48

1.89

71.81

T&D Losses

Total
Revenue
collected

AT&C
losses

72

461.52

14.35

1.81

87.40

3.62

3.58

87.52

84

488.21

6.59

1.78

72.96

3.56

3.99

69.70

36

375.09

12.55

1.70

86.49

3.39

3.73

85.15

303.83

7.92

0.99

87.46

1.99

2.49

84.29

48

384.54

8.53

1.93

77.42

3.85

4.01

76.48

36

351.52

8.52

1.76

79.29

3.53

3.22

81.10

12

503.98

4.89

1.36

72.18

2.72

2.85

70.87

84

670.06

13.03

2.82

78.34

5.64

4.31

83.45

72

471.66

12.54

1.94

84.57

3.87

4.86

80.61

72

369.76

8.9

1.96

77.96

3.92

4.03

77.39

48

596.48

18.09

3.08

83.00

6.15

5.35

85.20

36

728.76

15.98

2.84

82.25

5.67

7.22

77.40

17.03

1226.68

11.31

3.33

70.51

6.67

6.84

69.76

36

339.53

7.56

1.92

74.60

3.84

3.29

78.22

30

487.19

7.68

1.63

78.78

3.26

4.58

70.18

235.99
Total

Others

ed load(KW)

0 874.43

51.90

Energ Input
Energy
(LU)
Billed(LU)
(figures
from STD)
9.63

9.63

108.08
T&D Losses

0.00

Total
Energy
billed Rs
(in lacs)

74.12

109.98
Total
Revenue
collected

AT&C
losses

100.00

Feederwise Energy Account of 11kV Feeders for the Month Dece

S. No.

Name of Rec.
Station

Name of
11KV
Feeder

No. of Connections as per ATR for the Month of


december 2012

Aggremented Load as per ATR for the M


December 2012

Metered/UnMetered
Dom.

Com.

Ind.

State Others

965

145

Total

Dom.

Com.

Ind.

1124

626

290

53

Habak

F "2"

Metered

Habak

F "3"

Metered

780

54

842

440

209

31

Habak

F "5"

Metered

1377

366

12

11

1766

920

1166

78

Hazratbal

F "1"

Metered

62

Hazratbal

F "2"

Metered

416

302

732

510

44

Hazratbal

F "3"

Metered

735

148

889

630

180

40

Kathidarwaza

F "1"

Metered

871

81

959

456

58

18

Kathidarwaza

F "2"

Metered

1059

186

20

1266

580

288

79

Kathidarwaza

F "3"

Metered

10

14

12

10

Kathidarwaza

F "5"

Metered

1199

70

1274

570

49

45

11

Rainawari

F "1"

Metered

25

12

Rainawari

F "2"

Metered

150

35

189

77

14

35

13

Rainawari

F "3"

Metered

745

94

13

856

430

145

84

14

Rainawari

F "4"

Metered

1125

225

1357

730

235

Feederwise Energy Account of 33 KV Feeder for the Month December 201

Total

Domestic

Commercial

Industries

Metered

Others

Habak

State Deptt

PHE Pokhribal

Industries

Name of Rec. Name of 33 Metered/ Un


station
KV feeder
metered

Commercial

S.No

Agreemented load

Domestic

No of connections

Feeder No. 2 of Raninawari shared with Khanyar Sub division


1019.3
1004.9

Junior Engineer

Junior Engineer

Junior Engineer

eeders for the Month December 2012 of Sub Division Rainawari

ented Load as per ATR for the Month of


December 2012

Energy Input
Energy Billed
(LU's) figures
(LU's) during
from STD during
the Month of
the Month
December
December of
2012
2012

T&D %age
Loss = (1EI/EB)X100

Total Energy
Total Rev.
Billed (Lac's)
Collected as per AT&C %age Loss =
during the
ATR during the
(1Month of
Month of january EBxEIxRR/RB)x100
December 2012
2012 (Lacs)

State

Others

Total

15

222

1206

13.23

4.36

67.01

11.39

8.89

74.25

682

13.04

3.45

73.54

6.25

4.43

81.25

2171

16.00

3.56

77.75

9.29

9.26

77.83

2017

200

2279

5.60

5.35

4.46

49.01

0.16

99.69

1333

207

2094

13.66

6.89

49.53

34.47

30.43

55.45

851

9.18

3.11

66.12

10.29

6.13

79.82

535

11.57

2.23

80.73

4.30

3.93

82.38

949

16.94

3.01

82.23

4.85

6.35

76.74

1230

20

1262

1.20

1.17

2.50

11.23

5.96

48.25

664

13.37

2.31

82.72

3.65

4.15

80.36

395

421

2.59

2.15

16.99

10.44

23.53

-87.09

126

3.10

0.55

82.26

0.73

0.81

80.31

14

674

11.22

1.95

82.62

3.57

2.76

86.56

93

1074

18.81

2.62

86.07

6.70

4.66

90.31

149.51

42.72

71.43

166.17

111.45

80.84

r the Month December 2012 of Sub Division Rainawari ( PHE Pokhribal)

nior Engineer

State Deptt

Others

Total

Agreemented load

567

567

Energ Input (LU)


(figures from
STD)during the
month of
November 2012

Energy
Billed(LU)
during the
month of
November
2012

11.5

11.50

161.01

54.22

Assistant Engineer
Electric Sub-Division Rainawari

T&D %age
Loss= (1EI/EB) x100

0.00
66.33

Total Revenue
Total Energy
collected as per
billed Rs (in
ATR during the
lacs)during the
month of
month of
December (RS in
November 2012
lacs)

AT&C %age Loss


=(1-EB/EIxRR/RB)
x100

9.25

9.25

0.00

175.42

120.70

76.83

Assistant Executive Engineer


Electric Sub-Division Rainawari

Metered
Meterd
Un-Meterd
Un-Meterd
Meterd
Un-Meterd
Meterd
Un-Meterd
Un-Meterd
Metered
Total

Ahmad
Ahmad
Ahmad
Ahmad
Ahmad
Nasir
Nasir
Nasir
Nasir
Nasir

Industrial

Commercial

Total

others

State Deptts

Industrial

Commercial

Domestic

Agreement Load (k.Watts)

Number of Connections
Domestic

Metered/UnMetered

Name of 11 Kv
Feeder

Zakura
Z-1
Zakura
Z-2
Zakura
Z-3
Zakura
Z-4
Pandach P-2
Burzahama B-1
Burzahama B-2
Burzahama B-3
Burzahama B-4
Habak
H-4

Name of Feeder
Manager
Satpal singh

1
2
3
4
5
6
7
8
9
10

Name of Rec
Station

S.NO

FEEDER WISE ENERGY ACCOUNT OF 11 KV FEEDERS FOR THE MONTH O

0 41 40 6 0
87
0
73
1072
611 68
5 1
685
521
69
40.26
779 102 17 4
902
554.50
79
34.36
978 84 18 8
1088
628.25
88
33
326 45
1 2
374
222.25
35
7.5
458 13 13 2
486
280
16
19.53
709 27 14 4
754
496.045
23.5
26
168
8
4
180
98
12
9
448 11 13 4
476
275
14
18
452 137
1 6
596
374 126.4
3.7
4929 536 126 37 0 5628 3449.295 535.9 1263.35

Note: 1: 115 Kw load of CRPF camps of industrial Estate Zakura includes in Energy Input of Feeder-1
2: 50% Energy input of Pandach Feeder No 2 of Ahmed nagar R/stn and 50% Energy Input of Burzahama Feeder 3 is perta
respectively.

159
5
11.96
128.27
1.5
25.15
12
0
36.07
200.658
579.608

0
0

1304.00
635.26
679.82
877.52
266.25
340.68
557.55
119.00
343.32
704.76
5828.153

AT&C Losses

Revenue
realized (Rs in
Lac's)

T&D % Loss

Energy Billed
(LU's)

Energy Input
(LU's)

Total

others

State Deptts

(k.Watts)

Revenue Billed
(Rs in Lac's)

RS FOR THE MONTH OF DEC_2012 OF ZAKURA SUB-DIVISION

2.45
6.16
12.08

2.04
1.68
2.76

16.73

6.24

4.13

44.89

72.73

3.36

4.95

59.82

77.15

3.58

3.97

74.66

11.2
3.79

3.22
0.64

71.25

8.62

7.16

76.12

83.11

1.13

1.61

75.94

6.02
10.64

0.92
1.27

84.72

1.88

2.21

82.04

88.06

2.43

4.58

77.50

4.8
7.10

0.17
0.96

96.46

0.31

0.48

94.52

86.48

2.12

2.15

86.29

6.30
70.54

2.83
16.49

55.08

7.71

7.99

53.45

76.62

37.38

39.23

75.47

des in Energy Input of Feeder-1 Zakura and their Assessment per month is Rs 2.45 lac's
of Burzahama Feeder 3 is pertains to Electric Division Vth Ganderbal and Electric Division Ist srinagar

307.75

Feederwise Energy Account of 11 KV Feeder for the Month of DE

Name of
Feeder

Name of
Feeder
Manager

Ind

State/PHE

Others/ Bulk

Total

Dom

Com

Fateh Kadal

F1

Fayaz Ah

727

498

1231

380.5

195.05

Fateh Kadal

F4

asif Nazir

445

351

797

246.3

207.72

9.32

Fateh Kadal

F5

asif Nazir

11

80

khayam

F2

Fayaz Ah

918

262

1186

489.27

140.5

27.98

S. No

Industial

Name of
Receaving
station

Com

Agreemented load(KW)

Dom

No of connections

eder for the Month of DEC- 12 of K.K.moulla

greemented load(KW)
Others

Total

Total
Energy
billed Rs
(in lacs)

State

Energ Input Energy


(LU)
Billed(LU)
(figures
from STD)

20.5

596.05

11.25

3.15

72.00

6.10

4.35

80.03

463.34

8.86

2.40

72.91

3.38

3.14

74.84

535

60

675.00

0.48

0.47

2.08

2.73

6.51

-133.49

27

15

699.75

11.85

3.20

73.00

6.65

4.65

81.12

32.44

T&D Losses

9.22 219.991078 18.86

Total
Revenue
collected

AT&C
losses

18.65

Feederwise Energy Account of 11kV Feeders for the Mont

S. No.

Name of Rec.
Station

Name of
11KV
Feeder

Name of
Feeder
Manager

No. of Connections as per ATR for the Month of


december 2012

Aggremented Load as per


December

Metered/UnMetered
Dom.

Com.

Ind.

State Others

Total

Dom.

Fateh Kadal

F3

Zahoor Ah.

1082

281

17

1383

825.5

Fateh Kadal

F4

Zahoor Ah.

UM

715

192

909

568

Khanyar

F3

Zahoor Ah.

UM

476

80

558

410

Khanyar

F4

Zahoor Ah.

618

166

12

797

332.1

Khanyar

F7

Zahoor Ah.

UM

679

355

1044

512

Khanyar

F5

Iqbal

UM

526

141

676

302

Khanyar

F6

Iqbal

UM

1035

308

1352

692.5

Rainawari

F2

Iqbal

285

95

385

192.5

Junior Engineer

Junior Engineer

Junior Engineer

f 11kV Feeders for the Month December 2012 of Sub Division Khanyar
Aggremented Load as per ATR for the Month of
December 2012

Energy Input
Energy Billed
(LU's) figures
(LU's) during
from STD during
the Month of
the Month
December
December of
2012
2012

T&D %age
Loss = (1EI/EB)X100

Total Energy
Total Rev.
Billed (Lac's)
Collected as per
during the
ATR during the
Month of
Month of january
December 2012
2012 (Lacs)

Com.

Ind.

State

Others

Total

239

119.7

14.7

80

1278.9

19.88

3.98

79.98

10.35

5.65

77.8

17.7

663.5

6.56

1.29

80.34

3.35

2.96

25.2

7.5

3.7

446.4

4.50

1.12

75.11

4.42

2.94

51.8

4.9

74.5

463.3

12.50

2.62

79.04

6.81

3.29

177

33.8

4.7

727.5

5.96

2.41

59.56

6.27

6.52

43.2

18.8

83.7

447.7

9.84

2.10

78.66

5.46

2.84

192

42.8

11

938.3

17.99

2.94

83.66

7.64

3.91

27.7

16.5

20.5

257.2

6.44

4.21

34.63

2.10

0.85

83.67
593.28

Junior Engineer

20.67
162.13

Assistant Engineer
Electric Sub-Division Rainawari

75.30
72.67

46.40
460.16

28.96
317.42

Assistant Executive Engineer


Electric Sub-Division Rainawari

AT&C %age Loss =


(1EBxEIxRR/RB)x100

tive Engineer
sion Rainawari

89.07
82.62
83.44
89.87
57.95
88.90
91.64
73.54
84.58
81.15

You might also like