Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Purpose Use this procedure to run Multilevel BOM value amount status report. Trigger Perform this transaction when you need to display Cost estimates at each level of BOM breakdown. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Accounting > Controlling > Product Cost Controlling > Product Cost Planning > Information System > Detailed Reports > For Materials > CK86_99 - Costed Multilevel BOM

Transaction Code CK86_99

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

1/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Screen Flow

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

2/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Procedure 1. In SAP, start the transaction using the menu path or transaction code. SAP Easy Access

2. Double-click the Accounting node 3. Double-click the Controlling node 4. Double-click the Product Cost Controlling node 5. Double-click the Product Cost Planning node 6. Double-click the Information System node

. . . . .

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

3/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

7. Double-click the Detailed Reports node 8. Double-click the For Material node . 9. Double-click the CK86_99 - Costed Multilevel BOM node . Multilevel BOM: Value / Amount / Status

10 As required, complete/review the following fields: .

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

4/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

R Method R/O/C of distinguis hing two or more cost estimates for the same material. R Contains all control paramete rs for costing, including paramete rs that control how cost estimates are executed and which material prices or activity prices are used to valuate the costing items. R A plant is

Description

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

5/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

an organizati onal unit for dividing an enterprise according to productio n, procurem ent, maintena nce, and materials planning. It is a place where materials are produced, or goods and services are provided. The goods that are the subject of business activity. The material

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

6/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

can be traded, used in manufact ure, consumed , or produced. Field Example: 1 Costing version Example: PPC1 Costing variant Example: 7U11 Plant Example: 66810950 R Material

11 Click the Cost Comp. View drop-down list . 12 Click the Cost of Goods Manufactured list item . . 13 Click the Execute button . .

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

7/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Costed Multilevel BOM Value / Amount / Status

14 Click the FG RX ROL PAS-P 40ML P4x6 -N node . . 15 Click the Expand Subtree button . .

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

8/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Costed Multilevel BOM Value / Amount / Status

16 Click the Exit button .

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

9/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Result You have successfully run the Multilevel BOM value amount status report.

Wednesday, July 15, 2009

CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc

10/11

Work Instruction

CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Scenario Instructions In this simulation you are required to: Run the Multilevel BOM Value Amount Report in SAP ECC 6.0.