CO CK86 99 JPN Multilevel BOM Value Amount Status
CO CK86 99 JPN Multilevel BOM Value Amount Status
Purpose Use this procedure to run Multilevel BOM value amount status report. Trigger Perform this transaction when you need to display Cost estimates at each level of BOM breakdown. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Accounting > Controlling > Product Cost Controlling > Product Cost Planning > Information System > Detailed Reports > For Materials > CK86_99 - Costed Multilevel BOM
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
1/11
Work Instruction
Screen Flow
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
2/11
Work Instruction
Procedure 1. In SAP, start the transaction using the menu path or transaction code. SAP Easy Access
2. Double-click the Accounting node 3. Double-click the Controlling node 4. Double-click the Product Cost Controlling node 5. Double-click the Product Cost Planning node 6. Double-click the Information System node
. . . . .
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
3/11
Work Instruction
7. Double-click the Detailed Reports node 8. Double-click the For Material node . 9. Double-click the CK86_99 - Costed Multilevel BOM node . Multilevel BOM: Value / Amount / Status
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
4/11
Work Instruction
R Method R/O/C of distinguis hing two or more cost estimates for the same material. R Contains all control paramete rs for costing, including paramete rs that control how cost estimates are executed and which material prices or activity prices are used to valuate the costing items. R A plant is
Description
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
5/11
Work Instruction
an organizati onal unit for dividing an enterprise according to productio n, procurem ent, maintena nce, and materials planning. It is a place where materials are produced, or goods and services are provided. The goods that are the subject of business activity. The material
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
6/11
Work Instruction
can be traded, used in manufact ure, consumed , or produced. Field Example: 1 Costing version Example: PPC1 Costing variant Example: 7U11 Plant Example: 66810950 R Material
11 Click the Cost Comp. View drop-down list . 12 Click the Cost of Goods Manufactured list item . . 13 Click the Execute button . .
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
7/11
Work Instruction
14 Click the FG RX ROL PAS-P 40ML P4x6 -N node . . 15 Click the Expand Subtree button . .
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
8/11
Work Instruction
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
9/11
Work Instruction
Result You have successfully run the Multilevel BOM value amount status report.
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
10/11
Work Instruction
Scenario Instructions In this simulation you are required to: Run the Multilevel BOM Value Amount Report in SAP ECC 6.0.
Required Data This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise. 1 PPC1 7U11 Field Costing version Costing variant Plant 66810950 Material Value
CO_CK86_99_JPN_Multilevel-BOMValue-A mount-Status.udc
11/11