Cooling Tower Modification Project
Cooling Tower Modification Project
Cooling Tower Modification Project
Productivity
No.
38
Project No.
Prepared by:
Checked by:
Approved by:
R. Pedrigal
J. Fajardo
K. Kondo
4/19/2010 Date:
Date:
Current Situation :
CRACK PART
FIX TYPE
FIX TYPE
CRACK PART
PROBLEM ANALYSIS
Problem: Crack Weld portion of piping from ( desiel pump line to header pipe line
No Good foundation
App. Of proposal Inq. And qoutation request Submition of qoutation Check specs. Of qoutatio and design App. Of contractor design PR. And monitoring of p.o Checking of Contractors schedule Approval of schedule Starting of project
why?
Not so good welding at the pipe Big Vibration why? ( Due to fix type of piping why?
K. Kondo James Contractor James K. Kondo Ronald James K. Kondo Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor
why? L (500~1M ) Due to hard to weld coz electrode cannot reach. why?
due to flange very long from connection weld point.
ok
TARGET FOR VIBRATION LEVEL = REDUCE 15%~30% AFTER INSTALLATION OF COUNTERMEASURE TARGET FOR PRODUCTIVITY = NO BREAKDOWN MAINTENANCE RELATED TO PIPING CONNECTION TARGET FOR SAFETY = ZERO ACCIDENT
>100 L
mm/sec
SEPTEMBER
FLANGE ( FOR EASY MAINTENANCE
Modify foundation
OCTOBER MONTH
NOVEMBER
DECEMBER
SAFETY
PROJECT QUALITY
NOISE LEVEL
EVALUATION : LEGEND: SAFETY: COST : PROD PERMIT: (iso) Very Good ok Not so good No Good
Recommendation: