Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

WELL CONTROL DATA SHEET

Well Name: Sundance Location: 2-5-40-19W4

for

VERTICAL WELLS Wt. & Wt. METHOD


Rig: CDG 15 Date: 99-10-22 Engineer: Vass Karatzas

Well TD ft Drill Pipe OD in Last Csg ID in SIDPP psi Pump Efficiency Pump Liner Sz in

12000 4 1/2 8 1/8 500 96.0% 5 1/2

Hole Size in Drill Pipe ID in Csg Wt. Lb/ft SICP psi Slow P.strks/min Pump Rod Sz in Length ft

7 7/8 3 7/8 24.00 1040 1 0

VOLUMES and PUMPING TIMEs


bbl Volume gal 175.0 7352 121.7 5112 400.1 16805 696.9 29269 800.0 33600 1496.9 62869 61.0 2563 1986 1381 4539 7905 9075 16980 692

Drill Collars OD in Drill Pipe Wt. lb/ft Last Csg Set at TD ft Pit Gain bbl Slow Speed P.Pressure psi Stroke Length in

6 1/4 16.4 9000 20.0 700 12

Drill Collar Length ft Mud Weight ppg Leak Off Gradient psi/ft BOP psi Mud Tank Volume bbl o Working Pumps N Pump Strokes

600 15.00 1.00 5000 800 1 pump

1986 1381 4539 7905 Hole Totals Written by Vass Karatzas 9075 Mud Tanks WHITE TOWER CONSULTING Ltd. 16980 TOTAL MUD Comments: vkaratzas@sprint.ca 692 Baryte Vol. Gain 0.010816 1092.683 Pump Output= 0.0846 bbl/min CALCULATIONS for KILLING THE WELL 0.072 psi/ft 1200 psi Initial Kick Fluid Gradient: I. C. Pressure (RSPP + SIDDP) = Gas 737 psi Possible Kick type: Final Circulating Pressure = 9360 psi 0.80 ppg Hydrostatic Pressure at TD = Mud Wt. Increase = 9860 psi 15.80 ppg Formation Press = Kill Mud Wt. = 9000 psi 1.45 ppg Csg Shoe Fracture Pressure = Baryte Addition = 1986 psi 90912 lbs MACP with Original mud in csg = Total Baryte = 1610 psi 1031 sacks New MACP with Kill Mud = Number of 40kg Sacks Required = 8055 psi 0.06 40kg Sacks/min or 5 lbs/min Csg Shoe Pressure at Shut-in = Mixing Rate of = 7966 psi 61.0 bbls Csg Shoe Pressure with kick at Csg Shoe = Volume Gain from Baryte Addition =

Drill Pipe OH Annulus Csg Annulus

12000 3000 9000

bbl/ft Capacity gal/ft 0.0146 0.613 0.0406 1.704 0.0445 1.867

Time (min)

Rate of D.P. Pressure Drop from Surface to the Bit


< Pump Strokes,
1154 199 199 1107 397 397 strokes 0 min 0

Time in Minutes,
1061 596 596 1015 794 794 969 993 993

strokes = 10 psi per 43 D.P. Pressure (in psi) Reduction Schedule > Bit <
922 1191 1191 876 1390 1390 830 1588 1588 784 1787 1787 737 FCP 1986 bit 1986

Steady D.P. Press to Surface


737 2676 2676 737 3366 csg 3366 737 7905 7905

>

1200 ICP

1154 psi

1300 1200
DRILL PIPE PRESSURE, psi

DRILL PIPE PRESSURE REDUCTION SCHEDULE


1107 psi 1061 psi

969 psi

1100 1000 900 800 700 600 500

1015 psi

922 psi

876 psi

830 psi

784 psi

737 psi

737 psi

737 psi

PUMP STROKES 0 199 397 596 794 993 1191 1390 1588 1787 1986 2676 3366 7905

KICK at Csg SHOE

GAS to SURFACE

500 500

1040
8055 Csg 8055

1200

1040 Pump is started and I.C. Pressure established

737

1017 Kill Mud at the Bit. and Final

1017 Old Mud Wt. Pump's Off

944 944

951
7966 Csg 7966

737 737

1922
at Pump Stks

0 0

0 0 The Pump Stopped and the Well is SHUT-IN

The Well is Shut-in &


Pump Stks set @

5919 5919

Kick's out
at Pump Stks Pump Stks at Pump Stks Pump Stks

Pressures Stabilized

Pump Stks

Pump Stks

Circulating Pressure is in Effect

Pump Stks

and the Well is Shut-in

3366 3366

7905 7905
Kill Mud's up

Pump Stks

40

1986 1986

1986 1986

1100 1100

New MACP

4757 4757

7905 7905

737 psi

You might also like