Professional Documents
Culture Documents
Bore Pile Design
Bore Pile Design
Bore Pile Design
Project:
Owner:
Item:
1
7/23/2013
Rev. No.
Date:
Designed by: L Ngc Hin
Checked by: Nguyn Vn Don
CITY GATE
Df =
d=
Lp =
f=
n=
6.9
0.8
50.1
22
18
m
m
m
mm
Hw =
0.5
layer
type
g dn
(T/m3)
1.500
0.476
0.476
0.961
0.938
0.892
0.975
1.012
C
(T/m2)
1.00
0.68
0.68
1.00
4.16
2.81
1.00
4.79
SPT
clay
clay
clay
sand
clay
sand
clay
sand
sand
sand
sand
sand
sand
clay
g tn
(T/m3)
1.500
1.476
1.476
1.961
1.938
1.892
1.975
2.012
1
1
3
4
5
6
8
7
8
9
10
11
8
hi
(m)
2.72
4.18
16.8
4.5
4.1
1.9
19.9
2.88
30.00
6.45
6.45
27.60
16.78
21.72
27.80
18.95
4
1
1
26
13
12
25
47
2.012
1.012
4.790
18.950
47
cm
B. SOIL DATA
Underground water
Position
ABOVE
PILECAP
BELOW
PILECAP
END PILE
448
350
- Steel grade:
Pile capacity
Qvl=
M300
Rn =
60.00
Kg/cm2
A-III
Ra =
2200
Kg/cm2
448
(1)
Qa =
710
Ton
(3)
Ns
Nc
Ls
Lc
Area of pile:
Parameter of pile:
layer
1
1
3
4
5
6
8
7
8
9
10
11
END
PILE
SUM
h
(m)
2.72
4.18
16.82
4.5
4.1
1.9
19.9
2.88
NTB
Ap =
W=
0.50
2.51
Nc
Lc
(m)
m2
m
Ns
4
1
1
26
4.5
12
1.9
47
2.88
Ls
(m)
2.72
4.18
16.82
NcLc
NsLs
16.82
117
13
4.1
53.3
22.8
25
19.9
497.5
135.36
Wp
(T)
17.112
3.481
3.219
1.536
15.254
2.154
47
275.16
567.62
42.75658
Job N o :
Project:
Owner:
Item:
1
7/23/2013
Rev. No.
Date:
Designed by: L Ngc Hin
Checked by: Nguyn Vn Don
CITY GATE
Df =
d=
Lp =
f=
n=
6.9
0.8
50.1
22
18
m
m
m
mm
Hw =
0.5
layer
type
g dn
(T/m3)
1.500
0.476
0.476
0.961
0.938
0.892
0.975
1.012
C
(T/m2)
1.00
0.68
0.68
1.00
4.16
2.81
1.00
4.79
SPT
clay
clay
clay
sand
clay
sand
clay
sand
sand
sand
sand
sand
sand
clay
g tn
(T/m3)
1.500
1.476
1.476
1.961
1.938
1.892
1.975
2.012
1
1
3
4
5
6
8
7
8
9
10
11
8
hi
(m)
2.72
4.18
16.8
4.5
4.1
1.9
19.9
2.88
30.00
6.45
6.45
27.60
16.78
21.72
27.80
18.95
4
1
1
26
13
12
25
47
2.012
1.012
4.790
18.950
47
cm
B. SOIL DATA
Underground water
Position
ABOVE
PILECAP
BELOW
PILECAP
END PILE
Ptk
Chn
=
1. Refer to material
Material data :
- Concrete grade:
448
350
- Steel grade:
M300
Rn =
60.00
Kg/cm2
A-III
Ra =
2200
Kg/cm2
Qvl=
Pile capacity
448
(1)
(2)
Qa = QS / FSs + Qp/FSp
Ultimate pile capacity
Qu =
416
Qu = uSfsili + qpAp
With:
fsi:
skin friction
qp:
u:
Ap:
end bearing
pile diameter
pile cross section
FSs:
FSp:
1.5
FSp =
u=
Ap =
2
2.513
0.503
m
m
+ fs = Ca + s'h tgja
Ca =
ja =
3j/4
type
1
1
3
4
5
clay
clay
clay
sand
clay
sand
h
m
2.72
4.18
16.82
4.5
4.1
1.9
END
PILE
gi
(T/m)
1.5
0.476
0.476
0.961
0.938
0.892
Ci
(T/m)
1
0.68
0.68
1
4.16
2.81
ji
deg.
30
6.45
6.45
27.6
16.78
21.72
s'v
(T/m)
1.012
4.79
18.95
46.26
fs
(T/m)
fs*li
(T/m)
1.44
4.29
7.39
7.06
24.2
19.3
30.3
13.4
6.07
10.07
16.24
20.32
23.09
sum
j=
18.95 deg.
Nc
16.5
qp =
0.330739893
Nq
6.67
391.49
87.2
Ng
5.00
T/m2
Qa =
710
Ton
(3)
Ns
Nc
Ls
Lc
Area of pile:
Parameter of pile:
layer
1
1
3
4
5
6
8
7
8
9
10
11
END
PILE
SUM
h
(m)
2.72
4.18
16.82
4.5
4.1
1.9
19.9
2.88
NTB
Ap =
W=
0.50
2.51
Nc
Lc
(m)
m2
m
Ns
4
1
1
26
4.5
12
1.9
47
2.88
Ls
(m)
2.72
4.18
16.82
NcLc
NsLs
16.82
117
13
4.1
53.3
22.8
25
19.9
497.5
135.36
Wp
(T)
17.112
3.481
3.219
1.536
15.254
2.154
47
275.16
567.62
42.75658