PROJECT

ALTARNATE CANAL TO NTR CANAL , SATHUPALLY

CLIENT

GOVERNMENT OF ANDHRA PRADESH, IRRIGATION & CAD DEPT

EPC CONTRACTOR NAVAYUGA-TRANSTROY (JV), HYDERABAD


CONSULTANT
23.85

SUBJECT

DESIGN OF UNDER TUNNEL AT Km 23.850

DATE

/10/2008

REVISION ONE

UT-H-

DESIGN CODE

UT-H-23.850

Revision No.

Remarks with respect to Revision

Date

159982611.xls.ms_office

DESIGN OF UNDER TUNNEL AT Km 23.850


ON ALTARNATE CNAL TO NTR CANAL
CANAL DATA :
1) FULL SUPPLY DISCHARGE

Required
Design

2) FULL SUPPLY LEVEL

U/S =
D/S =

147.592 M.
147.592 M.

3) FULL SUPPLY DEPTH

U/S =
D/S =

1.700 M.
1.700 M.

4) BED LEVEL

U/S =
D/S =

145.892 M.
145.892 M.

5) BED WIDTH

U/S =
D/S =

9.000 M.
9.000 M.

6) BED SLOPE

U/S =
D/S =

7) FREE BOARD

U/S =
D/S =

0.750 M.
0.750 M.

8) VELOCITY

U/S =
D/S =

0.873 M/sec
0.873 M/sec

9) VALUE OF "N"

12.040 Cumecs
13.670 Cumecs

1 In 5000
1 In 5000

0.0250

10) TYPE OF CANAL

U/S =
D/S =

11) SIDE SLOPE

INNER
OUTER

12) TOP WIDTH OF BANK

U/S =
D/S =

13) GROUND LEVEL

Lined
Lined
1.500
2.000

In 1
In 1

Left/Right
Left/Right

7.00
7.00

4.00 M
4.00 M

146.350 M

14) TOP BANK LEVEL

U/S =
D/S =

HYDRAULIC PARTICULARS OF DRAIN


1) CATCHMENT AREA

148.342 M
148.342 M

0.810 sq.km

2) DISCHARGE

16.580 cumecs

3) BED LEVEL OF DRAIN

146.350 M

4) MFL OF DRAIN

146.808 M

Page 1

IN-RIMT,HYyderabad

159982611.xls.ms_office

ALTARNATE CANAL TO NTR CANAL , SATHUPALLY


DESIGN OF UNDER TUNNEL AT Km 23.850
Calculation of Bed Fall

Level @ 100m U/S


Level @ 0m D/S
Bed fall =

Level @ 0m U/S
Level @ -100m D/S

Level @ 100m U/S


Level @ -100m D/S

=
=

Average bed Fall =

0.0084

0.0005

0.00445

146.35
146.3

2000.0

=
=

147.19
146.3

+ 147.190 - +146.300
200
Say 1 in

119.05

+ 146.350 - +146.300
100
Say 1 in

Bed fall =

147.190
146.350

+ 147.190 - +146.350
100
Say 1 in

Bed fall =

=
=

224.7

0.00445
Say 1 in

225

C M3/4
Maximum Flood Discharge Q =
Where ,
Q = Maximum Flood Discharge in Cumecs
KM2
M = Catchment Area in Sq. Km
= 0.810
Catchment Area in Sq. Miles
= 0.313
Sq.miles
C = Constant & value of C should be adopted as under
Value of C
1400
1200
1060
Q=

Catchment area in Sq. Miles


Upto 1
Sq.miles
1 to 30
Sq.miles
More than 30
Sq.miles
=
=
=
=

C M3/4
1400 ( 0.313 )
16.579
3
16.58 M /sec

Page 2

3/4

585.5 Cusecs

IN-RIMT,HYyderabad

159982611.xls.ms_office

Section @100 m UP Stream


16.58
148.009
224.72

Maximun Flood Discharge


Maximum Flood Level
Bed Fall
Rugosity Coefficient

0.0225

S. No.

Reduced
Level

Ordinate

147.82

0.189

147.83

0.179

147.800

0.209

147.760

0.249

147.740

0.269

147.780

0.229

147.790

0.219

147.780

0.229

147.770

0.239

10

147.790

0.219

11

147.795

0.214

12

147.850

0.159

13

147.920

0.089

14

147.970

0.039

15

147.850

0.159

16

147.190

0.819

17

147.310

0.699

18

147.650

0.359

19

147.720

0.289

20

147.730

0.279

21

147.720

0.289
Totals =

Distance

Area

Perimeter

2.500

0.459

2.500

2.500

0.484

2.500

2.500

0.572

2.500

2.500

0.647

2.500

2.500

0.622

2.500

2.500

0.559

2.500

2.500

0.559

2.500

2.500

0.584

2.500

2.500

0.572

2.500

2.500

0.540

2.500

2.500

0.465

2.501

2.500

0.309

2.501

2.500

0.159

2.500

2.500

0.247

2.503

2.500

1.222

2.586

2.500

1.897

2.503

2.500

1.322

2.523

2.500

0.809

2.501

2.500

0.709

2.500

2.500

0.709

2.500

50.000

13.4

50.119

A
P

13.44
50.12

Hydraulic Radius = R=
=

0.268
R2/3x S1/2
n

Velocity = V =
=

1.233

Discharge = Q = A x V =
=

13.445 x 1.233
16.580

Page 3

Cumecs

IN-RIMT,HYyderabad

159982611.xls.ms_office

Section @ 0 m UP Stream
16.58
146.808
224.72

Maximun Flood Discharge


Maximum Flood Level
Bed Fall
Rugosity Coefficient

0.0225

Reduced
Level
146.870

146.870

0.000

146.790

0.018

146.620

0.188

146.520

0.288

146.490

0.318

146.470

0.338

146.490

0.318

146.380

0.428

10

146.370

0.438

11

146.360

0.448

12

146.350

0.458

13

146.380

0.428

14

146.390

0.418

15

146.410

0.398

16

146.520

0.288

17

146.620

0.188

18

146.730

0.078

19

146.890

0.000

20

146.890

0.000

21

146.880

0.000

S. No.

Ordinate

Distance

Area

Perimeter

2.500

0.000

0.000

2.500

0.022

2.500

2.500

0.257

2.506

2.500

0.595

2.502

2.500

0.757

2.500

2.500

0.820

2.500

2.500

0.820

2.500

2.500

0.932

2.502

2.500

1.082

2.500

2.500

1.107

2.500

2.500

1.132

2.500

2.500

1.107

2.500

2.500

1.057

2.500

2.500

1.020

2.500

2.500

0.857

2.502

2.500

0.595

2.502

2.500

0.332

2.502

2.500

0.097

2.501

2.500

0.000

0.000

2.500

0.000

0.000

50.000

12.6

42.519

A
P

12.59
42.52

0.000

Totals =

Hydraulic Radius = R=
=

0.296
R2/3x S1/2
n

Velocity = V =
=
Discharge = Q = A x V =
=

1.317
12.589 x 1.317
16.580

Page 4

Cumecs

IN-RIMT,HYyderabad

159982611.xls.ms_office

Section 100 m Down Stream


16.58
146.702
224.72

Maximun Flood Discharge


Maximum Flood Level
Bed Fall
Rugosity Coefficient

0.0225

Reduced
Level
146.590

146.560

0.142

146.550

0.152

146.520

0.182

146.480

0.222

146.440

0.262

146.410

0.292

146.390

0.312

146.350

0.352

10

146.320

0.382

11

146.300

0.402

12

146.310

0.392

13

146.340

0.362

14

146.360

0.342

15

146.390

0.312

16

146.420

0.282

17

146.450

0.252

18

146.480

0.222

19

146.480

0.222

20

146.530

0.172

21

146.570

0.132

S. No.

Ordinate

Distance

Area

Perimeter

2.500

0.317

2.500

2.500

0.367

2.500

2.500

0.417

2.500

2.500

0.504

2.500

2.500

0.604

2.500

2.500

0.692

2.500

2.500

0.754

2.500

2.500

0.829

2.500

2.500

0.917

2.500

2.500

0.979

2.500

2.500

0.992

2.500

2.500

0.942

2.500

2.500

0.879

2.500

2.500

0.817

2.500

2.500

0.742

2.500

2.500

0.667

2.500

2.500

0.592

2.500

2.500

0.554

2.500

2.500

0.492

2.500

2.500

0.379

2.500

50.000

13.43

50.004

A
P

13.43
50.00

0.112

Totals =

Hydraulic Radius = R=
=

0.269
R2/3x S1/2
n

Velocity = V =
=
Discharge = Q = A x V =
=

1.234
13.432 x 1.234
16.580

Page 5

Cumecs

IN-RIMT,HYyderabad

159982611.xls.ms_office

M.F.L. AT ENTRY
+148.009
+147.051
+146.808
+146.782

20.247
24.047

+146.702

100 U/S

-100 D/S
0.00

M.F.L. @ 100m U/S

+148.009

M.F.L. @ 0m

+146.808

M.F.L. @ 100m D/S

+146.702

M.F.L. @ 20.25m U/S

+147.051

M.F.L. @ 24.0471007183371m D/S

+146.782

Vent Way Calculations


Discharge Q

16.58 Cumecs

Assumed velocity in Barrel V

3.00 m/sec

Area Required Q/V =

5.53

Considering a Vent size of

1.80m x 1.20m

Height of Vent

1.20

Width of Vent

1.80

No. of vents required

=
Say

2.56 Nos.
3.00

Nos.

Velocity in Barrel

2.56 m/sec

Thickness of Pier

0.90

Total Width of Vent Way including Piers

7.20

Canal Bed Level

145.892

Lining Thickness

0.040

Bed filling

0.000

Slab Thickness

0.250

Height of Vent

Barrel Floor Level

Page 6

1.200 m
144.402

IN-RIMT,HYyderabad

159982611.xls.ms_office

Design of Tail Channel


Required discharge =
Section adopted

586

16.58

Cusecs =

Cumecs

Lacy's Bed width=

0.60
1.5 : 1

4.8*(Q)1/2
19.54490215

=
2.38
=

11.726941

11.75

x 2.38 =

36.467

20.332

11.750
Where bed width
Depth of Flow
Top width

11.750
2.380
18.891
(11.75 + 18.89)
2

Area A =

Wetted Perimeter P = B + 2(1+S.S)d

= 11.75 + 2(1 + 1.5x1.5) x 2.38 =

A
P

Hydraulic radious =

(18.89 + 11.75)
2

x 2.38 =

36.5
20.332

1.794

(1/n)RS =

Velocity (V) =

= (1/0.03)x1.794x sqrt(1/12000) =
Discharge(Desi) = A x V =36.467 x 0.449

0.449 m/sec
16.4

Cumecs

Hydraulic Particulars
1. Bed Width

11.750

6. Velocity

0.449

2. Depth of Flow

2.380

7. Side Slopes

1.5 : 1

3. Free board

0.60

8. Value of 'n'

0.03

4. Discharge(req)

16.580

9. Bed fall

12000

5. Discharge(Des)

16.381

D/S MFL
Barrel Floor Level

146.782

10. Bank Widhts L/R =


Computed MFL as per Bed Slope

144.402

Scour Depth Calculations D/S


Maximum Flood Discharge Q =

16.580

Linear water way =

18.891

Cumecs
m

M F L in Tail Channel = 144.402 + 2.38 =

146.782

Discharge per meter q =

16.580

0.878

18.891
Silt factor f =

m3/sec/m

1.50

Normal scour depth R =

1.35

1/3.

f
=

0.878

1.35

1/3.

1.50
=

1.13

Maximum scour depth =

1.5 x R
= 1.5 x 1.126 =

1.689

Maximum scour level = M.F.L. - Max. scour depth


= 146.782 - 1.689
D/S Cutoff depth = 144.402 - 145.094 = -0.692
Provide
Cut-Off may be provided from end to end of Return Walls

Page 7

0m

= +145.094 145.094
= +144.402 m

IN-RIMT,HYyderabad

159982611.xls.ms_office

TRANSITIONS:
Upstrem
a) Let the length of drop wall
=
b) Width at entry of barrel
=
c) Side splay proposed
=
d) Length of transition required = [(b-a)/2] x 2
Length of u/s transition provided =
U/S Return Level = U/S MFL + 0.50m
Downstream
a) Width at the end of d/s transition
=
b) Width at exit of barrel
=
c) Side splay proposed
=
d) Length of transition required = [(a-b)/2] x 3

11.75 M
7.20
M
1 in
2.0
=
4.55
M
5.80
M
( Drop bottom width+ solid apron)
=
148.150 M
11.75
7.20
3.0
6.825

1 in
=

M
M
M

Length of d/s transition provided =


6.90
M
D/S Return Level = D/S MFL + 030m
=
147.100 M
Head Loss and Bed Levels at different sections along the length of vent:
Sections 7
5
3
1
8
6
4
2

11.75 m

7.20
rectangular trough
31.29

5.80
8

6
7

At Section 1-1
At Section 2-2
At Section 3-3
At Section 4-4
At Section 5-5
At Section 6-6
At Section 7-7
At Section 8-8

146.402

6.90
4

2
3

Bed level
144.402
144.402
144.402
144.402
144.402
144.402
146.402
146.402

7.00
147.644

11.75

DOF
2.380
2.377
2.357
1.200
1.200
2.904
1.216
1.242

MFL
146.782
146.779
146.759
145.602
145.602
147.306
147.618
147.644

147.592
0.750
1.70
145.892
9.00
1.200
144.402

Page 8

1
Vel
0.455
0.594
0.977
2.559
2.559
0.793
1.208
0.335

TEL
146.793
146.797
146.807
147.278
147.278
147.338
147.687
147.693

4.00
146.779

+ 144.402

IN-RIMT,HYyderabad

159982611.xls.ms_office

FLOW CONDITIONS IN DRAIN

FLOW CONDITION AT SECTION 1-1


COEFFICIENT OF RUGOSITY (n)

0.0300

DISCHARGE (Q)

( in Cumecs)

16.580

BED LEVEL (BL)

144.402

SIDE SLOPE (s)

1.500

BED WIDTH (B)

( in mtrs)

FLOW DEPTH (D)

( in mtrs)

MFL

11.750
2.380

MFL + 146.782

146.782

AREA = (B+sD)D

( in Sqm)

36.467

( in m/s)

0.455

(m)

0.011

VELOCITY (V ) = Q / A
2 /

VELOCITY HEAD =V / 2g =
TEL @ 1-1 = MFL + VEL. HEAD
)

SURFACE SLOPE(S) =V n R

4/3

11.750

0.0 :1

2.377

20.332

(in m)

HYDRAULIC MEAN RADIUS (R) = A / P


2/

2.380

BL + 144.402

146.793

PERIMETER (P) = B + 2D(1 + s2

1.5 :1

( in m)

1.794
0.000085

FLOW CONDITION AT SECTION 2-2


LENGTH FROM PREVIOUS SECTION(L)

( in mtrs)

0.000

COEFFICIENT OF RUGOSITY (n)

0.0180

DISCHARGE (Q)

( in Cumecs)

BED WIDTH (B)

16.580

( in mtrs)

11.750

SIDE SLOPE (s)

0.000

BED LEVEL

144.402

FLOW DEPTH (D)

( in mtrs)

2.377

MFL

146.779

AREA = (B+sD)D

( in Sqm)

27.928

( in m/s)

0.594

(m)

0.018

VELOCITY (V ) = Q / A
VELOCITY HEAD =V2//2g =
PERIMETER (P) = B + 2D(1 + s2

HYDRAULIC MEAN RADIUS (R) = A / P

FRICTION LOSS (H )

BL + 144.402
11.750

16.504

(in m)
( in m)

1.692

SURFACE SLOPE(S) =V2 n2/R4/3 =


EDDY LOSS(he) = 0.5(V1 - V2)/2g

MFL + 146.779

0.000057
( in mtrs)

0.004

( in mtrs)

0.000

TEL wrt MFL = MFL + VEL HEAD

146.797

0.000

TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS

146.797

0.000 <------ Difference in TELs

Page 9

IN-RIMT,HYyderabad

159982611.xls.ms_office

FLOW CONDITION AT SECTION 3-3


LENGTH FROM PREVIOUS SECTION(L)

( in mtrs)

6.900

COEFFICIENT OF RUGOSITY (n)

0.0180

DISCHARGE (Q)
BED WIDTH (B)

( in Cumecs)

16.580

( in mtrs)

7.200

SIDE SLOPE (s)

0.000

BED LEVEL

144.402

FLOW DEPTH (D)

( in mtrs)

2.357

MFL

MFL + 146.759

146.759

AREA = (B+sD)D

( in Sqm)

VELOCITY (V ) = Q / A

BL + 144.402

0.977

7.200

( in m/s)

2 /

VELOCITY HEAD =V / 2g =
)

11.913

(in m)

HYDRAULIC MEAN RADIUS (R) = A / P

2.357

0.049

(m)

PERIMETER (P) = B + 2D(1 + s2

0.0 :1

16.967

( in m)

1.424

SURFACE SLOPE(S) =V2 n2/R4/3 =

0.000193

EDDY LOSS(he) = 0.3(V2 - V3)/2g

( in mtrs)

FRICTION LOSS(Hf)

0.009

( in mtrs)

0.001

TEL wrt MFL = MFL + VEL HEAD

146.807

TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS

146.807

0.000 <------ Difference in TELs

Loss of Head Calculations Inside The Barrel (Using UNWIN'S formula)


LENGTH FROM PREVIOUS SECTION(L)

( in mtrs)

31.294

( in Cumecs)

16.580

COEFFICIENT OF RUGOSITY (n)

0.018

DISCHARGE (Q)
NO OF VENTS

BED WIDTH (B)

( in mtrs)

1.800

SIDE SLOPE (s)

0.000

BED LEVEL

144.402

FLOW DEPTH (D)

( in mtrs)

MFL
AREA = (B+sD)D

( in Sqm)

VELOCITY (V ) = Q / A

( in m/s)

VELOCITY HEAD =V2//2g =


)

HYDRAULIC MEAN RADIUS (R) = A / P


2

SURFACE SLOPE(S) =V n /R

4/3

0.0 :1

145.602

BL + 144.402

6.480

1.800

1.200

2.559
0.334

(m)

PERIMETER (P) = B + 2D(1 + s2

MFL + 145.602

1.200

19.800

(in m)
( in m)

0.327
0.009405

f1 (coeffi. Of loss of head at entry)

0.08000

a (assuming that the walls inside the barrel are plastered)

0.00316

0.03050

f2 (at Entry) = a (1+ b/ R)

0.00345

Page 10

IN-RIMT,HYyderabad

159982611.xls.ms_office

Loss of head in side the barrel (h) = (1+f1+f2 L/R )V2 / 2g

0.471

TEL@ 4 - 4 = PRE.TEL + h

147.278

FLOW CONDITION AT SECTION 6-6


LENGTH FROM PREVIOUS SECTION(L)

( in mtrs)

<------ Difference in TELs


0.000

COEFFICIENT OF RUGOSITY (n)

0.018

DISCHARGE (Q)

( in Cumecs)

BED WIDTH (B)

16.580

( in mtrs)

7.200

SIDE SLOPE (s)

0.000

BED LEVEL

MFL + 147.306

144.402

FLOW DEPTH (D)

( in mtrs)

MFL
AREA = (B+sD)D

( in Sqm)

VELOCITY (V ) = Q / A
2 /

2/

SURFACE SLOPE(S) =V n R

4/3

0.032

( in m)

1.607
0.000108

EDDY LOSS(he) = 0.2(V5 - V6)/2g

7.200

2.904

13.008

(in m)

HYDRAULIC MEAN RADIUS (R) = A / P

147.306

0.0 :1

0.793

(m)

PERIMETER (P) = B + 2D(1 + s2

BL + 144.402

20.908

( in m/s)

VELOCITY HEAD =V / 2g =

2.904

( in mtrs)

0.060

FRICTION LOSS(Hf)

0.000000

TEL wrt MFL = MFL + VEL HEAD

147.338

TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS

147.338

0.000
<------ Difference in TELs

Page 11

IN-RIMT,HYyderabad

159982611.xls.ms_office

DROP CALCULATIONS:
This drop is proposed at U/S transision of vent ie at section 7-7

INPUT:
Design Discharge
Weir Length
Crest Level
d/s MFL
d/s Bed level

16.580
11.750
145.152
147.306
144.402

Cumecs
m
m
m
m

MFL CALCULATIONS:
u/s MFL assumed
flow depth
Coefficient of discharge, C =
1.733
Discharge, Q = Coeff x Weir length x U/s Flow Depth ^ (3/2)
= C.L.h^3/2
=
Since the calculated discharge is eqaul to design discharge, hence Safe.

147.051 m
1.899 m

6.90 cumecs

DESIGN OF DROP:
The depth of drop =

145.152

Top width of drop


=
Where 'd' is depth of water over sill
Top width of drop
=
Provide top width

144.402 =

0.750 m

0.5 d + 0.1524 to 0.5 d + 0.3048


0.486 m
0.395 m
0.400 m

Bottom wdth
=
(H + d )/ p1/2
Where 'H' is height of wall
=
'p' is specific gravity of wall material
Bottom wdth
Provide Bottom wIdth

0.750
2.4
0.798
0.800

Length of Apron
L = 2 d + 2( d h )1/2
Where 'h' is the diff.of u/s and d/s water levels
Length of Apron
Provide Length of Apron

1.668 m
2.772 m
2.800 m

Thickness of Apron
Thickness of Apron
Provide thickness of Apron

m
m
m
m

t = (( d + h )^.5 )1/2
0.349 m
0.350 m

Depth of water cushion


dw = 0.905 d h^1/2 - t
Depth of water cushion
However, provide depth of water cushion of

Page 12

-0.350 m
0.000 m

IN-RIMT,HYyderabad

159982611.xls.ms_office

FLOW CONDITION AT SECTION 7-7 (ie @ DROP)


DISCHARGE (Q)

( in Cumecs)

16.580

(in mtrs)

28.250

BED WIDTH (B)


SIDE SLOPE (s)

0.000

CREST LEVEL OF DROP

145.152

COEFICIENT OF DISCHARGE ( C )

1.733

FLOW DEPTH (D) = (Q/C B)^2/3

0.486

MFL

MFL + 145.638

145.638

AREA = (B+sD)D
VELOCITY (V ) = Q / A

( in Sqm)

13.726

( in m/s)

1.208

VELOCITY HEAD =V2//2g =


)

1.5 :1

1.615

BL + 145.152
28.250

29.222

(in m)

HYDRAULIC MEAN RADIUS (R) = A / P

0.486

0.074

(m)

PERIMETER (P) = B + 2D(1 + s2

0.0 :1

( in m)

0.470

TEL wrt MFL = MFL + VEL HEAD

145.712

+ 145.638

+145.152
+147.306

144.402

7
FLOW CONDITION AT SECTION 7-7 (ie @ DROP)

FLOW CONDITION AT SECTION 8-8


LENGTH FROM PREVIOUS SECTION(L)

( in mtrs)

0.000

COEFFICIENT OF RUGOSITY (n)

0.0350

DISCHARGE (Q)
BED WIDTH (B)

( in Cumecs)

16.580

( in mtrs)

28.250

SIDE SLOPE (s)

1.500

BED LEVEL

145.152

FLOW DEPTH (D)

( in mtrs)

1.615

MFL

MFL + 146.767

146.767

AREA = (B+sD)D

( in Sqm)

VELOCITY (V ) = Q / A
2/

VELOCITY HEAD =V / 2g =
PERIMETER (P) = B + 2D(1 + s

2/

4/3

( in m/s)

0.335

(m)

0.006

( in m)

28.250

1.454
0.000083

EDDY LOSS(he) = 0.3(V7 - V8)/2g

BL + 145.152

34.073

(in m)

HYDRAULIC MEAN RADIUS (R) = A / P


SURFACE SLOPE(S) =V n R

49.536

( in mtrs)

0.021

FRICTION LOSS(Hf)

0.000000

Page 13

IN-RIMT,HYyderabad

159982611.xls.ms_office

TEL wrt MFL = MFL + VEL HEAD

146.773

TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS

145.733

Page 14

-1.040 <------ Difference in TELs

IN-RIMT,HYyderabad

159982611.xls.ms_office

146.773

145.712

147.338

147.278
TEL

147.278

146.807

146.797

0.455

146.793

146.782

0.594

146.779

0.977

146.759

2.380

2.559

145.602

2.377

VELOCITY

MFL

2.357

2.559

145.602

1.200

0.793

147.306

DEPTH OF FLOW

1.208

145.638

1.200

0.335

146.767

2.904

IN-RIMT,HYyderabad

Page 15

0.486

1.615

144.402

144.402

144.402

144.402

BED LEVEL

144.402

144.402

145.152

8
7

145.152

159982611.xls.ms_office

DROP CALCULATIONS:
This drop is proposed at U/S transision of vent ie at section 7-7

INPUT:
Design Discharge
Weir Length
Crest Level
d/s MFL
d/s Bed level

16.580
11.750
146.402
147.306
144.402

Cumecs
m
m
m
m

MFL CALCULATIONS:
u/s MFL assumed
147.051 m
flow depth
0.649 m
Drowning Ratio = (D/S MFL - Crest Level)x100 / (U/S MFL - Crest Level)
=

147.306
146.402
x 100
147.051
146.402
=
139.29 %
Reading from Malikapur graph (in MKS units),
Coefficient of discharge, C =
1.052
Discharge, Q = Coeff x Weir length x U/s Flow Depth ^ (3/2)
= C.L.h^3/2
=
Since the calculated discharge is eqaul to design discharge, hence Safe.

16.58 cumecs

DESIGN OF DROP:
The depth of drop =

146.402

Top width of drop


=
Where 'd' is depth of water over sill
Top width of drop
=
Provide top width

144.402 =

2.000 m

0.5 d + 0.1524 to 0.5 d + 0.3048


1.216 m
0.760 m
0.800 m

Bottom wdth
=
(H + d )/ p1/2
Where 'H' is height of wall
=
'p' is specific gravity of wall material
Bottom wdth
Provide Bottom wIdth

2.000
2.4
2.076
2.100

Length of Apron
L = 2 d + 2( d h )1/2
Where 'h' is the diff.of u/s and d/s water levels
Length of Apron
Provide Length of Apron

0.312 m
3.664 m
3.700 m

Thickness of Apron
Thickness of Apron
Provide thickness of Apron

t = (( d + h )^.5 )1/2

Depth of water cushion


dw = 0.905 d h^1/2 - t
Depth of water cushion
However, provide depth of water cushion of

Page 12

m
m
m
m

0.618 m
0.650 m

-0.035 m
0.000 m

IN-RIMT,HYyderabad

159982611.xls.ms_office

FLOW CONDITION AT SECTION 7-7 (ie @ DROP)


DISCHARGE (Q)
BED WIDTH (B)

( in Cumecs)

16.580

(in mtrs)

11.750

SIDE SLOPE (s)

0.000

CREST LEVEL OF DROP

146.402

COEFICIENT OF DISCHARGE ( C )

1.052

FLOW DEPTH (D) (i.e. Arrived from Malikapur graph)

1.216

MFL

MFL 147.618
0.0 :1

147.618

AREA = (B+sD)D
VELOCITY (V ) = Q / A

( in Sqm)

14.288

( in m/s)

1.160

2 /

VELOCITY HEAD =V / 2g =

(m)

PERIMETER (P) = B + 2D(1 + s2

BL 146.402

11.75

0.069

(in m)

HYDRAULIC MEAN RADIUS (R) = A / P

1.216

14.182

( in m)

1.007

TEL wrt MFL = MFL + VEL HEAD

147.687
7

147.618
147.306
146.402

144.402
7
FLOW CONDITION AT SECTION 8-8 (ie @ DROP)

FLOW CONDITION AT SECTION 8-8 (APPROACH CHANNEL)


LENGTH FROM PREVIOUS SECTION(L)

( in mtrs)

COEFFICIENT OF RUGOSITY (n)

0.000
0.035

DISCHARGE (Q)
BED WIDTH (B)

( in Cumecs)

16.580

( in mtrs)

11.750

SIDE SLOPE (s)

1.500

BED LEVEL

146.402

FLOW DEPTH (D)

( in mtrs)

MFL

1.242

MFL 147.644
1.5 :1

147.644

AREA = (B+sD)D

( in Sqm)

VELOCITY (V ) = Q / A

( in m/s)

0.981

(m)

0.049

2 /

VELOCITY HEAD =V / 2g =
PERIMETER (P) = B + 2D(1 + s2

(in m)

HYDRAULIC MEAN RADIUS (R) = A / P

( in m)

SURFACE SLOPE(S) =V2 n2/R4/3 =


EDDY LOSS(he) = 0.3(V7 - V8)/2g

16.901

1.242

BL 146.402

11.75

16.227
1.042
0.001117

( in mtrs)

FRICTION LOSS(Hf)

0.006
0.000000

TEL wrt MFL = MFL + VEL HEAD

147.693

TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS

147.693

Page 13

0.000 <------ Difference in TELs

IN-RIMT,HYyderabad

159982611.xls.ms_office

1.160

0.793

2.559

147.693 147.687 147.338 147.278


0.981

TEL
VELOCITY
MFL
DEPTH OF FLOW

0.977

147.278 146.807
2.559

2.357

145.602 146.759
1.200

2.377

146.779

0.594

146.797

2.380

146.782

0.455

146.793

IN-RIMT,HYyderabad

Page 14

147.644 147.618 147.306 145.602

144.402

1.200

144.402

2.904

144.402 144.402

1.216
BED LEVEL

4
4

1.242

8
7

146.402 146.402 144.402 144.402

159982611.xls.ms_office

Design of Approach Channel


586

Required discharge =
Section adopted

16.58

Cusecs =

Cumecs

Lacy's Bed width=

0.60

4.8*(Q)1/2

1.5:1
=

19.54490215

11.73

11.75

1.756
11.750
11.750
1.24156
15.475

Where bed width


Depth of Flow
Top width
(11.75 + 15.47)
2

Area A =

x 1.24

Wetted Perimeter P = B + 2(1+S.S)d


A
P

Hydraulic radious =

Velocity (V) =

(15.47 + 11.75)
x 1.24 = 16.901
2

= 11.75 + 2(1 + 1.5) x 1.24 =


=

16.901
16.227

16.227
1.042

m
m

(1/n)R S =
= (1/0.03)x1.042x sqrt(1/1000) =

Discharge(Desi) = A x V =16.901 x 1.083

1.083 m/sec

18.305

Cumecs

Hydraulic Particulars
1. Bed Width

11.750

6. Velocity

1.203

2. Depth of Flow

1.242

7. Side Slopes

1.5:1

3. Free board

0.60

8. Value of 'n'

0.03

4. Discharge(req)

16.580

9. Bed fall

1000

5. Discharge(Des)

18.305

drain bed level


MFL
Depth of flow as per MFLs =
Afflux

=
=
=

10. Bank Widths L/R =

146.402
147.051
0.649
0.593

Scour Depth Calculations U/S


Maximum Flood Discharge Q =
Linear water way =
Maximum Flood Level =
Discharge per meter q =
Silt factor f =
Normal scour depth R =
=
=

16.58 Cumecs
15.47
m
147.644 m
16.58
=
15.47
1.50
q2
1.346
f
1.071
1.346
1.50
1.231 m

1.071

m3/sec/m

1/3.

1/3.

Maximum scour depth =


= 1.5 x 1.231 =
1.847
Maximum scour level = M.F.L. - Max. scour depth
= 147.644 - 1.847
Cutoff depth = 146.402 - 145.797 = 0.605
Provide
0.75 m
Cut-Off may be provided from end to end of Return Walls

Page 15

m
= +145.797
= +145.652m

IN-RIMT,HYyderabad

159982611.xls.ms_office

Rivetment & Bed pitching:

Depth of Flow in Approach Channel =

1.242

provide length of rivetment on u/s =

3 x depth of water in drain


=

Provide length of U/S rivetment =


length of bed pitching on U/S

Provide length of bed pitching on U/S

M.

3.75

M.

0.5 x 3.75

1.88

m.

2.00

2.380

4 x depth of water in drain


=

Provide length of U/S rivetment =


=

Page 16

3.72

provide length of rivetment on D/S

Provide length of bed pitching on U/S

3 x 1.24

1/2 length of rivetment on U/S

Depth of water in Tail Channel =

length of bed pitching on D/S

4 x 2.38
9.52

M.

9.75

M.

1/2 length of rivetment on D/S

0.5 x 4.88

4.88

m.

5.00

IN-RIMT,HYyderabad

Live Load Calculations


H Height of Banking = 2.490

Clear Span of Slab = 1.80

Maximum Axle Load = 11.4

tonnes

Load on each wheel = 11.4 / 2 = 5.7

tonnes

Ground Contact Area of each Wheels

250

Spacing of wheels in Longitudinal direction = 1.2

Spacing of wheels in each Axle = 1.8

500

Load Dispersion on Longitudinal direction = 250 + 2 H Tan 45 + 1.2


6.43

Clause 403.3.1

Load Dispersion on Transverse direction = 500 + 2 H Tan 45 + 1.8


7.28

Load Dispersion each wheel = ( 250 + 2 H Tan 45 ) x ( 500 + 2 H Tan 45 )


6.43 x 7.28
= 28.660

m2

Live load on slab = (5.7) / (28.66) =

0.199

t/m2

Live Load on slab due to Over lapping


longitudinal direction =

0.199

Live Load on slab due to Over lapping in


transverse direction =

0.199

t/m2

Total Live Load on slab = 0.597

t/m2

2.615
2.740

45

DESIGN OF U/S HEAD WALL


GIVEN DATA:
Head Wall Top Level
Slab Top Level
Slab Bottom Level

+
+
+

DENSITY:
147.606 Concrete
145.85 Earth
145.602

2.0 :1
0.500
0.50

TBL

DERIVED DATA:
Slab Thickness
Head Wall Height

=
=

2.4 t/m3
3
2.1 t/m

0.25 m
1.754 m

TBL

148.342

147.606
Load on Slab
7.299
Average Stress
6.310
9.086
0.759

W3

1.754
`
W2

WIDTHS:
Top-Width
Rear - Batter

=
=

0.50 m
1.00 m

0.25 A

1.00
1.50

145.852
145.602

STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width
=
1.5 m
SL.NO. FORCE
1
2
3
4

W1
W2
W3
PV

PH

`m'
0.5
1
1

PARTICULARS
`m'
`t/m2'
1.75395
2.4
1.75395
2.4
2.254
2.1
4.830
2.1
4.830

2.1

min. Ht head wall

MAGNITUDEL.A
MOMENT
`t'
`m'
`tm'
2.105
1.25
2.631
0.5
2.105
0.667
1.403
0.5
2.367
0.333
0.789
0.0796 0.807
SUM-V= 7.384
0.3046 3.090
0.737
2.276
SUM-M= 7.099
constant

X=SUM-M/SUM-V=
7.099 / 7.384
=
0.961 m
Eccentricity , e=X-b/2 = 0.961 - 1.5 /2 =
0.211 m
<b/6=
0.250 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 4.922
6*e/b = 0.846
STRESSES :
Maximum stress,fmax = SUM-V/b (1+6e/b)
9.086 t/m2
Minimum stress,fmin = SUM-V/b (1-6e/b)
0.759 t/m2

DESIGN OF D/S HEAD WALL


GIVEN DATA:
Head Wall Top Level
Slab Top Level
Slab Bottom Level

+
+
+

DENSITY:
147.606 Concrete
145.85 Earth
145.602

=
=

TBL

148.342

2.0 :1
0.500
0.50 147.606

TBL

DERIVED DATA:
Slab Thickness
Head Wall Height

2.4 t/m3
2.1 t/m3

0.25 m
1.754 m

W3

1.754
`
W2

WIDTHS:
Top-Width
Rear - Batter

=
=

0.50 m
1.00 m

0.25 A

1.00
1.50

145.852
145.602

STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width
=
1.5 m
SL.NO. FORCE
1
2
3
4

W1
W2
W3
PV

PH

`m'
0.5
1
1

PARTICULARS
`m'
`t/m2'
1.75395
2.4
1.75395
2.4
2.254
2.1
4.830
2.1
4.830

2.1

MAGNITUDEL.A
MOMENT
`t'
`m'
`tm'
2.105
1.25
2.631
0.5
2.105
0.667
1.403
0.5
2.367
0.333
0.789
0.0796 0.807
SUM-V= 7.384
0.3046 3.090
0.737
2.276
SUM-M=
7.099
constant

X=SUM-M/SUM-V=
7.099
7.384
=
0.961 m
/
Eccentricity , e=X-b/2 = 0.961 - 1.5 /2 =
0.211 m
<b/6=
0.250 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 4.922
6*e/b = 0.846
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
9.086 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
0.759 t/m2

min. Ht head wall

Load on Slab
7.299
Average Stress
6.310
9.086
0.759

U/S WING WALLS


GIVEN DATA:
Wing Wall Top Level = +
Earth Top Level
=
+
Foundation Top Level = +
Foundation Bottom Level= +
Concrete Offsets
=
DERIVED DATA:
Footing Thickness
=
Wing Height & Earth height =
Earth Height From Bottom
Of Foundation
=
WIDTHS:
Top-Width
=
Rear - Batter
=

DENSITY:
147.606 Concrete
147.606 Earth
144.327
143.727
0.3 m

2.4 t/m3
3
2.1 t/m

0.50
0.6
m
3.27895 m

W3
W4

3.279
3.87895 m

W2
`

0.50 m
1.80 m

0.3
0.6
B

STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
2.3 m
SL.NO.

FORCE

1
2
3
4

W1
W2
W3
PV

PH

PARTICULARS
`m'
`m'
`t/m3'
0.5
3.27895
2.4
1.8
3.27895
2.4
1.8
3.27895
2.1
10.752
2.1
10.752

147.606

2.1

W1

0.3 144.327
143.727

w5
2.90

MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
3.935
2.05
8.066
0.5
7.083
1.200
8.499
0.5
6.197
0.600
3.718
0.0395
0.892
SUM-V= 18.106
0.158
3.567
1.377
4.913
SUM-M= 25.196

X=SUM-M/SUM-V=
25.196
18.106
=
1.392 m
Eccentricity , e=X-b/2 =
1.392 - 2.3 /2 =
0.242 m
<b/6=
0.383 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 7.872
6*e/b = 0.630
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
12.834 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
2.911 t/m2
SRESSES ON SOIL:
Base Width ,b =
SL.NO.

FORCE

2.90 m
PARTICULARS

MAGNITUDEL.A

MOMENT

1
2
4
5
6
7

W1
W2
W3
W4
W5
PV

`m'
`m'
0.5
3.27895
1.8
3.27895
1.8
3.27895
0.300
3.27895
2.900
0.6
15.046

PH

15.046

`t/m3'
2.4
2.4
2.1
2.1
2.4
2.1
2.1

constant
0.5
0.5

0.0395
SUM-V=
0.158

`t'
3.935
7.083
6.197
2.066
4.176
1.248
24.704
4.992

`m'
2.35
1.500
0.900
0.150
1.450

`tm'
9.247
10.624
5.577
0.310
6.055

1.629
SUM-M=

8.133
39.946

X=SUM-M/SUM-V=
39.946 / 24.704
=
1.617 m
Eccentricity , e=X-b/2 =
1.617 - 2.90
0.167 m
/2 =
<b/6=
0.483 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 8.519
6*e/b = 0.345
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
11.462 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
5.576 t/m2

Head @ TBL
Head @ MFL
Wing Wall Top Level

12.8
2.9

148.342
147.6059
147.6059

11.46
5.58

144.327 abutment Foundation Level


= +145.652Foundation @ U/S Scour Level
144.327 Foundation Level

MOMENT

`
MOMENT

D/S WING WALLS


GIVEN DATA:
Wing Wall Top Level = +
Earth Top Level
=
+
Foundation Top Level = +
Foundation Bottom Level= +
Concrete Offsets
=
DERIVED DATA:
Footing Thickness
=
Wing Height & Earth height =
Earth Height From Bottom
Of Foundation
=
WIDTHS:
Top-Width
=
Rear - Batter
=

DENSITY:
147.606 Concrete
147.606 Earth
144.094
143.494
0.3 m

2.4 t/m3
3
2.1 t/m

0.50
0.6
m
3.51233 m

W3
W4

3.512
4.11233 m

W2
`

0.50 m
2.40 m

0.3
0.6
B

STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
2.9 m
SL.NO.

FORCE

1
2
3
4

W1
W2
W3
PV

PH

PARTICULARS
`m'
`m'
`t/m3'
0.5
3.51233
2.4
2.4
3.51233
2.4
2.4
3.51233
2.1
12.336
2.1
12.336

147.606

2.1

W1

0.3 144.094
143.494

w5
3.50

MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
4.215
2.65
11.169
0.5
10.116
1.600
16.185
0.5
8.851
0.800
7.081
0.0395
1.023
SUM-V= 24.205
0.158
4.093
1.475
6.038
SUM-M= 40.473

X=SUM-M/SUM-V=
40.473
24.205
=
1.672 m
Eccentricity , e=X-b/2 =
1.672 - 2.9 /2 =
0.222 m
<b/6=
0.483 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 8.346
6*e/b = 0.460
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
12.182 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
4.511 t/m2
SRESSES ON SOIL:
Base Width ,b =
SL.NO.

FORCE

3.50 m
PARTICULARS

MAGNITUDEL.A

MOMENT

1
2
4
5
6
7

W1
W2
W3
W4
W5
PV

`m'
`m'
0.5
3.51233
2.4
3.51233
2.4
3.51233
0.300
3.51233
3.500
0.6
16.911

PH

16.911

`t/m3'
2.4
2.4
2.1
2.1
2.4
2.1
2.1

constant
0.5
0.5

0.0395
SUM-V=
0.158

`t'
4.215
10.116
8.851
2.213
5.040
1.403
31.837
5.611

`m'
2.95
1.900
1.100
0.150
1.750

`tm'
12.434
19.219
9.736
0.332
8.820

1.727
SUM-M=

9.691
60.233

X=SUM-M/SUM-V=
60.233 / 31.837
=
1.892 m
Eccentricity , e=X-b/2 =
1.892 - 3.50
0.142 m
/2 =
<b/6=
0.583 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 9.096
6*e/b = 0.243
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
11.309 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
6.883 t/m2

Head @ TBL
Head @ MFL
Wing Wall Top Level

148.342
147.6059
147.6059

on Concreteon soil
12.18
11.31
4.51
6.88

144.327 abutment Foundation Level


144.094 Foundation @ D/S Scour Level
144.094 Foundation Level

MOMENT

`
MOMENT

U/S RETURN WALL


GIVEN DATA:
Wing Wall Top Level = +
Earth Top Level
=
+
Foundation Top Level = +
Foundation Bottom Level= +
Concrete Offsets
=
DERIVED DATA:
Footing Thickness
=
Wing Height & Earth height =
Earth Height From Bottom
Of Foundation
=
WIDTHS:
Top-Width
=
Rear - Batter
=

DENSITY:
147.945 Concrete
147.945 Earth
144.327
143.727
0.3 m

2.4 t/m3
3
2.1 t/m

0.50
0.6
3.618

m
m

4.218

W3
W4

3.618

W2
`

0.50 m
2.50 m

0.6

1
2
3
4

W1
W2
W3
PV

PH

PARTICULARS
`m'
`m'
`t/m3'
0.5
3.618
2.4
2.5
3.618
2.4
2.5
3.618
2.1
13.090
2.1
13.090

2.1

0.3 144.327
143.727

w5
3.60

STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
3m
FORCE

W1

0.3
B

SL.NO.

147.945

MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
4.342
2.75
11.939
0.5
10.854
1.667
18.090
0.5
9.497
0.833
7.914
0.0395
1.086
SUM-V= 25.779
0.158
4.343
1.520
6.600
SUM-M= 44.544

X=SUM-M/SUM-V=
44.544
25.779
Eccentricity , e=X-b/2 =
1.728 - 3

=
/2 =
<b/6=

As `e' is <b/6 ,Eccentricity is acceptable .


SUM-V/b= 8.593
6*e/b = 0.456
STRESSES :
Maximum stress,fmax

Minimum stress,fmin

1.728 m
0.228 m
0.500 m

SUM-V/b (1+6e/b)
12.510 t/m2
SUM-V/b (1-6e/b)
4.676 t/m2

SRESSES ON SOIL:
Base Width ,b =
SL.NO.
1

3.60 m

FORCE
W1

`m'
0.5

PARTICULARS
3
`m'
`t/m '
3.618
2.4

MAGNITUDEL.A
constant
`t'
`m'
4.342
3.05

MOMENT
`tm'
13.242

2
4
5
6
7

W2
W3
W4
W5
PV

2.5
3.618
2.5
3.618
0.300
3.618
3.600
0.6
17.792

2.4
2.1
2.1
2.4
2.1

PH

17.792

2.1

0.5
0.5

0.0395
SUM-V=
0.158

10.854
9.497
2.279
5.184
1.476
33.632
5.903

1.967
1.133
0.150
1.800

21.346
10.764
0.342
9.331

1.772
SUM-M=

10.458
65.483

X=SUM-M/SUM-V=
65.483 / 33.632
=
1.947 m
Eccentricity , e=X-b/2 =
1.947 - 3.60
0.147 m
/2 =
<b/6=
0.600 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 9.342
6*e/b = 0.245
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
11.632 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
7.053 t/m2

12.510
4.676

MOMENT

MOMENT

11.632
7.053

D/S RETURN WALL

GIVEN DATA:
Wing Wall Top Level
Earth Top Level
=
+
Foundation Top Level = +
Foundation Bottom Level= +
Concrete Offsets
=
DERIVED DATA:
Footing Thickness
=
Wing Height & Earth height =
Earth Height From Bottom
Of Foundation
=
WIDTHS:
Top-Width
=
Rear - Batter
=

DENSITY:
147.100 Concrete
147.100 Earth
144.094
143.494
0.3 m

2.4 t/m
2.1 t/m3

0.50
0.6
3.006

m
m
3.00638
3.60638 m
0.50 m
1.50 m

W3
W4

W2
`

0.6

w5
2.60

STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
2m

1
2
3
4
5

PH

9.038

17.879

MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
3.608
1.75
6.313
0.5
5.411
1.000
5.411
0.5
4.735
0.500
2.368
0.0395
0.750
SUM-V= 14.504
0.158
2.999
1.263
3.787
SUM-M= 17.879

14.504
1.233 - 2

=
/2 =
<b/6=

As `e' is <b/6 ,Eccentricity is acceptable .


SUM-V/b= 7.252
6*e/b = 0.698
STRESSES :
Maximum stress,fmax

Minimum stress,fmin

SRESSES ON SOIL:
Base Width ,b =

`t/m '
2.4
2.4
2.1
2.1
2.1

X=SUM-M/SUM-V=
Eccentricity , e=X-b/2 =

SL.NO.

0.3 144.094
143.494

FORCE
PARTICULARS
`m'
`m'
W1
0.5
3.00638
W2
1.5
3.00638
W3
1.5
3.00638
PV
9.038

W1

0.3

SL.NO.

147.100

1.233 m
0.233 m
0.333 m

SUM-V/b (1+6e/b)
12.315 t/m2
SUM-V/b (1-6e/b)
2.189 t/m2

2.60 m

FORCE
PARTICULARS
`m'
`m'
W1
0.5
3.00638

`t/m '
2.4

MAGNITUDEL.A
constant
`t'
`m'
3.608
2.05

MOMENT
`tm'
7.396

2
4
5
6
7

W2
W3
W4
W5
PV

1.5
3.00638
1.5
3.00638
0.300
3.00638
2.600
0.6
13.006

2.4
2.1
2.1
2.4
2.1

PH

13.006

2.1

0.5
0.5

0.0395
SUM-V=
0.158

5.411
4.735
1.894
3.744
1.079
20.471
4.315

1.300
0.800
0.150
1.300

7.035
3.788
0.284
4.867

1.515
SUM-M=

6.536
29.906

X=SUM-M/SUM-V=
29.906 / 20.471
=
1.461 m
Eccentricity , e=X-b/2 =
1.461 - 2.60
0.161 m
/2 =
<b/6=
0.433 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 7.873
6*e/b = 0.371
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
10.797 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
4.950 t/m2

12.315
2.189

MOMENT

MOMENT

10.797
4.950

Drowning
Ratio
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
1.000

Malikapur Graph
1.8

1.7
1.6
Coff.of Disc. 'C'

C
1.73412819
1.73342742
1.72522956
1.7195039
1.71314593
1.69999448
1.67602126
1.63969271
1.58750432
1.50468715
1.35108688
1.04221509
1.052

1.5
1.4
1.3

1.2
1.1
1
1

Drowning Ratio

10

11

12

159982611.xls.ms_office

Design OF SLAB UNDER CANAL BED:


The slab is designed as a water retaining structure with HYSD bars with a mix M20
with respect to IS-456
Mix cc(1:11/2:3) in M20
Stress in steel to HYSD bars upto 20 mm dia
2
stress in steel (t)
=
1500
kg/cm
2
stress in concrete( c)
=
70
kg/cm
shear stress(s)
=
17
kg/cm2
2
Local bond stress
=
11.20
kg/cm
Modular ratio (m)
=
13
n= (mc / (mc+t))
n= (13.000 X
n= 0.378
j = 1- n/3 = 0.874
Q =
11.55
2
Moment of Resistance =Qbd
Effective depth (d) =
Clear span =
F.S.D. =

70 ) / (

(13.000 X

2.45

1.80
1.70

Unit Wt. Of water =


1000
Unit Wt. of RCC =
2500
Unit Wt. of concrete =
2400
Assume overall depth of slab =
Wearing Coat thickness =
Clear corver
=
Main reinforcement =
Effective depth
=
=
Effective span of the slab =

M
M

=
Kg/m3
Kg/m3
3
Kg/m
0.25 m
0.04 m

40 MM

40 mm

12 mm

25.00 20.40
clear span
=
1.80
=
2.004
considering width of slab, total loads on the slab are
wt. Of water
2.45
x
wt. Of w.c.
0.04 m
x
wt. Of R.C.C.
0.25 m
x

4.00 - 0.600
cm
+
+

Max. D.L. B M =

WL2
12

Max. L. L. B M =

WL2
10

=
=

241.30

Max. D.L. B M =

-WL2
10

Max. L. L. B M =

-WL2
9
289.55

=
=
+

eff. Depth
0.204

M
1000
2400
2500
D.L.

Total Load =

Max. Support B M =

1500 )

(M.R./Qb)

Max depth water considered in the design


1.70
+
0.750

Max. Mid Span B M =

70 +

(721 X
241.30
(2450 X
983.92
983.92

(721 X

=
=

289.55
(2450 X

=
+

1093.25
1093.25

2450.00
96.00
625.00
721.00

kg/m2
kg/m2
2
kg/m
kg/m3

3171.00

kg/m2

2.004 X
12.00
Kg-M

2.004 )

2.004 X
10.00
Kg-M
=

2.004 )

2.004 X
10.00
Kg-M
2.004 X
9.00
Kg-M
=

1225.22
2.004 )

2.004 )

1382.80

IN-RIMT,HYyderabad
Page 18

159982611.xls.ms_office

sst = 1500

Q = 11.552

M/(QXb)

Effective Depth required =


= Sqrt(
=

j= 0.874

10.941

1382.80
10.941
<

So Provide thickness of slab =

0.25 m

Area of steel required =

M
st j d
1500 x

= 1225.220 / (
=
Sapcing of

4.581
12 mm

X 100 ) / (
11.552
Cm
20.40
CM
Hence ok
M

0.87414 x

X 100 )

20.400

Sq.cm
dia. Bars

/4 x
D2 x 100
Area of Steel Required
=
P /4 x
12 X
12
4.581
3 times effective depth = 3 x 20.4 = 61.2cm
Maximum =300mm

Spacing =

So Provide 12mm Dia bars @


Area of steel required at Support =

M
st j d
1500 x

= 1382.804 / (
=
Sapcing of

210 mm

5.170
12 mm

24.691

Cm

Clause 26.3.3.b.1 of IS 456-2000

C/C

0.87414 x

20.400

Sq.cm
dia. Bars

/4 x
D2 x 100
Area of Steel Required
=
P /4 x
12 X
12
5.170
3 times effective depth = 3 x = 0cm
Maximum =300mm

Spacing =

So Provide 12mm Dia bars @

215 mm

21.877

Cm

Clause 26.3.3.b.1 of IS 456-2000

C/C

Alternate bar can be cranked to take of care of shear resistance.


At top provide
12 mm
dia bar
420 mm
cm2 in addition to crank bars to take care of partial fixity at support.
area of
2.693

Area of steel Provided =


=
=

D2 x 100
/4 x
Spacing
/4 x
12 X
21
2
5.386 CM

12
>

2
4.581 CM

DISTRIBUTION STEEL:
( As per IS 3370 (Part-II)- 1965)
0.30%
100

450 0.20%
For 250 mm
=

0.30%
=

150
350

0.10%

0.26%

IN-RIMT,HYyderabad
Page 19

159982611.xls.ms_office

As HYSD bars of Fe-415 grade steel is used , reduce it by 20%


=
0.8
x
0.26%
=
0.002057143
=
0.206
x
100
x
5.386
100
=
1.108 cm2
As thickness of slab is more than 225 mm Provide steel on both the faces.
( As per Clause 7.1 I.S. 3370 Part-II )
Hence area of steel on each face =

0.55

0.554

cm

Spacing of
Spacing =

8 mm
Dia. Bars
/4 x
D2 x 100
Area of Steel Required
=
P /4 x
8 X
8
0.554
=
90.741 CM
5 times effective depth = 5 x 20.4 = 102cm
Maximum =450mm

So Provide
CHECK FOR SHEAR :
Max SF =
WL
2

8 mm

MM Dia Bars at
450
top and bottom
3171
x
2.004
2
3177.34
Kg

=
=

Shear Force @ "d" from support


=
3177
1.002
=
2530.5

2.004

420

mm c/c

=
=
The area of steel available =

D x 100
/4 x
Spacing
P /4 x
12 X
0
42.0
2
2.693 CM
0.5 X 5.386

5.386

As per Clause 47.2.1 & 47.2.1.1 of I.S. 456-2000


Permissible shear stress :
100Ast
=
5.386 X
bd
100 X
=
0.264
For M-20 Permissible shear stress for
%
%
%
=
=
=

Kg/cm2

dia @

Area of steel Provided =

For

0.204 )

Kg

Shear Stress taken by Steel:


50 % of bars are cranked up and
top bar provided
12 mm

0.25
0.5
0.264

MM C/C @ both

0.204
( 1.002 -

tv = V
bd
=
2530
20.40 x 100
=
1.240

Nominal shear stress =

Clause 26.3.3.b.2 of IS 456-2000

0.22
0.3

0.22 +
0.224
2.245

( 0.08 X
N/mm2
Kg/cm2

12

2.693

cm2

100
20.40
%
0.2640

% of Tensile reinforcement

N/mm2
N/mm2

0.014 ) / 0.250
>

1.240
Hence ok

Kg/cm2

IN-RIMT,HYyderabad
Page 20

159982611.xls.ms_office

DESIGN OF THE SLAB UNDER CANAL BANK


The mix proposed for the RCC slab unless earth bank is M-20

Mix adopted is M-20 Grade


stress in steel for HySD bars upto 20 mm j (if) =
stress on concrete ( c)
Modular ratio (m)
Neutial axis (m)
Level (a)
MR
Unit we. Of soil
Weight . Of earth filling over the slab
Assumed thickness of slab =
Bottom level of slab below canal bed =

Top of slab =
=
Height of earth fill =

1500
70
13
0.378
0.874
11.552
2100

=
=
=
=
=
=

2.49
0.25

x
x

Live load due to class A Loading =


Thickness of slab =
0.250
Clear corver =
25
Main reinforcement =
16
=
25.00
=
21.70

m
mm
mm
- 2.50 cm

clear span
=
1.80
Max. D. L. B M =

eff. Depth
0.217
=

+
+
WL2
12

WL
10

Max. L.L. B M =

Max. Mid Span B M =

1984.65

WL2

Max. D. L. B M =

2100
2500

WL2
9

Max. Support B M =

2381.58

Q = 11.55

st = 1500

Effective Depth required =


=
=

14.942

M
Qxb
2579.223
11.55
<

0.040 -

145.852

=
=

5229
625
5854
437

0.25

Kg/m2
Kg/m2
Kg/m2
Kg/m2

0.8

=
(5854 X

2.017
2.017 X
12

1984.6

(437.24 X

2.017 X
10
177.9

=
177.88

(5854 X

2.017 X

10
2381.6

10

Max. L.L. B M =

d
d
2
bd
kg/m2

0.250 M
C.B.L. -Th. of W.C. - Th.of slab under canal bed

=
+ 145.892 =
145.602
M
Bottom of slab + th of slab under canal bank
145.602
+
0.250
=
148.342
145.852
= 2.49
M

LOAD CALCULATIONS:
Wt. Of earth =
Wt. Of slab =

kg/cm
2
kg/cm

(437.24 X
=
197.65

2.017 X
9
197.6
=

m
2.017 )
Kg-M
2.017 )
Kg-M
2162.53
2.017 )
Kg-M
2.017 )
Kg-M
2579.22

j= 0.874

x
x
21.7
Hence ok

100
100
CM

IN-RIMT,HYyderabad
Page 18

159982611.xls.ms_office

So Provide thickness of slab =

0.25

M
st j d
= 2162.529 / (
=
7.60

Area of steel required =

Sapcing of

1500 X
Sq.cm

16 mm

Spacing of Steel Required


=

0.874 X

dia. Bars

/4 x

1.6 X
1.60
7.60
=
26.454 cm
3 times effective depth = 3 x 21.7 = 65.1cm
Maximum =300mm

So Provide

21.700

16 mm

Dia Bars at
/4 x
Spacing
=
/4 x

Area of steel Provided =

Clause 26.3.3.b.1 of IS 456-2000


MM C/C

D2 x 100

1.6 X
23
2
8.742 CM

=
M
st j d
= 2579.223 / (
=
9.06

230

1.6
2
7.600 CM

>

Area of steel required =

Sapcing of

16 mm

Spacing =
Spacing of Steel Required
=

/4 x

1500 X
Sq.cm

0.874 X

21.700

dia. Bars
D2 x 100

/4 x

1.6 X
1.60
9.06
=
22.180 cm
3 times effective depth = 3 x 21.7 = 65.1cm
Maximum =300mm
Alternate bar be cranked to take of care of shear resistance.
So Provide
16 mm
Dia Bars at

Clause 26.3.3.b.1 of IS 456-2000


220

MM C/C

DISTRIBUTION STEEL:
( As per IS 3370 (Part-II)- 1965)

For

250 MM
=

0.30%
100

0.20%
450
0.20%

100
300

=
0.26%
As HYSD bars of Fe-415 grade steel is used , reduce it by 20%
=
0.8
x
0.26%
=
=
0.206
x
100
x
100
=
1.798 cm2

0.02%

0.002057143
8.742

As thickness of slab is more than 225 mm


Provide steel on both the faces.
( As per Clause 7.1 I.S. 3370 Part-II )
Hence area of steel on each face =
1.798
=
1.798

cm2

IN-RIMT,HYyderabad
Page 19

159982611.xls.ms_office

Sapcing of

8 mm

Dia Bars
2

D x 100
P /4 x
Area of Steel Required
=
/4 x
8X
8
1.798
=
27.951 CM
5 times effective depth = 5 x 21.7 = 108.5cm
Maximum =450mm
8 mm
Dia Bars at
270

Spacing =

So Provide
CHECK FOR SHEAR :
Max SF =
WL
2

6291

=
Shear Force @ "d" from support
=
6345
1.009
=
4979.516

x
2
Kg

6344.7
( 1.009 -

Clause 26.3.3.b.2 of IS 456-2000


MM C/C @ both at top and
bottom
2.017

0.217 )
0.217

Kg
2.017

Nominal shear stress =

tv = V
bd
=
4980
2.017 X 100
=
2.469

Shear Stress taken by Steel:


50 % of bars are cranked up and
Also top bar provided
16 mm
Area of steel Provided =

dia brs
/4 x
Spacing
/4 x
=

220
D2 x 100

16 X
22
2
9.139 CM

=
The area of steel available =

Kg/cm

0.5 X 8.742
=

13.510

For

%
%
%
= 0.22 + (
=
0.339
=
3.392

mm c/c

16

9.139

cm2

As per Clause 47.2.1 & 47.2.1.1 of I.S. 456-2000


Permissible shear stress :
100Ast
=
13.510 X
100
bd
21.700 X
100
=
0.623 %
For M-20 Permissible shear stress for
0.623
0.25
0.5
0.623

% of Tensile reinforcement

0.22
0.3

N/mm2
2
N/mm

0.08 X
N/mm2
Kg/cm2

0.372585 / 0.250
>

2.469
Hence ok

Kg/cm2

IN-RIMT,HYyderabad
Page 20

159982611.xls.ms_office

DESIGN OF ABUTMENT (UNDER EARTH BANK)


INPUT:
Barrel floor level (ie Drain Bed Level)

= + 144.402 m

Concrete Density

= 2.4

Level at bottom of Abutment

= + 144.327 m

Earth Density

= 2.1

Canal Bed Level (CBL)

------>

= + 145.892 m

Bottom of Bund level (ie Slab top under E' bank)

= + 145.852 m

Top of Bank Level

------>

= + 148.342 m

Width of Bed block

------>

0.450 m

Height of Bed block

------>

0.300 m

Width of rear batter

------>

3.000 m

Width of ( w3 )

------>

0.450 m

Foundation offset

------>

0.300 m

Depth of foundation

------>

0.600 m

Total span of slab

------>

2.700 m

Thickness of slab under Earth Bank

0.250 m

Thickness of Sealing Coat on Canal Bed

0.040 m

Thickness of Wearing Coat on Barrel Floor

0.075 m

TBL=

148.342

2.490

W6

2.490

W9

R
+ 145.852
0.250
0.3

145.602
145.302

W1
W5
W8

1.52 0.975

W3
W2

W4

0.30
+ 144.327
0.600

+ 143.727

h
1.525
2.125 Pv

0.30
0.450
3.900

0.450
W7

Ph

3.000
A

4.500

IN-RIMT,HYyderabad
Page 24

159982611.xls.ms_office

DESIGN DATA:
Height of Earth Bank (Height of Surcharge)

2.490 m

Height of rear batter

------>

1.525 m

Base width of Abutment

------>

3.900 m

Reaction on abutment under earth bank = Wt of slab + Wt of Earth on span + Live Load
=(

2.700 /2 x

0.250 )

2.500

+(

2.700 /2 x

2.490 )

2.100

2.700 /2 x

0.437

8.493 t

Total Height of soil on foundation concrete = Ht. of Surcharge+ Ht. of Abutment


=

2.490

1.525

4.015 m

Total Height of soil on foundation soil = Ht. ot Surcharge + Ht. of Abutment + Foundation Depth
=

2.490

1.525

0.600

4.615

Taking moments about A(Stresses on concrete)


LOAD

DESCRIPTION

MAGNITUDE

LEVER

MOMENT

ARM
R

Reaction as calculated

in Tons

in mtrs.

in t-m

8.493

3.675

31.212

W1

1.000

0.450

0.300

2.500

0.338

3.675

1.242

W2

1.000

0.450

0.975

2.400

1.053

3.675

3.870

W3

1.000

0.450

1.525

2.400

1.647

3.225

5.312

W4

0.500

3.000

1.525

2.400

5.490

2.000

10.980

W5

0.500

3.000

1.525

2.100

4.804

1.000

4.804

W6

1.000

3.450

2.490

2.100

18.040

1.725

31.119

Pv

0.040

x(

4.015

x
2
-

) x

2.100

0.833

40.698

2.100

3.291

0.640

2.108

2.490

Total load
Ph

0.158

x(

4.015

2.490

) x

Total moment
Bottom width of abutment
L.A. = M / W--->

90.647

e = b/2-L.A--->

3.900

2 -

ep = b/6--->

3.900

e < b/6

40.698

-2.227

0.277

<

90.647

3.900 m

2.227 m

0.277 m

0.650 m

0.650

Hence NoTension.

Max. Stress = W/b(1+6*e/b)--->

14.882 T/Sq.m

Min. Stress = W/b(1-6*e/b)--->

5.988 T/Sq.m

Taking moments about B(Stresses on soil)

IN-RIMT,HYyderabad
Page 25

159982611.xls.ms_office

Taking moments about B(Stresses on soil)


NO.

DESCRIPTION

MAGNITUDE

LEVER

MOMENT

in Tons

in mtrs.

in t-m

8.493

3.975

33.760

ARM
R

Reaction as calculated

W1

1.000

0.450

0.300

2.500

0.338

3.975

1.344

W2

1.000

0.450

0.975

2.400

1.053

3.975

4.186

W3

1.000

0.450

1.525

2.400

1.647

3.525

5.806

W4

0.500

3.000

1.525

2.400

5.490

2.300

12.627

W5

0.500

3.000

1.525

2.100

4.804

1.300

6.245

W6

1.000

3.450

2.490

2.100

18.040

2.025

36.531

W7

1.000

4.500

0.600

2.400

6.480

2.25

14.580

W8

1.000

0.300

1.525

2.100

0.961

0.150

0.144

W9

1.000

0.300

2.490

2.100

1.569

0.150

0.235

Pv

0.040

x(

4.615

x
2
-

) x

2.100

1.268

50.143

Ph

0.158

x(

) x

2.100

5.010

2.490

Total load
4.615

2.490

TOTAL MOMENT
b = Width of foundation concrete
L.A. = M / W --->

119.929 /

50.143

e = b/2-L.A --->

4.500 /

ep = b / 6 --->

4.500 /

e < b/6

0.892
M

-2.392

0.142

<

4.500 m

2.392 m

0.142 m

0.750 m

0.750

4.471
119.929

Hence No Tension.

Max. Stress=W/b(1+6e/b)--->

13.253 t/sq.m

Min. Stress=W/b(1-6e/b)--->

9.033 t/sq.m

IN-RIMT,HYyderabad
Page 26

159982611.xls.ms_office

DESIGN OF PIER UNDER EARTH BANK :


T.B.L

+ 148.342

2.490
+ 145.852
0.25

+ 145.602

Concrete Offset

300

900
1.275
+ 144.402

W.C. 0.075

144.327

0.60

+ 143.727

1500
Load coming on the top of Pier :
( a ) Weight of Earth = ( 1.80 + 0.45 )

2.49 X

2.1

0.25

2.5

1.406 t

13.171 t

13.171 t

0.90 X 1.275 X 2.40 =


=

15.925 t

( b ) Weight of Slab =

1.80 + 0.45

Total Load
1

11.765 t

Stress in Concrete @ top of Pier :


13.171

14.635 t/m 2

0.90 X 1
2

Stress in Concrete @ top of Foundation Concrete :


Total Weight on top of Pier
Self Weight of Pier

Total Weight
Stress at bottom of pier

15.925

2.754 t

17.695

t/m2

0.9 X 1
3

Stress on Soil :
Total weight including Self wt. of pier at bottom of pier
Weight of foundation concrete

15.925 t

1.50 X 0.60 X 2.40 =

2.160 t

0.075 X 2.40 =

0.180 t

(Considering 2/3:1 dispersion)


Weight of wearing coat

Total Weight
Stress on Soil

18.265

=
12.2 t/m

18.265
2

1.50 x 1.0

IN-RIMT,HYyderabad
Page 39

159982611.xls.ms_office

DESIGN OF ABUTMENT (UNDER CANAL TROUGH)


( CONSIDERING 50 % HYDROSTATIC PRESSURE)
( CANAL FULL & DRAIN EMPTY )
INPUT:
Barrel floor level (ie Drain Bed Level)

= + 144.402 m

Concrete Density

= 2.4

t/cu.m

Level at bottom of Abutment

= + 144.327 m

Earth Density

= 2.1

t/cu.m

Canal Bed Level (CBL)

------>

= + 145.892 m

Full Supply Level of canal (FSL)

------>

= + 147.592 m

Top of Bund Level of canal (TBL) ------>

= + 148.342 m

Width of Bed block

------>

0.450 m

Height of Bed block

------>

0.300 m

Width of rear batter

------>

1.850 m

Width of ( w3 )

------>

0.450 m

Foundation offset

------>

0.300 m

Depth of foundation

------>

0.600 m

Total span of slab

------>

2.100 m

Thickness of slab under Canal trough

0.250 m

Thickness of Sealing Coat on Canal Bed

0.040 m

Thickness of Wearing Coat on Barrel Floor

0.075 m

TBL + 148.342
FSL+0.3 = + 147.892
W9

2.000

W6

2.000

R
0.040

2.000

CBL + 145.892
0.250

145.602

0.3

W1
+ 145.302

W5
W8

1.565 0.975

W3
W2

1.565
W4

0.3
144.327

0.600

143.727

0.45
2.75
3.35

0.45
W7

2.165

P1

0.3

P2
1.565

2.165

1.85
B

2.000

IN-RIMT,HYyderabad
Page 27

159982611.xls.ms_office

DESIGN DATA:
Full Supply Depth in Canal (FSD) ------>

1.700 m

FSD+Extra depth considered for design (=0.3)

2.000 m

Height of rear batter

------>

1.565 m

Base width of Abutment

------>

2.750 m

Width of Foundation

------>

3.350 m.

Reaction on abutment under canal trough = Wt of slab + Wt of Water on span + Wt of Wearing Coat
=(

2.100

/2 X

0.250 )

2.500

+(

2.100

/2X

2.000 )

1.000

+(

2.100

/2X

0.040 )

2.400

2.857 t

Eq. Height of surcharge = Ht of water x ( Unit Wt of Water / Unit Wt of Earth)


=

2.000 x

1.0 / 2.1

0.952 m

Total Height of soil on foundation concrete = Ht. ot Surcharge + Ht. of Abutment


=

0.952

1.565

2.517 m

Total Height of soil on foundation soil


= Ht. of Surcharge + Ht. of Abutment + Foundation Depth
=

0.952

1.565

0.600

3.117

Taking moments about A(Stresses on concrete)


LOAD

DESCRIPTION

MAGNITUDE

LEVER

MOMENT

in Tons

in mtrs.

in t-m

2.857

2.525

7.214

ARM
R

Reaction as calculated

W1

1.000

0.450

0.300

2.500

0.338

2.525

0.853

W2

1.000

0.450

0.975

2.400

1.053

2.525

2.659

W3

1.000

0.450

1.565

2.400

1.690

2.075

3.507

W4

0.500

1.850

1.565

2.400

3.474

1.233

4.283

W5

0.500

1.850

1.565

2.100

3.040

0.617

1.876

2.000

1.000

4.600

1.150

5.290

) x

2.100

0.450

17.502

W6

1.000

2.300

Pv

0.040

x(

2.517

0.952

Total load
2

x(

2.517

0.952

) x

2.100

1.801

0.657

1.184

P1(50%)

0.5 x 1.0 x

2.000

1.565

1.000

1.565

0.782

1.224

P2(50%)

0.5 x 0.5 x

1.565

1.565

1.000

0.612

0.522

Ph

0.158

Total moment

Bottom width of Abutment

2.750 m

1.623 m

e = b/2-L.A--->

0.248 m

ep = b/6--->

0.458 m

L.A. = M / W--->

28.409

e < b/6

0.248

<

17.502

0.458

0.319
28.409

Hence No Tension.

Max. Stress = W/b(1+6*e/b)--->

9.808 T/Sq.m

Min. Stress = W/b(1-6*e/b)--->

2.921 T/Sq.m

IN-RIMT,HYyderabad
Page 28

159982611.xls.ms_office

Taking moments about B(Stresses on soil)


NO.

DESCRIPTION

MAGNITUDE

LEVER

MOMENT

ARM
R

Reaction as calculated

in Tons

in mtrs.

in t-m

2.857

2.825

8.071

W1

1.000

0.450

0.300

2.500

0.338

2.825

0.955

W2

1.000

0.450

0.975

2.400

1.053

2.825

2.975

W3

1.000

0.450

1.565

2.400

1.690

2.375

4.014

W4

0.500

1.850

1.565

2.400

3.474

1.533

5.326

W5

0.500

1.850

1.565

2.100

3.040

0.917

2.788

W6

1.000

2.300

2.000

1.000

4.600

1.450

6.670

W7

1.000

3.350

0.600

2.400

4.824

1.675

8.080

W8

1.000

0.300

1.565

2.100

0.986

0.150

0.148

x
-

x
) x

1.000

0.600

0.150

0.090

0.952

2.100

0.740

24.202

W9

1.000

0.300

Pv

0.040

x(

3.117

2.000
2

Total load
2

x(

3.117

0.952

) x

2.100

2.930

0.909

2.664

P1(50%)

0.5 x 1.0 x

2.000

2.165

1.000

2.165

1.082

2.343

P2(50%)

0.5 x 0.5 x

2.165

2.165

1.000

1.172

0.722

0.846

44.970

Ph

0.158

TOTAL MOMENT
b = Width of foundation concrete

3.350 m

24.202 =

1.858 m

e = b/2-L.A --->

0.183 m

ep = b / 6 --->

0.558 m

L.A. = M / W --->

44.970

e < b/6

0.183

<

0.558

Hence No Tension.

Max. Stress=W/b(1+6e/b)--->

9.592 t/sq.m

Min. Stress=W/b(1-6e/b)--->

4.857 t/sq.m

IN-RIMT,HYyderabad
Page 29

159982611.xls.ms_office

DESIGN OF PIER UNDER CANAL TROUGH :


+ 147.892
2.00

sealing coat

0.04

+ 145.892
0.25

+ 145.602

900
1.27
+ 144.402

W.C. 0.075

144.327

0.60

+ 143.727

1500
Loads coming on the top of Pier :
( a ) Weight of Water = ( 1.8 + 0.45 )

2.00 X

1.00

4.500 t

0.29

2.5

1.631 t

6.131 t

6.131 t

1.275 X 2.40 =

2.754 t

( b ) Weight of Slab =

1.8

0.45

Total Load
1

Stress in Concrete @ top of Pier :


6.131

6.812 t/m2

1.0 x 0.9
2

Stress in Concrete @ top of Foundation Concrete :


Total Weight on top of Pier
Self Weight of Pier

0.9

Total Weight
Stress at bottom of pier

=
8.885

8.885 t
9.872

t/m2

1.0 x 0.9
3

Stress on Soil :
Total weight including Self wt. of pier at bottom of pier
Weight of foundation concrete

1.5+0.6
2

(Considering 2/3:1 dispersion)


Weight of wearing coat

8.885 t

0.60 X 2.40 =

1.512 t

0.075 X 2.40 =

0.180 t

Total Weight
Stress on Soil

10.577

10.577 t

7.05 t/m2

1.50 X 1

IN-RIMT,HYyderabad
Page 40

159982611.xls.ms_office

DESIGN OF HOLDING DOWN BOLTS


HEAD OF WATER FROM
BOTTOM OF SLAB

UPLIFT HEAD ON THE SLAB

M.F.L @ ENTRY OF BARREL - BOTTOM LEVEL OF SLAB

147.306 -

1.704 M.

1.704 x

145.602

1.0
2

1.704 T/M

DEAD WEIGHT OF SLAB


+ WT. OF SEALING COAT
( SLAB UNDER TROUGH)

0.25 x

0.721 T/M

BALANCE UPWARD THRUST

UPLIFT ON SLAB - TOTAL WT. OF SLAB

1.704 -

=
MAXIMUM UPWARD THRUST
(FACTOR OF SAFETY=
1.5 )

LENGTH OF THE SLAB


UNDER TROUGH

TOTAL UPWARD THRUST


ON SLAB

UPWARD THRUST ON
EACH ABUTMENT

PROVIDE

0.040 x

2.4

0.721
2

0.983 T/M

=
=

2.5

1.5

0.983
2

1.474 T/M

9.0

11.0 M.

1.474 x

4.055 T.

4.055 /

2.03 T.

1.0

1.0

11.0 x

0.25

20 mm. DIA. M.S. BOLTS

TENSILE STRENGTH OF M.S.


( IS: 3370, PAGE-8,TABLE-2)

2
1150 KG/M

TENSILE STRENGTH OF
EACH BOLT

3.142 x 1150
1000

3.613 T.

2.03 /

0.561

NO. OF BOLTS REQUIRED

3.613

HOWEVER PROVIDE
1 NOs. OF 20 mm. DIA. BOLTS @
11 m C/C
ON EACH SIDE OF THE SLAB FOR A HEIGHT OF
0.9 m. IN EACH ABUTMENT

IN-RIMT,HYyderabad
Page 30

159982611.xls.ms_office

UPLIFT PRESSURE:
Uplift pressure under Barrel
FSL of canal
Bottom level of Barrel Floor
Uplift head
W.C. thickness
Assume Floor thicness

=
=
=
=
=

Uplift head resisted by weight of the floor

0.375 x

=
=

0.900 m
2.665 m

Remaining uplift head


Uplift Pressure on barrel Floor

147.592
144.027
3.565
0.075
0.300

m
m
m
m
m
2.400

When there is no water in the barrel and the canal is flowing full for worst situation. In this condition,
water is likely to flow down, seeping by the side of the abutment, percolate under the foundations
and then exert pressure with the residual head.
145.892
145.602
1.565
2.750

144.402
144.327
143.727
=

1.565 +

0.300 +

0.600

3.350 +

-0.30

+
5.515 m

Assuming creep gradient of 1 in 4


Head lost in percolation

1.379 m

Head resisted by barrel floor

0.900

Creep lost in percolation

Total uplift head resisted

=
=
Residual head to be resisted
=
=
Uplift head resisted by the arch action of the floor:

1.379
2.279
3.565
1.286

+
m
m

0.900
2.279

Span of the floor barrel, L


radius of the arch
(2R-y)* y
y
R

=
=
=
=
=

1.80
R
(L/2)2
0.19
2.2538

R
0.900
0.375

1.800 m
= 2
cot = (R-y)/(L/2)
= 2.296
m
If '' is the maximum uplift head that can be resisted by the arch action and 'p' is the mean
pressure at the crown of the arch, then
Central angle subtended by arch

x t/2
Concrete mix used is M10

with FS=3,

t
x t/2

Hence
However Provide Barrel floor thickness of

x L/2 x

cot

=
=
=
=
=
=
=

0.70 x fc
0.7 x 100/3
4.041 kg/cm2
40.4 t/m2
0.375
x L/2 x cot
7.335 >
1.286
safe
for uplift
375 mm