Professional Documents
Culture Documents
UT at 23.85REV
UT at 23.85REV
CLIENT
SUBJECT
DATE
/10/2008
REVISION ONE
UT-H-
DESIGN CODE
UT-H-23.850
Revision No.
Date
159982611.xls.ms_office
Required
Design
U/S =
D/S =
147.592 M.
147.592 M.
U/S =
D/S =
1.700 M.
1.700 M.
4) BED LEVEL
U/S =
D/S =
145.892 M.
145.892 M.
5) BED WIDTH
U/S =
D/S =
9.000 M.
9.000 M.
6) BED SLOPE
U/S =
D/S =
7) FREE BOARD
U/S =
D/S =
0.750 M.
0.750 M.
8) VELOCITY
U/S =
D/S =
0.873 M/sec
0.873 M/sec
9) VALUE OF "N"
12.040 Cumecs
13.670 Cumecs
1 In 5000
1 In 5000
0.0250
U/S =
D/S =
INNER
OUTER
U/S =
D/S =
Lined
Lined
1.500
2.000
In 1
In 1
Left/Right
Left/Right
7.00
7.00
4.00 M
4.00 M
146.350 M
U/S =
D/S =
148.342 M
148.342 M
0.810 sq.km
2) DISCHARGE
16.580 cumecs
146.350 M
4) MFL OF DRAIN
146.808 M
Page 1
IN-RIMT,HYyderabad
159982611.xls.ms_office
Level @ 0m U/S
Level @ -100m D/S
=
=
0.0084
0.0005
0.00445
146.35
146.3
2000.0
=
=
147.19
146.3
+ 147.190 - +146.300
200
Say 1 in
119.05
+ 146.350 - +146.300
100
Say 1 in
Bed fall =
147.190
146.350
+ 147.190 - +146.350
100
Say 1 in
Bed fall =
=
=
224.7
0.00445
Say 1 in
225
C M3/4
Maximum Flood Discharge Q =
Where ,
Q = Maximum Flood Discharge in Cumecs
KM2
M = Catchment Area in Sq. Km
= 0.810
Catchment Area in Sq. Miles
= 0.313
Sq.miles
C = Constant & value of C should be adopted as under
Value of C
1400
1200
1060
Q=
C M3/4
1400 ( 0.313 )
16.579
3
16.58 M /sec
Page 2
3/4
585.5 Cusecs
IN-RIMT,HYyderabad
159982611.xls.ms_office
0.0225
S. No.
Reduced
Level
Ordinate
147.82
0.189
147.83
0.179
147.800
0.209
147.760
0.249
147.740
0.269
147.780
0.229
147.790
0.219
147.780
0.229
147.770
0.239
10
147.790
0.219
11
147.795
0.214
12
147.850
0.159
13
147.920
0.089
14
147.970
0.039
15
147.850
0.159
16
147.190
0.819
17
147.310
0.699
18
147.650
0.359
19
147.720
0.289
20
147.730
0.279
21
147.720
0.289
Totals =
Distance
Area
Perimeter
2.500
0.459
2.500
2.500
0.484
2.500
2.500
0.572
2.500
2.500
0.647
2.500
2.500
0.622
2.500
2.500
0.559
2.500
2.500
0.559
2.500
2.500
0.584
2.500
2.500
0.572
2.500
2.500
0.540
2.500
2.500
0.465
2.501
2.500
0.309
2.501
2.500
0.159
2.500
2.500
0.247
2.503
2.500
1.222
2.586
2.500
1.897
2.503
2.500
1.322
2.523
2.500
0.809
2.501
2.500
0.709
2.500
2.500
0.709
2.500
50.000
13.4
50.119
A
P
13.44
50.12
Hydraulic Radius = R=
=
0.268
R2/3x S1/2
n
Velocity = V =
=
1.233
Discharge = Q = A x V =
=
13.445 x 1.233
16.580
Page 3
Cumecs
IN-RIMT,HYyderabad
159982611.xls.ms_office
Section @ 0 m UP Stream
16.58
146.808
224.72
0.0225
Reduced
Level
146.870
146.870
0.000
146.790
0.018
146.620
0.188
146.520
0.288
146.490
0.318
146.470
0.338
146.490
0.318
146.380
0.428
10
146.370
0.438
11
146.360
0.448
12
146.350
0.458
13
146.380
0.428
14
146.390
0.418
15
146.410
0.398
16
146.520
0.288
17
146.620
0.188
18
146.730
0.078
19
146.890
0.000
20
146.890
0.000
21
146.880
0.000
S. No.
Ordinate
Distance
Area
Perimeter
2.500
0.000
0.000
2.500
0.022
2.500
2.500
0.257
2.506
2.500
0.595
2.502
2.500
0.757
2.500
2.500
0.820
2.500
2.500
0.820
2.500
2.500
0.932
2.502
2.500
1.082
2.500
2.500
1.107
2.500
2.500
1.132
2.500
2.500
1.107
2.500
2.500
1.057
2.500
2.500
1.020
2.500
2.500
0.857
2.502
2.500
0.595
2.502
2.500
0.332
2.502
2.500
0.097
2.501
2.500
0.000
0.000
2.500
0.000
0.000
50.000
12.6
42.519
A
P
12.59
42.52
0.000
Totals =
Hydraulic Radius = R=
=
0.296
R2/3x S1/2
n
Velocity = V =
=
Discharge = Q = A x V =
=
1.317
12.589 x 1.317
16.580
Page 4
Cumecs
IN-RIMT,HYyderabad
159982611.xls.ms_office
0.0225
Reduced
Level
146.590
146.560
0.142
146.550
0.152
146.520
0.182
146.480
0.222
146.440
0.262
146.410
0.292
146.390
0.312
146.350
0.352
10
146.320
0.382
11
146.300
0.402
12
146.310
0.392
13
146.340
0.362
14
146.360
0.342
15
146.390
0.312
16
146.420
0.282
17
146.450
0.252
18
146.480
0.222
19
146.480
0.222
20
146.530
0.172
21
146.570
0.132
S. No.
Ordinate
Distance
Area
Perimeter
2.500
0.317
2.500
2.500
0.367
2.500
2.500
0.417
2.500
2.500
0.504
2.500
2.500
0.604
2.500
2.500
0.692
2.500
2.500
0.754
2.500
2.500
0.829
2.500
2.500
0.917
2.500
2.500
0.979
2.500
2.500
0.992
2.500
2.500
0.942
2.500
2.500
0.879
2.500
2.500
0.817
2.500
2.500
0.742
2.500
2.500
0.667
2.500
2.500
0.592
2.500
2.500
0.554
2.500
2.500
0.492
2.500
2.500
0.379
2.500
50.000
13.43
50.004
A
P
13.43
50.00
0.112
Totals =
Hydraulic Radius = R=
=
0.269
R2/3x S1/2
n
Velocity = V =
=
Discharge = Q = A x V =
=
1.234
13.432 x 1.234
16.580
Page 5
Cumecs
IN-RIMT,HYyderabad
159982611.xls.ms_office
M.F.L. AT ENTRY
+148.009
+147.051
+146.808
+146.782
20.247
24.047
+146.702
100 U/S
-100 D/S
0.00
+148.009
M.F.L. @ 0m
+146.808
+146.702
+147.051
+146.782
16.58 Cumecs
3.00 m/sec
5.53
1.80m x 1.20m
Height of Vent
1.20
Width of Vent
1.80
=
Say
2.56 Nos.
3.00
Nos.
Velocity in Barrel
2.56 m/sec
Thickness of Pier
0.90
7.20
145.892
Lining Thickness
0.040
Bed filling
0.000
Slab Thickness
0.250
Height of Vent
Page 6
1.200 m
144.402
IN-RIMT,HYyderabad
159982611.xls.ms_office
586
16.58
Cusecs =
Cumecs
0.60
1.5 : 1
4.8*(Q)1/2
19.54490215
=
2.38
=
11.726941
11.75
x 2.38 =
36.467
20.332
11.750
Where bed width
Depth of Flow
Top width
11.750
2.380
18.891
(11.75 + 18.89)
2
Area A =
A
P
Hydraulic radious =
(18.89 + 11.75)
2
x 2.38 =
36.5
20.332
1.794
(1/n)RS =
Velocity (V) =
= (1/0.03)x1.794x sqrt(1/12000) =
Discharge(Desi) = A x V =36.467 x 0.449
0.449 m/sec
16.4
Cumecs
Hydraulic Particulars
1. Bed Width
11.750
6. Velocity
0.449
2. Depth of Flow
2.380
7. Side Slopes
1.5 : 1
3. Free board
0.60
8. Value of 'n'
0.03
4. Discharge(req)
16.580
9. Bed fall
12000
5. Discharge(Des)
16.381
D/S MFL
Barrel Floor Level
146.782
144.402
16.580
18.891
Cumecs
m
146.782
16.580
0.878
18.891
Silt factor f =
m3/sec/m
1.50
1.35
1/3.
f
=
0.878
1.35
1/3.
1.50
=
1.13
1.5 x R
= 1.5 x 1.126 =
1.689
Page 7
0m
= +145.094 145.094
= +144.402 m
IN-RIMT,HYyderabad
159982611.xls.ms_office
TRANSITIONS:
Upstrem
a) Let the length of drop wall
=
b) Width at entry of barrel
=
c) Side splay proposed
=
d) Length of transition required = [(b-a)/2] x 2
Length of u/s transition provided =
U/S Return Level = U/S MFL + 0.50m
Downstream
a) Width at the end of d/s transition
=
b) Width at exit of barrel
=
c) Side splay proposed
=
d) Length of transition required = [(a-b)/2] x 3
11.75 M
7.20
M
1 in
2.0
=
4.55
M
5.80
M
( Drop bottom width+ solid apron)
=
148.150 M
11.75
7.20
3.0
6.825
1 in
=
M
M
M
11.75 m
7.20
rectangular trough
31.29
5.80
8
6
7
At Section 1-1
At Section 2-2
At Section 3-3
At Section 4-4
At Section 5-5
At Section 6-6
At Section 7-7
At Section 8-8
146.402
6.90
4
2
3
Bed level
144.402
144.402
144.402
144.402
144.402
144.402
146.402
146.402
7.00
147.644
11.75
DOF
2.380
2.377
2.357
1.200
1.200
2.904
1.216
1.242
MFL
146.782
146.779
146.759
145.602
145.602
147.306
147.618
147.644
147.592
0.750
1.70
145.892
9.00
1.200
144.402
Page 8
1
Vel
0.455
0.594
0.977
2.559
2.559
0.793
1.208
0.335
TEL
146.793
146.797
146.807
147.278
147.278
147.338
147.687
147.693
4.00
146.779
+ 144.402
IN-RIMT,HYyderabad
159982611.xls.ms_office
0.0300
DISCHARGE (Q)
( in Cumecs)
16.580
144.402
1.500
( in mtrs)
( in mtrs)
MFL
11.750
2.380
MFL + 146.782
146.782
AREA = (B+sD)D
( in Sqm)
36.467
( in m/s)
0.455
(m)
0.011
VELOCITY (V ) = Q / A
2 /
VELOCITY HEAD =V / 2g =
TEL @ 1-1 = MFL + VEL. HEAD
)
SURFACE SLOPE(S) =V n R
4/3
11.750
0.0 :1
2.377
20.332
(in m)
2.380
BL + 144.402
146.793
1.5 :1
( in m)
1.794
0.000085
( in mtrs)
0.000
0.0180
DISCHARGE (Q)
( in Cumecs)
16.580
( in mtrs)
11.750
0.000
BED LEVEL
144.402
( in mtrs)
2.377
MFL
146.779
AREA = (B+sD)D
( in Sqm)
27.928
( in m/s)
0.594
(m)
0.018
VELOCITY (V ) = Q / A
VELOCITY HEAD =V2//2g =
PERIMETER (P) = B + 2D(1 + s2
FRICTION LOSS (H )
BL + 144.402
11.750
16.504
(in m)
( in m)
1.692
MFL + 146.779
0.000057
( in mtrs)
0.004
( in mtrs)
0.000
146.797
0.000
146.797
Page 9
IN-RIMT,HYyderabad
159982611.xls.ms_office
( in mtrs)
6.900
0.0180
DISCHARGE (Q)
BED WIDTH (B)
( in Cumecs)
16.580
( in mtrs)
7.200
0.000
BED LEVEL
144.402
( in mtrs)
2.357
MFL
MFL + 146.759
146.759
AREA = (B+sD)D
( in Sqm)
VELOCITY (V ) = Q / A
BL + 144.402
0.977
7.200
( in m/s)
2 /
VELOCITY HEAD =V / 2g =
)
11.913
(in m)
2.357
0.049
(m)
0.0 :1
16.967
( in m)
1.424
0.000193
( in mtrs)
FRICTION LOSS(Hf)
0.009
( in mtrs)
0.001
146.807
146.807
( in mtrs)
31.294
( in Cumecs)
16.580
0.018
DISCHARGE (Q)
NO OF VENTS
( in mtrs)
1.800
0.000
BED LEVEL
144.402
( in mtrs)
MFL
AREA = (B+sD)D
( in Sqm)
VELOCITY (V ) = Q / A
( in m/s)
SURFACE SLOPE(S) =V n /R
4/3
0.0 :1
145.602
BL + 144.402
6.480
1.800
1.200
2.559
0.334
(m)
MFL + 145.602
1.200
19.800
(in m)
( in m)
0.327
0.009405
0.08000
0.00316
0.03050
0.00345
Page 10
IN-RIMT,HYyderabad
159982611.xls.ms_office
0.471
TEL@ 4 - 4 = PRE.TEL + h
147.278
( in mtrs)
0.018
DISCHARGE (Q)
( in Cumecs)
16.580
( in mtrs)
7.200
0.000
BED LEVEL
MFL + 147.306
144.402
( in mtrs)
MFL
AREA = (B+sD)D
( in Sqm)
VELOCITY (V ) = Q / A
2 /
2/
SURFACE SLOPE(S) =V n R
4/3
0.032
( in m)
1.607
0.000108
7.200
2.904
13.008
(in m)
147.306
0.0 :1
0.793
(m)
BL + 144.402
20.908
( in m/s)
VELOCITY HEAD =V / 2g =
2.904
( in mtrs)
0.060
FRICTION LOSS(Hf)
0.000000
147.338
147.338
0.000
<------ Difference in TELs
Page 11
IN-RIMT,HYyderabad
159982611.xls.ms_office
DROP CALCULATIONS:
This drop is proposed at U/S transision of vent ie at section 7-7
INPUT:
Design Discharge
Weir Length
Crest Level
d/s MFL
d/s Bed level
16.580
11.750
145.152
147.306
144.402
Cumecs
m
m
m
m
MFL CALCULATIONS:
u/s MFL assumed
flow depth
Coefficient of discharge, C =
1.733
Discharge, Q = Coeff x Weir length x U/s Flow Depth ^ (3/2)
= C.L.h^3/2
=
Since the calculated discharge is eqaul to design discharge, hence Safe.
147.051 m
1.899 m
6.90 cumecs
DESIGN OF DROP:
The depth of drop =
145.152
144.402 =
0.750 m
Bottom wdth
=
(H + d )/ p1/2
Where 'H' is height of wall
=
'p' is specific gravity of wall material
Bottom wdth
Provide Bottom wIdth
0.750
2.4
0.798
0.800
Length of Apron
L = 2 d + 2( d h )1/2
Where 'h' is the diff.of u/s and d/s water levels
Length of Apron
Provide Length of Apron
1.668 m
2.772 m
2.800 m
Thickness of Apron
Thickness of Apron
Provide thickness of Apron
m
m
m
m
t = (( d + h )^.5 )1/2
0.349 m
0.350 m
Page 12
-0.350 m
0.000 m
IN-RIMT,HYyderabad
159982611.xls.ms_office
( in Cumecs)
16.580
(in mtrs)
28.250
0.000
145.152
COEFICIENT OF DISCHARGE ( C )
1.733
0.486
MFL
MFL + 145.638
145.638
AREA = (B+sD)D
VELOCITY (V ) = Q / A
( in Sqm)
13.726
( in m/s)
1.208
1.5 :1
1.615
BL + 145.152
28.250
29.222
(in m)
0.486
0.074
(m)
0.0 :1
( in m)
0.470
145.712
+ 145.638
+145.152
+147.306
144.402
7
FLOW CONDITION AT SECTION 7-7 (ie @ DROP)
( in mtrs)
0.000
0.0350
DISCHARGE (Q)
BED WIDTH (B)
( in Cumecs)
16.580
( in mtrs)
28.250
1.500
BED LEVEL
145.152
( in mtrs)
1.615
MFL
MFL + 146.767
146.767
AREA = (B+sD)D
( in Sqm)
VELOCITY (V ) = Q / A
2/
VELOCITY HEAD =V / 2g =
PERIMETER (P) = B + 2D(1 + s
2/
4/3
( in m/s)
0.335
(m)
0.006
( in m)
28.250
1.454
0.000083
BL + 145.152
34.073
(in m)
49.536
( in mtrs)
0.021
FRICTION LOSS(Hf)
0.000000
Page 13
IN-RIMT,HYyderabad
159982611.xls.ms_office
146.773
145.733
Page 14
IN-RIMT,HYyderabad
159982611.xls.ms_office
146.773
145.712
147.338
147.278
TEL
147.278
146.807
146.797
0.455
146.793
146.782
0.594
146.779
0.977
146.759
2.380
2.559
145.602
2.377
VELOCITY
MFL
2.357
2.559
145.602
1.200
0.793
147.306
DEPTH OF FLOW
1.208
145.638
1.200
0.335
146.767
2.904
IN-RIMT,HYyderabad
Page 15
0.486
1.615
144.402
144.402
144.402
144.402
BED LEVEL
144.402
144.402
145.152
8
7
145.152
159982611.xls.ms_office
DROP CALCULATIONS:
This drop is proposed at U/S transision of vent ie at section 7-7
INPUT:
Design Discharge
Weir Length
Crest Level
d/s MFL
d/s Bed level
16.580
11.750
146.402
147.306
144.402
Cumecs
m
m
m
m
MFL CALCULATIONS:
u/s MFL assumed
147.051 m
flow depth
0.649 m
Drowning Ratio = (D/S MFL - Crest Level)x100 / (U/S MFL - Crest Level)
=
147.306
146.402
x 100
147.051
146.402
=
139.29 %
Reading from Malikapur graph (in MKS units),
Coefficient of discharge, C =
1.052
Discharge, Q = Coeff x Weir length x U/s Flow Depth ^ (3/2)
= C.L.h^3/2
=
Since the calculated discharge is eqaul to design discharge, hence Safe.
16.58 cumecs
DESIGN OF DROP:
The depth of drop =
146.402
144.402 =
2.000 m
Bottom wdth
=
(H + d )/ p1/2
Where 'H' is height of wall
=
'p' is specific gravity of wall material
Bottom wdth
Provide Bottom wIdth
2.000
2.4
2.076
2.100
Length of Apron
L = 2 d + 2( d h )1/2
Where 'h' is the diff.of u/s and d/s water levels
Length of Apron
Provide Length of Apron
0.312 m
3.664 m
3.700 m
Thickness of Apron
Thickness of Apron
Provide thickness of Apron
t = (( d + h )^.5 )1/2
Page 12
m
m
m
m
0.618 m
0.650 m
-0.035 m
0.000 m
IN-RIMT,HYyderabad
159982611.xls.ms_office
( in Cumecs)
16.580
(in mtrs)
11.750
0.000
146.402
COEFICIENT OF DISCHARGE ( C )
1.052
1.216
MFL
MFL 147.618
0.0 :1
147.618
AREA = (B+sD)D
VELOCITY (V ) = Q / A
( in Sqm)
14.288
( in m/s)
1.160
2 /
VELOCITY HEAD =V / 2g =
(m)
BL 146.402
11.75
0.069
(in m)
1.216
14.182
( in m)
1.007
147.687
7
147.618
147.306
146.402
144.402
7
FLOW CONDITION AT SECTION 8-8 (ie @ DROP)
( in mtrs)
0.000
0.035
DISCHARGE (Q)
BED WIDTH (B)
( in Cumecs)
16.580
( in mtrs)
11.750
1.500
BED LEVEL
146.402
( in mtrs)
MFL
1.242
MFL 147.644
1.5 :1
147.644
AREA = (B+sD)D
( in Sqm)
VELOCITY (V ) = Q / A
( in m/s)
0.981
(m)
0.049
2 /
VELOCITY HEAD =V / 2g =
PERIMETER (P) = B + 2D(1 + s2
(in m)
( in m)
16.901
1.242
BL 146.402
11.75
16.227
1.042
0.001117
( in mtrs)
FRICTION LOSS(Hf)
0.006
0.000000
147.693
147.693
Page 13
IN-RIMT,HYyderabad
159982611.xls.ms_office
1.160
0.793
2.559
TEL
VELOCITY
MFL
DEPTH OF FLOW
0.977
147.278 146.807
2.559
2.357
145.602 146.759
1.200
2.377
146.779
0.594
146.797
2.380
146.782
0.455
146.793
IN-RIMT,HYyderabad
Page 14
144.402
1.200
144.402
2.904
144.402 144.402
1.216
BED LEVEL
4
4
1.242
8
7
159982611.xls.ms_office
Required discharge =
Section adopted
16.58
Cusecs =
Cumecs
0.60
4.8*(Q)1/2
1.5:1
=
19.54490215
11.73
11.75
1.756
11.750
11.750
1.24156
15.475
Area A =
x 1.24
Hydraulic radious =
Velocity (V) =
(15.47 + 11.75)
x 1.24 = 16.901
2
16.901
16.227
16.227
1.042
m
m
(1/n)R S =
= (1/0.03)x1.042x sqrt(1/1000) =
1.083 m/sec
18.305
Cumecs
Hydraulic Particulars
1. Bed Width
11.750
6. Velocity
1.203
2. Depth of Flow
1.242
7. Side Slopes
1.5:1
3. Free board
0.60
8. Value of 'n'
0.03
4. Discharge(req)
16.580
9. Bed fall
1000
5. Discharge(Des)
18.305
=
=
=
146.402
147.051
0.649
0.593
16.58 Cumecs
15.47
m
147.644 m
16.58
=
15.47
1.50
q2
1.346
f
1.071
1.346
1.50
1.231 m
1.071
m3/sec/m
1/3.
1/3.
Page 15
m
= +145.797
= +145.652m
IN-RIMT,HYyderabad
159982611.xls.ms_office
1.242
M.
3.75
M.
0.5 x 3.75
1.88
m.
2.00
2.380
Page 16
3.72
3 x 1.24
4 x 2.38
9.52
M.
9.75
M.
0.5 x 4.88
4.88
m.
5.00
IN-RIMT,HYyderabad
tonnes
tonnes
250
500
Clause 403.3.1
m2
0.199
t/m2
0.199
0.199
t/m2
t/m2
2.615
2.740
45
+
+
+
DENSITY:
147.606 Concrete
145.85 Earth
145.602
2.0 :1
0.500
0.50
TBL
DERIVED DATA:
Slab Thickness
Head Wall Height
=
=
2.4 t/m3
3
2.1 t/m
0.25 m
1.754 m
TBL
148.342
147.606
Load on Slab
7.299
Average Stress
6.310
9.086
0.759
W3
1.754
`
W2
WIDTHS:
Top-Width
Rear - Batter
=
=
0.50 m
1.00 m
0.25 A
1.00
1.50
145.852
145.602
STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width
=
1.5 m
SL.NO. FORCE
1
2
3
4
W1
W2
W3
PV
PH
`m'
0.5
1
1
PARTICULARS
`m'
`t/m2'
1.75395
2.4
1.75395
2.4
2.254
2.1
4.830
2.1
4.830
2.1
MAGNITUDEL.A
MOMENT
`t'
`m'
`tm'
2.105
1.25
2.631
0.5
2.105
0.667
1.403
0.5
2.367
0.333
0.789
0.0796 0.807
SUM-V= 7.384
0.3046 3.090
0.737
2.276
SUM-M= 7.099
constant
X=SUM-M/SUM-V=
7.099 / 7.384
=
0.961 m
Eccentricity , e=X-b/2 = 0.961 - 1.5 /2 =
0.211 m
<b/6=
0.250 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 4.922
6*e/b = 0.846
STRESSES :
Maximum stress,fmax = SUM-V/b (1+6e/b)
9.086 t/m2
Minimum stress,fmin = SUM-V/b (1-6e/b)
0.759 t/m2
+
+
+
DENSITY:
147.606 Concrete
145.85 Earth
145.602
=
=
TBL
148.342
2.0 :1
0.500
0.50 147.606
TBL
DERIVED DATA:
Slab Thickness
Head Wall Height
2.4 t/m3
2.1 t/m3
0.25 m
1.754 m
W3
1.754
`
W2
WIDTHS:
Top-Width
Rear - Batter
=
=
0.50 m
1.00 m
0.25 A
1.00
1.50
145.852
145.602
STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width
=
1.5 m
SL.NO. FORCE
1
2
3
4
W1
W2
W3
PV
PH
`m'
0.5
1
1
PARTICULARS
`m'
`t/m2'
1.75395
2.4
1.75395
2.4
2.254
2.1
4.830
2.1
4.830
2.1
MAGNITUDEL.A
MOMENT
`t'
`m'
`tm'
2.105
1.25
2.631
0.5
2.105
0.667
1.403
0.5
2.367
0.333
0.789
0.0796 0.807
SUM-V= 7.384
0.3046 3.090
0.737
2.276
SUM-M=
7.099
constant
X=SUM-M/SUM-V=
7.099
7.384
=
0.961 m
/
Eccentricity , e=X-b/2 = 0.961 - 1.5 /2 =
0.211 m
<b/6=
0.250 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 4.922
6*e/b = 0.846
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
9.086 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
0.759 t/m2
Load on Slab
7.299
Average Stress
6.310
9.086
0.759
DENSITY:
147.606 Concrete
147.606 Earth
144.327
143.727
0.3 m
2.4 t/m3
3
2.1 t/m
0.50
0.6
m
3.27895 m
W3
W4
3.279
3.87895 m
W2
`
0.50 m
1.80 m
0.3
0.6
B
STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
2.3 m
SL.NO.
FORCE
1
2
3
4
W1
W2
W3
PV
PH
PARTICULARS
`m'
`m'
`t/m3'
0.5
3.27895
2.4
1.8
3.27895
2.4
1.8
3.27895
2.1
10.752
2.1
10.752
147.606
2.1
W1
0.3 144.327
143.727
w5
2.90
MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
3.935
2.05
8.066
0.5
7.083
1.200
8.499
0.5
6.197
0.600
3.718
0.0395
0.892
SUM-V= 18.106
0.158
3.567
1.377
4.913
SUM-M= 25.196
X=SUM-M/SUM-V=
25.196
18.106
=
1.392 m
Eccentricity , e=X-b/2 =
1.392 - 2.3 /2 =
0.242 m
<b/6=
0.383 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 7.872
6*e/b = 0.630
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
12.834 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
2.911 t/m2
SRESSES ON SOIL:
Base Width ,b =
SL.NO.
FORCE
2.90 m
PARTICULARS
MAGNITUDEL.A
MOMENT
1
2
4
5
6
7
W1
W2
W3
W4
W5
PV
`m'
`m'
0.5
3.27895
1.8
3.27895
1.8
3.27895
0.300
3.27895
2.900
0.6
15.046
PH
15.046
`t/m3'
2.4
2.4
2.1
2.1
2.4
2.1
2.1
constant
0.5
0.5
0.0395
SUM-V=
0.158
`t'
3.935
7.083
6.197
2.066
4.176
1.248
24.704
4.992
`m'
2.35
1.500
0.900
0.150
1.450
`tm'
9.247
10.624
5.577
0.310
6.055
1.629
SUM-M=
8.133
39.946
X=SUM-M/SUM-V=
39.946 / 24.704
=
1.617 m
Eccentricity , e=X-b/2 =
1.617 - 2.90
0.167 m
/2 =
<b/6=
0.483 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 8.519
6*e/b = 0.345
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
11.462 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
5.576 t/m2
Head @ TBL
Head @ MFL
Wing Wall Top Level
12.8
2.9
148.342
147.6059
147.6059
11.46
5.58
MOMENT
`
MOMENT
DENSITY:
147.606 Concrete
147.606 Earth
144.094
143.494
0.3 m
2.4 t/m3
3
2.1 t/m
0.50
0.6
m
3.51233 m
W3
W4
3.512
4.11233 m
W2
`
0.50 m
2.40 m
0.3
0.6
B
STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
2.9 m
SL.NO.
FORCE
1
2
3
4
W1
W2
W3
PV
PH
PARTICULARS
`m'
`m'
`t/m3'
0.5
3.51233
2.4
2.4
3.51233
2.4
2.4
3.51233
2.1
12.336
2.1
12.336
147.606
2.1
W1
0.3 144.094
143.494
w5
3.50
MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
4.215
2.65
11.169
0.5
10.116
1.600
16.185
0.5
8.851
0.800
7.081
0.0395
1.023
SUM-V= 24.205
0.158
4.093
1.475
6.038
SUM-M= 40.473
X=SUM-M/SUM-V=
40.473
24.205
=
1.672 m
Eccentricity , e=X-b/2 =
1.672 - 2.9 /2 =
0.222 m
<b/6=
0.483 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 8.346
6*e/b = 0.460
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
12.182 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
4.511 t/m2
SRESSES ON SOIL:
Base Width ,b =
SL.NO.
FORCE
3.50 m
PARTICULARS
MAGNITUDEL.A
MOMENT
1
2
4
5
6
7
W1
W2
W3
W4
W5
PV
`m'
`m'
0.5
3.51233
2.4
3.51233
2.4
3.51233
0.300
3.51233
3.500
0.6
16.911
PH
16.911
`t/m3'
2.4
2.4
2.1
2.1
2.4
2.1
2.1
constant
0.5
0.5
0.0395
SUM-V=
0.158
`t'
4.215
10.116
8.851
2.213
5.040
1.403
31.837
5.611
`m'
2.95
1.900
1.100
0.150
1.750
`tm'
12.434
19.219
9.736
0.332
8.820
1.727
SUM-M=
9.691
60.233
X=SUM-M/SUM-V=
60.233 / 31.837
=
1.892 m
Eccentricity , e=X-b/2 =
1.892 - 3.50
0.142 m
/2 =
<b/6=
0.583 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 9.096
6*e/b = 0.243
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
11.309 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
6.883 t/m2
Head @ TBL
Head @ MFL
Wing Wall Top Level
148.342
147.6059
147.6059
on Concreteon soil
12.18
11.31
4.51
6.88
MOMENT
`
MOMENT
DENSITY:
147.945 Concrete
147.945 Earth
144.327
143.727
0.3 m
2.4 t/m3
3
2.1 t/m
0.50
0.6
3.618
m
m
4.218
W3
W4
3.618
W2
`
0.50 m
2.50 m
0.6
1
2
3
4
W1
W2
W3
PV
PH
PARTICULARS
`m'
`m'
`t/m3'
0.5
3.618
2.4
2.5
3.618
2.4
2.5
3.618
2.1
13.090
2.1
13.090
2.1
0.3 144.327
143.727
w5
3.60
STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
3m
FORCE
W1
0.3
B
SL.NO.
147.945
MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
4.342
2.75
11.939
0.5
10.854
1.667
18.090
0.5
9.497
0.833
7.914
0.0395
1.086
SUM-V= 25.779
0.158
4.343
1.520
6.600
SUM-M= 44.544
X=SUM-M/SUM-V=
44.544
25.779
Eccentricity , e=X-b/2 =
1.728 - 3
=
/2 =
<b/6=
Minimum stress,fmin
1.728 m
0.228 m
0.500 m
SUM-V/b (1+6e/b)
12.510 t/m2
SUM-V/b (1-6e/b)
4.676 t/m2
SRESSES ON SOIL:
Base Width ,b =
SL.NO.
1
3.60 m
FORCE
W1
`m'
0.5
PARTICULARS
3
`m'
`t/m '
3.618
2.4
MAGNITUDEL.A
constant
`t'
`m'
4.342
3.05
MOMENT
`tm'
13.242
2
4
5
6
7
W2
W3
W4
W5
PV
2.5
3.618
2.5
3.618
0.300
3.618
3.600
0.6
17.792
2.4
2.1
2.1
2.4
2.1
PH
17.792
2.1
0.5
0.5
0.0395
SUM-V=
0.158
10.854
9.497
2.279
5.184
1.476
33.632
5.903
1.967
1.133
0.150
1.800
21.346
10.764
0.342
9.331
1.772
SUM-M=
10.458
65.483
X=SUM-M/SUM-V=
65.483 / 33.632
=
1.947 m
Eccentricity , e=X-b/2 =
1.947 - 3.60
0.147 m
/2 =
<b/6=
0.600 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 9.342
6*e/b = 0.245
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
11.632 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
7.053 t/m2
12.510
4.676
MOMENT
MOMENT
11.632
7.053
GIVEN DATA:
Wing Wall Top Level
Earth Top Level
=
+
Foundation Top Level = +
Foundation Bottom Level= +
Concrete Offsets
=
DERIVED DATA:
Footing Thickness
=
Wing Height & Earth height =
Earth Height From Bottom
Of Foundation
=
WIDTHS:
Top-Width
=
Rear - Batter
=
DENSITY:
147.100 Concrete
147.100 Earth
144.094
143.494
0.3 m
2.4 t/m
2.1 t/m3
0.50
0.6
3.006
m
m
3.00638
3.60638 m
0.50 m
1.50 m
W3
W4
W2
`
0.6
w5
2.60
STRESSES IN CONCRETE:
By taking moments about 'A'
Base Width,b
=
2m
1
2
3
4
5
PH
9.038
17.879
MAGNITUDEL.A
MOMENT
constant
`t'
`m'
`tm'
3.608
1.75
6.313
0.5
5.411
1.000
5.411
0.5
4.735
0.500
2.368
0.0395
0.750
SUM-V= 14.504
0.158
2.999
1.263
3.787
SUM-M= 17.879
14.504
1.233 - 2
=
/2 =
<b/6=
Minimum stress,fmin
SRESSES ON SOIL:
Base Width ,b =
`t/m '
2.4
2.4
2.1
2.1
2.1
X=SUM-M/SUM-V=
Eccentricity , e=X-b/2 =
SL.NO.
0.3 144.094
143.494
FORCE
PARTICULARS
`m'
`m'
W1
0.5
3.00638
W2
1.5
3.00638
W3
1.5
3.00638
PV
9.038
W1
0.3
SL.NO.
147.100
1.233 m
0.233 m
0.333 m
SUM-V/b (1+6e/b)
12.315 t/m2
SUM-V/b (1-6e/b)
2.189 t/m2
2.60 m
FORCE
PARTICULARS
`m'
`m'
W1
0.5
3.00638
`t/m '
2.4
MAGNITUDEL.A
constant
`t'
`m'
3.608
2.05
MOMENT
`tm'
7.396
2
4
5
6
7
W2
W3
W4
W5
PV
1.5
3.00638
1.5
3.00638
0.300
3.00638
2.600
0.6
13.006
2.4
2.1
2.1
2.4
2.1
PH
13.006
2.1
0.5
0.5
0.0395
SUM-V=
0.158
5.411
4.735
1.894
3.744
1.079
20.471
4.315
1.300
0.800
0.150
1.300
7.035
3.788
0.284
4.867
1.515
SUM-M=
6.536
29.906
X=SUM-M/SUM-V=
29.906 / 20.471
=
1.461 m
Eccentricity , e=X-b/2 =
1.461 - 2.60
0.161 m
/2 =
<b/6=
0.433 m
As `e' is <b/6 ,Eccentricity is acceptable .
SUM-V/b= 7.873
6*e/b = 0.371
STRESSES :
Maximum stress,fmax =
SUM-V/b (1+6e/b)
10.797 t/m2
Minimum stress,fmin =
SUM-V/b (1-6e/b)
4.950 t/m2
12.315
2.189
MOMENT
MOMENT
10.797
4.950
Drowning
Ratio
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
1.000
Malikapur Graph
1.8
1.7
1.6
Coff.of Disc. 'C'
C
1.73412819
1.73342742
1.72522956
1.7195039
1.71314593
1.69999448
1.67602126
1.63969271
1.58750432
1.50468715
1.35108688
1.04221509
1.052
1.5
1.4
1.3
1.2
1.1
1
1
Drowning Ratio
10
11
12
159982611.xls.ms_office
70 ) / (
(13.000 X
2.45
1.80
1.70
M
M
=
Kg/m3
Kg/m3
3
Kg/m
0.25 m
0.04 m
40 MM
40 mm
12 mm
25.00 20.40
clear span
=
1.80
=
2.004
considering width of slab, total loads on the slab are
wt. Of water
2.45
x
wt. Of w.c.
0.04 m
x
wt. Of R.C.C.
0.25 m
x
4.00 - 0.600
cm
+
+
Max. D.L. B M =
WL2
12
Max. L. L. B M =
WL2
10
=
=
241.30
Max. D.L. B M =
-WL2
10
Max. L. L. B M =
-WL2
9
289.55
=
=
+
eff. Depth
0.204
M
1000
2400
2500
D.L.
Total Load =
Max. Support B M =
1500 )
(M.R./Qb)
70 +
(721 X
241.30
(2450 X
983.92
983.92
(721 X
=
=
289.55
(2450 X
=
+
1093.25
1093.25
2450.00
96.00
625.00
721.00
kg/m2
kg/m2
2
kg/m
kg/m3
3171.00
kg/m2
2.004 X
12.00
Kg-M
2.004 )
2.004 X
10.00
Kg-M
=
2.004 )
2.004 X
10.00
Kg-M
2.004 X
9.00
Kg-M
=
1225.22
2.004 )
2.004 )
1382.80
IN-RIMT,HYyderabad
Page 18
159982611.xls.ms_office
sst = 1500
Q = 11.552
M/(QXb)
j= 0.874
10.941
1382.80
10.941
<
0.25 m
M
st j d
1500 x
= 1225.220 / (
=
Sapcing of
4.581
12 mm
X 100 ) / (
11.552
Cm
20.40
CM
Hence ok
M
0.87414 x
X 100 )
20.400
Sq.cm
dia. Bars
/4 x
D2 x 100
Area of Steel Required
=
P /4 x
12 X
12
4.581
3 times effective depth = 3 x 20.4 = 61.2cm
Maximum =300mm
Spacing =
M
st j d
1500 x
= 1382.804 / (
=
Sapcing of
210 mm
5.170
12 mm
24.691
Cm
C/C
0.87414 x
20.400
Sq.cm
dia. Bars
/4 x
D2 x 100
Area of Steel Required
=
P /4 x
12 X
12
5.170
3 times effective depth = 3 x = 0cm
Maximum =300mm
Spacing =
215 mm
21.877
Cm
C/C
D2 x 100
/4 x
Spacing
/4 x
12 X
21
2
5.386 CM
12
>
2
4.581 CM
DISTRIBUTION STEEL:
( As per IS 3370 (Part-II)- 1965)
0.30%
100
450 0.20%
For 250 mm
=
0.30%
=
150
350
0.10%
0.26%
IN-RIMT,HYyderabad
Page 19
159982611.xls.ms_office
0.55
0.554
cm
Spacing of
Spacing =
8 mm
Dia. Bars
/4 x
D2 x 100
Area of Steel Required
=
P /4 x
8 X
8
0.554
=
90.741 CM
5 times effective depth = 5 x 20.4 = 102cm
Maximum =450mm
So Provide
CHECK FOR SHEAR :
Max SF =
WL
2
8 mm
MM Dia Bars at
450
top and bottom
3171
x
2.004
2
3177.34
Kg
=
=
2.004
420
mm c/c
=
=
The area of steel available =
D x 100
/4 x
Spacing
P /4 x
12 X
0
42.0
2
2.693 CM
0.5 X 5.386
5.386
Kg/cm2
dia @
For
0.204 )
Kg
0.25
0.5
0.264
MM C/C @ both
0.204
( 1.002 -
tv = V
bd
=
2530
20.40 x 100
=
1.240
0.22
0.3
0.22 +
0.224
2.245
( 0.08 X
N/mm2
Kg/cm2
12
2.693
cm2
100
20.40
%
0.2640
% of Tensile reinforcement
N/mm2
N/mm2
0.014 ) / 0.250
>
1.240
Hence ok
Kg/cm2
IN-RIMT,HYyderabad
Page 20
159982611.xls.ms_office
Top of slab =
=
Height of earth fill =
1500
70
13
0.378
0.874
11.552
2100
=
=
=
=
=
=
2.49
0.25
x
x
m
mm
mm
- 2.50 cm
clear span
=
1.80
Max. D. L. B M =
eff. Depth
0.217
=
+
+
WL2
12
WL
10
Max. L.L. B M =
1984.65
WL2
Max. D. L. B M =
2100
2500
WL2
9
Max. Support B M =
2381.58
Q = 11.55
st = 1500
14.942
M
Qxb
2579.223
11.55
<
0.040 -
145.852
=
=
5229
625
5854
437
0.25
Kg/m2
Kg/m2
Kg/m2
Kg/m2
0.8
=
(5854 X
2.017
2.017 X
12
1984.6
(437.24 X
2.017 X
10
177.9
=
177.88
(5854 X
2.017 X
10
2381.6
10
Max. L.L. B M =
d
d
2
bd
kg/m2
0.250 M
C.B.L. -Th. of W.C. - Th.of slab under canal bed
=
+ 145.892 =
145.602
M
Bottom of slab + th of slab under canal bank
145.602
+
0.250
=
148.342
145.852
= 2.49
M
LOAD CALCULATIONS:
Wt. Of earth =
Wt. Of slab =
kg/cm
2
kg/cm
(437.24 X
=
197.65
2.017 X
9
197.6
=
m
2.017 )
Kg-M
2.017 )
Kg-M
2162.53
2.017 )
Kg-M
2.017 )
Kg-M
2579.22
j= 0.874
x
x
21.7
Hence ok
100
100
CM
IN-RIMT,HYyderabad
Page 18
159982611.xls.ms_office
0.25
M
st j d
= 2162.529 / (
=
7.60
Sapcing of
1500 X
Sq.cm
16 mm
0.874 X
dia. Bars
/4 x
1.6 X
1.60
7.60
=
26.454 cm
3 times effective depth = 3 x 21.7 = 65.1cm
Maximum =300mm
So Provide
21.700
16 mm
Dia Bars at
/4 x
Spacing
=
/4 x
D2 x 100
1.6 X
23
2
8.742 CM
=
M
st j d
= 2579.223 / (
=
9.06
230
1.6
2
7.600 CM
>
Sapcing of
16 mm
Spacing =
Spacing of Steel Required
=
/4 x
1500 X
Sq.cm
0.874 X
21.700
dia. Bars
D2 x 100
/4 x
1.6 X
1.60
9.06
=
22.180 cm
3 times effective depth = 3 x 21.7 = 65.1cm
Maximum =300mm
Alternate bar be cranked to take of care of shear resistance.
So Provide
16 mm
Dia Bars at
MM C/C
DISTRIBUTION STEEL:
( As per IS 3370 (Part-II)- 1965)
For
250 MM
=
0.30%
100
0.20%
450
0.20%
100
300
=
0.26%
As HYSD bars of Fe-415 grade steel is used , reduce it by 20%
=
0.8
x
0.26%
=
=
0.206
x
100
x
100
=
1.798 cm2
0.02%
0.002057143
8.742
cm2
IN-RIMT,HYyderabad
Page 19
159982611.xls.ms_office
Sapcing of
8 mm
Dia Bars
2
D x 100
P /4 x
Area of Steel Required
=
/4 x
8X
8
1.798
=
27.951 CM
5 times effective depth = 5 x 21.7 = 108.5cm
Maximum =450mm
8 mm
Dia Bars at
270
Spacing =
So Provide
CHECK FOR SHEAR :
Max SF =
WL
2
6291
=
Shear Force @ "d" from support
=
6345
1.009
=
4979.516
x
2
Kg
6344.7
( 1.009 -
0.217 )
0.217
Kg
2.017
tv = V
bd
=
4980
2.017 X 100
=
2.469
dia brs
/4 x
Spacing
/4 x
=
220
D2 x 100
16 X
22
2
9.139 CM
=
The area of steel available =
Kg/cm
0.5 X 8.742
=
13.510
For
%
%
%
= 0.22 + (
=
0.339
=
3.392
mm c/c
16
9.139
cm2
% of Tensile reinforcement
0.22
0.3
N/mm2
2
N/mm
0.08 X
N/mm2
Kg/cm2
0.372585 / 0.250
>
2.469
Hence ok
Kg/cm2
IN-RIMT,HYyderabad
Page 20
159982611.xls.ms_office
= + 144.402 m
Concrete Density
= 2.4
= + 144.327 m
Earth Density
= 2.1
------>
= + 145.892 m
= + 145.852 m
------>
= + 148.342 m
------>
0.450 m
------>
0.300 m
------>
3.000 m
Width of ( w3 )
------>
0.450 m
Foundation offset
------>
0.300 m
Depth of foundation
------>
0.600 m
------>
2.700 m
0.250 m
0.040 m
0.075 m
TBL=
148.342
2.490
W6
2.490
W9
R
+ 145.852
0.250
0.3
145.602
145.302
W1
W5
W8
1.52 0.975
W3
W2
W4
0.30
+ 144.327
0.600
+ 143.727
h
1.525
2.125 Pv
0.30
0.450
3.900
0.450
W7
Ph
3.000
A
4.500
IN-RIMT,HYyderabad
Page 24
159982611.xls.ms_office
DESIGN DATA:
Height of Earth Bank (Height of Surcharge)
2.490 m
------>
1.525 m
------>
3.900 m
Reaction on abutment under earth bank = Wt of slab + Wt of Earth on span + Live Load
=(
2.700 /2 x
0.250 )
2.500
+(
2.700 /2 x
2.490 )
2.100
2.700 /2 x
0.437
8.493 t
2.490
1.525
4.015 m
Total Height of soil on foundation soil = Ht. ot Surcharge + Ht. of Abutment + Foundation Depth
=
2.490
1.525
0.600
4.615
DESCRIPTION
MAGNITUDE
LEVER
MOMENT
ARM
R
Reaction as calculated
in Tons
in mtrs.
in t-m
8.493
3.675
31.212
W1
1.000
0.450
0.300
2.500
0.338
3.675
1.242
W2
1.000
0.450
0.975
2.400
1.053
3.675
3.870
W3
1.000
0.450
1.525
2.400
1.647
3.225
5.312
W4
0.500
3.000
1.525
2.400
5.490
2.000
10.980
W5
0.500
3.000
1.525
2.100
4.804
1.000
4.804
W6
1.000
3.450
2.490
2.100
18.040
1.725
31.119
Pv
0.040
x(
4.015
x
2
-
) x
2.100
0.833
40.698
2.100
3.291
0.640
2.108
2.490
Total load
Ph
0.158
x(
4.015
2.490
) x
Total moment
Bottom width of abutment
L.A. = M / W--->
90.647
e = b/2-L.A--->
3.900
2 -
ep = b/6--->
3.900
e < b/6
40.698
-2.227
0.277
<
90.647
3.900 m
2.227 m
0.277 m
0.650 m
0.650
Hence NoTension.
14.882 T/Sq.m
5.988 T/Sq.m
IN-RIMT,HYyderabad
Page 25
159982611.xls.ms_office
DESCRIPTION
MAGNITUDE
LEVER
MOMENT
in Tons
in mtrs.
in t-m
8.493
3.975
33.760
ARM
R
Reaction as calculated
W1
1.000
0.450
0.300
2.500
0.338
3.975
1.344
W2
1.000
0.450
0.975
2.400
1.053
3.975
4.186
W3
1.000
0.450
1.525
2.400
1.647
3.525
5.806
W4
0.500
3.000
1.525
2.400
5.490
2.300
12.627
W5
0.500
3.000
1.525
2.100
4.804
1.300
6.245
W6
1.000
3.450
2.490
2.100
18.040
2.025
36.531
W7
1.000
4.500
0.600
2.400
6.480
2.25
14.580
W8
1.000
0.300
1.525
2.100
0.961
0.150
0.144
W9
1.000
0.300
2.490
2.100
1.569
0.150
0.235
Pv
0.040
x(
4.615
x
2
-
) x
2.100
1.268
50.143
Ph
0.158
x(
) x
2.100
5.010
2.490
Total load
4.615
2.490
TOTAL MOMENT
b = Width of foundation concrete
L.A. = M / W --->
119.929 /
50.143
e = b/2-L.A --->
4.500 /
ep = b / 6 --->
4.500 /
e < b/6
0.892
M
-2.392
0.142
<
4.500 m
2.392 m
0.142 m
0.750 m
0.750
4.471
119.929
Hence No Tension.
Max. Stress=W/b(1+6e/b)--->
13.253 t/sq.m
Min. Stress=W/b(1-6e/b)--->
9.033 t/sq.m
IN-RIMT,HYyderabad
Page 26
159982611.xls.ms_office
+ 148.342
2.490
+ 145.852
0.25
+ 145.602
Concrete Offset
300
900
1.275
+ 144.402
W.C. 0.075
144.327
0.60
+ 143.727
1500
Load coming on the top of Pier :
( a ) Weight of Earth = ( 1.80 + 0.45 )
2.49 X
2.1
0.25
2.5
1.406 t
13.171 t
13.171 t
15.925 t
( b ) Weight of Slab =
1.80 + 0.45
Total Load
1
11.765 t
14.635 t/m 2
0.90 X 1
2
Total Weight
Stress at bottom of pier
15.925
2.754 t
17.695
t/m2
0.9 X 1
3
Stress on Soil :
Total weight including Self wt. of pier at bottom of pier
Weight of foundation concrete
15.925 t
2.160 t
0.075 X 2.40 =
0.180 t
Total Weight
Stress on Soil
18.265
=
12.2 t/m
18.265
2
1.50 x 1.0
IN-RIMT,HYyderabad
Page 39
159982611.xls.ms_office
= + 144.402 m
Concrete Density
= 2.4
t/cu.m
= + 144.327 m
Earth Density
= 2.1
t/cu.m
------>
= + 145.892 m
------>
= + 147.592 m
= + 148.342 m
------>
0.450 m
------>
0.300 m
------>
1.850 m
Width of ( w3 )
------>
0.450 m
Foundation offset
------>
0.300 m
Depth of foundation
------>
0.600 m
------>
2.100 m
0.250 m
0.040 m
0.075 m
TBL + 148.342
FSL+0.3 = + 147.892
W9
2.000
W6
2.000
R
0.040
2.000
CBL + 145.892
0.250
145.602
0.3
W1
+ 145.302
W5
W8
1.565 0.975
W3
W2
1.565
W4
0.3
144.327
0.600
143.727
0.45
2.75
3.35
0.45
W7
2.165
P1
0.3
P2
1.565
2.165
1.85
B
2.000
IN-RIMT,HYyderabad
Page 27
159982611.xls.ms_office
DESIGN DATA:
Full Supply Depth in Canal (FSD) ------>
1.700 m
2.000 m
------>
1.565 m
------>
2.750 m
Width of Foundation
------>
3.350 m.
Reaction on abutment under canal trough = Wt of slab + Wt of Water on span + Wt of Wearing Coat
=(
2.100
/2 X
0.250 )
2.500
+(
2.100
/2X
2.000 )
1.000
+(
2.100
/2X
0.040 )
2.400
2.857 t
2.000 x
1.0 / 2.1
0.952 m
0.952
1.565
2.517 m
0.952
1.565
0.600
3.117
DESCRIPTION
MAGNITUDE
LEVER
MOMENT
in Tons
in mtrs.
in t-m
2.857
2.525
7.214
ARM
R
Reaction as calculated
W1
1.000
0.450
0.300
2.500
0.338
2.525
0.853
W2
1.000
0.450
0.975
2.400
1.053
2.525
2.659
W3
1.000
0.450
1.565
2.400
1.690
2.075
3.507
W4
0.500
1.850
1.565
2.400
3.474
1.233
4.283
W5
0.500
1.850
1.565
2.100
3.040
0.617
1.876
2.000
1.000
4.600
1.150
5.290
) x
2.100
0.450
17.502
W6
1.000
2.300
Pv
0.040
x(
2.517
0.952
Total load
2
x(
2.517
0.952
) x
2.100
1.801
0.657
1.184
P1(50%)
0.5 x 1.0 x
2.000
1.565
1.000
1.565
0.782
1.224
P2(50%)
0.5 x 0.5 x
1.565
1.565
1.000
0.612
0.522
Ph
0.158
Total moment
2.750 m
1.623 m
e = b/2-L.A--->
0.248 m
ep = b/6--->
0.458 m
L.A. = M / W--->
28.409
e < b/6
0.248
<
17.502
0.458
0.319
28.409
Hence No Tension.
9.808 T/Sq.m
2.921 T/Sq.m
IN-RIMT,HYyderabad
Page 28
159982611.xls.ms_office
DESCRIPTION
MAGNITUDE
LEVER
MOMENT
ARM
R
Reaction as calculated
in Tons
in mtrs.
in t-m
2.857
2.825
8.071
W1
1.000
0.450
0.300
2.500
0.338
2.825
0.955
W2
1.000
0.450
0.975
2.400
1.053
2.825
2.975
W3
1.000
0.450
1.565
2.400
1.690
2.375
4.014
W4
0.500
1.850
1.565
2.400
3.474
1.533
5.326
W5
0.500
1.850
1.565
2.100
3.040
0.917
2.788
W6
1.000
2.300
2.000
1.000
4.600
1.450
6.670
W7
1.000
3.350
0.600
2.400
4.824
1.675
8.080
W8
1.000
0.300
1.565
2.100
0.986
0.150
0.148
x
-
x
) x
1.000
0.600
0.150
0.090
0.952
2.100
0.740
24.202
W9
1.000
0.300
Pv
0.040
x(
3.117
2.000
2
Total load
2
x(
3.117
0.952
) x
2.100
2.930
0.909
2.664
P1(50%)
0.5 x 1.0 x
2.000
2.165
1.000
2.165
1.082
2.343
P2(50%)
0.5 x 0.5 x
2.165
2.165
1.000
1.172
0.722
0.846
44.970
Ph
0.158
TOTAL MOMENT
b = Width of foundation concrete
3.350 m
24.202 =
1.858 m
e = b/2-L.A --->
0.183 m
ep = b / 6 --->
0.558 m
L.A. = M / W --->
44.970
e < b/6
0.183
<
0.558
Hence No Tension.
Max. Stress=W/b(1+6e/b)--->
9.592 t/sq.m
Min. Stress=W/b(1-6e/b)--->
4.857 t/sq.m
IN-RIMT,HYyderabad
Page 29
159982611.xls.ms_office
sealing coat
0.04
+ 145.892
0.25
+ 145.602
900
1.27
+ 144.402
W.C. 0.075
144.327
0.60
+ 143.727
1500
Loads coming on the top of Pier :
( a ) Weight of Water = ( 1.8 + 0.45 )
2.00 X
1.00
4.500 t
0.29
2.5
1.631 t
6.131 t
6.131 t
1.275 X 2.40 =
2.754 t
( b ) Weight of Slab =
1.8
0.45
Total Load
1
6.812 t/m2
1.0 x 0.9
2
0.9
Total Weight
Stress at bottom of pier
=
8.885
8.885 t
9.872
t/m2
1.0 x 0.9
3
Stress on Soil :
Total weight including Self wt. of pier at bottom of pier
Weight of foundation concrete
1.5+0.6
2
8.885 t
0.60 X 2.40 =
1.512 t
0.075 X 2.40 =
0.180 t
Total Weight
Stress on Soil
10.577
10.577 t
7.05 t/m2
1.50 X 1
IN-RIMT,HYyderabad
Page 40
159982611.xls.ms_office
147.306 -
1.704 M.
1.704 x
145.602
1.0
2
1.704 T/M
0.25 x
0.721 T/M
1.704 -
=
MAXIMUM UPWARD THRUST
(FACTOR OF SAFETY=
1.5 )
UPWARD THRUST ON
EACH ABUTMENT
PROVIDE
0.040 x
2.4
0.721
2
0.983 T/M
=
=
2.5
1.5
0.983
2
1.474 T/M
9.0
11.0 M.
1.474 x
4.055 T.
4.055 /
2.03 T.
1.0
1.0
11.0 x
0.25
2
1150 KG/M
TENSILE STRENGTH OF
EACH BOLT
3.142 x 1150
1000
3.613 T.
2.03 /
0.561
3.613
HOWEVER PROVIDE
1 NOs. OF 20 mm. DIA. BOLTS @
11 m C/C
ON EACH SIDE OF THE SLAB FOR A HEIGHT OF
0.9 m. IN EACH ABUTMENT
IN-RIMT,HYyderabad
Page 30
159982611.xls.ms_office
UPLIFT PRESSURE:
Uplift pressure under Barrel
FSL of canal
Bottom level of Barrel Floor
Uplift head
W.C. thickness
Assume Floor thicness
=
=
=
=
=
0.375 x
=
=
0.900 m
2.665 m
147.592
144.027
3.565
0.075
0.300
m
m
m
m
m
2.400
When there is no water in the barrel and the canal is flowing full for worst situation. In this condition,
water is likely to flow down, seeping by the side of the abutment, percolate under the foundations
and then exert pressure with the residual head.
145.892
145.602
1.565
2.750
144.402
144.327
143.727
=
1.565 +
0.300 +
0.600
3.350 +
-0.30
+
5.515 m
1.379 m
0.900
=
=
Residual head to be resisted
=
=
Uplift head resisted by the arch action of the floor:
1.379
2.279
3.565
1.286
+
m
m
0.900
2.279
=
=
=
=
=
1.80
R
(L/2)2
0.19
2.2538
R
0.900
0.375
1.800 m
= 2
cot = (R-y)/(L/2)
= 2.296
m
If '' is the maximum uplift head that can be resisted by the arch action and 'p' is the mean
pressure at the crown of the arch, then
Central angle subtended by arch
x t/2
Concrete mix used is M10
with FS=3,
t
x t/2
Hence
However Provide Barrel floor thickness of
x L/2 x
cot
=
=
=
=
=
=
=
0.70 x fc
0.7 x 100/3
4.041 kg/cm2
40.4 t/m2
0.375
x L/2 x cot
7.335 >
1.286
safe
for uplift
375 mm
IN-RIMT,HYyderabad
Page 31