Professional Documents
Culture Documents
IRS Calculation Sheet 10 26 2010
IRS Calculation Sheet 10 26 2010
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
IRS Calculation Sheet Please enter accurate values for the bold dimensions in the corresponding shaded boxes Dimension Outer Circumference of Pot Pot Height Pot Height to Handles Liner Thickness Insulation Thickness Sheet Metal Thickness Angle Iron Thickness Angle Iron Width Round Bar Thickness
Formulas Pot Diameter = C = PotDiameter = _______ = Pot volume = x (0.5 x D)2 x H = Pot volume (mm3) = x (0.5 x _______)2 x _________ Pot volume in L = Vmm 1,000,000 = Pot volume in L = _____________ 1,000,000 Combustion Chamber Size Combustion Chamber Size 2 Gap A (mm) = Cc (4 x Cc) = Gap A (mm) = _____ (4 x ____) = Gap B (mm) = Cc2 (4 x (Cc + 60)) = Gap B (mm) = _______ ((4 * (____ + 60)) = GapC = Cc2 C = GapC = ____ ____ = GapD = 0.75 x Gc = GapD = 0.75 x ____ = Slope Height B = Ga-Gb = Slope Height B = ______ ______ = Length of metal section that produce slop B = 4 x (Cc+ (2 x lt) + 2) Length of one side of the square metal section that form slop B = 6b 4 Slope Height C = Ga-Gc = Slope Height C = ______ ______ = Skirt Length = (D + 2 x Gd + t) x = Skirt L= (_____+ 2 x ____ + _____) x = Skirt Height = Hh-15 = Skirt H = ______ -15 = Base Plate Diameter = D + (2 x Gd) + (2 x t) = Base Plate D = ____ + (2 x ____) + (2 x ____) = Base plate Opening = Cc + (2 x lt) = Base plate Opening = ______ + (2 x lt) = Combustion Height = Cc + (1.5 x Cc) + lt + i
Combustion Height = ___+ (1.5 x ___) + ___ + ___ = CombustionWidth =Cc + (2 x (lt + i)) = CombustionWidth = ____ + (2 x (____ + ____)) = Combustion chamber box front and back covers width = Cw - 2*t = Combustion chamber box front and back covers width = ____ - 2*t = Combustion Chamber box front and back covers height = Ch - t = Combustion Chamber box front and back covers height = ___ - t = Fuel inlet opening from the edge of the front box = i + lt t = Fuel inlet opening from the edge of the front box = ____ + ____ x t = Base ring D = D + (2 x Gd) + (2 x t) + RBt = Base ring D = ____ + (2 x ___) + (2 x ___ ) + (2 x____) +RBt = Base ring C = (BRd-RBt) x = Base ring C = (____-____) x = 2 2 Angle iron Length= 2 x ((((BR)-RBt))/2) -((Cw2)-(Aw-At)) ) = AI Length=2 x ((((___)-___)/2)2-((___2)-(___-___))2) = Angle iron Length (shorter)= Cw Angle iron Length (shorter)= _______ Leg Length = Ch + Aw + At = Leg Length = ____ + ____ + ____= Height of Pot Supports = Gap A - 2mm Height of Pot Supports = _______= Diameter of Pot Support Cap = 6 mm Diameter of Pot Support Cap = Vertical armlength of wood support = (BPD2) - (lt + i + (Cc2)) Vertical armlength of wood support = ( ______ 2) - (_____ + ____ +____ 2) + 10 Horizontal armlength of the wood support = 2 x Cc Horizontal armlength of wood support = ____ - 2 x _____ Wood support width = Cc + 40mm Wood support width = _____ + 40 mm Hollow square tube length to hinge the Wood support = Wood support width - 20 mm Hollow square tube length to hinge the Wood suppor = ____ - 20 mm Wood shelf width = Cc - 4mm Wood shelf width = _____ - 4mm Wood shelf length = lt + i + 10mm Wood shelf length = _____ + ______ + 10mm Position of hollow square tube hinge for wood support on front face plate = Va - 2/3*Cc Position of hollow square tube hinge for the wood support on the front face plate = _____ - 2/3*______ Pot Stabilizer Height = 75 mm
Term C H Hh lt i t At Aw RBt
H (mm)
Hh (mm)
C (mm)
D (mm)
Vl (L)
400 340 2460 783 193 All measurements are in centimeters, except the volume which is expressed in liters 580 360
Combustion Chamber
X *X
Liters
Skirt
Slope B 10mm RB 12
Ch Cw CCw CCh FI BRd BRc Ailong Aishort Ll PS SC Va Ha Ww STl Wsw Wsl Pst Psh
580 360 356 578 78 823 2549 739 360 613 48 6 226 400 240 220 196 90 92 75
Ga (mm)
Gb (mm) Gc (mm)
Gd (mm) Ga - Gc (mm)
Ga - Gb
16
12
34
200
40mm
Legs (3 in quantity)
811
Bottom ring
613
Skirt
325
360
Wood Support
10mm
RB 220
X = 200
739
92
Enter the name of the location the clay sample is brought from and values for shirnkage rate in the greay shaded
Location Name = Clay Shirnkage rate = Stove Dimension Liner thickness = Insulation thickness =
Legedadi 8.00% 20.0 cm 3.0 cm 5.0 cm Liner Size Width Height/Length 20.0 28.0 31.0 23.0 26.0 5.0 26.0 30.0 26.0 23.0
Liner No. 1 2 3 4 5
Description Bottom horizontal Bottom sides - vertical Top Horizontal Top Vertical and back bottom Back top
Mould Size Width Height/Length 21.7 30.4 33.7 25.0 28.3 5.4 28.3 32.6 28.3 25.0
33.7 25.0
B A
30.7
33.7
A
5.4
B A A
28.3
Top front and side walls and back bottom wall of the combustion ch Cross section (A-A)
22.3
32.6 28.3
B
28.3
A A
Mold No.5:
Back top wall of the combustion chamber Top View Cross section (A-A) 22.3
25.0 28.3
B
28.3
mbustion chamber =
3.0
30.4
3.0
3.0
25.0
3.0
3.0 3.0
5.4
3.0
32.6
3.0
3.0
25.0
3.0