R2 Metro Feature Requirements

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 13

S.

No 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 109 110 112 113 117

FEATURE NAME AMR Radio Link Timers Low capacity BSC (100TRX) TA based aceess control (enh) TRX power optimization Cell Load Sharing Dynamic SDCCH Handover Power Boost Idle Channel Measurement Intra-cell Handover GPS support. Repeated FACCH 2G-3G Handover /Cell Reselection & Vice Versa O&M TRX Blocking (enh.) E1 Compression at A interface AMR Power Control Directed Assignment to Another Cell Dynamic FR/HR Adaptation Mobile Crosstalk Control (MCC) AMR FR 5.9 Extended coverage AMR FR 5.9 on 8Kbps Abis Speech Loudness Control Enhanced measurement reporting for Frame Erasure rate calculation Advanced Frequency Handling Advanced Handling of Fast Moving Mobiles Application Aware Timeslot Allocation Channel Repacking

Marketing Release 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11B 11B 11B 11B 11B 11B 11B 11B 12A 12A 12B

Priority

R2 Metro requirement Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

High Medium Medium

Y Y Y

121

12A

High

123 131

Double BCCH Allocation (BA) Lists Dynamic Abis allocation for EGPRS

12A 12A

High Medium

Y Y

133

Flexible MAIO Management

12A

High

139

Frequency re-configuration with minimum disturbance

12A

Medium

140 144 150 169 174

Extended Uplink TBF Mode Handling of External BTS site Hardware Increased SDCCH Capacity Speech Quality Supervision support Call Queuing

12A 12A 11A 12A 12A

High High

Y Y Y

High Medium

Y Y

176

Interference Rejection Combining (IRC)

12A

High

177

BTS at site Synchronisation

12A

High

182

Abis Optimization

12A

High

183 184 193 194 197

Packet Abis over TDM Packet Abis over IP Reuse of upto 32 Frequencies within a cell Scalable BSC: 500 to 4000 TRX GERAN Support

12A 12A 12A 12A 12A

High High High High High

Y Y Y Y Y

199 203 209

Data offload to WiFi support Optimized MAIO management Multiple CCCH Support

12A 12A 12A High High

Y Y Y

229

Automatic Level Control

12A

Medium

230 235 237

Acoustic echo cancellation Abis over public IP Zero call failure on switchover EGPRS in R2 BTS (MCS1..9 in DL & MCS1..4 in UL) 4-4-4 Configuration support OMC DB upgrade BSC DB upgrade OMC installer requirements enhancements OMC back and restore Mutiple MIB support KPI tool enhancements Alarm Severity configuration OMC Data purging Inactivity Alarms Handover failure counters

12A 12A 12A 11B 11B

Medium High High High High

Y Y Y Y Y

Justification (R2)

Description

Ongoing calls/GPRS session will also be controlled as per TA value Concentrating calls on a TRX. Also on either half of a TRX Traffic based HO

With call saving

Repeated SACCH

32 Frequency for 4-4-4

The maximum number of frequencies per cell is increased to up to 128 frequencies.This Resources for MS is allocated based on its speed of the movement Improve dynamic balancing of downlink and uplink timeslots allocated to a GPRS/EGPRS MS based on the direction of Channel Repacking improves the GPRS/EGPRS performance by moving calls that are blocking the use of multiple consecutive timeslots. Possibility to define idle and active mode BA lists Needed when transmission is TDM

Flexible MAIO Management gives the operator the opportunity to use the 1/1 reuse pattern. This feature gives the operator the possibility to change frequencies, including the BCCH and to remove or add transceivers in a frequency hopping cell without releasing any ongoing calls in the cell. This feature improves the supervision for external BTS hardware like antenna related equipment. Speech Quality Supervision (SQS) allow operators to get information about the subjective speech quality in the network (as perceived by the end users). Queuing, pre-emption Interference Rejection Combining (IRC) is an interference suppression algorithm which significantly improves the uplink radio quality. The purposes of applying the ICC are as follows: * Enhancing the capability to resist multipath attenuation * Enhancing the capability to resist co-channel interference * Enhancing the receiver sensitivity of the BTS For better frequency utilization, fast handovers 1. Single RSL/OML for a cell. 2. Dynamic allocation of Abis Compression, silence frame suppression, local TS among cells in a site. switching 3. Same E1 for Voice and GPRS.

At a three sector site, HFS is reused in all cells Upto 500 TRX in single BSC cluster, MSC sees them as single BSC.

From the MS only Required for 4-4-4 configuration This describes the Automatic Level Control (ALC), which keeps the voice level of the It is MGC entire network in a predefined state and avoids the volume fluctuation of two parties during a call. This describes Acoustic Echo Cancellation It is mobile cross talk control (AEC). AEC is used to reduce or remove the acoustic echo reflected from the MS. Only for PICO

Planned at System Level Requirement and feasibility study to be done Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Yes Yes Yes Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done

BSC M H M H H M L H M

BTS

OMC L H L

Transmi ssion H

H M H M M M

L L

H M ? H H H H H H M H H

H H H H

L L

M H H

Requirement and feasibility study to be done

Requirement and feasibility study to be done No

? ?

Requirement and feasibility study to be done

Requirement and feasibility study to be done

Requirement and feasibility study to be done

M ?

No Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done

M M H

M M M

Requirement and feasibility study to be done

Yes

No

No Already supported Requirement and feasibility study to be done No No

A A ?

A A

? Yes Requirement and feasibility study to be done H H M M M M

Requirement and feasibility study to be done

Requirement and feasibility study to be done same as GPS support. No Yes Yes Yes Yes Yes Yes Yes Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done M M H H M H M H H H H M M M M H M M M

TRAU

H H H H

HW and platform changes to be done by BTS Engg team

Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services

R10B R11A R11B R12A R12B R13A R13B

Marketing Release Available now (2.5.5) Roadmap Q2-2011 (R2.6) Q4-2011 Q2-2012 (R3 onwards) Q4-2012 Q2-2013 Q4-2013

You might also like