Professional Documents
Culture Documents
R2 Metro Feature Requirements
R2 Metro Feature Requirements
R2 Metro Feature Requirements
No 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 109 110 112 113 117
FEATURE NAME AMR Radio Link Timers Low capacity BSC (100TRX) TA based aceess control (enh) TRX power optimization Cell Load Sharing Dynamic SDCCH Handover Power Boost Idle Channel Measurement Intra-cell Handover GPS support. Repeated FACCH 2G-3G Handover /Cell Reselection & Vice Versa O&M TRX Blocking (enh.) E1 Compression at A interface AMR Power Control Directed Assignment to Another Cell Dynamic FR/HR Adaptation Mobile Crosstalk Control (MCC) AMR FR 5.9 Extended coverage AMR FR 5.9 on 8Kbps Abis Speech Loudness Control Enhanced measurement reporting for Frame Erasure rate calculation Advanced Frequency Handling Advanced Handling of Fast Moving Mobiles Application Aware Timeslot Allocation Channel Repacking
Marketing Release 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11A 11B 11B 11B 11B 11B 11B 11B 11B 12A 12A 12B
Priority
R2 Metro requirement Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y
121
12A
High
123 131
Double BCCH Allocation (BA) Lists Dynamic Abis allocation for EGPRS
12A 12A
High Medium
Y Y
133
12A
High
139
12A
Medium
Extended Uplink TBF Mode Handling of External BTS site Hardware Increased SDCCH Capacity Speech Quality Supervision support Call Queuing
High High
Y Y Y
High Medium
Y Y
176
12A
High
177
12A
High
182
Abis Optimization
12A
High
Packet Abis over TDM Packet Abis over IP Reuse of upto 32 Frequencies within a cell Scalable BSC: 500 to 4000 TRX GERAN Support
Y Y Y Y Y
Data offload to WiFi support Optimized MAIO management Multiple CCCH Support
Y Y Y
229
12A
Medium
Acoustic echo cancellation Abis over public IP Zero call failure on switchover EGPRS in R2 BTS (MCS1..9 in DL & MCS1..4 in UL) 4-4-4 Configuration support OMC DB upgrade BSC DB upgrade OMC installer requirements enhancements OMC back and restore Mutiple MIB support KPI tool enhancements Alarm Severity configuration OMC Data purging Inactivity Alarms Handover failure counters
Y Y Y Y Y
Justification (R2)
Description
Ongoing calls/GPRS session will also be controlled as per TA value Concentrating calls on a TRX. Also on either half of a TRX Traffic based HO
Repeated SACCH
The maximum number of frequencies per cell is increased to up to 128 frequencies.This Resources for MS is allocated based on its speed of the movement Improve dynamic balancing of downlink and uplink timeslots allocated to a GPRS/EGPRS MS based on the direction of Channel Repacking improves the GPRS/EGPRS performance by moving calls that are blocking the use of multiple consecutive timeslots. Possibility to define idle and active mode BA lists Needed when transmission is TDM
Flexible MAIO Management gives the operator the opportunity to use the 1/1 reuse pattern. This feature gives the operator the possibility to change frequencies, including the BCCH and to remove or add transceivers in a frequency hopping cell without releasing any ongoing calls in the cell. This feature improves the supervision for external BTS hardware like antenna related equipment. Speech Quality Supervision (SQS) allow operators to get information about the subjective speech quality in the network (as perceived by the end users). Queuing, pre-emption Interference Rejection Combining (IRC) is an interference suppression algorithm which significantly improves the uplink radio quality. The purposes of applying the ICC are as follows: * Enhancing the capability to resist multipath attenuation * Enhancing the capability to resist co-channel interference * Enhancing the receiver sensitivity of the BTS For better frequency utilization, fast handovers 1. Single RSL/OML for a cell. 2. Dynamic allocation of Abis Compression, silence frame suppression, local TS among cells in a site. switching 3. Same E1 for Voice and GPRS.
At a three sector site, HFS is reused in all cells Upto 500 TRX in single BSC cluster, MSC sees them as single BSC.
From the MS only Required for 4-4-4 configuration This describes the Automatic Level Control (ALC), which keeps the voice level of the It is MGC entire network in a predefined state and avoids the volume fluctuation of two parties during a call. This describes Acoustic Echo Cancellation It is mobile cross talk control (AEC). AEC is used to reduce or remove the acoustic echo reflected from the MS. Only for PICO
Planned at System Level Requirement and feasibility study to be done Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Yes Yes Yes Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done
BSC M H M H H M L H M
BTS
OMC L H L
Transmi ssion H
H M H M M M
L L
H M ? H H H H H H M H H
H H H H
L L
M H H
? ?
M ?
No Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done
M M H
M M M
Yes
No
A A ?
A A
Requirement and feasibility study to be done same as GPS support. No Yes Yes Yes Yes Yes Yes Yes Yes Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done Requirement and feasibility study to be done M M H H M H M H H H H M M M M H M M M
TRAU
H H H H
Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services Requirement by Services
Marketing Release Available now (2.5.5) Roadmap Q2-2011 (R2.6) Q4-2011 Q2-2012 (R3 onwards) Q4-2012 Q2-2013 Q4-2013