IR Sub Grade Construction
Unless otherwise approved,this inspection request form shall be submitted during the daily morning meeting among LTA,Contractor and QP(S) Contractor: SAMWOH CORPORATION PTE LTD SK E&C To: Project:
NO:
ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND ASSOCIATED ROAD WIDENING WORKS INTERCHANGE
Date: Time:
The work described below has been inspected by our Site engineer and is complete and ready for your inspection. A checklist is attached overleaf. Location Checked and Requested By: Chainage Activity Drawings Used for Construction Other Description
The meeting noted that the information provided by the Contractor is adequate/not adequate*. QP(S) may proceed *delete where appropriate Request Rejected
__________________________________________
QP(S) Name & Signature/Date work approved to start:___________________ LTA The above process for request for inspection of work by Contractor and approval by QP(S) is noted. ___________________________ LTA's Representative/Date/Time work completed on:__________________________
NO:
Location:
Description of Works
Chainage:
Checked by Contractor Confirmed by QP(S)
Send properly labelled soil samples for last 500mm of subgrade for the following tests 1.1 Maximum Dry Density 1.2 California Bearing Ratio (CBR)
2 3 4 5 6 7 8
Ensure soaked CBR conform to specifications Check formation levels of subgrade Provide proper drainage for subgrade surface Conduct field density tests (TABLE A) Continue mechanical compaction until in-situ test results conform to specifications Check sufficient temporary traffic devices if lane closure is required Others
TABLE A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 Chainage : Wt of soil from hole Wt of sand (+ cylinder ) before pouring (M1) Wt of sand (+ cylinder ) after pouring (M4) Wt of sand in hole (M5 = M1 - M4 - M2 ) Ratio = Mw/M5 Bulk density of sand Pa Bulk density of soil P = (Mw/M5)xPa Moisture content (w) Dry density Pd = 100P/(100+w) Max. dry density Optimum moisture content % of compaction Remarks Calibration (* Cylinder*) *Mean of sand in core (of pouring cylinder) (M2) Volume of calibrating container (V) *Wt of sand (+ cylinder) before pouring (M1) *Wt of sand (+ cylinder) After pouring (M3) *Sand to fill calibrating container (Ma = M1 - M3 - M2) Bulk density of sand Pa = Ma/V Mg/m3 Mg/m3 % Mg/m3 Mg/m3 % m g g g g A B C D E F
g mL
g g g Mg/m3