Inspection Request Form For Site Clearance (Demolition of Buildings & Structures)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

INSPECTION REQUEST FORM FOR SITE CLEARANCE (DEMOLITION OF BUILDINGS & STRUCTURES)

meeting among LTA,Contractor and QP(S) Contractor: SAMWOH CORPORATION PTE LTD SK E&C Project:

NO.

Unless otherwise approved,this inspection request shall be submitted during the daily morning

ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND ASSOCIATED ROAD WIDENING WORKS INTERCHANGE

To: LTA

Date: Time:

The work described below has been inspected by our Site Engineer and is complete and ready for your inspection. A checklist is attached overleaf. Location Checked and Requested By: Chainage Type of Structure Activity Other Description Contractor's PM Name & Signature The meeting noted that the information provided by the Contractor is adequate/not adequate* QP(S) may proceed
*delete where appropriate

Request Rejected

INITIAL INSPECTION DECISION BY QP(S)


We have inspected the above referenced works and found them acceptable. You may proceed. You cannot proceed. Please carry out corrective works as noted on the checklist and submit a fresh request for inspection. Other comments:

LTA's RE/RTO Name & Signature/ Date

FINAL INSPECTION DECISION BY QP(S)


_____________________________ QP(S) Name & Signature/Date work approved to start:__________________ work completed on:______________________

LTA The above process for request for inspection of work by Contractor and approval by QP(S) is noted. ________________________________ LTA's representative/Date/Time

NO. CHECKLIST FOR SITE CLEARANCE (DEMOLITION OF BUILDINGS & STRUCTURES) Date/Time:
S/No 1 2 3 4 5 6 7 8 9 10 11 12 13

Location:
Description of Works

Chainage:
Checked by Contractor Confirmed by QP(S)

Confirm affected buildings, structures for demolition are those indicated on site plan Check contractor has notified services depts of his intention to demolish structure Check all meters and services removed / disconnected Check contractor has notified ENV (Sewerage) Confirm with ENV that sewer mains and manholes properly protected and sealed Check contractor has obtained necessary approval / license from Chief Inspector of Factories Check sufficient machinery, scaffolding hoarding etc. Check all warning signs for traffic and pedestrian Check temporary provision of footpath No burning of debris Sweeping and clearing of roadway after each demolition exercise is completed Check sufficient temporary traffic devices if lane closure is required Others

You might also like