BSC COMMISSIONING STEPS: PROCEDURE

1. Check the layout, installation, power(-54 V), earthing

2. Check all backplane cablingfor all computer units 1 cable each go to MCMU 0 and MCMU 1 SBUS-HWAT to CLAB, CLS SCSI BUS SYNC cable 473 for electrical PDH BSCD 460-463, for optical BSCD 470-

2M1- 512, 2M2-576, 2M3-528, 2M4-592

3. Check the backplane for any shortage of pins

4. Jumper settings of cards GSW, SWCOP, HWAT, AS7-C, PCU2-D, SERO-B SWCOP, HWAT, SERO-B, AS7-C, PCU2D already set need to check them

5. Insert cards and switch ON power from left to right (while switching OFF, go right to left)

6. Now connect the VDU LAN cable to OMU-CPU-J7 Power ON OMU, MCMU0, MCMU1 and then other units Check logs for OK, connect cables 512, 513, 514, 515 cables to MCMU0, MCMU1

7. Log on to BSC using VTP1 and then start MML session

Perform diagnosis of all units with MCMU0 and MCMU1 OMU, EMB, BCSU, MCMU, CLAB, CLS, SBUS Also check switchover of BCSU with MCMU0 and MCMU1

8. Define IP for OMU 172.32.172.32 using ZQRN . Check ZISI to see that WDU-00, WDU-01 and FDU-00 are WO-BU

9. Now connect through LAN port Connect to best network 172.32.172.32 set PC IP to 172.32.172.33 and subnet mask as default Attach ET uniformly to all BCSU( atleat 1 for each BCSU except for spare one) Now make all BCSU WO except the spare one and run diagnosis on all ET with MCMU 0 and MCMU 1 Check ZAHO; no critical alarms

10.Change ET 513 to DBLF ZYEI, check ZAHO :ET,513:; no alarms

11.Change BSC name using ZQNM

12.Modify system time ZDCS and ZDCA and give a system restart ZUSS

13.CD IMPLEMENTATION-cd5AND cd6 COPY ALL FILES IN TO CDTEMP DIRECTORY INSIDE THE DEFAULT PACKAGE AND RUN MACRO

14.Creation Of X.25

15.PR files implementation-Copy all PR files in to the CONVPR directory in default package and then run the commands for PRfile activation and then feature activation

16.Licence-Copy all licences in the LICENCE directory on top view and then ZW7L:ON:;

17.Measurements-Enable measurements using the excel file

18.Add BCF PACK-Copy the BCF SW in to the BCF_PACK directory in PACK_0, PACK_1, PACK_2.. and then run command for activation

19.TCSM CREATION AND SIGNALLING CREATION

SETTINGS GKSWB256B Standalone BSC

Cards Settings in each No. CARD 1 2 3 4 5 6 7 8

SW1 All OFF All OFF 1,2 ON rest OFF 1,2 ON rest OFF All OFF 1,2 ON rest OFF 1,2 ON rest OFF 1,2 ON rest OFF

SW2

SW3

SW4

SW5

SW6

SETTINGS GKSWB256B Combi BSC

Cards Settings in each No. CARD 1 2 3 4

SW1

SW2

SW3

SW4 3ON 3ON

SW5

SW6 3ON 3ON

1,2 ON 1,2 ON

5 6 7 8 1,2 ON 1,2 ON 1,2 ON 1,2 ON 1,2 ON 3ON 3ON 3ON 3ON

CD 5 Implementation
All options Y. Dont forget to make a TCP/IP connection for the BSC first and connect first

CD 6 Implementation
All options yes expect the one saying Deleting CDTEMP comtents make it no

S13 upgrade for new BSC

1. Run copy macro uprcop13.hit -all options yes 2. Copy SDREL.zip file in FTPTMP directory on top

3. Copy CD0 300SX_SD0000NO contents in CDTEMP directory inside the package ASD_1_30_0 4. Copy CD1, CD2 M98 contents in CDTEMP directory inside the package ASD_1_30_0 5. PR files in CUST3I directory inside the package ASD_1_30_0 6. Licences in the LICENCE directory on top 7. Run the MML command to unzip SDREL.zip file ZIXX:OMU,,/FTPTMP,SDREL.ZIP:,:,,/ASD_1_30_0:TIME=7200,PATHS=Y,; 8. Expected Outcome: 3963 FILE(S) DECOMPRESSED TO DIRECTORY /ASD_1_30_0/ 9. Run copy macro again-all options yes except the one saying unzipping SDREL contents make it no as the contents have already been unzipped using the MML command 10.Gives popup to stop measurements-do this from the excel sheet provided and verify using the MML command ZTPI:MEASUR,:; if some measurements are still enabled disable them using the MML command ZTPS 11.Run upgrade macro uprupg13.hit this again gives a popup to install CDs manually 12.Open the S13CD3.xls file and run all the command for CD0,1,2 one by one 13.Again run the upgrade macro and for multivendor option say no 14.Now after this verify that BU package is SD0200NO with active as Y 15.For CD3&4 empty the CDTEMP directory in WSB 16.Copy CD3&CD4 M98 contents in CDTEMP directory 17.Open the S13CD.xls sheet again and run all command one by one there in the sheet CD3 18.Remember to change following commands 19.ZWNA-1->1&2 20.ZWQC, ZWSS-SD0300NO->SD0400NO

21.Now after this verify that BU package is SD0400NO with active as Y

Standalone TCSM
1. For every TCSM cartridge 17th and 18th card are ET16 cards toward Ater interface. Take out 2 lower cables from 1st ET16 card and shift them to same position(two upper cables in 1st ET card) in 2nd ET16 card. This is for redundancy of ET16 card

2. Also below these four cables there are two control cables in 1st ET card. Shift the lower control cable to 2nd ET card at the same position as the first one in 1st ETcard

LEARNINGS

1. CP816 CARDS-ALL CARDS WITH NO SCSI LABEL (BCSU AND MCMU) AND ONE CARD WITH SCSI LABLE (OMU). 2. GKSWB256B3456 3. EMB cards- two cards will be there with SWCOP cards-these are for MCMU and rest 6 are for LANU0&1 12

4. To check connect the login cable in SER port of ESB26 card and set parity to 8-none

Password

nokia

ESB26> en(not visible) ESB# ESB# shspacerun reload for repair

5. While checking the IP-10.1.2.2. for MCMU 0 and 10.1.3.2 for MCMU 1

6. For combi TCSM- FIRST EI as Aremo see dehradoon logs

For Normal BSC every 8th E1 as A rest as Gb and Abis