Email: rajendra.ch.205@gmail.com Contact No: 8523076900 Proposed Position : QA/ QC Electrical Engineer
: : : :
Egis India Consulting Engineers Pvt. Ltd. Ch. Rajendra Electrical Engineer Available for assignment Date of birth Nationality : 07th July 1984 : Indian
Membership in Professional Societies: Nil Detailed Tasks Assigned : .Electro- Mechanical works
Key Qualifications : QA/ QC Electrical, Erection & Execution, Maintenance, Inspection. Education : B.Tech. (Electrical) Passed in 2005 from G. Pulla Reddy Engineering College, Kurnool.
Employment Record : Jan 2008 to till date SGS India Pvt.Ltd. Inspection Engineer
1. Name of assignment or Project: Third Party Quality Control/ Assurance of civil works, Pipeline and Allied works, Hydro Mechanical, Electro- Mechanical works for 5 Stage pumping of water from Gandikota Reservoir to Chitravathi Balancing Reservoir and Lifting Irrigation Schemes on left side of Chitravathi River to total Stage LI 01 to LI 06.
Year: Jan 2008 to till date Location: Andhra Pradesh, India Client: I & CAD Department. Position held: Inspection Engineer Activities performed: (QA/QC Electrical) Prepare & submit all test result reports for pipe lines. Inspecting source of materials and on site construction works & Preparing Records of inspection results.
Reviewing calibration of testing equipment. Preparing non-conformance, corrective action reports, Preventive action reports, compliance reports on action taken etc. Responsible for incoming materials Inspection in storage area with respect to approved Specification, Data sheets, and Quality Assurance Plan Design of Electrical Drawing for Central Lab as per I & CAD Requirement. Supervision of Domestic Electrical wiring of Central Lab for I & CAD Department. Installation of various panels such as HT Panels, LT Panels, Generator, Cable trays, Cables, Illumination in Switchgear room and Transformers, Batteries, Earth pits as per approved drawings. Erection of Fire fighting and Service water pump motors.
Responsible for incoming materials Inspection in storage area with respect to approved Specification, Data sheets, and quality plan. Taking preventive and predictive actions for the non-conformities observed in site. Prepare daily Quality reports regarding inspections, material, Non-conformances etc. Prepare weekly and monthly surveillance reports and verification of corrective actions reports. Preparation of Quality certificates and project monitoring system. Ensure that all works are carried out as per the approved method statements and drawings. Ensure that all equipments used are calibrated and with valid certificates.
Responsible for allotment and execution of work from sub-ordinates staff. SWITCH GEAR AND STRUCTURAL INDIA Pvt. Ltd., Hyderabad Quality Engineer
Name of assignment or Project: SWITCH GEAR AND STRUCTURAL INDIA Pvt. Ltd., Hyderabad . .Year: Jan 2007 Dec 2007 Location: Andhra Pradesh, India
Production Engineer
Name of assignment or Project: Manufacturing the dehumidi fires and air handling units for chemical laboratories. Year: Nov 2005 Dec 2006 Location: Andhra Pradesh, India Client: HETERO DRUGS Position held: Production Engineer
Activities performed: Inspection of Relays, contactors, MCBs as per client requirements. Responsible for incoming materials Inspection in storage area with respect to approved Specification, Data sheets, and production ready to as per Client Requirements
Certification : I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me,