13
--gas incl in Runspec section 04.04.13
--reducing no of cells for out-of-memory problem
--GRID section converted to radial block centred.
--GOC and OWC reconfigured 26.04.13
--radial block centred 48 x 48 ON 26.04.13
--modified time step 27.04.13
--RPTRST FREQ changed to 1 from 6
--DATES keyword demobilised in SCHEDULE section
--wt rel-perm table horiz scaling
--imported SCAL data from Eclipse tutorial example3 scal data
--OUTRAD changed to 740.17
--Reservoir pressure @ datum, GOC - PDD changed to 3814 to equal Pbub
RUNSPEC ==============================================================
-- Title is used as header on output, to identify run
TITLE
Rim tank model buildup
-- Specify dimension of model, NX, NY, NZ
DIMENS
-- Nr Ntheta Nz
48 1 48 /
RADIAL
GAS
DISGAS
-- Units to use, alternatives are METRIC, FIELD or LAB
FIELD
-- Specify maximum values for well data (# means max number of)
WELLDIMS
-- #wells #cell-connections Next three values are defaulted
4 5 3* /
GRID ===========================================================
-- Turn off writing of data to report file
NOECHO
--INRAD
0.22 /
OUTRAD
740.17 /
DTHETAV
360. /
DZ
1152*26.24 576*3.28 576*26.24/
--BOX
-- 1 100 1 100 51 52 /
--DZ
-- 200000*10 /
--ENDBOX
-- So far the grid shape has been defined, but we also need to define at
-- which depth (measured from sea level) the cell tops are. We assume a
-- horizontal reservoir, and input depths which are consistent with the
-- DZ-values we defined above.
--BOX
-- 1 50 1 50 1 1 /
TOPS
48*9186.4 /
--ENDBOX
PERMR
2304*200 /
PERMTHT
2304*200 /
PERMZ
2304*20 /
PROPS ===============================================================
PVDG
1214.70 13.9470 0.01240
1414.70 7.02800 0.01250
1614.70 4.65700 0.01280
1814.70 3.45300 0.01300
2214.70 2.24000 0.01390
2614.70 1.63800 0.01480
3014.70 1.28200 0.01610
3414.70 1.05200 0.01730
3814.70 0.89000 0.01870
/
PVTO
-- Rs Pbub(Rs) FVF(Pbub?) OilVisc(Pbub?)
--Mscf/stb psia
rb/stb
cP
1.97000 /
1.55600 /
1.39700 /
1.28000 /
1.09500 /
0.96700 /
0.84800 /
0.76200 /
0.69100
4214.70 1.44050
0.69400
4614.70 1.43400
0.69700 /
PVTW
Pref
Bw(Pref)
GRAVITY
35.0000 1.00960 0.75000 /
ROCK
3214.70
0.40E-05 /
SWOF
--- Water/Oil Saturation Functions
--- (Table 1)
---
Sw
Krw
Kro
Pc
-- ----------------------------------------------0.15
0.36595 0.435765
0.38216
0.45
1
0 0.186255
0
/
-SGOF
--- Gas/Oil Saturation Functions
--- (Table 1)
---
Sg
Krg
Kro
Pc
-- ----------------------------------------------0
0.05
0 0.593292 0.0523257
0.6
0.22096
--BOX
-- 50 50 50 50 50 50 /
--SWCR
-- 0.45 /
--SGCR
-- 0.30 /
--SWCR
--2304*0.35 /
--SGCR
--2304*0.25 /
RPTPROPS
1 1 1 1 1 1 1 0 1 1 /
SOLUTION
RSVD
6000.0 0.7700
8000.0 0.7700
/
SOLUTION =============================================================
EQUIL
-- DD = Datum depth, the depth to which all reports will be referenced.
-- DD Pressure@DD OWC Pcow(OWC) Default rest of data items
-- (summarily taking OWC as DD - 3012 below, for now, pressure at 4800psi -- =332 bars
-- DD
--PDD @ GOC as specified above is probably wrong in relation with the PVTO specified now
--for model saturated reservoir? with a gas cap. specified PDD @GOC should be around
--Pbub of 3814psi (check PVTO above)
-- DD
RPTRST
BASIC=2 /
SUMMARY ==============================================================
-- List data vectors which we want stored for graphics post-processing
-- Field Oil Production Rate
FOPR
-- Field Oil Production Total
FOPT
-- Field Water Cut
FWCT
-- Field Pressure (averaged reservoir pressure)
FPR
-- Field Oil In Place
FOIP
-- Field Water Production Rate
FWPR
BSGCR
BSWCR
SCHEDULE ==============================================================
-- Specify output of graphics result files for cell data, and times which
-- to write these. (Details to come later)
--RPTRST
--BASIC=5 NORST=1 FREQ=6 /
RPTRST
BASIC=2 /
DRSDT
0.0003 /
-- Well specification: Give names, positions (i, j) and main phase of wells
WELSPECS
--wname group i j Z(bhp) prefPhase
'WP1' 'G' 1 1 1* 'OIL' /
/
-- (Note two slashes, one terminates each well, one terminates the keyword)
-- Completion data, the well is open to the reservoir in cells in layers
-- from k_hi to k_lo.
COMPDAT
--wname ic jc k_hi k_lo open/shut 2*DontCare well_diam Default...
-- Q1. What det d size of the well diam? in this case 0.3m = ?"
-- WELL PERFORATED AT K15, Rw of 0.2
/
-- Milestone dates, e.g. to write results
--DATES
--1 'JUL' 2004 /
--1 'JAN' 2005 /
/
-- Change production rate to 4000 STB/day
--WCONPROD
--wname open/shut ctrlmode orat 4*Default bhpmin Rest default...
--'WP1' 'OPEN' 'ORAT' 4000 4* 3365 /
--/
--DATES
--1 'JUL' 2005 /
--/
-- Number and size (days) of timesteps
TSTEP
400*30 /
END