PTSC Mechanical & Construction

1. Field Layout

Petroleum Vietnam Gas Corporation

PTSC Mechanical & Construction


2. Sequence of TL-DD Project

Petroleum Vietnam Gas Corporation

PTSC Mechanical & Construction


3. Schedule of Review (1/2)

Petroleum Vietnam Gas Corporation

PTSC Mechanical & Construction

Petroleum Vietnam Gas Corporation

3. Schedule of Review (2/2)


Original

Description
Start

HD-2500
Finish

Add. Weather Standby

Dur.

HD-2500 Sch.
Start
Finish Dur.

Catch-up Plan

HD-2500 Sch.
Start
Finish Dur.

MILESTONE

DSV Sch.
Finish

Dur

2013-08-12 2013-09-19 39.0

19 TL PLEM Installation

2013-07-13 2013-07-15 3.0

2013-07-30 2013-08-01 3.0

2013-07-30 2013-08-01 3.0

20 Flooding/Cleaning/Gauging from DD WHP(6/8/10")

2013-07-16 2013-07-19 4.0

2013-08-02 2013-08-05 4.0

2013-08-02 2013-08-05 4.0

21 Spool Install at DD PLEM~P/L from DD WHP(3 points)

2013-07-20 2013-07-25 6.0

2013-08-06 2013-08-11 6.0

2013-08-06 2013-08-08 3.0

2013-08-16 2013-08-18 3.0

2013-08-12 2013-08-13 2.0

2013-08-09 2013-08-10 2.0

2013-08-19 2013-08-20 2.0


2013 08 21 2013-08-22
2013-08-21
2013 08 22 2.0
20

22

Weather Standby

S
l Install
I t ll att DD PLEM~P/L
PLEM P/L from
f
TL WHP(2 points)
i t)
23 Spool

2013 07 26 2013-07-29
2013-07-26
2013 07 29 4.0
40

2013 08 14 2013-08-17
2013-08-14
2013 08 17 4.0
40

2013 08 11 2013-08-12
2013-08-11
2013 08 12 2.0
20

24 Flooding/Cleaning/Gauging from TL PLEM(6")

2013-07-30 2013-07-31 2.0

2013-08-18 2013-08-19 2.0

2013-08-13 2013-08-14 2.0

2013-08-20 2013-08-21 2.0

2013-08-15 2013-08-16 2.0

2013-08-23 2013-08-24 2.0

25

Weather Standby

26 Spool Installation at TL PLEM(6")

2013-08-01 2013-08-02 2.0

2013-08-22 2013-08-23 2.0

2013-08-17 2013-08-17 1.0

2013-08-25 2013-08-25 1.0

27 Spool Installation at TL PLEM(12")

2013-08-03 2013-08-04 2.0

2013-08-24 2013-08-25 2.0

2013-08-18 2013-08-18 1.0

2013-08-26 2013-08-26 1.0

2013-08-26 2013-08-27 2.0

2013-08-19 2013-08-20 2.0

2013-08-27 2013-08-28 2.0

28

Weather Standby

29 DD WHP Topside Installation

2013-08-05 2013-08-08 4.0

2013-08-28 2013-08-31 4.0

2013-08-21 2013-08-24 4.0

30 Spool Installation at DD WHP(6"/8"/10")

2013-08-09 2013-08-13 5.0

2013-09-01 2013-09-05 5.0

2013-08-25 2013-08-27 3.0

2013-08-29 2013-08-30 2.0

2013-09-06 2013-09-06 1.0

2013-08-28 2013-08-28 1.0

2013-08-31 2013-08-31 1.0

31

Demo
b

Start

Weather Standby

32 PLET Installation

2013-08-14 2013-08-15 2.0

2013-09-07 2013-09-08 2.0

2013-08-29 2013-08-30 2.0

33 Spool Installation at PLET(6")

2013-08-16 2013-08-17 2.0

2013-09-09 2013-09-10 2.0

2013-08-31 2013-08-31 1.0

34 H/Test for 6" P/L from TL PLEM to PLET

2013-08-18 2013-08-19 2.0

2013-09-11 2013-09-12 2.0

2013-09-02 2013-09-03 2.0

35 H/Test for 6"/8"/10" P/L DD WHP~DD PLEM~TL WHP

2013-08-20 2013-08-28 9.0

2013-09-13 2013-09-21 9.0

2013-09-04 2013-09-12 9.0

36 H/Test from TL WHP to TL PLEM

2013-08-29 2013-08-31 3.0

2013-09-22 2013-09-24 3.0

2013-09-13 2013-09-15 3.0

2013-09-01 2013-09-01 1.0

2013-09-25 2013-09-25 1.0

Customs Clearance

2013-09-01 2013-09-01 1.0

2013-09-01 2013-09-01 1.0

2013-09-16 2013-09-19 4.0

PTSC Mechanical & Construction

Petroleum Vietnam Gas Corporation

4. Schedule (Catch-up Plan)


Note : In case of weather standby 14 days from 21st of June.
No.

Case

Spread

Original

HD-2500

Add.
Weather

HD-2500

Catch-up

HD-2500
HD
2500
+DSV

June
1

5 10 15 20 25 30

July
1

5 10 15 20 25 30

Aug
1

Sep

5 10 15 20 25 30

5 10 15 20 25 30

31

5
5

24
16

31

15

1 Weather impact is 8 days so far


1.
2. Assume 14 days as further weather impact, completion date is 24-Sep
3. Reduce 10 days
y when DSV is mobilized
4. Diving team of DSV will be bolting after HD-2500 put seabed with spool assembly
5. Additional catch-up will be tried by HD-2500 operating simultaneously (spool measuring and
spooll assembly)
bl ) att spooll iinstallation
t ll ti position
iti

PTSC Mechanical & Construction

Petroleum Vietnam Gas Corporation

5. Progress & Delay Status


Description

Start

TL~DD PLEM (6" x 12.7 x 3.05 km)

TL~DD PLEM (8" x 14.3 x 3.1 km)

DD~DD PLEM (6" x 12.7 x 2.68 km)

Pipelaying

DD~DD PLEM (8" x 14.3 x 2.88 km)

DD~DD PLEM(10" x 12.7 x 2.53 km)

TL~TL PLEM(12" x 19.1 x 2.77 km)

Plan

5-Jun

9-Jun

Plan

8-Jun

10-Jun

Actual

10 Jun
10-Jun

20 Jun
20-Jun

Plan

11-Jun

14-Jun

Actual

21-Jun

24-Jun

Plan

15-Jun

17-Jun

Actual

27-Jun

29-Jun

Plan

18 Jun
18-Jun

20 Jun
20-Jun

Actual

30-Jul

2-Jul

Plan

21-Jun

23-Jun

Plan
Actual

4-Jul

6-Jul

24-Jun

25-Jun

7-Jul

8-Jul

Delayed
15
10
5

Delayed

0
Delayed

Weather

Welding

Period

Standby

Repair

Others

June
5

10

15

July
20

25

30

10

7-Jun

Actual

Actual
TL PLEM~PLET(6" x 12.7 x 0.8 km)

5-Jun

Finish

8- Jul

PTSC Mechanical & Construction


6. Spool Lowering

Petroleum Vietnam Gas Corporation