Earthquake Resistance of Earth and Rock Fill Dams

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 150

MISCELLANEOUS PAPER S71-17

EARTHQUAKE RESISTANCE OF EARTH AND ROCK-FILL DAMS


Report 2

ANALYSIS OF RESPONSE O F RIFLE.GAP D A M TO PROJECT RULISON UNDERGROUND NUCLEAR DETONATION


bv
J. E. Ahlberg, J. Fowler, L W. Heller
........ ... .... .
*,

......-

. -

......

->-w-J*: -

..

June

1972

s~omsoredby Office, Chief of Engineers,


Conducted by

U. S. Army

U. S. A m y Engineer Waterways Experiment Station


Soils and Pavements Laboratory Vicksburg, Mississippi
APPROVED FOR WBLlC RELEASE: DISTRIBUTION UNLIMITED

List

o f Associated Reports
are:

Previous reports

under Engineering Study 540

.\
v ,

,
0 1

.
P,

,
,

"A Comparative Summary o f Current Earth Dam Analysis Methods for Earthquake Response," issued by Office, Chief o f Engineers, a s Inclosure 1 to Engineer . Jeihnical Letter No. 1110-2-77, 9 December 1969.
-

r i

- .

%A

'.

../.
. a 3

+c_Eaithquake Studies for Earth and Rock-fill Dams," issued by Office, Chief of Engineers, as Engineer Technical L e t t e r NO. 11 10-2-79, 12 January 1970. "Motion o f R i f l e Gap Dam, Rifle, Colorado; Proiect Rulison Underground Nuclear Detonation," published by the Waterways Experiment Station as Miscellaneous Paper 5-70-1, January 1970. "Earthquake Resistance of Earth and R o c k - f i l l Dams; Report 1, Discussions by Professors H. B. Seed and R. V. Whitman," published by the Waterways Experiment Station as Miscellaneous Paper 5-7 1-17, h a y 1971.

Destroy t h i s report when n o longer needed. D o not return i t to t h e originator.

T h e findings in this report are n o t to be construed as an o f f i c i a l Department of the Army p o s i t i o n unless s o designated by other authorized documents.

MISCELLANEOUS PAPER S-71-17

EARTHQUAKE RESISTANCE OF EARTH AND ROCK-FILL DAMS


Report 2

ANALYSIS OF RESPONSE OF RIFLE GAP DAM TO PROJECT RULISON UNDERGROUNDNUCLEAR DETONATION


by

J. E. Ahlberg, J. Fowler, L W. Heller

June
Sponsored by

1972

Office, Chief of Engineers,

U. S. Army

Conducted by

U. S. Army Engineer Waterways Experiment Station


Soils and Pavements Laboratory Vicksburg, Mississippi

ARYV-YRC

VICKSOUIQ.

YtSm.

APPROVED FOR PUBUC RELEASE; DISTRIBUTION UNLIMITED

T H E CONTENTS OF T H I S REPORT ARE NOT T O BE USED FOR ADVERTISING, P U B L I C A T I O N , OR PROMOTIONAL PURPOSES. C I T A T I O N O F TRADE
.

NAMES DOES NOT CONSTITUTE AN O F F I C I A L ENDORSEMENT OR APPROVAL O F T H E USE OF SUCH COMMERCIAL PRODUCTS.

iii

F O R E W O R D This r e p o r t p r e s e n t s an a n a l y s i s o f t h e motion of R i f l e Gap Dam during t h e underground n u c l e a r e x p l o s i o n , P r o J e c t RULISON. This analy-.


S. A r v

s i s was made f o r t h e O f f i c e , Chief of Engineers ( O C E ) , by t h e U.

Engineer Waterways Experiment S t a t i o n (WES) d u r i n g f i - s c a l y e a r 1971 under Engineering Study 540, " ~ a r t h q u a k eR e s i s t a n c e o f Earth and Rockf i l l Dams." Engineers of . t h e S o i l s and Pavements Laboratory, WES, a c t i v e l y engaged i n d i r e c t i n g t h e work .and r e p o r t p r e p a r a t i o n were Messrs and SP5 W.
C . Moss.

. S . J.

Johnson, R . W . Cunny, J. Fowler, D r . L. W . H e l l e r , 1 L T J . E. Ahlberg, The work was under t h e g e n e r a l s u p e r v i s i o n o f This r e p o r t was

M r . J. P. Sale, Chief, S o i l s and Pavements Laboratory.


D r . Heller

prepared by 1LT Ahlberg w i t h minor c o n t r i b u t i o n s by M r . Fowler and

Director o f WES d u r i n g t h e a n a l y s i s and t h e p r e p a r a t i o n of t h i s r e p o r t was COL E r n e s t D . P e i x o t t o , CE, and Technical D i r e c t o r was

M r . F. R . Brown.

This page intentionally left blank

CONTENTS
Page

.. ......... ... .............. CONVERSION FACTORS, B R I T I S H TO M E T R I C U N I T S O F MEASUREMENT. . . .


FOREWORD. PART I PART PART PART

ix
1

. . .. . . . . . I1: F I E L D OBSERVATIONS. . . . . I1I : MATERIAL P R O P E R T I E S . . . . IV : CALCULATIONS. . . . . . . . General . . . . . . . . . . . .


-.
INTRODUCTION

O n e - D i m e n s i o n a l A n a l y s e s of T w o - D i m e n s i o n a l A n a l y s e s o f E m b a n k m e n t a n d Foundation P A R T V: COMPARISONS OF OBSERVED AND CALCULATED R E S P O N S E S

. .. .. . . ..... .. ..... .. ..... .. ....... Foundation. . . .

... . . ... . . . . .... .... .... . . .


.

.. .. PART .. .. Two-Dimens ional A n a l y s i s . . . . . . . . . PART V I I : CONCLUSIONS. . . . . . . . . . . . . LITERATURE C I T E D . . . . . . . . . . . . . . . .


T A B L E S 1-4 P L A T E S 1-40 A P P E N D I X A: P L A T E S A1-A12 A P P E N D I X B: PLATES ~ 1 - B 6 A P P E N D I X C: PLATES ~ 1 - C 8 A P P E N D I X D: S E I S M I C F I E L D STUDY OBSERVED MOTIONS

. ... .. . .. . .. ... ...... ...... VI: DISCUSSION. . . . . . . . . . . . one-~imensional Analysis. . . . . . .


Method. One-Dimens ional A n a l y s i s . Two-Dimensional Analysis'.

......
... ... ... ... . . . ... ... . . . . . . .

. . . . .

. . . . .

. .

.. . . . . .. . .. . .. . .. . .. . ... ... ... .. . ... ... .. . ... ...

.3

5 8

1 1

ACCEIXRATION R E S P O N S E S P E C T R A FROM ONE-DIMENSIONAL ANALYSIS

ACCELERATION R E S P O N S E S P E C T R A FROM TWO-DIMENSIONAL ANALYSIS

This page intentionally left blank

CONVERSION FACTORS, BRITISH TO METRIC UNITS OF MEASUREMENT

~ritish u n i t s o f measurement u s e d i n t h i s r e p o r t c a n be c o n v e r t e d t o m e t r i c u n i t s as f o l l o w s : Multiply inches feet miles


'

By 2.54

To O b t a i n centimeters meters

(u. S.
,

statute)

.kilometers kilograms newtons p e r s q u a r e c e n t i m e t e r k i l o n e w t ons p e r s q u a r e m e t e r kilograms p e r cubic meter c e n t i m e t e r s p e r second m e t e r s p e r seco'nd

pounds pounds p e r s q u a r e i n c h kips per square f o o t pounds p e r c u b i c f o o t .inches per second f e e t p e r second

This page intentionally left blank

SUMMARY
The motion of R i f l e Gap D a m w a s measured i n September 1969 d u r i n g t h e P r o j e c t 'RULISON underground n u c l e a r e x p l o s i o n . The observed response was t h e n compared w i t h t h e response computed i n a mathematical model. Observed and computed responses were s i m i l a r . From t h i s s t u d y it appears t h a t t h e mathematical models used a r e a p p l i c a b l e t o t h e design and a n a l y s i s of s o i l s t r u c t u r e s , a t l e a s t f o r ground motion i n t e n s i t i e s comparable t o t h o s e observed a t R i f l e Gap Dam.

This page intentionally left blank

EARTHQUAKE RESISTANCE OF EARTH AND ROCK-FILL D A M S O PROJECT ANALYSIS O F RESPONSE O F RIFLE G A P DAM T RULISON U N D E R G R O U N D N U C L E A R DETONATION

PART I : INTRODUCTION

1. The U. S. A r m y Engineer Waterways Experiment S t a t i o n (WES) was r e q u e s t e d by t h e O f f i c e , Chief of Engineers ( O C E ) ,t o measure and t o ana l y z e t h e response of R i f l e Gap Dam t o ground motions g e n e r a t e d by t h e P r o j e c t RULISON d e t o n a t i o n because it was thought t h a t t h e s e motions would be s i m i l a r t o t h o s e g e n e r a t e d by e a r t h q u a k e s . The o b j e c t i v e of

t h i s study was t o determine t h e a p p l i c a b i l i t y of seismic d e s i g n procedures i n designing Corps of Engineers ( C E ) e a r t h and r o c k - f i l l dams t o w i t h s t a n d earthquake l o a d i n g s . 2. P r o j e c t RULISON, p a r t of t h e PLOWSHARE program o f t h e Atomic

Energy Commission ( A E C ) , was one o f a s e r i e s o f d e t o n a t i o n s f o r i n v e s t i g a t i n g s t i m u l a t i o n of t h e p r o d u c t i o n of n a t u r a l gas by t h e u s e of nuc l e a r explosives. The A u s t r a l O i l Company conducted t h i s experiment as

a p r i v a t e commercial v e n t u r e w i t h t h e a s s i s t a n c e o f t h e AEC, which was


r e s p o n s i b l e f o r s a f e t y a n d t h e d e t o n a t i o n of t h e n u c l e a r d e v i c e .

3.

The W E S instrumented R i f l e Gap Dam w i t h t h e c o o p e r a t i o n o f t h e Other dams i n s t r u m e n t e d f o r

owner, t h e Bureau of Reclamation (BU Rec).

ground motion measurements d u r i n g P r o j e c t RULISON were Harvey Gap D a m , instrumented by t h e National Ocean Survey and analyzed by t h e Environmental Research Corporation f o r t h e AEC analyzed by t h e Bu Rec.

and Vega Dam, i n s t r u m e n t e d and

The a n a l y s i s o f R i f l e Gap Dam i n c l u d e s an as-

sessment of t h e geology and e l a s t i c p r o p e r t i e s of t h e s i t e and t h e dam, c a l c u l a t i o n s of t h e expected s u r f a c e motions u s i n g a v a i l a b l e p r o c e d u r e s , and a comparison of c a l c u l a t e d responses o f t h e dam with measured r e sponses r e s u l t i n g from P r o j e c t RULISON.

4.

Ground zero ( G Z ) f o r P r o j e c t RULISON was l o c a t e d southwest of

R i f l e , Colorado, a t a depth of 8442.5 f t . * The n u c l e a r d e v i c e was deton a t e d a t 3:00 p.m. MST, 1 0 Septeniber 1 9 6 9 , and had a d e s i g n y i e l d of 40 k t .

5.
plate .l)

R i f l e Gap Dam,. a n e a r t h - f i l l s t r u c t u r e , w a s completed i n 1966

and i s l o c a t e d n o r t h of R i f l e , Colorado, 1 8 . 5 m i l e s from RULISON GZ ( s e e

S p e c i f i c a t i o n s f o r t h e dam a r e p r e s e n t e d i n r e f e r e n c e 1.

The

dam h a s a c r e s t l e n g t h of 1500 f%, maximum h e i g h t of 120 ft. sand, g r a v e l , and c o b b l e s . r e s e r v o i r l e v e l was

a maximum b a s e width o f 800 f t , and a The

The dam c o n s i s t s o f a m i x t u r e o f c l a y , s i l t , A c r o s s s e c t i o n i s shown i n p l a t e 2 .

41 ft below t h e c r e s t d u r i n g P r o j e c t RULISON.

Two

Bu Rec b o r i n g s ( s e e b o r i n g l o g s i n p l a t e 3 and l o c a t i o n s i n p l a t e 4 ) ind i c a t e t h a t t h e f o u n d a t i o n m a t e r i a l s a r e a l l u v i a l s o i l s c o n s i s t i n g of i n t e r b e d d e d c l a y s , s i l t s , s a n d s , and g r a v e l s t o d e p t h s g r e a t e r t h a n 100 f t . Bedrock was not reached i n t h e s e b o r i n g s .


A~ assumed p r o f i l e

o f t h e foundation s o i l s i s shown i n p l a t e 5 .

The method used t o produce,

t h e assumed p r o f i l e i s d i s c u s s e d i n paragraph 1 1 .

A t a b l e o f f a c t o r s f o r c o n v e r t i n g B r i t i s h u n i t s o f measurement t o m e t r i c u n i t s i s p r e s e n t e d on page i x .

PART 11:
: ,

FIELD OBSERVATIONS

6.

The observed motions o f R i f l e Gap D a m d u r i n g P r o j e c t RULISON The i n s t r u m e n t s used f o r t h e measurements

are r e p o r t e d i n r e f e r e n c e 2.
t i o n transducers (PAT), p l a t e 4,

c o n s i s t e d of p a r t i c l e v e l o c i t y t r a n s d u c e r s (PVT) and p a r t i c l e a c c e l e r a and t h e measurements were recorded by o . s c i l l o The l o c a t i o n s o f t h i s equipment are shown i n graphs and t a p e r e c o r d e r s .

and a l i s t of equipment i s g i v e n i n t a b l e 1 along w i t h peak obHistories of the first

s e r v e d motions.

6 s e c ' o f observed motion and reTransverse ( p a r a l l e l t o

sponse s p e c t r a a r e p r e s e n t e d i n Appendix A f o r v e r t i c a l and r a d i a l (norm a l t o c r e s t o f dam) components o f motion.

c r e s t o f dam) motions are r e p o r t e d by ~ o w l e r , ' b u t a r e not a n a l y z e d herein.

7.

There i s e x c e l l e n t agreement between t h e v e l o c i t y h i s t o r i e s

observed a t l o c a t i o n

6 ( p l a t e ~ l land ) those calculated a t location 5

( p l a t e s A9 and A10) by t h e i n t e g r a t i o n o f t h e a c c e l e r a t i o n h i s t o r i e s .

A1 Comparison o f t h e c a l c u l a t e d v e i o c i t y h i s t o r i e s a t l o c a t i o n 1 ( ~ l a t e s
a n d ~ 2 i )n t h e r a d i a l and v e r t i c a l d i r e c t i o n s w i t h t h o s e observed at l o c a t i o n 7 ( p l a t e A12) i n d i c a t e s remarkably good agreement, even though l o c a t i o n s 1 and 7 were a p p r o x i m a t e l y 200 f t a p a r t along t h e c r e s t o f t h e dam. However, r a d i a l components o f l o c a t i o n s 1 and 7 do i n d i c a t e a cons i d e r a b l e phase s h i f t .

8.

L o c a t i o n 4 w a s i n t h e g a t e chamber, l o c a t e d i n t h e l e f t 'abut-

ment o f t h e dam.

The motion observed a t t h i s l o c a t i o n i s assumed t o be

r e p r e s e n t a t i v e of bedrock motion i n t h e v a l l e y , and motions f o r t h e first

6 s e c were u s e d f o r i n p u t i n t h e a n a l y s e s , d e s c r i b e d l a t e r .
9.
The Bu Rec t o o k p r e s h o t and p o s t s h o t survey readings from s e t '

t l e m e n t markers on t h e dam and found t h a t no permanent displacements occ u r r e d as a result of P r o j e c t RULISON. 0 The s h e a r wave v e l o c i t i e s o f t h e m a t e r i a l s i n t h e f o u n d a t i o n

and embankment were d e t e r r d n e d d u r i n g a W E S seismic f i e l d i n v e s t i g a t i o n ( ~ ~ ~ e n Dd ) i xP l a t e


.

..

6 shows t h e s h e a r wave v e l o c i t y a s a f u n c t i o n o f

d e p t h f o r t h e f o u n d a t i o n p r o f i l e o b t a i n e d from t h e s u r f a c e v i b r a t o r y

t e s t d a t a , and s h e a r wave v e l o c i t i e s o b t a i n e d from t h e Rayleigh wave

d i s p e r s i o n d a t a a r e shown i n p l a t e 7.

Curro ( ~ p p e n d i x D ) suggested t h a t

the' v i b r a t o r y s h e a r wave velocity data b e used as a lower bound and t h e maximum Rayleigh wave v e l o c i t y data be. used a s an upper bound f o r t h e material property description.

PART 1 1 1 :

MATERIAL PROPERTIES

1 1 .

The foundation s h e a r wave v e l o c i t y p r o f i l e s ( ~ p p e n d i x D ) and This was accomplished with

B u Rec b o r i n g s DH21 and DH22 ( p l a t e 3 ) were combined t o produce t h e a s sumed foundation p r o f i l e shown i n p l a t e 5. c a l of a l l u v i a l d e p o s i t s . some d i f f i c u l t y due t o t h e h e t e r o g e n e i t y o f t h e s e s o i l s , which i s t y p i Location 5 w i l l be used a s t h e l o c a t i o n f o r

which t h e observed and c a l c u l a t e d r e s p o n s e s o f t h e f o u n d a t i o n a r e compared. However, no b o r i n g s were made a t t h i s l o c a t i o n and b o r i n g s DH21 Seismic mea-

and DH22 a r e over 500 f t and 400 f t away, r e s p e c t i v e l y .


'

surements were made o v e r a c o n s i d e r a b l e a r e a a t t h e downstream t o e of

D) t h e dam. ( ~ p p e n d i x
12.

The s h e a r moduli were determined from t h e s h e a r wave v e l o c i t y

d a t a using t h e following equation:


2 G = vsp

where
G = s h e a r modulus

= s h e a r wave v e l o c i t y

P = mass d e n s i t y
These moduli a r e compared i n p l a t e 8 w i t h t h e s h e a r moduli computed from

3 Hardin ' s e q u a t i o n :

where
G

max

= s h e a r modulus ( a t low s t r a i n amplitudes p e r c e n t ), p s i


'

, i .e.

c0.25

10

-4

e = void r a t i o

OCR = o v e r c o n s o l i d a t i o n r a t i o ( 1 . 0 assumed)
k = v a r i a b l e t h a t i s a function o f t h e p l a s t i c i t y index
'

a 0 = mean p r i n c i p a l e f f e c t i v e s t r e s s , p s i ( h o r i z o n t a l normal s t r e s s e s were assumed e q u a l )

^ '

- _ _ _ _-_

_ _ .

__.

_
&

._.
-

__-.
-

.A

._

__.. - .
A_

_---

- - .--. -.

--..---

---.--.--

A .

A.

-.--

--.&

. .

---

The s h e a r moduli c a l c u l a t e d u s i n g e q u a t i o n 2 compare f a v o r a b l y with t h o s e o b t a i n e d u s i n g t h e v i b r a t o r y t e c h n i q u e e x c e p t a t t h e bedrockalluvium i n t e r f a c e .


.

Thus, t h e p r o p e r t i e s i n t h e f o u n d a t i o n a t l o c a t i o n

5 c a l c u l a t e d from t h e v i b r a t o r y t e c h n i q u e w e r e m o d i f i e d a c c o r d i n g t o
e q u a t i o n 2 and w e r e used t o e s t i m a t e s h e a r modulus d i r e c t l y u n d e r t h e dam, where it was n o t measured. This m o d i f i c a t i o n i s necessary because

t h e weight of t h e dam w i l l i n c r e a s e t h e c o n f i n i n g p r e s s u r e , t h u s i n c r e a s i n g t h e modulus as compared w i t h t h a t measured i n t h e f o u n d a t i o n away from t h e dam. Confining p r e s s u r e s w e r e o b t a i n e d from a s t a t i c f i n i t e element code (FESS shown i n p l a t e 9 . 13. T e s t d a t a from t h e Bu Rec showed t h a t t h e enibankment mateu n i t w e i g h t o f 119.6 p c f and an average moisThe s h e a r wave v e l o c i t y p r o f i l e o b t a i n e d
A Poisson's r a t i o

4 1 ) developed a t WES.

A p l o t o f s h e a r modulus v e r s u s

depth o f t h e f o u n d a t i o n d i r e c t l y u n d e r t h e c e n t e r l i n e of t h e dam i s

r i a l s had a n a v e r a g e d*

t u r e c o n t e n t of 12.6 p e r c e n t .

using t h e v i b r a t o r y t e c h n i q u e i s , shown i n p l a t e 1 0 .

of 0.4 w a s assumed f o r t h e dam a n d t h e f o u n d a t i o n m a t e r i a l .

14.

The s h e a r moduli and damping v a l u e s u s e d

in

t h e f i n a l re-

sponse c a l c u l a t i o n s were o b t a i n e d by m o d i f i c a t i o n f o r t h e computed s h e a r strain level.

.4

The s h e a r moduli .and damping c u r v e s a r e shown i n The s h e a r moduli a s d e t e r m i n e d from

1 and 1 2 , r e s p e c t i v e l y , f o r s a n d and i n p l a t e s 1 3 a n d 1 4 , replates 1

spectively, for saturated clays. 10

f i e l d d a t a o r e q u a t i o n 2 were assumed t o b e a t a s h e a r s t r a i n o f

-4 p e r c e n t .
15. The depth t o b e d r o c k , measured ' u s i n g s e i s m i c t e c h n i q u e s , The b e d r o c k p r o f i l e v a r i e d conFor t h e two-

ix ). ranged from 80 t o 120 ft ( ~ p ~ e n d D

s i d e r a b l y , and d i f f e r e n t d e p t h s were u s e d i n t h e a n a l y s e s .

dimensional ( 2 ~ a ) n a l y s e s , a h o r i z o n t a l bedrock p r o f i l e w a s assumed f o r reasons o f s i m p l i f i c a t i o n and l a c k o f s p e c i f i c i n f o r m a t i o n on d e p t h o f bedrock u n d e r t h e embankment.

16.

The fundamental p e r i o d of t h e s t r u c t u r e w a s computed u s i n g

Arnbrasey' s e q u a t i o n :

'
C

T = fundamental p e r i o d o f t h e dam, sec

H = h e i g h t o f dam,

k .

120 f t

= s h e a r wave v e l o c i t y i n dam, x 950 f t / s e c ( p l a t e 1 0 )

This computation gives a fundamental p e r i o d of 0.33 s e c .

PART I V :

CALCULATIONS

General

17.

The c a l c u l a t i o n s o f t h e response of t h e a l l u v i u m 500 f t down-

s t r e a m from R i f l e Gap Dam were made u s i n g t h r e e d i f f e r e n t methods o f a n a l y s i s ; t h e s e were : a. b. c. One-dimens i o n 1 ( 1 ) ~ lumped-mass a n a l y s i s o f f o u n d a t i o n a l l u v i urn o n l y

. 1 D F o u r i e r a n a l y s i s o f foundation a l l u v i u m only

TWO-dimensional ( 2 D ) f i n i t e element a n a l y s i s , u s i n g m o a1 s u p e r p o s i t i o n t e c h n i q u e s , of foundat.ion and embankment

The same 2D f i n i t e element a n a l y s i s was a l s o used t o c a l c u l a t e t h e r e sponse of t h e embankment.

18.
follows :

The r e s p o n s e o f t h e .foundation m a t e r i a l downstream from t h e

dam u s i n g t h e 1 D lumped-mass a n a l y s i s i s e v a l u a t e d i n r e f e r e n c e 6 as .~ssentiala l ~s o i l d e p o s i t i s r e p r e s e n t e d by a s e r i e s of l a y e r s . . . , t h e m a s s o f each l a y e r i s lumped a t t h e t o p and bottom o f e a c h l a y e r and t h e masses a r e connected by s h e a r s p r i n g s whose c h a r a c t e r i s t i c s a r e determined by t h e s t r e s s - s t r a i n r e l a t i o n s h i p s o f t h e s o i l s i n t h e various layers. S i m i l a r l y , t h e damping c h a r a c t e r i s t i c s ,of t h e system a r e determined by t h e . s o i l properties'. Modal s u p e r p o s i t i o n t e c h n i q u e s a r e used t o e v a l u a t e t h e r e s p o n s e o f t h e d e p o s i t t o t h e i n p u t b a s e motion. 19. The base i s assumed t o be r i g i d . The dynamic F o u r i e r a n a l y s i s of l a y e r e d systems a l l o w s con-

s i d e r a t i o n of e n e r g y r a d i a t i o n i n t o t h e bedrock and, "uses a onedimensional F o u r i e r t r a n s f o r m a n a l y s i s t o compute t h e r e s p o n s e o f l i n e a r , v i s c o e l a s t i c , nonuniform s o i l d e p o s i t s

, subjected

t o a base excitation.

1 1 8

S o i l p r o p e r t i e s assumed were t h o s e o b t a i n e d from t h e 1 D lumped-mass a n a l y s i s taken from t h e f i e l d v i b r a t o r y t e s t s and m o d i f i e d f o r t h e app r o p r i a t e shear s t r a i n l e v e l . analysis. The b a s e i s assumed t o b e e l a s t i c i n t h i s The amount of energy r a d i a t e d . i n t o t h e bedrock depends upon

t h e r e l a t i v e s t i f f n e s s o f t h e s o i l and bedrock.

20.
'

The f i n i t e element method o f a n a l y s i s c o n s i s t s of d e v e l o p i n g

a f i n i t e element network, o b t a i n i n g t h e s t f f f n e s s of each e l e m e n t , assembling t h e elements i n t o a s t r u c t u r e , s o l v i n g t h e e q u a t i o n s o f equilibrium u s i n g modal s u p e r p o s i t i o n t e c h n i q u e s , and e v a l u a t i n g t h e response of t h e s t r u c t u r e . surface. The f i n i t e element mesh ( p l a t e 1 5 ) was gene r a t e d t o account f o r . m a t e r i a l zones, s t r e s s zones, and t h e p h r e a t i c The element s i z e s were based on recommendations p r e s e n t e d i n The l o c a t i o n s f o r comparison of t h e observed a n d c a l c u The s o i l p r o p e r t i e s were m o d i f i e d
A horizontal

reference .9.

l a t e d motions a r e a l s o i n p l a t e 1 5 .

f o r t h e s h e a r s t r a i n l e v e l s obtained d u r i n g e x c i t a t i o n . r i g i d base a t t h e depth o f bedrock was assumed. One-Dimensional Analyses of Foundation 21. t a b l e 2.

The c a s e s i n v e s t i g a t e d u s i n g t h e I D analyses a r e l i s t e d i n Cases 1-18 were analyzed u s i n g t h e lumped-mass a n a l y s i s , and The s h e a r modulus

c a s e s 19-21 were analyzed u s i n g t h e F o u r i e r a n a l y s i s .

p r o f i l e used was t h a t obtained from s u r f a c e v i b r a t o r y d a t a ( p l a t e 6 ) except i n c a s e s 14-18, i n which t h e p r o f i l e used was t h a t from t h e Rayleigh wave d i s p e r s i o n d a t a ( p l a t e 7 ) .
.

The s h e a r moduli o f t h e

c l a y s o i l i n cases 9-13 and 19 were a d j u s t e d by a f a c t o r of 1.875 t o produce ,more comparable r e s u l t s . In a l l o t h e r c a s e s , t h e modulus proThe f i l e used was t h a t observed from i t s r e s p e c t i v e f i e l d measurement.' damping value i s t h a t value used i n t h e f i n a l response c a l c u l a t i o n s a f t e r t h e s o i l p r o p e r t i e s have been modified f o r s h e a r s t r a i n . The ex'

a c t depth t o bedrock was unknown; t h e r e f o r e , many depths were a n a l y z e d and t h e value l i s t e d i n t a b l e 2 i s t'hat f o r each r e s p e c t i v e c a s e . m a t e r i a l c l a s s i f i c a t i o n r e f e r s t o t h e curves f o r modifying m a t e r i a l properties for shear s t r a i n .
S r e f e r s t o sand and t h e m o d i f i c a t i o n

The

curves i n p l a t e s 1 1 and 1 2 , C r e f e r s t o c l a y and t h e curves i n p l a t e s 1 3 and 1 4 , and M r e f e r s t o a l a y e r e d mixture, a s designated i n t h e t y p i c a l foundation p r o f i l e ( p l a t e 5 ) i n which t h e r e s p e c t i v e curve was u s e d f o r each l a y e r of m a t e r i a l . used i n most analyses. S i x seconds o f h o r i z o n t a l i n p u t motion w e r e The e f f e c t of u s i n g 1 2 s e c o f motion w a s

d e t e r m i n e d i n c a s e 13.

I n case 1 2 , t h e e f f e c t o f u s i n g raw i n p u t d a t a The

t h a t had n o t been c o r r e c t e d f o r b a s e - l i n e s h i f t was inves-tigated. s e s a r e g i v e n i n Appendix B. . Two-Dimensional Analyses of Embankment and Foundation

D analyc a l c u l a t e d r e s p o n s e s p e c t r a and maximum a c c e l e r a t i o n s f o r t h e I

22.

Table 3 l i s t s t h e cases investigated using t h e 2 D analyses.

For all c a s e s , t h e s h e a r moduli ( G) were conrputed from t h e v i b r a t o r y s h e a r wave v e l o c i t y p r o f i l e s f o r t h e -foundation and embankment. Because

no f i e l d measurements were taken d i r e c t l y under t h e embankment, t h e s h e a r moduli p r o f i l e ' f o r . t h a t l o c a t i o n was modified, a s shown i n p l a t e 9 , Void r a t i o s of t h e from t h e v a l u e s computed u s i n g Hardinls e q ~ a t i o n . ~ f o m d a t i o n m a t e r i a l were computed from v i b r a t o r y d a t a . The s o i l proper-

t i e s of s h e a r modulus and damping were modified f o r computed s h e a r s t r a i n s , and t h e 'damping v a l u e l i s t e d i s t h a t used i n t h e f i n a l c a l c u l a lations. sponse. I n some of t h e a n a l y s e s , t h e moduli and damping values were F o r example, i n c a s e 27 a t r i a l was made u s i n g a l a r g e r modulus The modulus of t h e m a t e r i a l i n t h e embankment w a s changed as shown i n t a b l e 3 t o determine t h e e f f e c t s on t h e computed ret h a n was measured. t i p l i e d by 1 . 5 .

m u l t i p l i e d by 2 . 5 , w h i l e t h a t of t h e m a t e r i a l .in t h e foundation was m u l The damping v a l u e of t h e e n t i r e system w a s 4.6 p e r c e n t . Ninety modes o f v i b r a t i o n were used i n t h e 2D I n c a s e 2 6 , t h e f o u n d a t i o n depth was 80 f t ; a depth of 100 f t was used
i n a l l o t h e r 2D a n a l y s e s .

analyses.

S i x seconds o f h o r i z o n t a l and v e r t i c a l a c c e l e r a t i o n d a t a were It was important t o i.nclude t h e v e r t i c a l compoThe

u s e d as i n p u t m o t i o n .

n e n t i n t h e s e a n a l y s e s because t h e energy s o u r c e , an underground n u c l e a r e x p l o s i o n , produced l a r g e v e r t i c a l a c c e l e r a t i o n s a t R i f l e Gap Dam.


A damping r a t i o of 5 p e r c e n t was used f o r a l l s p e c t r a l

c a l c u l a t e d r e s p o n s e s p e c t r a and maximum a c c e l e r a t i o n s a r e p r e s e n t e d i n Appendix C . calculations.

PART V:

COMPARISONS O F OBSERVED AND CALCULATED RESPONSES Method

23.

A s y s t e m a t i c method was needed t o compare t h e amplitudes and

frequency contents o f observed motion records w i t h t h o s e of computed mo-

t i o n records.

The amplitudes can b e compared by u s i n g maximum a c c e l e r a -

I
I

t i o n s , while t h e frequency c o n t e n t s can b e compared u s i n g response spec-

tra.

The number of peaks, p e r i o d s at which peaks o c c u r r e d , and r e l a t i v e One-

magnitudes of peaks a r e used i n t h e s p e c t r a l comparisons.

dimensional a n a l y s i s r e s u l t s were compared w i t h mot ions a t l o c a t i o n 5 , on. t h e s u r f a c e o f t h e alluvium. Two-dimensional a n a l y s i s r e s u l t s were compared with motions a t l o c a t i o n 5 and a t dam l o c a t i o n s 1-3. One-Dimens i o n a l A n a l y s i s
.
,

Observed
24.

The maximum obse'rved h o r i z o n t a l a c c e l e r a t i o n o f ' t h e alluvium The a c c e l e r a t i o n response spectrum ( p l a t e ~ 1 ) The l a r g e s t o c c u r r e d a t a t h e s i z e of t h e

( l o c a t i o n 5 ~ w)a s 0.051 g. p e r i o d o f 0.15 s e c .

of t h e observed motion c o n t a i n e d t h r e e peaks.

A peak approximately two-thirds

l a r g e s t peak occurred a t a p e r i o d o f 0.33 s e c , and a ' r e l a t i v e l y minor peak occurred a t a p e r i o d o f 0.51 s e e . Cases 1-5 ( e f f e c t o f depth of a l l u v i u m ) 25. The e f f e c t ' of t h e depth t o bedrock

, which

v a r i e d from 80 f t For

i n case 1 t o 110 f't

i n c a s e 5 , was i n v e s t i g a t e d i n t h e s e c a s e s .

c a s e s 1-5, t h e lumped-mass

a n a l y s i s was used t o analyze a sand p r o f i l e


. .

with s h e a r moduli o b t a i n e d from t h e s u r f a c e v i b r a t o r y t e s t s .

The r e -

sponses o f cases 1-5 showed s e v e r a l marked s i m i l a r i t i e s t o t h e observed responses ( p l a t e B 1 )

One. s i m i l a r i t y .was t h e r e l a t i v e magnitudes o f

peaks, a s t h e second peak w a s t w o - t h i r d s t h e s i z e o f t h e maximum peak and t h e t h i r d peak (when' p r e s e n t ) w a s r e l a t i v e l y minor. which peaks occurred were a l s o similar. The p e r i o d s a t

The maximum peak of t h e r e In a l l

sponse s p e c t r a occurred i n t h e p e r i o d range o f 0.15 t o 0.19 s e c .

cases

,a

subsequent peak occurred i n t h e p e r i o d range o f 0.31 t o

0.33 sec

A minor peak o c c u r r e d i n t h e p e r i o d range o f 0.49 t o 0.51 s e c

f o r c a s e s 4 and 5 b u t was not p r e s e n t f o r c a s e s 1, 2 , and 3. l e s s t h a n t h o s e observed. 26.

The maxi-

muin a c c e l e r a t i o n s ranged from 0.035 t o 0.04'6 g; t h e a c c e l e r a t i o n s were


A comparison o f t h e response s p e c t r a f o r c a s e s 1 and

5 is

shown i n p l a t e

16.

The peaks of t h e s h a l l o w e r depth p r o f i l e (80 f t , P l a t e 17 shows a comparison of t h e The d a l c u l a t e d response, c a s e 2 ,

c a s e 1) a r e s h i f t e d upwards and t o t h e l e f t , i n d i c a t i n g more response a t lower periods. o f h i g h e r f r e q u e n c i e s . which had a depth t o bedrock o f 85 f t . p r e d i c t e d u s i n g t h e 1D a n a l y s i s method. Cases 6 and 7 ( e f f e c t of a l l u v i a l s o i l t y p e )
.

response s p e c t r a f o r t h e observed motion and t h a t c a l c u l a t e d i n c a s e 2 , compares favorably with t h e observed and i n d i c a t e s t h a t response can b e

27.

The e f f e c t of u s i n g a c l a y p r o f i l e was i n v e s t i g a t e d i n cases

6 and 7 ( p l a t e ~ 2 ) . For c a s e s 6 and 7 , t h e curves i n p l a t e s 1 3 and 1 4


were used t o modify s o i l p r o p e r t i e s f o r s h e a r s t r a i n . O n t h e response s p e c t r a f o r c a s e s 6 and 7 , t h e maximum peaks occurred a t p e r i o d s o f 0.23 and 0.25 s e c , and a n o t h e r peak, two-thirds t h e s i z e o f t h e maximum, occ u r r e d a t periods o f 0.14 and 0.15 s e c . c u l a t e d were 0.033 and 0.044 g . 90 f t and i n c a s e 7 was 110 f t . The maximum a c c e l e r a t i o n s c a l The depth o f s o i l d e p o s i t i n c a s e

6 was

' A comparison of c a s e 6 ( c l a y p r o f i l e )

with c a s e 3 (sand p r o f i l e ) i s shown i n p l a t e 18.

The response curve f o r

case 3 i s s h i f t e d upwards and t o t h e l e f t o f t h a t f o r case 6 , i n d i c a t i n g more response a t lower p e r i o d s f o r c a s e 3 ( s a n d ) t h a n f o r c a s e f i n a l response c a l c u l a t i o n i n case 3 w a s 6.5 c a s e 6 w a s 3.7
x

6 (clay).

'

The average s h e a r s t r a i n used t o modify t h e s o i l p r o p e r t i e s f o r t h e


x

p e r c e n t and i n modulus r e d u c t i o n s

percent.

These s t r a i n s

of 1 5 and 32 p e r c e n t i n c a s e s 3 and

6, respectively. 6

28.
5 (plate

The s h i f t i n response s p e c t r a o f c a s e 3 ( s a n d ) versus case

( c l a y ) ( p l a t e 18) i s s i m i l a r t o t h e s h i f t o b t a i n e d ' i n case 1 versus c a s e

16), where t h e depth increased from 80 t o 110 f t .

The e q u a t i o n

f o r t h e fundamental period

( ~ ~ of )h o ir i z o n t a l s o i l l a y e r s , each

having uniform m a t e r i a l p r o p e r t i e s ( r e f e r e n c e

lo),

is:

where

Hi

i s t h e thickness of t h e g

th

layer,

Gi

is the shear

i s t h e density. ' i This e q u a t i o n shows t h a t a d e p o s i t w i l l 'have a s i m i l a r change i n funda-

modulus,

i s a c c e l e r a t i o n due t o g r a v i t y , and

mental p e r i o d by i n c r e a s i n g t h e depth and d e c r e a s i n g t h e modulus, o r vice versa. This i s i l l u s t r a t e d by t h e s i m i l a r r e s p o n s e s p e c t r a s h i f t s i n p l a t e 16 (case 1 versus c a s e 5 ) f o r an i n c r e a s e i n d e p t h and i n p l a t e 18 ( c a s e 3 versus case 6 ) f o r a d e c r e a s e i n modulus. 29.
A comparison of t h e observed motion w i t h t h a t c a l c u l a t e d i n

case 6 ( c l a y p r o f i l e ) i s shown i n p l a t e 19. case 6 ( p l a t e . 19 )

The agreement between mea-

sured and computed responses w a s b e t t e r f o r c a s e 2 ( p l a t e 1 7 ) t h a n f o r

.
The assumed f o u n d a t i o n p r o f i l e ( p l a t e 5 ) o f i n t e r b e d d e d The s h e a r moduli

Cases 8-11 ( e f f e c t of l a y e r i n g )

30.

P l a t e B3 shows comparisons o f observed and computed s p e c t r a

f o r cases 8-11.

c l a y s , s i l t s , sands, and g r a v e l s was u s e d i n c a s e 8. t h e a p p r o p r i a t e curves f o r sand o r c l a y .

were computed from t h e v i b r a t i o n d a t a and modified f o r s h e a r s t r a i n b y Depth t o bedrock was 90 f t f o r

cases 8 and 9.

The response o f t h e motion i n c a s e 8 w a s s i m i l a r t o t h e


A

response of case 6 f o r a 9 0 - f t ' p r o f i l e o f e n t i r e l y c l a y m a t e r i a l .

comparison o f computed s p e c t r a f o r c a s e s 6 and 8 i s shown i n p l a t e 20. P l a t e 21 shows moduli versus d e p t h p l o t s of, t h e v i b r a t o r y s h e a r d a t a , which have been modified f o r s h e a r s t r a i n , f o r c a s e s and 8 ( l a y e r e d mixture )

6 (clay), 3 (sand),

The r e s p o n s e s o f c a s e s 6 and 8 a r e s i m i l a r ,

showing t h a t t h e response a t t h e s u r f a c e ( l o c a t i o n 5R) i s c o n t r o l l e d by low-velocity o r low-modulus l a y e r s i n t h e p r o f i - l e , even though c a s e 8 has sbme l a y e r s - with higher modulus v a l u e s t h a n does c a s e

6..

compar-

i s o n of t h e 'response s p e c t r a o f . t h e motions c a l c u l a t e d i n c a s e 8 w i t h

.those which were observed i s shown i n p l a t e 2 2 ; t h e s e s p e c t r a a r e not similar. 31. Cases 9-11 used m a t e r i a l t y p e s such a s t h o s e shown i n p l a t e 5 , This w a s done t o produce a. c a l c u l a t e d response s i m i l a r t o t h e There were s i m i l a r i t i e s between t h e computed r e The maximum peak of but with t h e s h e a r moduli f o r t h e c o h e s i v e m a t e r i a l i n c r e a s e d by 87.5 percent.

observed response.

sponses f o r c a s e s 9-11 and t h e observed responses. r i o d of

t h e response s p e c t r a was a t a p e r i o d o f 0.15 s e c i n c a s e 8 and a t a pe-

0.16 i n c a s e 9.

The magnitude o f t h e second peak i n a l l cases

was approximately t w o - t h i r d s as g r e a t as t h a t o f t h e maximum peak. Cases 10 and 1 1 had t h r e e peaks i n t h e , r e s p o n s e s p e c t r a , while only two peaks were v i s i b l e i n c a s e 8. The maximum a c c e l e r a t i o n s f o r cases 9 , 1 0 , and 1 1 were 0.042, 0.039, and 0.040 g, r e s p e c t i v e l y . Cases 12 and 1 3 ( e f f e c t o f i n p u t motion) 32. location The e f f e c t of b a s e - l i n e s h i f t of t h e observed a c c e l e r a t i o n a t

4~ (bedrock ) was s t u d i e d i n c a s e 1 2 , which w a s e x a c t l y t h e same


A s shown i n p l a t e s , B3 ( c a s e 11) and ~4 ( c a s e 1 2 ) ,
Both cases

as c a s e 1 1 except t h a t t h e i n p u t d a t a i n c a s e 1 2 were not c o r r e c t e d f o r base-line s h i f t . t h e r e was no a p p r e c i a b l e d i f f e r e n c e i n t h e response s p e c t r a . 1 2 . a n d 1 3 had a maximum a c c e l e r a t i o n o f 0.040 g. 33. i n case 13. The e f f e c t of ' u s i n g 1 2 s e c o f i n p u t motion was i n v e s t i g a t e d
Case 13 was e x a c t l y t h e same a s c a s e 1 1 except t h a t

6 sec

of input motion -was used i n c a s e 1 1 .

Because t h e r e was no appreciable

d i f f e r e n c e between t h e r e s p o n s e s p e c t r a f o r c a s e s '13 and 1 1 (plate B&) o r between t h e maximum a c c e l e r a t i o n s (0.040 g i n b o t h c a s e s ) , put motion was used i n a l l o t h e r c a s e s . Cases 14-18 ( e f f e c t o f f i e l d m o d u l i ) 34. p l a t e 7. As p r e v i o u s l y s t a t e d , t h e s o i l p r o p e r t i e s f o r cases 14-18 The o n l y s i m i l a r i t y o f t h e c a l c u l a t e d response with t h e obwere determined from t h e R a y l e i g h wave d i s p e r s i o n d a t a , a s shown i n

6 sec of in-

served response was t h a t c a s e 1 5 h a d a maximum. a c c e l e r a t i o n o f 0.053 g and case 1 4 had a maximum a c c e l e r a t i o n o f 0.044 g. shown i n p l a t e B5. Comparisons a r e Case 1 4 had a number o f p e a k s , w i t h t h e maximum peak

obcurring a t a p e r i o d of 0.24 sec

Cases 15-17 each had two peaks, with The maximum accelerations

t h e maximum o c c u r r i n g a t a p e r i o d of 0 . 3 1 t o 0.35 s e c and a l e s s e r peak o c c u r r i n g at a p e r i o d o f 0.14 t o 0.17 s e c . ranged from 0.070 t o 0.074 f o r cases

16 and 1 7 . The s o i l properties i n case 1 4 were m d i f i e d f o r s h e a r s t r a i n u s i n g p l a t e s 1 3 and 1 4 ; p l a t e s 10


P l a t e s 23 and 24 compare t h e observed responses with the These p l a t e s do

and 1 1 were used t o modify t h e s o i l p r o p e r t i e s f o r s h e a r s t r a i n f o r cases 15-17. c a l c u l a t e d responses i n cases 1 4 and 1 5 , r e s p e c t i v e l y . modulus determined from t h e s u r f a c e v i b r a t o r y data. Cases 19-21 ( e f f e c t of a n a l y s i s method and damping ) 35. response. P l a t e ~ 6 shows comparisons o f observed and computed responses f o r c a s e s 19-21, which used t h e 1D F o u r i e r a n a l y s i s f o r computations of The e f f e c t o f u s i n g t h i s t y p e a n a l y s i s a s opposed t o the 1 D This p l a t e shows a compariBoth cases had t h e The assumed shear 'Note t h a t the relumped-mass a n a l y s i s is given i n p l a t e 25.

not show as good a comparison a s do p l a t e s 1 7 and 1 9 , which used the

son of t h e response s p e c t r a f o r c a s e 20 ( F o u r i e r a n a l y s i s ) with the response s p e c t r a f o r case 2 (lumped-mass a n a l y s i s ) . same foundation m a t e r i a l p r o p e r t i e s .and i n p u t motion. t h e s h e a r wave v e l o c i t y of t h e o v e r l y i n g s o i l l a y e r . sponse s p e c t r a a r e s i m i l a r f o r c a s e s 20 and 2. i s l e s s than t h a t f o r c a s e 2. 0.033 g, whereas f o r c a s e 2 it i s 0.041 g.

wave v e l o c i t y of t h e bedrock was approximately f i v e times g r e a t e r than The response f o r case 20

The maximum a c c e l e r a t i o n f o r case 20 i s


A l i k e comparison can be

) 8 ( p l a t e B3). made of cases 19 ( p l a t e ~ 6 and


36. The e f f e c t of reducing t h e i n t e r n a l s o i l damping i n the F o u r i e r a n a l y s i s was s t u d i e d i n c a s e 21, which was s i m i l a r t o case 20 except t h a t t h e damping was reduced by 100 p e r c e n t . case 20. The maximum accel-

e r a t i o n f o r case 2 1 was i n c r e a s e d t o 0.035 g , a s compared t o 0.033 g f o r The response s p e c t r a were a l s o very s i m i l a r ( s e e p l a t e ~6 )

Although i t w a s expected t h a t t h e r e would b e a g r e a t e r difference i n t h e damped c a l c u l a t e d responses, t h i s was n o t t r u e f o r t h e condition a t R i f l e Gap D a m .

Two-Dimens i o n a l A n a l y s i s General 37. The observed r a d i a l and v e r t i c a l motions a t l o c a t i o n s 1, 2 , T r a n s v e r s e motions 3, and 5 were compared with t h e c a l c u l a t e d motions.

were measured, b u t could not be c a l c u l a t e d u s i n g a 2 D a n a l y s i s method. P l a t e 4 shows t h e l o c a t i o n s o f t h e PAT'S which measured t h e o b s e r v e d mot i o n s , and d e s c r i p t i o n s 'of t h e l o c a t i o n s a r e g i v e n i n t a b l e 1. f i n i t e element network ( p l a t e 1 5 ) . The l o c a t i o n s from which t h e c a l c u l a t e d motions were t a k e n a r e shown on t h e

It w a s n e c e s s a r y f o r 2D a n a l y s i s
Although t h i s i s n o t
.

t h a t a l l l o c a t i o n s be i n t h e same v e r t i c a l p l a n e .

t h e t r u e f i e l d c a s e , t h e l a t e r a l o f f s e t s between PAT and t h e v e r t i c a l p l a n e assumed f o r a n a l y s i s were not c o n s i d e r e d l a r g e . w i t h r e s p e c t t o t h e h o r i z o n t a l d i s t a n c e s i n t h e f i n i t e e l e m e n t network. The d e t a t l e d comp a r i s o n s of t h e observed and c a l c u l a t e d r e s p o n s e s f o r t h e r a d i a l a n d v e r t i c a l components at l o c a t i o n s 1, 2 , 3, . a n d 5 a r e g i v e n i n t a b l e 4. The response s p e c t r a f o r t h e o b s e r v e d and c a l c u l a t e d motions f o r loca-, t i o n s 1, 2 , 3, and 5 . a r e p r e s e n t e d i n p l a t e s ~ Case 22 ( 2 compared ~ with 1D a n a l y s i s ) 38. Case 22 w a s a 2D f i n i t e e l e m e n t a n a l y s i s of t h e 120-ft-high f o u n d a t i o n a s shown i n p l a t e 15. Although embankment and 100-ft-deep

1 ~ 8 .

b e t t e r comparisons could be made i n t h e 1 D a n a l y s e s f o r s h a l l o w e r foundations a t location 5 (alluvium), t h e seismic p r o f i l e s ( ~ p p e n d i x D) i n '

d i c a t e d t h a t an average depth o f 100 f t would be a more v a l i d a s s u m p t i o n . The s h e a r moduli of t h e m a t e r i a l s w e r e computed from t h e v i b r a t o r y s h e a r wave v e l o c i t i e s .
,

The s h e a r wave v e l o c i t y p r o f i l e s are shown i n p l a t e 1 0

f o r t h e embankment and i n p l a t e 6 f o r t h e f o u n d a t i o n a t l o c a t i o n 5 (alluvium). The s h e a r modulus p r o f i l e o f t h e f o u n d a t i o n d i r e c t l y u n d e r The mat h e c e n t e r l i n e o f t h e embankment, which was t a k e n f r o m t h e v i b r a t o r y d a t a and modified f o r c o n f i n i n g p r e s s u r e s , i s shown i n p l a t e 9 . t e r i a l i n t h e foundation was assumed t o r e s p o n d as a s a n d , and t h e curves i n p l a t e s 11 and 1 2 w e r e used t o modify m a t e r i a l p r o p e r t i e s f o r shear s t r a i n . The m a t e r i a l i n t h e embankment i s a c o h e s i v e material, and t h e curves i n p l a t e s 1 3 and 1 4 were u s e d t o modify material

properties f o r shear s t r a i n .
,

The damping v a l u e o f 5.3 p e r c e n t was t h e

a v e r a g e used d u r i n g t h e f i n a l r e s p o n s e c a l c u l a t i o n a f t e r t h e m a t e r i a l p r o p e r t i e s h a d been m o d i f i e d f o r s h e a r s t r a i n ( s e e t a b l e 3).

39. Case 22 c a l c u l a t e d motions were s i m i l a r t o t h e observed motions. The p e r i o d s of t h e m a x i m u m c a l c u l a t e d peaks were s i m i l a r t o t h e The o b s e r v e d maximum peaks f o r t h e r a d i a l components a t a l l l o c a t i o n s .

maximum c a l c u l a t e d a c c e l e r a t i o n s a t a l l r a d i a l and v e r t i c a l l o c a t i o n s were o n l y s l i g h t l y l e s s t h a n t h e o b s e r v e d a c c e l e r a t i o n s e x c e p t a t l o c a t i o n s 2R and 2V where t h e c a l c u l a t e d a c c e l e r a t i o n s were h i g h e r t h a n t h e observed. The p e r i o d s a t which t h e peaks o c c u r r e d i n t h e v e r t i c a l The c a l c u motion r e s p o n s e s p e c t r a were d i f f e r e n t from t h o s e o b s e r v e d . r e s p o n s e had t h e second o r t h i r d l a r g e s t peak.

l a t e d r e s p o n s e had a maximum peak a t t h e p e r i o d where t h e . observed I n t h e same way, t h e maximum observed peak o c c u r r e d i n t h e same p e r i o d s as t h e second o r t h i r d l a r g e s t peaks on t h e c a l c u l a t e d r e s p o n s e curves: 40. The e f f e c t o f t h e a d d i t i o n o f t h e v e r t i c a l a c c e l e r a t i o n s t o Note t h a t The foundat h e response of l o c a t i o n 5 R c a n be s e e n i n p l a t e 26, which shows t h e response s p e c t r a and maximum a c c e l e r a t i o n s f o r c a s e s 4 and 22. t h e r e s p o n s e s p e c t r a a n d maximum a c c e l e r a t i o n s a r e similar. c a s e 4.

t i o n s o i l p r o p e r t i e s assumed i n c a s e 22 a r e t h e same as t h o s e assumed i n . Case 4 w a s a 1D a n a l y s i s and o n l y t h e h o r i z o n t a l i n p u t motion Case 22 w a s a 2 D a r i a l y s i s and u s e d b o t h t h e h o r i z o n t a l c o u l d be used.

and v e r t i c a l bedrock a c c e l e r a t i o n h i s t o r i e s a s i n p u t .
Case 23 ( e f f e c t o f i n c r e a s e d modulus)

41.

Case 23 was computed t o show t h e e f f e c t o f . i n c r e a s i n g t h e Other

s h e a r modulus of t h e material i n t h e enibankment and f o u n d a t i o n . and a 1 0 0 - f t sand f o u n d a t i o n .

assumptions were t h e same as i n c a s e 22 w i t h a 1 2 0 - f t c l a y embankment The v a l u e o f 4.7 p e r c e n t damping w a s used R e s u l t s are shown i n . p l a t e s 27-34. The peaks on t h e computed r e i n t h e f i n a l response c a l c u l a t i o n .

The c a l c u l a t e d r e s p o n s e s i n c a s e 23 o f t h e v e r t i c a l m o t i o n s a t l o c a t i o n s

3V and 5 V w e r e s i m i l a r t o t h o s e o b s e r v e d .
t h e . r e l a t i v e magnitudes w e r e s i m i l a r .

sponse s p e c t r a o c c u r r e d a t t h e s a m e p e r i o d s a s d i d t h o s e observed, ' and The maximum a c c e l e r a t i o n s o f t h e v e r t i c a l components were h i g h e r t h a n t h o s e observed e x c e p t a t l o c a t i o n 5V.

The computed h o r i z o n t a l maximum a c c e l e r a t i o n s were u s u a l l y lower except a t l o c a t i o n 2R, and t h e computed a c c e l e r a t i o n a t l o c a t i o n 5 R w a s 0.050 g, as compared w i t h an observed a c c e l e r a t i o n of 0.051 g. The response s p e c t r a f o r t h e observed and c a l c u l a t e d components o f t h e r a d i a l motion had peaks o c c u r r i n g a t t h e same p e r i o d s , but t h e maximum observed w a s often a t a p e r i o d corresponding t o t h e second o r t h i r d c a l c u l a t e d maxi-

mum, and v i c e v e r s a .
Case 24 ( e f f e c t of reduced modulus) 42. case 24. The e f f e c t of a r e d u c t i o n o f .shear modulus was computed i n The assumptions were s i m i l a r t o t h o s e i n c a s e s 22 and 23 except The c a l c u l a t e d motion f o r c a s e 24 had only The maximum a c c e l e r a t i o n s a t
'

t h a t i n case 24 t h e shear moduli o f t h e foundation and embankment were m u l t i p l i e d by t h e value 0.5. a few s i m i l a r i t i e s t o t h e observed motion. l a r t o t h o s e observed.

locations 2 V and 5V were. 0.042 and 0.092 g, r e s p e c t i v e l y , and were simiThe' h o r i z o n t a l maximum a c c e l e r a t i o n s were usua l l y lower t h a n t h o s e observed except a t l o c a t i o n 2R. s p e c t i v e l y , t h a n t h e observed a c c e l e r a t i o n s .

The computed

v e r t i c a l a c c e l e r a t i o n s a t l o c a t i o n s 1 V and 3 V were lower and h i g h e r , reThe p e r i o d - o f t h e maximum, and u s u a l l y o n l y , peak on t h e response s p e c t r a occurred i n t h e range of -0.30 t o 0.34 s e c , and t h e p e r i o d o f t h e second peak, p r e s e n t o n l y i n t h e v e r t i c a l motion response s p e c t r a , , was i n t h e range o f 0.14 t o 0.18 s e c . Case 25 ( e f f e c t o f reduced dampint?) 43. Case 25 i n v e s t i g a t e d t h e e f f e c t of r e d u c i n g t h e damping v a l u e The o n l y d i f f e r e n c e between c a s e s 22 and as Consequently, t h e maximum a c c e l e r a t i o n s The computed response specThis means
.

used i n response c a l c u l a t i o n s . g r e a t a s t h a t used f o r case 22.

25 was t h a t t h e damping value used f o r c a s e 25 was o n l y two-thirds

f o r c a s e 25 were g r e a t e r t h a n t h o s e f o r case 22 , ' e s p e c i a l l y i n t h e rad i a l components of l o c a t i o n s 1-3 on t h e dam. t r a ' f o r cases 22 and 25 had t h e same shape except t h a t a few more minor spikes were p r e s e n t i n t h e response s p e c t r a f o r c a s e 25. t h a t only t h e amplitude o f t h e motion was changed a n d t h e frequency cont e n t remained e s s e n t i a l l y u n a l t e r e d between c a s e s 22 and 25. Case 26 ( e f f e c t o f depth o f alluvium)

44.

The e f f e c t of an 80-ft-deep

foundation w a s i n v e s t i g a t e d i n

c i s e 26.

a s .made because b e t t e r comparisons could be This a n a l y s i s w


A 120-ft c l a y .embankment , sand foundation, and

made i n t h e 1D a n a l y s i s a t l o c a t i o n 5R, downstream from t h e dam, with t h e shallower p r o f i l e . i n c a s e 22. moduli obtained from t h e s u r f a c e v i b r a t o r y d a t a were used a s i n p u t , a s The maximum a c c e l e r a t i o n s computed a t l o c a t i o n s 1 and 3 Similar periods of t h e p e a k s . f o r the Compariwere s i m i l a r t o those observed.

v e r t i c a l components a t l o c a t i o n s 1-3 i n t h e dam were measured. 3 R and 3 V a r e shown ' i n p l a t e s 35 and 36, r e s p e c t i v e l y . l o c a t i o n s 5R and 5V were smaller t h a n t h e observed.

sons of t h e computed -responses w i t h t h e observed r e s p o n s e s a t l o c a t i o n s The computed r e sponses a t l o c a t i o n s 2 R and 2 V were g r e a t e r t h a n t h e observed, and a t The peaks o c c u r r i n g i n t h e range of 0.12 t o 0.17 sec i n t h e observed r e s p o n s e s p e c t r a f o r l o c a t i o n s 1 R and 1 V were only minor i n t h e computed response f o r case 26. Note t h a t not as good a comparison could be made a t l o c a t i o n 5 R f o r c a s e 26 ( p l a t e ~ 7 a) s could be made with t h e 1 D a n a l y s i s i n c a s e 1 may be due t o t h e i n c r e a s e d s t r a i n i n t h e m a t e r i a l ( p l a t e ~ 1 ) This . from t h e inclusion of t h e v e r t i c a l a c c e l e r a t i o n . Case 27 ( e f f e c t of s t i f f foundation under s t i f f e r dam) 45. In case 27, t h e e f f e c t o f i n c r e a s i n g t h e s h e a r modulus o f t h e The s h e a r modulus o f t h e m a t e r i a l i n t h e foundaA f a c t o r o f 2.5

m a t e r i a l i n t h e foundation by a f a c t o r d i f f e r e n t from t h a t i n t h e embankment was i n v e s t i g a t e d . t i o n was increased by t h e f a c t o r 1 . 5 , a s i n c a s e 23. ment.

was used t o increase t h e shear modulus o f t h e m a t e r i a l i n t h e embank'

As expected, t h e responses measured a t t h e a l l u v i u m l o c a t i o n s 5R The maxi-

and 5 V were s i m i l a r t o t h o s e measured i'n c a s e 23 ( p l a t e s 37 and 3 8 ) . The response i n t h e embankment was similar t o t h a t observed. were very s i m i l a r t o t h e observed ( p l a t e s 39 and 40).
.
'

mum a c c e l e r a t i o n and response s p e c t r a computed a t l o c a t i o n s 2 R and 2~


A t locations 3 R

and 3V, peaks of t h e c a l c u l a t e d response s p e c t r a o c c u r r e d a t t h e same p e r i o d s a s those i n t h e observed s p e c t r a , b u t t h e maximum a c c e l e r a t i o n a t location 3 V was much higher t h a n t h e observed. The computed maximum a c c e l e r a t i o n a t l o c a t i o n 1 V was s i m i l a r t o t h e observed a c c e l e r a t i o n , b u t a t l o c a t i o n l R , t h e computed a c c e l e r a t i o n was much lower t h a n t h e observed a c c e l e r a t i o n .

PART V I :

DISCUSSION

One-Dimens i o n a l A n a l y s i s

46.

The U> a n a l y s i s i s used t o d e t e r m i n e t h e response of semiFor t h i s r e a s o n , t h e 1 D a n a l y s i s could

i n f i n i t e horizontal s o i l layers. s t r e a m o f R i f l e Gap Dam.

b e used only t o c a l c u l a t e response a t l o c a t i o n 5 R on t h e alluvium downDuring t h e a n a l y s i s , it became apparent t h a t These facmany f a c t o r s were v i t a l i n a c c u r a t e l y s i m u l a t i n g response. t o r s i n c l u d e t h e following: a. Shear m o d u l i , o f t h e i n s i t u medium Depth t o bedrock R e l a t i o n s h i p o f s h e a r modulus and damping t o s t r a i n amp l i t u d e f o r modification o f s o i l properties

-. b c. 47.

Use of t h e i n s i t u s h e a r moduli as measured by WES i n t h e The d a t a d e t e r -

s e i s m i c f i e l d i n v e s t i g a t i o n u s i n g t h e s u r f a c e v i b r a t o r y technique gave computed r e s u l t s comparable t o t h e f i e l d o b s e r v a t i o n s . mined by t h e Rayleigh wave d i s p e r s i o n t e c h n i q u e d i d n o t give c a l c u l a t e d

results a s good a s t h o s e c a l c u l a t e d u s i n g t h e v i b r a t o r y technique.


48. The depth t o bedrock i n t h e f o u n d a t i o n m a t e r i a l varied conN o b o r i n g s were made a t Therts i d e r a b l y throughout t h e R i f l e Gap Dam a r e a .

t h e s i t e of l o c a t i o n 5 on t h e a l l u v i u m downstream from t h e dam.'

f o r e , no a c c u r a t e determination of s o i l d e p t h could b e used i n t h e lD analyses. The e f f e c t of depth t o bedrock i s shown i n p l a t e 1 6 , which d e p o s i t with t h a t of a 110-ftB e t t e r agreement w i t h t h e observed response was obtained compares t h e response of an 80-ft-deep deep d e p o s i t . u s i n g t h e shallower bedrock depths.

49.

The type o f m a t e r i a l used, s a n d o r c l a y , determined t h e re-

l a t i o n s h i p used t o modify t h e m a t e r i a l p r o p e r t i e s f o r shear ' s t r a i n l e v e l . The comparison o f m a t e r i a l t y p e s i s made i n p l a t e 18 f o r cases 3 and 6. Both t h e maximum a c c e l e r a t i o n s and response s p e c t r a were considerably d i f f e r e n t f o r t h e two cases i n v e s t i g a t e d . c o n s i d e r i n g t h e m a t e r i a l a s sand. F o r t h e foundation m a t e r i a l

a t R i f l e .Gap Dam, b e t t e r agreement w i t h t h e observed d a t a was obtained by The g r a n u l a r m a t e r i a l was present i n

b d t h Bu Rec b o r i n g s ( p l a t e . 3 ) , b u t c o h e s i v e m a t e r i a l was a l s o p r e s e n t and r e s u l t s comparable t o t h o s e observed c o u l d be o b t a i n e d only by mult i p l y i n g t h e cohesive modulus by a f a c t o r of 1 . 8 7 5 , which a c t u a l l y gave about t h e same modulus a s t h a t f o r t h e s a n d c u r v e s a t t h a t s h e a r s t r a i n level. Because t h e e x a c t s o i l p r o f i l e i s n o t known a t l o c a t i o n 5 , it c a n o n l y be concluded t h a t t h e m a t e r i a l i n t h e p r o f i l e a t l o c a t i o n 5 responded more c l o s e l y t o t h e sand c u r v e s used i n m o d i f i c a t i o n o f s o i l properties ( ~ l a t e s 1 1 and 1 2 ) . 50. F o r t h e motions measured a t R i f l e Gap Dam, t h e r e s p o n s e s did
1 used 6 . s e c o f i n p u t mon o t change i n c a s e s 11-13 ( p l a t e ~ 4 ) . Case 1

t i o n t h a t had been c o r r e c t e d f o r b a s e - l i n e s h i f t , whereas t h e i n p u t mot i o n i n c a s e 1 2 w a s not c o r r e c t e d . Case 1 3 used 1 2 sec of i n p u t motion. The The agreement of c a s e s 1 1 and 1 2 showed t h a t t h e a c t u a l a c c e l e r a t i o n d a t a a t l o c a t i o n 4~ d i d not have a n a p p r e c i a b l e ba'se-line s h i f t .
s i s , t h e maximum r e s p o n s e o c c u r r e d b e f o r e
'(

comparison of c a s e s 1 1 and 1 3 showed t h a t , when u s i n g an e l a s t i c analy-

6 s e c and was n o t changed by

t h e a d d i t i o n of 6 s e c more of e x c i t a t i o n .

51.

The i n p u t motion f o r a l l a n a l y s e s was t h a t observed a t locaThe motion a t l o ,

t i o n 4 on bedrock i n t h e gate chamber ' ( s e e p l a t e 4 ) . profile a t location 5.

c a t i o n 4 was assumed t o occur i n t h e bedrock u n d e r l y i n g t h e foundation Most o f t h e a n a l y s e s i n d i c a t e d t h a t t h e response a t location 5 R c o u l d be p r e d i c t e d w i t h t h e 1 D a n a l y s i s ; t h u s , t h e assumption t h a t t h e motion observed a t l o c a t i o n 4 w a s bedrock motion w a s a p p a r e n t l y a v a l i d assumption. 52. The 1 D a n a l y s i s gave r e s u l t s v e r y s i m i l a r t o t h o s e observed f o r t h e a l l u v i u m ( l o c a t i o n 5 ~ ) . With t h e a d d i t i o n o f t h e . v e r t i c a l mot i o n input i n the 2 D a n a l y s i s , p l a t e 26 shows t h a t good agreement between t h e 1 D and 2D a n a l y s i s r e s u l t s i s o b t a i n e d . much s i m p l e r and c h e a p e r dimensional e x c i t a t i o n . ~wo-~imen io s n a l Analys i s 53. V for S i m i l a r r e s u l t s were o b t a i n e d a t l o c a t i o n s 5R and 5
U)

T h i s means t h a t t h e

a n a l y s i s can b e used t o p r e d i c t t h e h o r i s o i l d e p o s i t even during three-dimensional

z o n t a l motion i n a s e m i - i n f i n i t e

7.

_-.. :

.: .

-.

...

->-.

: : : -

- 3 - 7 -

-=

,-..-;

=.

.- -

.-

. A , -

. .... -. '

I . . . . ,
L

..i..'I.

- . - - - - . - - A

-.

i . A.

c a s e s 23 and 27, a s shown i n p l a t e s 37 and 38. o v e r t h a t f o r case 23.

The only d i f f e r e n c e i n

t h e two cases was t h e i n c r e a s e of modulus i n t h e embankment f o r c a s e 27 This shows t h a t t h e instrument l o c a t e d more t h a n dam w a s a t a s u f f i c i e n t d i s t a n c e 520 ft downstream from t h e 120-ft-high a l l y c a l l e d f r e e - f i e l d response 1.
.

from t h e dam t h a t ' i t s response was n o t a f f e c t e d by t h e s t r u c t u r e . ( g e n e r -

54.

The response of t h e ' foundation m a t e r i a l was b e s t p r e d i c t e d by However, comparable r e s u l t s were o b t a i n e d f o r c a s e 22

c a s e 23 ( p l a t e s 33 and 34) i n which t h e v i b r a t o r y s h e a r modulus was m u l t i p l i e d by 1.5.


4

i n which t h e -shear modulus was t h a t computed from t h e f i e l d measurements. Thus, t h e shear wave v e l o c i t i e s measured u s i n g t h e ' s u r f a c e v i b r a t o r y technique can be used i n t h e 2D f i n i t e element models.

55.

The responses computed a t l o c a t i o n s 2 R and 2 V were u s u a l l y B e t t e r agreement was o b t a i n e d by i n c r e a s -

g r e a t e r than those observed.

i n g t h e modulus i n t h e s t r u c t u r e , and s i m i l a r r e s u l t s were o b t a i n e d f o r c a s e 27, as shown i n p l a t e s 39 and 40.

56.

A change i n t h e damping v a l u e f o r t h e s t r u c t u r e , a s i n c a s e

25, had only a s l i g h t e f f e c t on t h e magnitude o f t h e response. nents.

The r a -

d i a l components of motion were more a f f e c t e d t h a n t h e v e r t i c a l compoChanging t h e damping value d i d n o t c a u s e a noticeab1.e change i n 57. t o predict. The response a t t h e c r e s t of t h e dam was t h e most d i f f i c u l t Most c a s e s produced s i n i i l a r maximum a c c e l e r a t i o n s b u t had t h e p e r i o d s of t h e peaks.

only one peak a t a p e r i o d o f 0.30 t o 0.33 s e c , which i s near t h e f'undamental period of t h e s t r u c t u r e , and d i d not have s u b s t a n t i a l r e s p o n s e a t lower periods, as w a s observed. Attempts t o produce a g r e a t e r response
a t t h e lower periods by i n c r e a s i n g t h e modulus of t h e dam were success-

ful, b u t t h e maximum a c c e l e r a t i o n s were reduced c o n s i d e r a b l y .


58. The change of modulus produces d i f f e r e n t modal f r e q u e n c i e s of I f t h e s e a r e d i f f e r e n t .from t h e major f r e q u e n c i e s o f t h e This c o u l d have been t h e reason f o r t h e ' the structke.

i n p u t , t h e responses a r e low.
was expected.

low response i n case 27 a t l o c a t i o n s 1 R and lV, where a g r e a t e r response


',

Thus, it i s 'important i n d e s i g n and a n a l y s i s t h a t a num-

b e r o f inputs be used t o produce a smooth response spectrum so t h a t t h e

PART V I I :
59.

CONCLUSIONS

The following conclusions can b e drawn from t h e 1 D analyses : a. The response of h o r i z o n t a l s o i l l a y e r s can b e p r e d i c t e d using a I D analysis. The lumped-mass and F o u r i e r analyses g i v e s i m i l a r r e s u l t s f o r a p r o f i l e i n which t h e r e i s a ' d e f i n i t e change i n s h e a r wave v e l o c i t i e s between t h e bedrock and s o i l . For t h e a n a l y s i s of R i f l e Gap Dam, t h e v e l o c i t y o f t h e bedrock m a t e r i a l was approximately f i v e times t h a t of t h e soil.

b_.

c. d. -

It i s important t o have a n a c c u r a t e determination o f t h e soil profile.


It i s important t o determine t h e exact depth t o Sedrock.
The s o i l property modification curves ' f o r s h e a r s t r a i n l e v e l a r e applicable. The s h e a r wave v e l o c i t i e s determined u s i n g t h e s u r f a c e v i b r a t o r y technique can be used i n t h e 1D a n a l y s e s . A n instrument placed a t a d i s t a n c e f i v e times t h e h e i g h t o f t h e dam w i l l give f r e e - f i e l d response. The s h e a r wave v e l o c i t i e s measured u s i n g t h e s u r f a c e v i b r a t o r y technique can be used i n the 2D a n a l y s e s , b u t due t o t h e i n c l u s i o n of t h e v e r t i c a l i n p u t motion, a more similar response was c a l c u l a t e d a t ~ i f l e Gap Dam when t h e modulus was increased by 50 p e r c e n t . -Due t o t h e complex geometry and m a t e r i a l p r o p e r t i e s . o f t h e s t r u c t u r e , use of t h e f i n i t e element a n a l y s i s i s nece s s a r y t o p r e d i c t t h e response o f v a r i o u s l o c a t i o n s i n 'the structure.

e. f. 60.

The following conclusions can b e drawn from t h e 2D analyses: a. -

b.

c. -

d. -

It i s important t o use more t h a n one i n p u t motion t o . anal y z e a s t r u c t u r e . A v a r i e t y o f input f r e q u e n c i e s i s nece s s a r y t o f i n d t h e maximum response.

e. -

here was c l o s e r agreement between computed aqd observed maximum a c c e l e r a t i o n s than between shapes o f computed and observed response s p e c t r a .

61.

For t h e a n a l y s i s of R i f l e Gap Dam, t h e f o l l o w i n g assumptions a. -

provided t h e b e s t agreement between t h e observed and c a l c u l a t e d motions : One-dimensional analysis ( l o c a t i o n 5 R on alluvium) (1)
.

Lumped-mass a n a l y s i s method Shear modulus determined from v i b r a t o r y t e s t d a t a

(2)

(3)
,

Damping from r e l a t i o n s h i p s by Seed a n d I d r i s s shear s t r a i n

for

(4)

Modulus modified from r e l a t i o r i s h i p s by s e e d and Idriss f o r s h e a r s t r a i n 8 5 - f t depth t o bedrock F i n i t e element modal superposing a n a l y s i s method Shear modulus determined from v i b r a t o r y t e s t d a t a and i n c r e a s e d 50 p e r c e n t shear s t r a i n

( 5 ) Sand m a t e r i a l
(6)
b. -

TWO-dimens i o n a l analysi s ('1)


(2)

( 3 ) Damping from r e l a t i o n s h i p by Seed and I d r i s s f o r


(4) Modulus modified from r e l a t i o n s h i p s by Seed and I d r i s s for shear strain

( 5 ) Sand i n f o u n d a t i o n ( 6 ) Clay i n embankment ( 7 ) Average 100-ft depth t o bedrock

LITERATURE CITED

U. S. Department of I n t e r i o r , Bureau o f Reclamation, " R i f l e Gap Dam and Road R e l o c a t i o n , " S p e c i f i c a t i o n NO. DC-6120, 1964, Washingt o n , D. C .

Fowler, J. , "Motion of R i f l e Gap Dam, R i f l e , Colorado; P r o j e c t R u l i s o n Underground Nuclear Detonation ,"Miscellaneous Paper S-70-1, J a n 1970, U. S. Army Engineer Waterways Experiment S t a t i o n , CE, Vicksburg, Miss. Hardin, B. 0. and Drnevich , V. P. , "Shear Modulus and Damping i n S o i l s ,"T e c h n i c a l Report UKY 27-70-CE 3 , s o i l Mechanics S e r i e s No. 2 , J u l 1970, U n i v e r s i t y of Kentucky, Lexington, Ky. Seed, H. B. and I d r i s s , I. M . , " S o i l Moduli a n d Damping F a c t o r s f o r E R C 70-10 , Dec 1970, UniDynamic Response Analyses, " Report No. E v e r s i t y of C a l i f o r n i a , College o f E n g i n e e r i n g , Earthquake Engineeri n g Research C e n t e r , Berkeley, C a l i f

O f f i c e , Chief o f ~ n ~ i n e e r s "Earthquake , S t u d i e s f o r E a r t h and Rockf i l l Dams ,"Engineer T e c h n i c a l L e t t e r No. 1110-2-79 , 12 J a n 1970, Washington, D. C . I d r i s s , I. M . , D e z f u l i a n , H. , and Seed, H. B. , "Computer Programs f o r E v a l u a t i n g t h e Seismic Response o f S o i l D e p o s i t s w i t h NonL i n e a r C h a r a c t e r i s t i c s Using E q u i v a l e n t L i n e a r Procedures , If Apr 1969, U n i v e r s i t y of C a l i f o r n i a , G e o t e c h n i c a l E n g i n e e r i n g , Berkeley, C a l i f . R o e s s e t , J. M.. and Whitman, R . V. , " ~ h e o r e t i c a lBackground f o r A m p l i f i c a t i o n S t u d i e s ," S o i l s E n g i n e e r i n g D i v i s i o n P u b l i c a t i o n No. 231, Mar 1 9 6 9 , Department o f C i v i l Engineering, Inter-American Program, Massachusetts I n s t i t u t e o f Technology,. Cambridge, Mass. R o e s s e t , J . M. and H a g a n n , A . J. , "Users Manual, Program D y f a l s I ," Jul 1969, Department o f C i v i l E n g i n e e r i n g , D i v i s i o n of S o i l Mechani c s , Massachusetts I n s t i t u t e of Technology, Cambridge, Mass. I d r i s s , I. M. , " ~ i n i t eElement A n a l y s i s f o r Seismic Response o f E a r t h Banks , I 1 J o u r n a l , S o i l Mechanics and Foundations D i v i s i o n , American S o c i e t y of C i v i l Engineers. Vol 94, No. SM3, Paper 5929, May 1968, pp 617-636. I d r i s s , I. M. and Seed, H. B., Seismic' Response o f H o r i z o n t a l S o i l Layers," J o u r n a l , S o i l Mechanics and Foundat i o n s D i v i s i o n , American S o c i e t y o f C i v i l E n g i n e e r s , Vol 9 4 , No. S M,~Paper 6043, Jul 1968, p p 1003-1031.
I1

Table 1 Summary of Equipment Used, Locations, and F i e l d Measurements Particle Acceleration Transducer
x

No. -

Transducer Location* C r e s t of dam


'

Orientation Vertical Radial Vertical Radial Vertical Radial Vertical Radial Transverse Vertical Radial Transverse
. Vertical

Particle Velocity Transducer

Peak Acceleration g's 0.062 0.094

Peak Velocity ips

1
2 3

Downstream face o f dam


'

Near t o e o f dam Gate chamber

Alluvium

Alluvium

Radial Transverse 7 C r e s t o f dam Vertical Radial Transverse


-

Note:

I n i t i a l a r r i v a l of motion was 6.9 sec a f t e r detonation. See p l a t e 4 .

Table 2 Cases f o r One-Dimensional Analyses, Location 5 R on Alluvium 500 Ft Downstream from Toe o f D a m F i e l d Test from Which Material P r o p e r t i e s Were Determined Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Vibratory Rayleigh 2
. Rayleigh 2

1 2 3 b 5
6 7

Case No.

Type Analysis Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mas-s Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Lumped-mass Fourier Fourier Fourier

Shear Modulus

Damping

%
3.9 3.8 3:7 3.5 3.7 3.2 3.3 3.3 3.3 3.2 3.2 3.2 3.2 4.0 4.7 b.7 5.9 3.2 3.4 3.8 1.9

Depth t o Bedrock ft 80 85 90 i00 110 90 110 90 90 100 110 110 110 110 110 125 80 80 80 85 85

Material Classification* S S S' S S


C C M M M M M M C S

Remarks

C C C G C C C C

8 9
10 1 1 12 13
,

1.875G4' 1.87501.875G*+ 1.875G** 1.875c**


C C G C C 1.875c+* C C

Original acceleration d a t a used f o r i n p u t 12 s e c of i n p u t f o r c a l c u l a t i n g response

14
15 16 17

18 19
20 21

Rayleigh 1 Rayleigh 1 Rayleigh 1 Vibratory Vibratory Vibratory

S S C
M

S
. S

1 / 2 damping of case 20

**

S r e f e r s t o sand and t h e modification curves i n p l a t e s 1 1 and 1 2 , C r e f e r s t o clay and t h e curves i n p l a t e s 1 3 and 1 4 , and M r e f e r s t o a mixture as d e s i g n a t e d i n t h e t y p i c a l foundation p r o f i l e i n p l a t e 5. Only t h e s h e a r moduli of t h e clay layers were changed by t h i s f a c t o r .

Table 3 Cases f o r Two-Dimensional Analyses

Case No.

Damping Shear Modulus

Foundation Depth

ft

Remarks

2 / 3 damping of case 22

27

1.5G ( f o u n d a t i o n )
2 . 5 ~(dam)
.

4.6

100

Note:

Six seconds o f h o r i z o n t a l and v e r t i c a l a c c e l e r a t i o n d a t a were u s e d as i n p u t motion. The modal s u p e r p o s i t i o n a n a l y s i s method was used. Ninety modes o f v i b r a t i o n 'were considered.

Table b C-arison of Observed'and Calculated Responses f o r 2 D Analysis Amplitude Ratio of Peaks Second Third to to Mkximum Maximum

Case
NO.

Maximum Acceleration K' s

Number of Peaks

Maximum Peak

Period of Peak, s e c Second Third Largest Largest Peak Peak

Remarks

a m Location l R , Radial Component, C r e s t of D Observed 22 23 24 25 26 27 0.094 0.073 0.052 0.041 0.119 0.091 0.035 3 1 0.32 0.31 0.27 0.32 0.31 0.29 0.29 0.12 0.32 0.19 0.15 t o 0.18 0.52 0.17 0.14 t o 0.18 3/4 4/5 1/3 Minor spike a t 0.17 sec 2/3 1/3 3/4 2/3

3
1 2 1 3

Location l V , V e r t i c a l Component, Crest of D a m Observed 22 ' 23 24 25 26 27 0.13 0.33 0.30 0.34 0.32 0.36 0.30

0.31.

0.21

2/3 1/2

i/3

0.14 0.16 0.19 0.15 t o 0.17 0.13

1/4
1/3 1/3 1/2

Location 2R. ~ a d i a Component. l Halivay D o v n Face of D a m Observed 22 23 24 25 26 27 0.32 0.29 0.24 0.33 0.31 0.30 0.15 0.13 0.16 0.14 0.16 0.16 0.30
D

0.31

314 1/3 1/1 1/3 2/5 2/3


m Face of D a m

7/10

Minor peak a t 0.56 s e c

Location 2V. V e r t i c a l Component. Hal*ay Observed 22 23 24 25 26 27 0.08 t o 0.13 0.31 0.29 0.33 0.30 0.30 0.29
'

0.30 0.14 O.lb 0.14 0.14 0.14 0.14

4/5 1/3 5/8 1/2 1/3 2/5 1/1

Minor peak a t 0.19 s e c

Location 3R. Radial Component. Near Toe of Dam Observed 22

0.052 0.039

3 3

0.13 0.27

0.20 0.24

0.31 0.9

5 /6 1/1

1/2 2/3

Minor peak a t 0.49 s e c Relatively minor peak a t 0.51 s e c

l/b 3/4 a m Location 3V. Vertical Comonent. Near Toe of D Observed

Location 5R. Radial Component. Alluvium Observed 22 28 23 25 26 27 0.051 0.032 0.050 0.046 0.039 0.032 0.52 1 0.30 0.19 t o 0.23 0.19 0.15 3/5 1/2 9/10 2/3 9/10 8/10

'I4
112 1/2

Minor spikes present

4
2 3

0.28 0.31 0.35

0.32 0.27

0.061

Fourth. peak a t 0.49 sec Tvo minor Desks a t 0.24 and 0.47-sec Minor peak

Location 5V. V e r t i c a l Component. Alluvium Observed 22 0.088

0.061
0.072 0.092 0.063 0.050 0.069

23 24
26 25 27

2 3 2 2 4 3 2

0.08 t o 0.4 0.29 0.14 t o 0.19 0.32 0.22 0.19 0.14 t o 0.19

0.29 0.13 0. Y 0.14 0.29 0.14 0.31

0.20

1/2 9/10 1/2 3/10

8/10

0.24 0.28

'I1 3/4
1/2

1/1 '2/3

Fourth peak a t 0.14 sec

SCALE

Or NlLLS

KEY MAC

.LOCATION MAP
RIFLE GAP D A M

PLATE I

C Crest o f dom...

... J
I

J Riprop on

10

LLLLLLW.1

M a

100

belor E L 5910

SCILL OF

FEE1

MAXIMUM

SECTION

8
@

EMBANKMENT

EXPLANATION
,

Cloy, silt. sand ond qrorel compacted by tompinq rollers t o 6 -inch layers. 11 Cloy, silt, sond,qrovrl and cobblts tomllortcd by tompinq rallcrs b Q - l n m Iayers,

Miscelloneour clor. s r l t , sond. grovel. ond cobbles or rock fropments compocled by tomplnp r o l l e r s t o 12-inch l o p r s . Selected sond,qravel ond cobbles or r o c k trogmrnts p l o r t d in 2,. Inch loyerr.

GENERAL PLAN AND SECTION


RIFLE GAP DAM

OH21
0 I L O W I I ~ ~ . to ro eo

EL 5861.2

NOTE:

N I S I Z E H O L E . N I C S 0-100'. D R I V E S A M P L E S 0-55.. 80'-01)'. W A S H S A M P L E S 51'-80'.

AND

D H 22
aLOw,I*l.

SAND. F l N E W l T H L I T T L E C L A V . L O O S E L Y P A C K E D . T A N

20

21'-36'

GRAVEL A N 0 CLAV. S I L T Y . WlTH LENSES O F SAND A N D G R A V E L LOOSE TO MEDIUM DENSITY

.o
S I L T Y . GRAY. C O N S I S T E N C Y IS S T I F F

I ,
DENSITV

ee.-a!o
ao a,,?

CLAY;

SILTY.

MEDIUM'

CONSISTENCY

1.11
O W

01'-94' 94'-100'

SAND. F l N E W I T H S O M E C L A V : M E O l U M C O N S I S T E N C Y GRAVEL. eOULDERS. A N D SAND. DENSE T O VERY D E N S E

ma

,
12-#B-a.

NOTE:

A L L M A T E R I A L F R O M 0-100' A R E S T R E A M C H A N N E L A N D F L O O D PLAIN DEPOSITS. N X C S 0-100.. A L T E R N A T I N G W A S H AND D R I V E SAMPLES.

NOTE: SEE P L A T E 4 FOR BORING LOCATIONS.

B O R I N G LOGS
HOLES DH21 A N D OH22
!

PLATE 3
\

L O C 5 AND 6

C Crest of d o m - . .

L O C 1 AND 7 -cres t 1.5978

s e t t l e m e n t potnt ( p r o j e c t e d 1

MAXIMUM

SECTION

NOTE:

LOCATION 4 I S O F F S E T 560 FT EAST OF A L I N E THROUGH L O C 1. A N 0 L O C 3 A T E L 5878.81.

LOCATIONS O F MOTION MEASURING STATIONS

PLATE 4

L O G OF BORING
0;SAND (120

DESCRIPTION PCF)

SAND, GRAVEL, BOULDERS ( 1 3 0 PCF)

W T p ---

--

2 0

SILTY

CLAY (125 PCF)

4 0

C L A Y (125

PCF)

I-

LL

f
W 0

60-

GRAVEL, BOULDERS (130 P C F )

a .

C L A Y (125
80

PCF)

G R A V E L , SAND, B O U L D E R S ( 1 3 5 P C F )

I00

BEDROCK

120POISSON'S RATI 0 0.40

ASSUMED PROFILE OF FOUNDATION SOILS

PLATE 5

800 0

S H E A R WAVE V E L O C I T Y , FT/SEC 9 00 1000 700 800

1 1 0 0

20

P -

40

F
LL
C

"

F
Q
W 0

6 0 -

80

100

0
120

S H E A R WAVE VELOCITY PROFILE FOR THE FOUNDATION


VIE RATORY T E S T DATA

PLATE 6

600
0

800

SHEAR WAVE VE LOCITY, 1000 1200

FT/SEC

1400

1600

I800

20

40.

&

60,
I LL

+ n
W

80
2720 rA

R-2
R-l 100
*

I20

R - l FROM SEISMIC L I N E S - I , SEE APPENDIX D R - 2 F R O M S E I S M I C L l N E 5 - 2, S E E A P P E N D I X 0

%?a

140

SHEAR WAVE VELOCITY P R O F I L E FOR THE FOUNDATION


RAY L E I G H WAVE DISPERSION DATA
PLATE 7

SHEAR MODULUS, KSF

--//IN/

LEGEND
VIBRATORY DATA RAY L E I G H D I S P E R S I O N DATA

R A N G E FOR e = 0.9 e = 0 . 4 , O C R K = I, M A T E R I A L PROPERTIES IN P L A T E 5

FOUNDATION S H E A R MODULUS C O M P A R I S O N S

PLATE 8

SHEAR

MODULUS,

KSF

3
0

20

40
I LL

I
C Q
W

60

80

100

SHEAR M O D U L U S VS DEPTH O F F O U N D A T I O N AT CENTER LINE O F D A M

PLATE 9

SHEAR

WAVE

0 0

400

800

VELOCITY, FT/SEC 1200

I600

2000

20

40
LL

I -

m W a
0
W

60

rn

x
C
W

a
80

100

120

SHEAR WAVE VELOCITY PROFILE FOR THE EMBANKMENT


V I B R A T O R Y T E S T DATA

PLATE 1 0

1 .o

*z
2 ,

I -

0.8

a u
a0
W

za
a' 0
I
11

"'F .a 2
V)

0.6

DL"
a n 0 0

0.4

1 1

a a a 40.2
W W

I I
IJl v,

0 10-4

10-3

10-2 S H E A R S T R A I N 7 , .P E R C E N T

10-1

V A R I A T I O N O F SHEAR M O D U L U S W I T H SHEAR S T R A I N FOR SANDS


AFTER REF 4

28-

/
24

/ '

20

z W
U

a
0

I a

I0 - 4

10-3

10-2 SHEAR STRAIN,

10-1
PERCENT

DAMPING RATIOS FOR SANDS AFTER REF 4

0 10 4

10-3

10-2 SHEAR STRAIN

10-1

Y ,P E R C E N T

10

TYPICAL REDUCTION OF SHEAR MODULUS W I T H SHEAR STRAIN FOR SATURATED CLAYS


AFTER REF 4

35

30

25
I -

z W

U K

0 I 0

20

<
15

Z 0 x 4
0

/
. /

1 0

,
5
. ,

/'I

----0 10-4

10-3

10-2 SHEAR S T R A I N ,

10-1 PERCENT

I'o

DAMPING RATIOS FOR SATURATED CLAYS


AFTER REF 4
b

UPSTREAM

+ I 1

DOWNSTREAM

FINITE ELEMENT MESH FOR

20 ANALYSIS AND LOCATIONS OF


MEASUREMENT STATIONS

I
PLATE I 5

0 35

0 30

0 25
0,

' 2
Q

0 k

a
W
J

0 20
y*CASE
/

U 4
W V)

I\
I I I
0.15.
CASZ 5

a
W

0
y,

CK

a
0 10-

0 05

I
I

0
0

02

04

06

08

10

PERIOD, SEC

RESPONSE SPECTRA FOR I D LUMPED-MASS ANALYSIS


C A S E S I AND 5

PLATE 1 6

035r

0 30

0 25
[r,

'2

I u

0
[ I

/ - OBSERVED

W 1
W

020.

U U

0 a m 0 15.
W

I f\ \ 1 I

&

u
W

a
0.10

1 II' \\ \v f lI
f

' y CASE

\$J

0 05

0 ,

0.2

04

06

08

10

P E R I O D , SEC

OBSERVED AND COMPUTED I D RESPONSE SPECTRA


CASE 2
w

PLATE 17

0 35

0 30

0 25
0,

'z
a
W

J W

0 20

a
z

W
V)

0
0.
W
(t

,CASE
0.15

y,

n
I\
y-CASE 6

W 0.

s u

0. I 0

0 05.

-----10

0.2

0.4 0 8 PERIOD, SEC

08

COMPUTED I D RESPONSE SPECTRA,


CASES 3 A N D 6

PLATE 1 8
I

. =

. .
_

. . .. _

- -- 7

-77

..=--:-

-7'

. - . _ _ - . - -

i -

.=_

. C

: - - = > A

-z-;.

A.

-.

%.
A

: .

z--

.... .A

i _ _ . ; -

.
0 35

0 30

0 25
0 ,

2 '

a
W A
W

0 20
--OBSERVED

V U

z a
W

V)

0
y,

0 15'

,/CASE

a
s

a
W

a
0 I 0

0 05

.--

-\,
10

0
0

02

0 4 0 8 PERIOD, SEC

08

OBSERVED AND COMPUTED I D RESPONSE SPECTRA


CASE 6

PLATE 1 9

0 35

030-

0 25
IJ)

'z
4

F
( I

0
W

u u
4
W

J W

0 20

v,

Z 0

a.
y,
W

0 15,

a
f 2
W

n
0 I0

0 05

0
0

02

04

08 PERIOD, SEC

08

10

COMPUTED I D RESPONSE SPECTRA


C A S E S 6 AND 8

SHEAR M O D U L U S , 0 0I

KSF
4

20.

40
LL
L

x
l W

a .
0

60,

\
80
I I

--

-4-

I OD
L.

LEGEND --- -

CASE' 3 CASE 6 CASE 8

NOTE: MODULUS MODIFIED' FOR SHEAR STRAIN.

SHEAR MODULUS PROFILE MODIFIED FOR SHEAR STRAIN


PLATE 21

0 35.

0 30

0 25

m
'2

u a
W

0 I J W

OBSERVED

020,

V
W

u
Q.

cn

z
0 0 .
y,
W

0 15,

LL

f
4
W

a .
0 10,

I Ij
/
0 05

: y

\vt

\ ,I

1,

I
I

I '
0

' .
0.
0 0 2
04
0 6 PERIOD, SEC

08

10

OBSERVED AND COMPUTED I D RESPONSE SPECTRA


CASE 8

PLATE 22

0 35

0 30

il,

' 1 I I

025.
m
2 '

I -

a
_t

1
0 20

' I I I
l

I I

1
1

a
W
W

!
I

I
I

U U

z a y,
W

0 15.

I I '

'

I I I
I t

lx
L
w

a
0 I0

OBSERVED

0 05

02

04

06

08

10

PERIOD, S E C

OBSERVED AND COMPUTED I D RESPONSE SPECTRA


CASE 1 4

PLATE 23

PLATE 24

0.3 5

0.30

0.25

r n

9 0 I -

4
J

[ I

W W

0.20

u
V

ul

'.
0.15-

0
y,
W
( t .

,CASE

.
-CASE 2 0
0.10.

CL

0.05

\ -----0 0 0.2 0.4 . 0.8 PERIOD, SEC 0.8 I .O

COMPUTED I D RESPONSE SPECTRA


CASES 2 AND 2 0
7

PLATE 25

0 35

0 30

0.25
D

I -

2 '

a
W W
J

0 20

U V

W
V)

a cn 0 15
W

Q f

W Q

0. I 0

0 05

0.2

04 0 6 PERIOD, SEC

08

10

COMPARISON OF I D AND 2 D RESPONSE SPECTRA


LOCATION 5 R A D I A L COMPONENT CASES 4 A N D 2 2

.
0.35

0.30

0 . 25

+
a
W J W

2 -

0.20

0
U

0 .
y,

0
W

0.15

a a
W

a .
0. I 0

0.05

0.2

0.4

0.8' PERIOD, SEC

0.8

1 .O

OBSERVED AND COMPUTED 2 D RESPONSE SPECTRA


LOCATION I RADIAL C O M P O N E N T C A S E 23

PLATE 27

0 35

0 30

I,

p,
I

/'

I ' ' I
I

I
025
I

'

I
\ \

+
a
W

2 '

I I I I I I

I
\

z
a
s
4
W W

OBSERVED

0 2 04 08 08
PERIOD, SEC

10

OBSERVED AND COMPUTED 2 D RESPONSE SPECTRA


LOCATION I V E R T I C A L COMPONENT C A S E 23

PLATE 28

0.35

0.30

0.25
0,

r.

0 + u

z '

I
0.20
I

a
W

V 4
W

ul
Z

a
W

y,

0.15

'

a
z

1 I

W-

0.

\
0.1 0'

\ \

&--0BSf RVED

n
0.05

0.2

0.4 0.8 PERIOD, SEC

0.8

1 .O

OBSERVED AND COMPUTED 2 D RESPONSE SPECTRA


'

LOCAT ION 2 RADIAL COMPONENT CASE 2 3

PLATE 29

0351

0 30,

0 25
n ,
2 '

I -

a
w

a
W
J

I
020

,'\
\

\ '

a
W
( r

I . I I
/
1

I
\ \
-CASE 2 3

m 0 15,

a
W

a
0 10

-OBSERVED

0 05

0
0

0 2

0 4

0 8 PERIOD, SEC

08

10

OBSERVED AND COMPUTED 2 D RESPONSE SPECTRA


LOCAT I O N 2 VERT I C A L COMPONENT C A S E 23

, PLATE 30

0 35

0 30

025
0,

2 '

u a
W J

0 -

0 20

U U

z a .
y,
W

W V)

0 15

a
z
W

a
a
0 I0

0 05

0
0

0.2

04

0.8

08
I

10

PERIOD, SEC

OBSERVED AND COMPUTED 2 D RESPONSE S P E C T R A


LOCATION 3 R A D I A L COMPONENT. C A S E 23
>

PLATE 3 1

0 35*

0 30

025
0)

, ' l

C
a
4

2 '

1 I I I I

V U

W J W

020

Ij,;
-CASE 23

W V)

n
V)
W (L:

0 15,

a
W

<
-OBSERVED
0. I 0

( 1

0.05

; J

0
0 0.2 0 4 0 6 PERIOD, SEC 0 8
10

OBSERVED AND COMPUTED 2 D RESPONSE SPECTRA


LOCAT l O N 3 VE R T I C A L COMPONENT C A S E 23

PLATE 32

__

_ _ _.

-.

_. .
-

--

____.
&

.-

._
L

_-- -.A

-.

-.

- -.
- . .-

-.-&

.._--.
&

_/

-._ .. .

-..&

_.

1111111111111111111llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllmlllllllllllttttttttmttttttttttt~~~~~~~~w"~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

0.35

0.30-

5 0.2
0

I -

2 '

OBSERVED

a
W _r
W

<
0.20

U U

<
z

ln

0
P
W

cn 0.15

a
W

* a

.
0.I0

0.05

0' 0

0.2

0.4

0.8

0.8

I .O

PERIOD, SEC

OBSERVED ANDCOMPUTED 2 D RESPONSE SPECTRA


LOCATION 5 RADIAL COMPONENT C A S E 23

PLATE 3 3

0 35
3

0 30

025

0 l-

m z '

a
W
J

a
W

0 20

U U

Z 0

a
W

Y ,

0 15

I I I
I

a s a
W

a
0 I0

0 05

-.------0
0

0.2

04 08 PERIOD, SEC

08

10

OBSERVED AND COMPUTED 2 D RESPONSE SPECTRA


LOCAT ION 5 V E R T I C A L COMPONENT C A S E 23
L

PLATE 34

- _ -

__.

_ __ _ _

.__

_ .L

. . I

-_

._.

_----- - . -

<.

-- _

.-.

..

._A

__ _

_:_
&

_.

- - - -- .
. . C

.-

0.35.

0.30.

0.2 5
(T,

'z
I-

a
W
J W

0.20

u u
d
W

z 0 n
m

0.15

a
s
Q
W

a
0.I 0

9,'
; I
1

I\ I

1 I

.I I

'

!!
I 6' I /

+-CASE I I

26

/
,

\(\,
\

0.05

.'
------,
0' 0

0.2

0.4

0.6

0.8

1 :O

PERIOD, SEC

OBSERVED. AND COMPUTED 2 D RESPONSE SPECTRA


LOCAT ION 3 RADIAL COMPONENT C A S E 26

PLATE 35

0 35

030,

025
0 ,

k
n
W

2 '

f-'\

020

!
I

' I

',
I

U U

-CASE 26

a .

- OBSERVED

\ \ 0.05

\ \

/ !

0 0

02

04

08

08

10

P E R I O D , SEC

OBSERVED AND COMPUTED 2 D RESPONSE S P E C T R A


L O C A T ION 3 V E R T I C A L COMPONENT CASE 2 6
6

PLATE 36

0 35

0 30

025.
0,

'z
I -

a
W

<
020, I\
I'

W U

<

u l
Z

0
[L

y,

0 15

a
z
4
W

a
0. I 0
I

N '"'

L'

0.05

0.2

0.4

0 8

08

10

P E R I O D , SEC

COMPUTED 2 D RESPONSE SPECTRA


LOCATION 5 RADIAL COMPONENT CASES 23 AND 27

PLATE 37

035r

0 30

CASE 27
025,
[T,

'z
I -

0 4

a
W
W
_J

020

U U

m Z 0 Q. m 0 15
W
(t

YZ
W

a
0 10,

0 05

0'
0

-02
04 08 08
10

P E R I O D , SEC

COMPUTED 2 D RESPONSE SPECTRA


LOCATION 5 VE R T I C A L COMPONENT C A S E S 23 A N D 27
2

PLATE 38

0.35

0.30

0.25

cn
'2
I -

0 4

a.
W

0.20

V U

a
z

W V)

0
(L

y,
W

0.15

a
'L

17
\

-- OBSERVED

W Q

0. I 0

0.05

0.2

0.4

0.6 PERIOD, SEC

0.8

1 .O

OBSERVED AND COMPUTED 2 0 RESPONSE SPECTRA


LOCATION 2 R A D I A L COMPONENT C A S E 27
'

PLATE 39

0 35

0 30

025
m
'2 0
I -

a
W _1

020?

U U

- OBSER YED
I

cn

z
W

0 0 .
y,

0 15

a
s
Q
W
(L

0
0

02 04 06
08
10

PEBIOD, SEC

OBSERVED AND COMPUTED 2 D RESPONSE S P E C T R A


LOCATION 2 V E R T I C A L COMPONENT

C A S E 27
&

PLATE 40

This page intentionally left blank

This page intentionally left blank

1.
,

The f i r s t

6 s e c o f motion h i s t o r y f o r t h e r a d i a l and v e r t i c a l

components a r e shown i n p l a t e s A l through A 1 0 f o r l o c a t i o n s 1 through 5 , r e s p e c t i v e l y ; a c c e l e r a t i o n response s p e c t r a a r e a l s o shown i n t h e s e plates. P l a t e s A l l and A12 show t h e observed r a d i a l and v e r t i c a l motion

h i s t o r i e s from PVT l o c a t i o n s

6 and 7.

The r a d i a l components were mea-

sured h o r i z o n t a l l y and p e r p e n d i c u l a r t o t h e a x i s o f t h e dam; t r a n s v e r s e

. motion components were measured h o r i z o n t a l l y and p a r a l l e l t o t h e a x i s o f


t h e dam and a r e r e p o r t e d i n r e f e r e n c e 2. have been modified f o r b a s e - l i n e histories.
2. A response spectrum i s t h e maximum r e s p o n s e of a single-degree-

The a c c e l e r a t i o n h i s t o r i e s

s h i f t with a parabolic correction.

They have a l s o been i n t e g r a t e d t o produce v e l o c i t y and displacement

of-freedom system t o an a c c e l e r a t i o n h i s t o r y , a s i l l u s t r a t e d i n f i g . A l . In t h i s c a s e , t h e s p e c t r a a r e p l o t t e d a s c u r v e s o f maximum a c c e l e r a t i o n versus n a t u r a l period v a l u e s of


T T

f o r a v a l u e of damping

By v a r y i n g t h e
A re-

and

,a

complete s e t of c u r v e s i s developed.

sponse spectrum can be used a s a v e h i c l e t o compare t h e frequency cont e n t of various motion h i s t o r i e s .


WES b u t a r e not p r e s e n t e d h e r e i n .

The r e l a t i v e v e l o c i t y and r e l a t i v e

displacement response s p e c t r a have been computed and a r e a v a i l a b l e from

K M
U U

<

D T

CIRCULAR F R E Q U E N C Y STIFFNESS MASS DAMPING PERIOD

CURVES FOR VARIOUS

RESPONSE SPECTRA

Fig. A l .

Response s p e c t r a

0. I
I .O

0,

0 +

2 '

0.0

J W

<
-0. I 2.0

2 0
C

< 0.6 u
w
J

; I
4
W

9b C R I T I C A L DAMPING
0.4

$
I .O
0 '

u
-U

.'

E * ' t

0 2
0

t:
w

>

0.2

0.4

0.6

0.0

I .O

1 .O

.PERIOD, SEC

b. ACCELERATION RESPONSE SPECTRUM

-2.0 0.1
N O T E : LOCATION I WAS ON THE SURFACE Of THE DAM AT THE CREST.

c
I 2 . W

5
4

-a

? !

-0.1

L
0

I
I .O

I 2 .O

1 3.0 TIME, SEC

I
4.0

I
5.0

1
8.0

a. M O T I O N HISTORY

MOTION HISTORY AND ACCELERATION RESPONSE SPECTRUM RADIAL.COMPONENT


LOCATION I

0.8

0)

2 .

0
W

; 0 . 8 LI
Y J

6 w

% CRITICAL DAMPING
4

. " :
0 .n

0 PERIOD, SEC

b. ACCELERATION RESPONSE SPECTRUM

N O T E : L O C A T I O N I WAS ON THE SURFACE OF THE DAM AT THE CREST.

z
I '

w
D 6
-1
6

v
1
I

Ul

-0.1

I I
4

J
8.0

MOTION HISTORY AND ACCELERATION

0 '

.o

2 0

3 0 TIME, SEC

.o

5 0

RESPONSE SPECTRUM
V E R T I C A L COMPONENT
LOCATION I

a . ' M O T I O N HISTORY
~

045

0
O
0 38

2 '

2
w
U
_I

0
-0
I

i
027

2 0

u u

<

% CRITICAL DAMPING

w
$018
1 0
L
" w 7

u u L , n

r u

o
0

09

>

0,
>
- I

0
0

0 2

0 4

0 6

0 8

I 0

PERIOD, SEC

b ACCELERATION RESPONSE SPECTRUM

- 2

1 -

NOTE

L O C A T I O N 2 WAS ON THE DOWNSTREAM FACE OF DAM

z
I '

$'
6

u
_I

" l

a
-0
I

I
I

I 0

2 0

3 0
TIME, sEc

4 0

5 0

J 6 0

MOTION HISTORY AND ACCELERATION RESPONSE SPECTRUM


RADIAL COMPONENT
LOCATION 2

a M O T I O N HISTORY

.
1.00.8-

m
2 '

0
' i o.e u

0.2

0.4

0.6

0.8

I .o

PERIOD. SEC

b. ACCELERATION RESPONSE SPECTRUM

NOTE: LOCATION 2 WAS ON THC DOWNSTREAM FACE OF DAM.


0. I r

E
I -

.
. 0 ,

5
Q

I?
-0.1

I
0
I .O

MOTION HISTORY
I
* O .

I
3 0

I
4.0

I
.5 0

I
6.0

AND ACCELERATION
RESPONSE SPECTRUM VERTICAL COMPONENT
LOCATION 2

TIME,

SEC

a. M O T I O N HISTORY

r
0
1

l
J
U W

<
-0
I

0
W

i
6

20
J
Y

2 0

U
U

u L n 2 0 4 0
1 0

% C R I T I C A L DAMPING

'n

,
Z
>

0 0

u
0 w >
- I 0
0

0 2

0 1

0 6

0 8

1 0

PERIOD, SEC

b ACCELERATION RESPONSE SPECTRUM

-2
0

0 1 NOTE LOCATION 3 WAS NEAR TOE OF DAM

6
J
' n

- 0

I 1 0

I 2 0

I 3 0 TIME, SEC

I
4 0

I 5 0

I
6 0

RESPONSE SPECTRUM
RADIAL COMPONENT
LOCATION 3

MOT1ON HISTORY AND ACCELERATION

M O T I O N HISTORY

.
0. I
0

I .O

0
b -

1 '

2
u
J U

0 . 8

2
-0.1 2.0

0.8

u
u J
U

u
0.4

I .O
U

W LA

a
u

96 CRITICAL DAMPING
0.2 0

'

> '

0,
>

- 2I . 0 0 0. I

t
0
I 1.0

0 0.2 0.4

0.6

0.8

I .O

PERIOD. SEC

b. ACCELERATION RESPONSE SPECTRUM

NOTE: LOCATION 3 WAS NEAR TOE

oc

DAM.

3
I '

" l

-0.1,I 2.0

MOTION HISTORY
I

3 0 TIME, SEC

I 4.0

I 5.0

1
8.0

AND ACCELERATION

RESPONSE SPECTRUM
VERTICAL COMPONENT
LOCATION 3

a. MOTION H I S T O R Y .

I
0
0

'2

0 +

2
U

w J

-0

2 0

1 0

% CRITICAL DAMPING

U
" 7

, z
0

.+ u
W 2

>

>
0
- I

0 2

0 4 0.8 P E R I O D . SEC

0 8

10

b ACCELERATION RESPONSE SPECTRUM

- 2 0

0 l r

NOTE

L O C A T I O N 4 WAS IN T H E GATE C H A M B E R

*w

Z
J

0 .

MOTION HISTORY
1 1 0

" 7

-0

L
0

I 2 0

3 0
TIME, SEC

I 4 0

I 5 0

I 6 0

AND ACCELERATION

RESPONSE SPECTRUM
RADIAL COMPONENT
LOCATION 4

M O T I O N HISTORY

0
0

0 35

0 $
Y J

2 '

0 28

u U

2
0
- 0 I

2 021 I
Y

2 0

J Y

r
Y

014

1 0
U
" l

a
Y

u l

a
% C R I T I C A L DAMPING

2
2 '

0 07
0

U
Y J

>
- I 0

0 0 2
D
d

0 I PERIOD. SEC

0 8

1 0

b ACCELERATION RESPONSE SPECTRUM

-2 0
0
1 -

NOTE

LOCATION 4 WAS IN THE GATE CHAMBER

z
I I d

:
4

-L
0 I 1 0

A A MOTION HISTORY AND ACCELERATION

" l

- 0

1 2 0

I
3 0 T IUC, SCC

I
4 0

I 5 0

I
6 0

RESPONSE SPECTRUM
VERTICAL COMPONENT
LOCATION 4

M O T I O N HISTORY

0.2

0.4

0.6

0.0

1.0

PERIOD, SEC

b. ACCELERATION RESPONSE SPECTRUM

- 0 . l L

I
0

1 1.0

1 2.0

I 3.0 TIME, SEC

I
4 .O

I
0.0

MOTION HISTORY AND ACCELERATION

5.0

RESPONSE SPECTRUM
RADIAL COMPONENT
LOCATION 5

a. M O T I O N HISTORY

1.0

111

2 '

d
Y J

0 . 8

u U

0
- 0 . 1 2.0

2
0.6

u u

:
J

Y
4

u
0.4 I .O
0 n

I n
a
W

U
Y " 7

% CRITICAL DAMPING
0 0

"

>

t
0
Y

>

- 1 .o

0.2

0.4

0.6

0.8

I .O

PERIOD. SEC

b. ACCELERATION RESPONSE SPECTRUM

- 2 . 0 0. I NOTE: LOCATION 5 W A S ON THE SURFACE OF THE ALLUVIAL VALLEY.

z
' e
W

u I
U

" l

-0.1

MOTION HISTORY
I
0

I
1.0

I 2 0

I
3 0 TIME, s c c

I
4.0

I
5 0

I
6 .O

AND ACCELERATION
RESPONSE SPECTRUM VERTICAL COMPONENT
LOCATION 5

a. M O T I O N HISTORY

-I

2 ' -2 z
U)

D -

! z

RADIAL COMPONENT
2
I 1

S W
>

-A- .

-lo

I I

3
T I M E , SEC

VERTICAL COMPONENT

N O T E : L O C A T I O N 6 W A S A D J A C E N T TO L O C A T I O N 5 (ON T H E S U R F A C E O F THE ALLUVIAL VALLEY APPROXIMATELY 5 0 0 F T D O W N S T R E A M FROM LOCATION 3 )

MOTION H I S T O R I E S
LOCATION 6

PLATE All

-I

U
W
V)

'-2 z
> -

RADIAL COMPONENT

9
W

>

-I

-2

3
T I ME, SEC

VERTICAL COMPONENT
NOTE

: LOCATION

7 WAS AT A S E T T L E M E N T MARKER, 2OOFT W E S T OF L O C A T I O N I, O N T H E SURFACE' OF T H E D A M AT T H E CREST.

M O T I O N HISTORIES
LOCATION 7
, PLATE A12

This page intentionally left blank

This page intentionally left blank

Response s p e c t r a as defined i n Appendix A a r e shown i n p l a t e B 1 f o r t h e observed motion a t l o c a t i o n 5 R , which i s t h e r a d i a l component o f a c c e l e r a t i o n on t h e alluvium over 500 f t downstream from R i f l e Gap Dam. Acceleration response s p e c t r a computed from t h e 1D analyses f o r t h e var* . a l l p l a t e s i s 5 percent.

ious cases i n v e s t i g a t e d a r e shown i n p l a t e s ~ 2 - ~ 6 S . p e c t r a l damping i n

0.25

0 20

0 15

0.10

0 05

CASE 1, 8 0 F T TO BEDROCK
025

C A S E 2, 85 FT T O BEDROCK

0 20

i
0
W

2
J

0 IS

. Y

L J

0
Z 0 L w VI

lo

a
0 05

CASE 3. 9 0 F T TO BEDROCK

0 2

0 4 0 6 PERIOD. T, SEC

08

10

CASE 4, 100 F T TO BEDROCK

--

LEGEND

OBSERVED AT LOCATION 5 COMPUTED NOTE' MATERIAL ASSUMED TO BE SAND. SHEAR MODULUS C FROM VIBRATORY F I E L D M E T H O D WAS USED I N COMPUTATIONS. SIX SEC OF HORIZONTAL I N P U T MOTION.

PERIOD,

T, SEC

CASE 5, 110 F T TO BEDROCK

ACCELERATION RESPONSE SPECTRA FROM 1 0 LUMPED-MASS ANALYSES CASES 1, 2, 3, 4, A N D 5


PLATE 8 1

0.25

0.20

II

rn

z
0

2
a
W

0.15

2
W
U U

a 0.10
Q
W

z 0
a

I 4 1 I rl\!\
1-

*I , I'
I
I

II

11

4,
I
\

V)

0 05

0.2

0.4

0.6

0.8

"%bl
-PERIOD, 1.0 T,0 SEC 0.2 0.4 0.8 0.8
1.0

CASE 6, 9 0 F T TO BEDROCK
LEGEND
OBSERVED AT LOCATION L) COMPUTED

CASE 7, 1 1 0 FT TO BEDROCK

--

ACCELERATION RESPONSE

NOTE: MATERIAL ASSUMED TO BE C L A Y . SHEAR MODULUS C USED I N COMPUTATIONS SIX SEC OF HORIZONTAL INPUT MOTION.

SPECTRA FROM I D
CASES 6 AND 7

LUMPED-MASS ANALYSES

0 25

0 20

I5

0 10

0 05

2
IW

i
0

:
W A

U U

CASE 8, 80 F T T O BEDROCK

CASE 9, 9 0 F T T O BEDROCK

10 0 PERIOD, 1, SEC

0.2

0.4

0.8

0.8

1.0

CASE 10, 1 0 0 FT TO BEDROCK

1 0 FT TO BEDROCK CASE 1 1 , 1

-NOTE

LEGEND

OBSERVED AT LOCATION 5 COMPUTED MATERIAL ASSUMED T O BE SAND AND CLAY MIXED. CLAY MODULUS C MULTIPLIED BY 1 8 7 5 . SIX SEC OF HORIZONTAL INPUT USED.

A C C E L E R A T I O N RESPONSE SPECTRA F R O M I D L U M P E D - M A S S ANALYSES


CASES 8, 9, 10, A N D I I
b

PLATE 83

0. Z

0.4 '0.6 PERIOO, T. SEC

0.8

1.0

CASE 12, SIX SECONDS OF INPUT

LEGEND

--NOTE:

- COMPUTED

OBSERVED AT LOCATION 5

MATERIAL ASSUMED TO BE SAND AND CLAY MIXED. CLAY SHEAR MODULUS G MULTIPLIED BY 1.875. DEPTH TO BEDROCK IS 110 FT.

ACCELERATION RESPONSE
SPECTRA FROM I D LUMPED
PERIOD, T, SEC CASE 13. TWELVE SECONDS OF I N P U T

M A S S ANALYSES
CASES 1 1 , 12, A N D 1 3
'
,

PLATE 8 5

0.2 5

0.20

0.15

0.10

z P

0.05

:
J
W

U U 4

CASE 19, 80 F T OF LAYERED SAND A N D CLAY

PERIOD, T, SEC

CASE 20, 85 FT OF SAND

I n

0.25

VI P
W

0 20

0.15

LEGEND

o . 0 5
OBSERVED AT L O C A T I O N 5 COMPUTED 0.10 NOTE: SHEAR MODULUS C FROM VIBRATORY FIELD M E T H O D WAS USED IN COMPUTATIONS. OO 0.2 0.4 0.6 PERIOD, T , SEC

---

0.8

1 .O

CASE 2 1, 85 F T OF S A N D

ACCELERATION RESPONSE SPECTRA FROM ID FOURIER ANALYSIS M E T H O D CASES 19, 20, AND 2 1

This page intentionally left blank

This page intentionally left blank

The response s p e c t r a , a s d e f i n e d i n Appendix A , a r e given i n t h e

p l a t e s l i s t e d below f o r t h e computed and observed responses of t h e measurement. l o c a t i o n s a t R i f l e Gap Dam. The computed s p e c t r a a r e from t h e

2D analyses, and s p e c t r a l damping i n a l l p l a t e s i s 5 p e r c e n t .

Location

Plate
C1 C2

1R
1V

2R
2v

C3

3R

c4 c5
c6
c7
.

3v 5R 5v

c8

PLATE C1

MOOULI=l.5 C

I! ,],

II

CASE 22 1 0 0 - F T FOUNDATION
0.50

CASE 23 1 0 0 - F T FOUNDATION

CASE 2 4 100 - F T FOUNDATION

" W l

f a 0.45 0

/
..-&loF

j DAMPING RE' DUCEO TO $

w .

i
20.40---i a
W

0 35

i li
I.

!
I

0 PERIOD, SEC

'

CASE 2 5 1 0 0 - F T FOUNDATION
LEGEND

CASE 2 6 8 0 - F T FOUNDAT I O N

CASE 27 1 0 0 - F T FOUNDATION

---- OBSERVED
COMPUTED N O T E : S H E A R M O D U L U S C F R O M VIBRATORY F I E L D TECHNIQUE. SAND FOUNDATION W I T H 1 2 0 - F T CLAY EMBANKMENT.

ACCELERATION RESPONSE SPECTRA FROM . 2 D ANALYSIS


VERTICAL COMPONENT
LOCATION I

PLATE C2

MODUL1=0.5 G

1
.J -.

--

i
I

--TT,

I I

I
.

I
I

J
W

CASE 22
100-FT FOUNDATION

u -0 5.0
W

CASE 23 100-FT FOUNDATION

100-FT

CASE 2 4 FOUNDATION

" 7

0
W

z
0.45---.+

!
--t
I

. F O,

1
1

i DAMPING
I

; DUCED TO

RE-

D A M MOOUL I

= 2.5

CASE 2 2

a
W

j
I

0.40-

i FOUNDATION MODULI =I1.5 G i 1 I !


'

0 35.-

!
I

,
I

!
0 30---

.
i
I
I

.
'

I-+-- -- -. - - -

L-. -.

0.25.-

-- -

- .. .

. ..-

... - - --

PERIOD, SEC

CASE 2 5 100-FT FOUNDATION


LEGEND

CASE 2 6 8 0 - F T FOUNDATION

C A S E 27 109 FT FOUNDAT ION

----

OBSERVED COMPUTED

NOTE: SHEAR MODULUS C F R O M VIBRATORY F I E L D TECHNIQUE. SAND FOUNDATION W I T H 1 2 0 - F T C L A Y EMBANKMENT.

ACCELERATION RESPONSE SPECTRA FROM 2 D ANALYSIS


RADIAL COMPONENT
LOCATION 2

PLATE C3

CASE 22 100-FT FOUNDATION

PERIOD, SEC

CASE 2 5 1 0 0 - F T FOUNDATION

CASE 26 8 0 - F T FOUNDATION

CASE 2 7 1 0 0 - F T FOUNDATION

---- OBSERVED
COMPUTED NOTE: S H E A R M O D U L U S G F R O M VIBRATORY F I E L D TECHNIQUE. SAND FOUNDATION WITH 120-FT CLAY EMBANKMENT.

LEGEND

ACCELERATION RESPONSE SPECTRA FROM 2 D ANALYSIS


VERTICAL COMPONENT
LOCATION 2 .

PLATE c4

0.45

0:40

-' 0 . 3 5

0.30

0.25

3
. t CASE 22 100-FT FOUNDATION CASE 23 100-FT
RE-

-'

1i !

0.20

0.I 5

0.10
b

2
l-

Z-0.05

W J

u
Y

u
VI

(5 0 " 0 .

z
Y

% 0.45
a
x
W

i i -i
I

FOUNDATION

CASE 2 4 1 0 0 - F T FOUNDATION

DAMP&G

, DUCED TO

I DAM MODULI = 2 . 5 G '

-OF

CASE. 2 2

, FOUNDATIONMOOULI = 1.5 G
I
I

j
---

0.40

a .
.

7 -

PERIOD, SEC

CASE 25 1 0 0 - F T FOUNDATION
LEGEND

CASE 26 8 0 - F T FOUNDATION

CASE 27 1 0 0 - F T FOUNDAT ION

---- OBSERVED
COMPUTED
NOTE: SHEAR MODULUS G FROM VIBRATORY F I E L D TECHNIQUE. SAND FOUNDATION WITH 1 2 0 - F T C L A Y C M ~ A N B M E N T .

ACCELERATION RESPONSE SPECTRA FROM 2 D ANALYSIS


RADIAL COMPONENT
LOCATION 3

PERIOD, SEC

CASE 25 1 0 0 - F T FOUNDATION

CASE 26 8 0 - F T FOUNDATION

CASE 2 7 1 0 0 - F T FOUNDATION

----

LEGEND
OBSERVED COMPUTED

NOTE: SHEAR MODULUS C F R O M VIBRATORY FIELD TECHNIQUE. SAND FOUNDATION WITH 120-FT C L A Y EMBANKMENT.

ACCELERATION RESPONSE SPECTRA FROM 2 D ANALYSIS


R A D I A L COMPONENT
LOCATION 5
I

PLATE C7

CASE 2 4

'0

0.2

0.4

0.6

0.8

1.00

0.2

0.4 0.6 PERIOD, SEC

0.8

1.00

0.2

0.1

0.6

0.8

1.0

CASE 25 1 0 0 - F T FOUNDATION

CASE 2 6 8 0 - F T FOUNDATION

CASE 27 100 - F T FOUNDAT ION

---- O B S E R V E D
COMPUTED NOTE: SHEAR M O D U L U S C F R O M VIBRATORY FIELD TECHNIQUE. SAND FOUNDATION W I T H 1 2 0 - F T CLAY EMBANKMENT.

LEGEND

ACCELERATION RESPONSE SPECTRA FROM 2 D ANALYSIS


VERTICAL COMPONENT
LOCAT ION 5

PLATE ~8

This page intentionally left blank

APPENDIX D:
\

SEISMIC FIELD STUDY

This page intentionally left blank

DEPARTMENT OF THE ARMY


WATERWAYS E X P E R I M E N T STAT I O N . CORPS OF E N G I N E E R S

P. 0. B O X 631
VICKSBURG. MISSISSIPPI 39180

IN R C C L V

~crsn TO,

WESSD

3 1 March 1 9 7 1

MEMORANDUM FOR RECORD


SUBJECT: Seismic F i e l d Study, R i f l e Gap Dam, R i f l e , Colorado,, 16-28 November ,1970

1. A seismic f i e l d study was conducted a t R i f l e Gap Dam n e a r R i f l e ,

Colorado, during t h e p e r i o d 16-28 November 1970. T h i s f i e l d s t u d y cons i s t e d of conventional s u r f a c e v i b r a t o r y and r e f r a c t i o n seismic t e s t s . I n a d d i t i o n t o t h e s e t e s t s , a n o t h e r seismic t e s t was conducted i n which t h e Rayleigh wave t r a i n w a s r e c o r d e d . f i e purpose of t h e s e tests w a s t o provide seismic information r e l a t i v e t o s o i l c o n d i t i o n s and e l a s t i c p r o p e r t i e s w i t h i n t h e R i f l e Gap Dam and o f t h e f o u n d a t i o n on t h e downstream s i d e of t h e dam. S p e c i f i c a l l y , - compress i o n w a v e v e l o c i t i e s , depth t o i n t e r f a c e s , bedrock c o n f i g u r a t i o n , and s h e a r wave v e l o c i t i e s a s a function of depth were t o b e determined from t h e f i e l d s t u d y . Ano t h e r purpose of t h e s e i s m i c tests, i n which t h e Rayleigh wave t r a i n was recorded was t o determine Rayleigh wave v e l o c i t i e s w i t h depth (Rayleigh wave d i s p e r s i o n method) s o t h a t a' comparison and e v a l u a t i o n o f d a t a could be m d e between t h e Rayleigh wave d i s p e r s i o n method and t h e sur-face v i b r a t o r y method.
2 . Messrs. F. K. Chang, M. M. Carlson, and J. R. Curro, Jr., v i s i t e d t h e s i t e t o perform t h e s u b j e c t s t u d y . P r i o r t o a r r i v i n g a t t h e t e s t s i t e , mechanical d i f f i c u l t i e s were encountered w i t h t h e i n s t r u m e n t a t i o n v e h i c l e i n Denver and F r i s c o , Colorado. These mechanical breakdowns caused a time l o s s of some f o u r days. When t h e i n s t r u m e n t a t i o n v e h i c l e was repaired, Messrs. Chang and Curro .proceeded t o Grand J u n c t i o n , Colorado, t o meet with o u r c o n t a c t , M r . B i l l McCleneghan, Bureau o f Reclamation. M r . Carlson drove t h e i n s t r u m e n t a t i o n v e h i c l e t o t h e Rifle Gap Dam test s i t e . M r . McCleneghan was presenTed w i t h a p l a n o f t e s t s which were t o be performed a t t h e test s i t e . He approved t h e p l a n of t e s t s , b u t s t i p u l a t e d t h a t c h a r g e s i z e s be l i m i t e d t o 2 l b and detonated i n shotholes l e s s t h a n 5 f t deep. He a l s o r e q u e s t e d t h a t a n y h o l e s caused by t h e d e t o n a t i o n o f e x p l o s i v e s b e b a c k f i l l e d . During t h e course of conversation, M r . Curro a s k e d about w a t e r l e v e l s in piezome t e r s t h a t were located on t h e downstream s i d e o f t h e dam a b o u t 100 ft from t h e t o e . M r . McCleneghan s t a t e d t h a t approximately s i x weeks p r i o r t o 20 November, a l l piezometer p i p e s were overflowing. A t t h e p r e s e n t time (20 ~ovember), water l e v e l s i n t h e p i e z o m e t e r s were a b o u t 2-3 ft above t h e ground s u r f a c e toward t h e west end o f t h e dam and 2-3 ft below t h e ground s u r f a c e toward t h e e a s t end o f t h e dam.

W E S SD SUBJECT:

3 1 March 1971 Seismic F i e l d Study, R i f l e Gap Dam, R i f l e , Colorado, 16-28 November 1970

M r . McCleneghan a l s o o b t a i n e d . p e r m i s s i o n from t h e Colorado S t a t e ' Highway Department f o r t h e conduct o f a ' v i b r a t o r y t e s t on S t a t e Highway 325 which t r a v e r s e s t h e c r e s t o f t h e dam.
E S c o n t i n g e n t went t o t h e 3. A f t e r meeting w i t h M r . McCleneghan, t h e W R i f l e Gap Dam t e s t s i t e , m e t M r . C a r l s o q and made a v i s u a l reconnaissance o f the site. N o s e e p a g e from t h e embankment and no p i p i n g o r s a n d b o i l s from t h e f o u n d a t i o n were observed. M r . S. W. GUY, Instrument a t i o n Branch, WES; j o i n e d t h e f i e l d p a r t y 2 0 November f o r t h e conduct of t h e v i b r a t o r y tests and r e t u r n e d t o W E S on 23 November. 4 . Seven r e f r a c t i o n s e i s m i c t r a v e r s e s , s e v e n seismic t r a v e r s e s f o r t h e Rayleigh wave d i s p e r s i o n method, and t h r e e v i b r a t o r y t r a v e r s e s were r u n a t t h e R i f l e Gap D a m site'. R e f r a c t i o n s e i s m i c . t r a v e r s e s S-1 through S-6 are shown i n I n c l 1 and S-7 is shown i n I n c l 2. The s e i s m i c t r a v e r s e s f o r t h e Rayleigh wave d i s p e r s i o n method were l o c a t e d i n t h e same p o s i t i o n as t h e r e f r a c t i o n seismic t r a v e r s e s . The v i b r a t o r y t r a v e r s e s (V-1 through V-3). were l o c a t e d as shown i n I n c l 3. 5. The d a t a o b t a i n e d from t h e r e f r a c t i o n s e i s m i c t e s t s ( t r a v e r s e s S-1 through S-7) are shown i n t h e t i m e v e r s u s d i s t a n c e p l o t s , I n c l s 4-7. The t i m e v e r s u s d i s t a n c e p l o t s were used t o c o n s t r u c t s u b s u r f a c e p r o f i l e s f o r t h e s e i s m i c d a t a . The s u b s u r f a c e p r o f i l e is shown in I n c l 8 f o r t r a v e r s e s S-1 and S-2, i n I n c l 9 f o r t r a v e r s e s . S - 3 and S-4, and i n I n c l 10 f o r t r a v e r s e s S-5 and S-6. A s u b s u r f a c e p r o f i l e f o r t r a v e r s e S-7 c o u l d n o t be c o n s t r u c t e d because it was s h o t i n o n l y one d i r e c t i o n . 6. The seismic d a t a ( I n c l s 7-10) i n d i c a t e d one minor and t h r e e major v e l o c i t y zones. The minor v e l o c i t y zone was n e a r t h e s u r f a c e of t h e ground w i t h a maximum t h i c k n e s s o f 4 f t and had v e l o c i t i e s t h a t ranged from 1000 t o 1200 f p s . The thre; major v e l o c i t y zones were, 1400 t o 2500 f p s w i t h a maximum t h i c k n e s s o f a b o u t 37 f t , 4800 t o 8600 f p s with a maximum t h i c k n e s s o f a b o u t 116 f t , and 10,800 t o 12,500 f p s f o r t h e bedrock v e l o c i t y zone. Bedrock w a s encountered a t a maximum depth of 130 f t below t h e ground surface. 7. Data o b t a i n e d from t h e v i b r a t o r y t r a v e r s e s are p l o t t e d a s number of waves v e r s u s d i s t a n c e from which s h e a r (Rayleigh) wave v e l o c i t i e s a r e determined. These p l o t s a r e shown f o r t r a v e r s e s V-1 t h r o u g h V-3 i n I n c l s 11-13, r e s p e c t i v e l y . From t h e d a t a t a k e n from t h e number of waves v e r s u s d i s t a n c e p l o t s , surface wave v e l o c i t y is simply c a l c u l a t e d a s wavelength times frequency. Assuming t h a t t h e surface wave v e l o c i t y is e q u a l t o t h e s h e a r wave v e l o c i t y and is a p p l i c a b l e a t . a depth e q u a l t o o n e - h a l f t h e wavelength, p l o t s o f s h e a r wave v e l o c i t y v e r s u s depth were p r e p a r e d f o r t r a v e r s e s V-1 t h r o u g h V-3, as shown i n I n c l s 14-16, respectively. For t r a v e r s e V-1, t h e s h e a r wave v e l o c i t y g e n e r a l l y

W E S S D SUBJECT:

3 1 March 1 9 7 1 Seismic F i e l d Study, R i f l e Gap Dam, R i f l e , Colorado, 16-28 November 1970

increased from 560 f p s a t a d e p t h o f 7 f t t o 750 f p s a t 93.5 ft. A s l i g h t l y lower v e l o c i t y o f 495 fps a t a d e p t h o f 1 1 f t was noted. The s h e a r wave v e l o c i t y f o r t r a v e r s e V-2 i n c r e a s e d from 625 fps a t a depth of 6.5 f t t o 1085 f p s a t 108.5 ft. The s h e a r wave v e l o c i t y f o r t r a v e r s e .V-3 i n c r e a s e d from 700 f p s a t a depth o f 7 f t t o 960 f p s a t 32 ft, t h e n showed a s h a r p d e c r e a s e i n v e l o c i t y t o 805 f p s a t 33.5 f t . The s h e a r wave v e l o c i t y i n c r e a s e d a g a i n t o 1090 f p s a t 90 f t . The d a t a p o i n t s t are q u e s t i o n a b l e b e c a u s e o f s i g n a l q u a l i t y . . a t 97 f t and 117.5 f 8. The p l o t s of s h e a r modulus, .G , v e r s u s depth f o r t r a v e r s e s V-1 through V-3 a r e shown in I n c l s 17-19, r e s p e c t i v e l y . S h e a r modulus is equal t o t h e s h e a r wave v e l o c i t y s q u a r e d t i m e s t h e mass d e n s i t y . F o r t r a v e r s e s V - 1 and V-2, a wet u n i t w e i g h t o f 120 p c f w a s used above 50 ft and 130 p c f below 50 ft. For t r a v e r s e V-3, a w e t u n i t weight o f 135 pcf was used f o r a l l depths. The s h e a r modulus ranged from 63,50 p s i t o 33,800 p s i a s shown i n I n c l s 17-19. 9. Only t h e r e s u l t s o f t h e R a y l e i g h wave v e l o c i t y s e i s m i c t e s t s conducted a l o n g t r a v e r s e s S-1 and S-2 and a l o n g t r a v e r s e S-7 are p r e s e n t e d i n t h i s memorandum. The o t h e r two s e i s m i c tests c r o s s e d o v e r a c r e e k about 1 0 f t deep and t h e Rayleigh wave e n e r g y was n o t w e l l d e t e c t e d which may i n d i c a t e t h a t a t r e n c h could b e d e t r i m e n t a l t o t h e normal propagation o f Rayleigh wave e n e r g y . There were a l s o o t h e r problems encountered i n o b t a i n i n g good d a t a from t h e Rayleigh wave d i s p e r s i o n seismic t e s t s . The most d i f f i c u l t problem was o b t a i n i n g u s a b l e amplitudes o f t h e Rayleigh wave t r a i n . A m p l i f i e r g a i n s a r e c r i t c a l and must be a d j u s t e d f o r a p a r t i c u l a r c h a r g e s i z e . If t h e g a i n s a r e t o o h i g h , t h e d a t a traces w i l l exceed t h e o s c i l l o g r a m width and b e l o s t . Conversely, i f t h e g a i n s are t o o low, t h e Rayleigh wave train w i l l n o t b e d e t e c t e d . T h i s p r o c e d u r e caused a number o f s h o t s t o b e r e p e a t e d . Another problem is t h e e r r o r i n t r o d u c e d i n t h e d a t a caused by s h o o t i n g i n o r n e a r t h e o r i g i n a l d i s t u r b e d s h o t h o l e . When t h e i n i t i a l c h a r g e i s detonated, it produces a c a v i t y i n t h e s3i1, t h u s c a u s i n g a n o t h e r charge d e t o n a t e d i n t h e same s h o t h o l e t o produce d a t a somewhat d i f f e r e n t from t h e o r i g i n a l s h o t . 1 0 . The r e s u l t s o f t h e Rayleigh wave seismic t e s t a l o n g t r a v e r s e s S-1 and S-2 a r e shown i n I n c l 2 0 a l o n g w i t h t h e d a t a from v i b r a t o r y traverse V-1. . The Rayleigh wave v e l o c i t y from t h i s t e s t i s determined a s t h e d i s t a n c e between two geophones d i v i d e d b y t h e , t i m e r e q u i r e d t o t r a v e l between t h e same two geophones. The Rayleigh wave v e l o c i t i e s a r e a b o u t two t o t h r e e t i m e s h i g h e r t h a n t h e s h e a r wave v e l o c i t i e s determined from t h e v i b r a t o r y d a t a . It s h o u l d b e n o t e d t h a t d a t a from two b o r i n g l o g s have b e e n i n c l u d e d i n I n c l 20. Data from b o r i n g DH21, which i n d i c a t e s two d i s t . i n c t b o u n d a r i e s a t d e p t h s o f 56 and 84 ft,

'

WESSD SUBJECT:

3 1 March 1970 Seismic F i e l d Study, R i f l e Gap Dam, R i f l e , Colorado, 16-28 November 1970

c o r r e l a t e w e l l w i t h t h e Rayleigh wave v e l o c i t y p r o f i l e . However, o t h e r b o r i n g s i n t h e a r e a , such as b o r i n g DH22 ( I n c l 20), i n d i c a t e a d i f f e r ence as r e g a r d s d e p t h s a t which certain materials a r e encountered. The r e s u l t s o f t h e Rayleigh wave seismic t e s t a l o n g t r a v e r s e S-7, which w a s s h o t up t h e f a c e o f t h e dam, i n d i c a t e d t h a t t h e d i r e c t compression and s h e a r wave v e l o c i t i e s o b t a i n e d were 4000 a n d 1900 fps, r e s p e c t i v e l y , f o r t h e embankment as shown in I n c l 21. The a v e r a g e s h e a r wave v e l o c i t y determined from t h e v i b r a t o r y d a t a ( t r a v e r s e V-3) was a b o u t 900 f p s and t h e compression-wave v e l o c i t y was 4800 f p s from t r a v e r s e S-7.
'

'

1 1 . Thus f a r , r e a s o n s f o r d i f f e r e n c e s between s u r f a c e , v i b r a t o r y , and Rayleigh wave d i s p e r s i o n d a t a h a v e n o t b e e n determined. It is suggested t h a t t h e v i b r a t o r y s h e a r wave v e l o c i t y d a t a b e used as a lower bound . and t h e maximum R a y l e i g h wave v e l o c i t y d a t a b e used as t h e upper bound f o r t h e material property description.

21 Incl

J. R. CURRO, JR.
Geophys i c i s t V i b r a t o r y Loads S e c t i o n

as
CF w/ i n c l : M r . S. J. Johnson

Shotpoint Seismic traverse no. and d i r e c t i o n 1"= 2 00


O

SRI

'

SEISMIC T!ST LAYOUT Rifle Gap Dam, Colorado

Inclosure 1

o
X

Shotpoint Geophones

1"= 100 f t .

S5ISP;IC TEST WYOiJT Traverse 5-7 (up f a c e of d m ) R i f l e Gap Dam, Colorado

Inclosure 2

Vibrator location Vibration t r a v e r s e no. and d i r e c t i o n

VIBRATCISY m T LAYOUT Z f l e Gap Dam, Colorado

1 "= 200 f t .

Inclosure 3

'-t

2
0

F
ID

Traverses S-1 and S-2


I

.STANCZ
and S-4

0 Traverse S-5
X

Distance, ft. TIMIX versus DISTANCE Traverses S-5 and S-6

Traverse S-6

:
t-'

;
i D

,1 .. .., . ,;, , ,
'Ti'

/>

,- .;I.:

ijl~;~:~?~~''~:

..::::.i.:

;-7 (up face of dam)

Zast ,

Distance ft

. .

APPR0XC;AT:I PROFILE O F SUBSURFACE !~IATUIIAIS Traverses S-1 and S-2

North,

Distance, ft.

APPROXS34ATE PROFILE OF SUBSURFACE NATERIALS

Traverses S-3 and S-4

I .'
I

H
0

I-'

I
I

E
:

0
'

I-'

APPltOl!llihTiS PROl"'CL2 31: SUElmI?AC:<ilATXR1I;LS

Traverses S-5 and S-6

Inclosure 1 1

Inclosure 1 2

I n c l o s u r e 13

Velocity,

fps

SHZAR dAVZ VZLOCITY versus DEPTH

Traverse V-1 Yest


6

Velocity,

fps

SHEAR HAVE VEI.OCITY versus DSPTH Traverse V-2 North

I n c l o s u r e 16

10

3 Shear Moduli. 10 psi '15 2 9 2 5 3,O Shear doduli, ld kips/sq. 2 . L 1 3.2 L . 0 I

d.

SHEAR MODULI versus DEPTH


Traverse V-1

3 Shear Moduli, 10 osi 2 0 30

SHEllR MODULI versus DEPTH

Traverse V-2

3
Shear Moduli, 10 psi

SHEAR I*IODULI versus DEPTH Traverse V-3

Comparison Of Kayleigh W a v e Velocities versus Depth(along Traverses ,S-1 and S-2) and Shear Wave Velocities versus Depth(Traverse V-1)

TDU versus 'DISTANCE Rayleigh Wave Seismic ~ e s t ( u p face of dam)

This page intentionally left blank

Unclassified
..
securityC l a s s i f i c a t i o n

I
(S.~,,,I~~ c ~ r ~ ~ r l l c = t r oo f tltl*. n
'I.

DOCUMENT CONTROL DATA


body 01 = b a r r r c t and Ind.xln#
O R 0 , G l N A T l N G A C T I V I T V fCO)PO.*t*

-R 6D
Ir.

.
when the o.~~.II r.por~ 1 , clm..lllrd,
R E P O R T SKCURITV
CLASSICICATION

. n n o t = t l m muat & .nt.r*d

*"thol)

U. S. Army Engineer Waterways Experiment S t a t i o n Vicksburg, M i s s i s s i p p i


3. R E P O R T T I T L E

~ n c l a s s 'fii e d
~ b GIOUP .

EARTHQUAKE: RESISTANCE O F E A R T H AND ROCK-FILL DAMS; Report 2, ANALYSIS O F RESPONSE O F N D E R G R O U N D NUCLEAR DETONATION RIFLE G A P DAM TO PROJECT RULISON U
NOTES f f l p .

m. OESCIIPTIVL

01 t*pcat a d I n c l u ~ l ~ d.t*o) *

Report 2 of a s e r i e s
5 . ~ u ~ u o R t(F1t.1 l 1

nome. middle Inltl*l.

1a.t

n*m*J

James E. Ahlberg Jack Fowler Lyman W. Heller


8. R E P O R T O A T E

7..

TOTAL'WO.

O F PACKS

7b. NO. O C R L C S

June 1972
or. C O N T R A C T
01G R A N T N O .

132
9 . . ORIOINATOR.S

10
R E P O R T NUMLIISI

b. P R O J E C T N O .

I,

M i s c e l l a n e o u s Paper S-71-17,

Report 2

C.

ob. O T u L R n L P o l l T N O I S I (Any other numb.thl* n p o n )

h.t.ur

& r**I@.d

d.
10. D I S T R I B U T I O N S T A T E Y C N T

Approved f o r p u b l i c r e l e a s e ; d i s t r i b u t i o n u n l i m i t e d .
II

SUPPLEYLNTARV NOTES

II. S P O N S O R I N G Y I L I T A R V

ACTIVITV

O f f i c e , Chief of Engineers, U. S. Amy Washington, D. C . The motion of R i f l e Gap Dam w a s measured i n September 1969 during t h e P r o j e c t RULISON underground n u c l e a r e x p l o s i o n . The observed r e s p o n s e w a s then compared with t h e response computed i n a mathematical model. Observed and computed responses were s i m i l a r . From t h i s study it appears t h a t t h e mathematical models used a r e applicable t o t h e des i g n and a n a l y s i s of s o i l s t r u c t u r e s , a t l e a s t f o r ground motion i n t e n s i t i e s comparable t o t h o s e observed a t R i f l e Gap D m .

DD ,'27,,1473

I m C L A C C m 00 C O I Y 1.7.. I J A N S1. W W I C I I . o m s o L m y m .om Am-* u r n .

I
Unclassified
Security C l ~ ~ ~ i f i c ~ t i o n

Unclassified
Security Classification
I a.

LINK A

LINK W T ROLE

I)

K C V W0110S

LINK
T

C
. , I

'

ROLE

ROLL

Earth dams Earthquake-resistant structures Ground motion Mathematical models Nuclear explosion effects Rifle Gap Dam Rock-fill dams Rulison (h-oject ) Underground explosions

Unclassified
Security CIsaaification

You might also like