April 3, 2012 Jerry Fortier Northeast Utilities Mike Kloiber Burns & McDonnell
Before
Lessons Learned
DOCUMENTATION IS CRITICAL! Develop and Maintain: Sequencing Documents Pl th Plan the W Work k Work W k the th Plan Pl Testing/Commissioning Procedures Configuration Control Procedures As-Built Document Procedures Maintain Open Communications with Project Management Outage Planning Area Control Center Engineering E i i Testing Group
Lessons Learned
Minimize Variables During Implementation Firmware Changes Un-necessary System Enhancements or Functionality Brownfield Sites: Have a Restoration Plan Understand Impact of Each Step
Day 2: IEC61850 Relay Configuration and GOOSE Messages ICD file properties and creation Goose Message definition and configuration g and interconnecting g techniques q Networking Programming the Siemens Bay Controller with DIGSI
Day 4: SICAM PAS Data Concentrator Overview and Configuration SICAM PAS UI the user interface SICAM PAS Configuration managing databases Importing and configuration using the SCD file Mapping data to the other interfaces (Control Center, HMIs) Lab system Database
Day 5: SICAM PASCC HMI Overview and Project Management Overall project structure and tools within PASCC/WinCC I Importing ti and d management t of f the th SICAM PAS database d t b Basics of Project creation and management Lab system features and functionality
QUESTIONS!