Professional Documents
Culture Documents
West Irving Library Presentation
West Irving Library Presentation
Supporting Goals
#2 ‐ Nurture and Promote Vital, Vibrant Neighborhoods
#7 – Promote Excellence in Irving’s Cultural, Recreational and Educational Environments
#10 – Become a Successful Environmentally Sustainable Community 1
6.17.09
West Irving Library
¾ Objectives
¾ Site Analysis
¾ Schematic Site Plans
¾ Schematic Floor Plan
¾ Exterior Elevation
¾ Next Steps
2
6.17.09
West Irving Library
Project Objectives
¾ Enhance and expand library services in west and central
Irving area.
¾ Create a State-of-the-Art destination for residents.
¾ Achieve LEED Certification resulting in reduced utilities cost.
¾ Enhance the site by using native plants and public art.
¾ Integrate the interior spaces of the building and the site
enhancements through the use of glass to maximize views.
¾ House the Bookmobile for a more central service location.
3
6.17.09
West Irving Library
Site Analysis
R
NEW RESIDENTIAL
CONVENIENT TO
NEIGHBORHOODS
69.09
4
6.17.09
West Irving Library
Site Plan
SOLAR PANELS
Photovoltaic
Panels
Public Art
Outside Reading
Areas
Retention
Pond
6.17.09 Outdoor Activity Spaces 6
West Irving Library
Floor Plan
TEEN’S CHILDREN’S
ADULT
MULTI-
PURPOSE
ROOM
QUIET
READING
COMPUTER
LAB
Main Entry
Exterior drive-up
Book Drop STAFF
FLOOR PLAN Multipurpose Meeting Room Children’s Collec. and Storytime Adult Collection
25,000 SF Lobby / Vending Area Craft Room / Puppet Stage Quiet Reading
Interior Book Drop TEEN Area Study Rooms
Staff Work Area Computer Lab Business Center
7
6.17.09
West Irving Library
North Elevation
8
6.17.09
West Irving Library
West Elevation
9
6.17.09
West Irving Library
Next Steps
¾ Construction Documents complete October 13th
¾ Open Bids – Early November 2009
¾ Contract Award – Late November 2009
¾ Begin Construction – December 2009
¾ Grand Opening & Dedication – Early 2011
10
6.17.09