Detailed Estimate and Abstract of Cost for Construction of R.C.C. Slab Culvert 3 Nos. of 6m.

Span
S. No. Item of work
1 2 Earthwork in excavation of foundation for structures complete I/c dewatering & disposal of excavated material as directed / as per drawing and technical specification (Payment shall be restricted to the designed section only. A. All types of Soil. (i) Upto 1.5 m depth below Av. G.L. Abutments Return Pier

No.
3

L
4

B
5

H/D
6

Qty.
7

Rate/ Unit Amount


8 9

1/ 11.1(1)

2 4 2

9.20 3.92 8.70

3.550 3.700 2.300

1.00 1.00 0.50

65.32 58.02 20.01 143.35 Cum. 65.32 58.02 40.02 163.36 Cum. 32.66 29.01 20.01 81.68 Cum.

97.00 Cum.

13904.56

(II)

Up to 3.0 Ordinary rock (not requiring blasting) Abutments Return Pier 2 4 2 9.20 3.92 8.70 3.550 3.700 2.300 1.00 1.00 1.00

163.00 Cum.

26627.03

(III)

Hard rock (requiring blasting) Abutments Return Pier

2 4 2

9.20 3.92 8.70

3.550 3.700 2.300

0.50 0.50 0.50

284.00 Cum.

23196.55

2/11.4(1) Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10, Nominal mix 1:3:6 a) P.C.C. M-10 Grade. Abutments Return Pier Plain/reinforced cement concrete in substructure complete as 3/12.5(II per drawings and technical specification Clauses 802, 804, ) 805, 806, 807, 1202 ans 1204.P.C.C grade M 15, Nominal mix (1:2.5:5) M15 Nominal Mix Concrete Abutments B=(3.25+.9)/2 Pier I Pier I Half Round Potion =2x2x (22/7x(1.2)2]/2 Returns B=(0+.60)/2 2 2 2 2 4 7.250 8.300 7.000 0.560 3.920 1.850 2.075 2.000 1.000 4.700 1.500 3.200 3.200 4.500 2 4 2 9.20 3.92 8.70 3.550 3.700 2.300 0.20 0.20 0.20 13.06 11.60 8.00 32.67 Cum.

2732.00 Cum.

89257.72

141.41 49.80 44.80 3.58 130.54 370.13 Cum.

2916.00 Cum.

1079302.73

4/12.9

Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 Abutments

10 12 8 8 8 8

1.50 1.00 1.50 1.00 1.50 1.00

15.00 12.00 12.00 8.00 12.00 8.00 67.00 RM

Retuns

112.00 RM

7504.00

5/13.1

Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5, R.C.C M 25 Slab I/c kerb.As per SP 20plate no. 7.08-( 19.811cum./Slab) For 3 Slabs= Abutment Caps Dirt Wall Pier Cap I/c cut wate Kerb Beem

3 2 2 2 2

6.80 6.00 6.00 7.00 18.80

6.00 0.70 0.30 1.00 0.25

0.48 0.20 0.48 0.20 0.30

58.75 1.68 1.73 2.80 2.82 67.78 Cum 3817.00 Cum 258716.26

6X2

1 of2

Detailed Estimate and Abstract of Cost for Construction of R.C.C. Slab Culvert 3 Nos. of 6m. Span
S. No. Item of work
1 6/13.2 2 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 Deformed bars or ribbed steel bars (Tor Steels). Slab including karbs( As per SP20 Plate no. 7 -08 1.4157m tons)per slab For 3 Slabs Surface reinforcement @2.50kg./Sqm in the form of 8mm tor Abutment cap, Dirt wall,&pier cap.@1.2% of R.C.C.

No.
3

L
4

B
5

H/D
6

Qty.
7

Rate/ Unit Amount


8 9

3 9.03

1.42 370.13 X 2.5/1000= 1.2/100 7850/1000

1.00

4.26 0.93 0.85 6.04 MT 54998.00 MT 331965.23

7/12.10

Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8, Granular material between Abutment between returns 2 2 2 2 2 1.30 2.45 2.65 2.65 2.65 3.15 4.20 4.80 4.04 3.90 4.65 0.50 2.15 2.30 0.70 38.08 10.29 54.70 49.25 14.47 166.79 Cum 356.00 Cum 59375.85

8/13.5

Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

18.80

5.50

0.075

15.51 CUM

8561.00 CUM 650.00 cum

132781.11

9/14.9

Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 Providing and fixing in position 25 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications (6x7)

30.00

3.00

0.20

72.00 cum

46800.00

13.16 (iv)

6.000

24.00

173.00

4152.00

12.15

Anchor bar for RCC slabs of submersible bridges Providng and fixing 20mm dia MS anchor bar duly welded at bottom with MS plate of size 500mm x 75mm x 10mm including all material labour charges etc. as per plate no. 7.22 SP-20 or otherwise as directed by Engineer incharge. ( A) Fixed end anchor bar ( B) Free end anchor bar 4x4 4x4

RM 16.00 16.00 Each

RM 489.00 982.00 Each 7824.00 15712.00

12.16

Providng and fixing in position bituminious paper bearing for slabs as per approved drawing and confirming to IS:1398 6 6.000 0.500 18.00 Sqm 2097893.04 43.00 774.00

SAY

Rs.

20.98